Mining with Paste Fill
Mehmet Yumlu, Principal Mining Engineer
AMC Consultants Pty Ltd
AusIMM Cobar Mining Seminar
sultantsPtyLtd
6 August 2010
AMC
Co
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
2/26
A
US
T
RA
L
IOutline
N
n ro uc on
What is Paste Fill?
Why Using Paste Fill?
Paste Fill System Design
Paste Fill Making Process
Distribution and placement
Mining with Paste Fill - Case Studies
sultantsPtyLtd
AMC
Co
6 August 2010 2
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
3/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
4/26
A
US
T
RA
L
IWhy Paste fi ll?
N
eng neere pro uc cons s en g qua y
suitable for most mining methods - versatile
lower cost for a given exposure duty - economic
reduces surface footprint - environment friendly
allows extraction of ore pillars - increasing resource extraction
allows effective local and regional ground support - safety
fast filling rates enables shorter stope cycle times - productivity
non se re atin - reduced dilution
sultantsPtyLtd
AMC
Co
46 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
5/26
A
US
T
RA
L
IWhat are Paste Fil l Duties in UG Mining?
N
en n egra e n o e m n ng cyc e pas e ac serves
as a working platform,
as an engineered artificial back
provides confinement to ore pillars and the host rock, and
revents unravellin thereb limitin conver ence and subsidence into the mine
voids.
sultantsPtyLtd
AMC
Co
56 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
6/26
A
US
T
RA
L
ISome Myths.
N
as e s
The solution to all future mine fill problems
A fill type by which all the water is absorbed through cement hydration
sultantsPtyLtd
AMC
Co
66 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
7/26
A
US
T
RA
L
IPaste Fil l Design
N
Flow properties (rheology)
deliver of aste from surface to under round via boreholes and i es at the hi hest ractical
pulp density
Strength properties
pas e o rema n s a e w en expose o s a c or ynam c oa ng con ons exper ence y
the mining operation
This includes short term during the local mining operation and
Long term stability against regional seismicity
sultantsPtyLtd
AMC
Co
76 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
8/26
A
US
T
RA
L
IStrength Design
N
na y ca
Empirical
Numerical
sultantsPtyLtd
AMC
Co
86 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
9/26
A
US
T
RA
L
IRheology Design
N
eo ogy s e s u y o e ow proper es o u s
Water is a Newtonian fluid If you tip water out of a glass it will start to flow immediately
Pastefill is a non-Newtonian fluid
If you want to get toothpaste out of the tube, you must squeeze it first
Yield stress is the measure of how much work is required for the paste to start
flowing
sultantsPtyLtd
AMC
Co
96 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
10/26
A
US
T
RA
L
ITypical Paste Fill Characteristics
N
ar c e s ze s r u on
Minimum 15% passing 20 micron
No to size
Rheological properties
Yield stress for surface disposal less than 100 Pa
Yield stress for backfill 100 to 700 Pa
Strength properties
Stiffness, E=150 to 450 MPa
Can be engineered to desired strength ( 100 kPa to 5 MPa)
sultantsPtyLtd Typical strength values (UCS)
300 to 1,000 kPa for vertical exposures
>1,000 kPa for undercut exposures
AMC
Co
106 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
11/26
A
US
T
RA
L
IWhat are methods of making paste fi ll?
N
sultantsPtyLtd
AM
C
Co
116 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
12/26
A
US
T
RA
L
IWhat are the delivery options?
N
Gravity delivery to borehole
Surface conveyor to borehole
Pum deliver thru
Borehole
Decline
Agi truck delivery to borehole
Internal boreholes
Level pipelines
sultantsPtyLtd
AM
C
Co
126 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
13/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
14/26
A
US
T
RA
L
IPaste Fill Operations Increasing Popularity
N
ou opera ons wor w e
Many ongoing projects
Canada = 35 / 2
Australia = 24 / 5
South America = 12 /4
Europe = 11 /8
Asia = 7 / 9
Africa = 5 /1
sultantsPtyLtd
AM
C
Co
146 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
15/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
16/26
A
US
T
RA
L
ICase Study 1
N
Online paste fill plant, 45 m3/hour
Using full tailings, SG of 4.5
PSD (50-60% passing 20 microns with P80 of 63 microns)
Solid density 82%w/w (49.5%v/v)
Slump: 7 10 inch
Paste bulk and dry density: 2.6 and 2.0 tonnes/m3
Stope size 20m H x 7m W x 30m L (panels)
Target design strength: 1.0 MPa
GP cement; 7% 150 k /m3 for rimaries and 5% 110k /m3 for secondaries
sultantsPtyLtd
Pump delivery, 125 mm diameter thru decline and boreholes
Shotcrete barricades
AM
C
Co
16
6 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
17/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
18/26
A
US
T
RA
L
ICase Study 1
N
sultantsPtyLtd
AM
C
Co
186 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
19/26
A
US
T
RA
L
ICase Study 2
N
n ergroun go m ne
Production 450 TPA Mining method
Underhand cut and fill
Backfill types Paste fill
Rockfill
sultantsPtyLtd
AM
C
Co
196 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
20/26
A
US
T
RA
L
ICase Study 2
N
ry pas e sys em, m our
Using volcanic tuff
- m cron, m cron , o .
Solids density 50%w/w (28%v/v)
Wet and dry bulk density 1.5 t/m3 and 0.8 t/m3
GP cement; 15 to 20%w/w (100 to 150 kg/m3)
Target design UCS >1,500 kPa
Stope size 5m W x 5m H x 30m L (cells)
sultantsPtyLtd Shotcrete barricade
Gravity delivery thru borehole, 150mm dia distribution system
AM
C
Co
206 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
21/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
22/26
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
23/26
A
US
T
RA
L
ICase Study 3
N
n ergroun n an m ne
Production 1.6 MTPA
Tabular flat dipping massive sulphide orebody (dip
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
24/26
A
US
T
RA
L
ICase Study 3
N
n ne pas e p an us ng , m our
Full mill tailings (35% passing 20 micron, P80 100 micron), SG of 3.6
o s ens y w w v v
Wet and dry bulk density 2.15 t/m3 and 1.6 t/m3
Yield stress 50 to 100 Pa (10 to 10.5 inch slump)
Pump delivery through decline, 200 mm diameter, 3.5 km long
Shotcrete barricades
Stope size 10m W x 6m H x 150m L
sultantsPtyLtd Target design UCS 500 kPa, @7% cement (100 kg/m3)
Slag 60% : cement 40%
AM
C
Co
246 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
25/26
A
US
T
RA
L
ICase Study 3
N
sultantsPtyLtd
AM
C
Co
256 August 2010
-
8/12/2019 Cobar 1400 Yumlu Mining With Paste Fill
26/26
A
US
T
RA
L
IThank you for listening