A1-Intake access from district road A2-Access to proposed
Yard/Storage area
![Page 3: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/3.jpg)
Drawing CCT01
![Page 4: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/4.jpg)
A3-Backfilling at right hand side waterway A4-Disposal area 4
![Page 5: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/5.jpg)
B1- soil at river areaB2- Piling needed at left
side waterway
![Page 6: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/6.jpg)
B3-Outcrop Rock in main river D1-Access to proposed site office
![Page 7: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/7.jpg)
Figure 1:Airport location, Jakarta and site at Cimanggu
![Page 8: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/8.jpg)
D2-CIBURUG the nearest facilitated town D3-Yard storage area
![Page 9: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/9.jpg)
D4-Proposed laydown area
D5- Existing waterways to be widen
![Page 10: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/10.jpg)
D6-Electricity supply for construction tap point
E1-Adidas factory at Cikembar
![Page 11: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/11.jpg)
E2-Kampong residential area near proposed site E3-CUBURUG town
![Page 12: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/12.jpg)
E4-Jakarta to Ciawi tol hiway
F1-possssible landslide in rainy season
![Page 13: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/13.jpg)
F2-Possible shear at headpond area
F3-Bad rock at waterway
![Page 14: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/14.jpg)
F4-Hydrological condition, rainfall2 ,800mm per year
F5-Rainfall 2,800mm per year
![Page 15: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/15.jpg)
Figure2- Indonesia hydro consult
![Page 16: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/16.jpg)
I1-Feed in point to PLN I2-Site is nearby to
village resident having access to electric power
![Page 17: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/17.jpg)
Figure J1-Hydrology regime
![Page 18: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/18.jpg)
J1-Rock in river
J2-Existing weir to be upgrade
![Page 19: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/19.jpg)
J3-waterway to be upgrade
J4- sandtrap area near to main river for ease of silt disposal
![Page 20: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/20.jpg)
J5-Headpond area 26m above powerhouse J6- Existing Waterway to be
widen to 9 m
![Page 21: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/21.jpg)
J7-water discharge channel
J8-Penstock location at high level 26m above powerhouse downstream
![Page 22: Cicatih mini hydro site visit report](https://reader033.vdocuments.site/reader033/viewer/2022060111/5567ab55d8b42ada108b5034/html5/thumbnails/22.jpg)
Feed in point to PLN 1.2km from powerhouse