Change Management & Lean Process Implementation with CET Designer
• Background
• What is 6 Sigma
• Change Management
• Process Improvement
Background
• Lincoln Office – 12 years– Designer– Account Manager– Design Team Leader– Six Sigma Black Belt
What is 6 Sigma?
• Reduce Variation• Problem Focused• Root Cause• Less waste = Increased efficiency• Less Variation = Consistent Output
Change Management and CET
• Commitment• Tools• Engagement• Continuous Improvement
• Project Initiation• Building Shell• Existing Furniture• New Furniture• Finishes• Budget• Presentation Drawings• Preliminary Customer Review• Revisions• Specification Check• Quote• Final Customer Review
The Process
Project Initiation
• Deliverables• Quoting Requirements• Alternatives• Check List
Building Shell
• Import CAD Drawing• Draw CET Walls
Existing Furniture
• Convert PM Symbols• Redraw as Smart Symbols
New Furniture
• Typicals• Blocks• Favorites• Furniture First• Limit Repeated Project Matrix Symbols
Finshes
• Schemes• Find it with the calculation
Budget Pricing
• Keep your eye on the $$$$• Tagging• Sort & Group
Presentation Drawings
• Decide Early• No Overkill• Call them what they are
Review Preliminary Solution• Hard Copy Plans & Renderings• Walk them through their space• Brochures• Websites• Insert Images• Have Finishes Available
Revisions
• Smart Symbols• During Customer Review
Specification Check
• Validate!• Walk Through The Space• Provide Information to Checker
Convert to Quote
• Sif • Direct Link
• Load Cost Factor
Review Final Solution with Customer
• Layout• 3D (Contour Image)• Basic Rendering• Full Rendering• Walk Through• Fly through video• Product/Finish Images• Brochures• Quote
Where Do We Go from Here?
Questions?