Afghan National Police Provincial HQ at CharikarParwan Province, Afghanistan
Who: USACE Bagram Area Office
What: The Charikar compound is a $5.8M facility designed to support the admin, billeting, maintenance, and life support infrastructure needs for the ANP HQ in Parwan province.
Where: Charikar lies 30 km northwest of Bagram Airfield
When: 21 August 2014 site visit
Why: A site visit was conducted to assess final completion of work prior to acceptance and turnover
Way Ahead: Project is 95% complete and is on track to be troop ready in September 2014. Upon final acceptance, USACE will coordinate with CSTCA for turnover to the Afghan National Police.
A USACE Afghan National Quality Assurance Representative and contractor staff brief Bagram Resident Engineer Drasa Maciunas (left) and district commander COL Pete Helmlinger (right) on site
The new self contained Charikar compound overlooks the valley the Afghan Police will operate in and protect