![Page 1: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/1.jpg)
City Birmingham Multi-Modal Transportation Plan
Visioning Workshop Results Meeting
Monday, January 28, 2013
7:30 PM, City Hall
Norman Cox, PLA, ASLA
The Greenway Collaborative, Inc. Ann Arbor, Michigan
The Greenway Collaborative, Inc. www.greenwaycollab.com
![Page 2: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/2.jpg)
The Greenway Collaborative, Inc
.
Community Visioning Workshop
• Overview of Best
Practices &
Inventory and
Analysis Findings
• Individual and Group
Exercises:
– Role Playing
– Corridor
Evaluations
– Neighborhood
Connectors and
Trails
– Downtown
Birmingham
– Woodward Avenue
Baldwin Public Library
January 17th from 7pm to 9pm
43 people signed in
![Page 3: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/3.jpg)
The Greenway Collaborative, Inc
.
Group Exercises: Corridor Evaluations
• Major and Minor
Corridors
• Participants asked
to vote on what
they thought the
appropriate
balance should be
between:
– Road Crossings
– Bicycle Facilities
– Motor Vehicle
Flow & Speed
Pedestrian
road crossings Better Motor
Vehicle Flow
Designated
Bike Facilities No Bike
Facilities
![Page 4: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/4.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: East Maple Avenue
• Balance between Pedestrian Crossings and Motor Vehicle Flow
• No clear direction for bicycle facilities
![Page 5: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/5.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: Maple Ave (Downtown)
• Balance between Pedestrian Crossings and Motor Vehicle Flow
• Shared Lane Marking
![Page 6: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/6.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: West Maple Ave
• Balance between Pedestrian Crossings and Motor Vehicle Flow
• Parallel Bike Routes
![Page 7: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/7.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: Southfield Road
• Pedestrian Crossings
• Shared Lane Marking
![Page 8: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/8.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: Adams Road (North of Madison)
• Pedestrian Crossings
• Bike Lanes through 4 to 3 lane conversion
![Page 9: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/9.jpg)
The Greenway Collaborative, Inc
.
Major Corridor: 14 Mile Road
• Pedestrian Crossings
• Shared Lane Marking vs. Parallel Bike Route
![Page 10: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/10.jpg)
The Greenway Collaborative, Inc
.
Minor Corridor: S. Eton Road (E Maple to Lincoln)
• Safer Pedestrian
Road Crossings
• More Frequent
Pedestrian Road
Crossings
• Bike Line with On-
street Parking on
One Side of the
Street
![Page 11: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/11.jpg)
The Greenway Collaborative, Inc
.
Minor Corridor: Oak Avenue (Chesterfield to Quarton)
• Safer Pedestrian
Road Crossings
• More Frequent
Pedestrian Road
Crossings
• Buffered Bike
Lanes and No On-
Street Parking
![Page 12: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/12.jpg)
The Greenway Collaborative, Inc
.
Minor Corridor: W Lincoln Street (Cranbrook to Southfield)
• Balance between
Safer Pedestrian
Road Crossings
and Motor Vehicle
Speeds
• Balance between
Frequent
Pedestrian Road
Crossings and
Motor Vehicle
Flow
• No Clear Direction
for Bicycle
Facilities
![Page 13: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/13.jpg)
The Greenway Collaborative, Inc
.
Minor Corridor: Lincoln Street (Southfield to Woodward)
• Safer Pedestrian
Road Crossings
• More Frequent
Pedestrian Road
Crossings
• Keep on-street
parking on both
sides of streets
• Shared Lane
Markings or Keep
as it Currently
Exists
![Page 14: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/14.jpg)
The Greenway Collaborative, Inc
.
Neighborhood Connector Routes
Comments noted by more
then one group:
• Improve pedestrian crossing
at Woodward Ave and Oak
St
• Crossing needed on W
Maple at Rouge Trails
• Enhance crossing at
Woodward Ave and
Chapin/Emmons
• Add full crossing at
Woodward Ave and Forest
• Crossing Improvement
needed at Maple and Like
Park Drive
• Need pedestrian bridge in
Linn Smith Park over river
• Provide connection railroad
district to connect to new
transit and over to Target
• Like the proposed pathway
connection along Woodward
Ave between Wimbledon Dr
and Oak Ave
![Page 15: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/15.jpg)
The Greenway Collaborative, Inc
.
Downtown
Comments noted by more
then one group:
1. W Maple at Park – Kill
remnants of by-pass
5. Woodward Ave at Forest –
Dangerous, needs a light
11. Forest at Peabody – Fix,
make all stop
12. Woodward Ave at Maple –
Fix crossing, crossing light
needs to be longer for
pedestrian crossing
14. Park at Oakland – Fix
Dangerous Intersection
16. Woodward Ave at Maple –
Pedestrian tunnel or bridge
needed
![Page 16: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/16.jpg)
The Greenway Collaborative, Inc
.
Woodward Corridor
Vision for Woodward
• Balance between
Main Street and
By-Pass
![Page 17: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/17.jpg)
The Greenway Collaborative, Inc
.
Woodward Corridor
Space Allocation:
• Narrow Sidewalk
• Parallel Parking
• Landscape Buffer
• Designated Transit
Facilities
• Use of Travel
Lane
• Service Drive with
a Bike Lane vs.
One-way Cycle
Track
![Page 18: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/18.jpg)
The Greenway Collaborative, Inc
.
Project Vision, Goals and Objectives
• The purpose is to
guide the
development of
the plan
• Drawn from Web
Survey responses
– 429 responses
• Revised by the
Project Steering
Committee
• Web Survey
provided for one
week after
workshop to get
feedback
![Page 19: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/19.jpg)
The Greenway Collaborative, Inc
.
Project Vision, Goals and Objectives Survey Results
• 14 people
participated in web
survey, 1 person
provided written
response
• Strongly Agreed:
– Vision 71%
– Complete
Infrastructure 82%
– A Connected
Community 60%
– Inclusive
Transportation
System 67%
• Concerns of traffic
impact, tax
implications,
priorities, need
3 Disagreements
2 Disagreements
2 Disagreements
3 Disagreements
![Page 20: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/20.jpg)
The Greenway Collaborative, Inc
.
Comment Cards
Due to the tightly
structured meeting,
comment cards were
available for any
additional comments
from participants
• Very concerned about loss of street parking. I
live at corner of Lincoln and Pierce and if street
parking is lost I could lose all street parking
which is needed. Make Lincoln (Woodward to
Southfield) bump outs permanent.
![Page 21: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/21.jpg)
The Greenway Collaborative, Inc
.
Next Steps
• Preliminary Plan
Workshop Feb 28
– 3pm to 5pm
– 7pm to 9pm
• City Commission
Meeting March 11
– To review results
of Preliminary
Plan Workshop
Please visit the project website at:
www.greenwaycollab.com
Vision, Goals & Objectives Survey
Web Survey & Workshop Results
Draft Inventory and Analysis Maps
Project Materials and Updates
![Page 22: City Birmingham Multi-Modal Transportation Plan Visioning …greenwaycollab.com/Projects/Birmingham/BCMMTPWorkshop... · 2020-03-03 · City Birmingham Multi-Modal Transportation](https://reader033.vdocuments.site/reader033/viewer/2022052800/5f1128780227001d6f38c576/html5/thumbnails/22.jpg)
Questions or Comments
Norm Cox, PLA, ASLA
The Greenway Collaborative, Inc.
205 Nickels Arcade
Ann Arbor, MI 48104
734-668-8848
www.greenwaycollab.com