City Development Plan
Chakghat, Madhya Pradesh
Submitted to:
Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh
Project co-ordination:
City Managers Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh
Submitted by:
DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh
-
Chakghat Town
DISTRICT REWA
POPULATION- 10676
Chakghat is also known as a Mandi Town. About 70 percent of
working population is engaged in tertiary activities such as trade
& commerce, informal business activities. Chakghat
Bazar/Market, Galla Mandi and krishi Upaj Mandi (food grains)
are the main market area for the town.
-
8167.2
-
Latitude
Longitude
Average rainfall (annual) MM
Height above mean sea level Mts
Municipal area (1991) Sq kms
Municipal area (2001) Sq kms
Municipal area (2011) Sq kms
Date of Constitution of ULB Date
Historic importanceIn one or two
sentences
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)
Name of Population projection Method
Projected population adopted Year 2015
Projected population adopted Year 2025
Projected population adopted Year 2035
Land Use% Standard (as per
UDPFI)
Land use (Tentative
in Sq kms )
Land use (Tentative
in percentage)
Residential 45-50% 0.221 22.74
Commercial 2-3% 0.048 4.93
Public - semi public 6-8% 0.044 4.49
Industrial 8-10% 0.003 0.35
Roads 10-12% 0.104 10.65
Recreational 12-14% NA NA
Sensitive rest NA NA
Water bodies rest 0.553 56.85
Total Developed area 0.972 100.00
Agriculture / Undeveloped area rest 4.237 81.35
Total Municipal Area 5.208
City Profile
16,399
22,163
DMG Consulting P. Ltd.
Chakghat
Yes
4,637
6,576
9,105
10,676
Geometric Progression Method
12,133
25 degree 80'
81 degree 41'
1100 mm
390 m
5.21 sqkm
5.21 sqkm
5.21 sqkm
NA
Lan
d U
se
Town level
NA
CompanyName
ULB Name
Whether the Sectoral Analysis report is as per UADD requisitesP
op
ula
tio
nT
ow
n B
rief
Geographical location (Town)
1
-
Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Name of ward NA Tilak ward Ramlila ward NA NA NA NA NA NA Tamsa wordBhagat singh
ward
Rajiv gandhi
ward
Dr.
Rammanohar
lohia ward
NA NA
Ward Population (2001) 667 784 588 445 347 426 643 665 689 810 589 675 597 505 675 9105
Area (sq kms) 0.06 0.07 0.16 0.23 0.05 0.04 0.07 0.92 0.12 1.33 0.05 0.48 1.04 0.23 0.34 5.2081
Density (PPSqkm) 2001 11600 11089 3641 1919 6414 10416 8619 724 5704 611 11687 1394 572 2154 1988 1748
Male 363 409 309 234 175 229 340 341 373 438 318 361 314 264 352 4820
Female 304 375 279 211 172 197 303 324 316 372 271 314 283 241 323 4285
SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1702
ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1736
BPL (year 2012) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1924
Sex ratio 837 917 903 902 983 860 891 950 847 849 852 870 901 913 918 889
Literacy rate (%) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 0.6256
No. of Primary schools NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3
No. of Primary Health
CentreNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3
No. of Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1494
Primary occupation
(Majority)Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Agriculture Agriculture Manufacturing Manufacturing Manufacturing
Seconday occupation AgricultureCommerce and
TradeAgriculture NA
Commerce and
TradeNA
Commerce and
TradeAgriculture Agriculture Agriculture
Commerce and
TradeManufacturing NA Agriculture Agriculture Agriculture
Tertiary occupationCommerce and
TradeAgriculture
Commerce and
TradeNA Agriculture NA Agriculture
Commerce and
Trade
Commerce and
Trade
Commerce and
TradeAgriculture
Commerce and
TradeManufacturing
Commerce and
Trade
Commerce and
Trade
Commerce and
Trade
No. of SS/LS industrial
unitsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Small scale
industries
No. of Commercial
establishmentsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Slum pockets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Slum population NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3207
No. of Slum Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Individual water
connections in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 421
No. of Community water
connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Commercial water
connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Tubewells NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 9
No. of Handpumps NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
400 private & 92
municipal
handpump
No. of OHTs NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3
% Coverage of piped water
supplyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Individual Toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 374 HHs
No. of Individual Septic
tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Community Septic
tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Community toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
% of population NA Open
defecationNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1120 HHs
No. of Dust bins NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA four to six
Wardwise Waste generated
(Kgs)189 180.25 186 125.75 820 101 181.25 199.5 172.25 259.75 136.5 206.75 262.5 146.25 240.25 3407
Road sweeping (1 time or 2
times)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA daily
City Profile (Ward Wise)
2
-
Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Name of ward NA Tilak ward Ramlila ward NA NA NA NA NA NA Tamsa wordBhagat singh
ward
Rajiv gandhi
ward
Dr.
Rammanohar
lohia ward
NA NA
City Profile (Ward Wise)
Total no. of sanitary
workers in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Length of Pucca road (Mts) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 14000 mts
Length of Kuccha road
(Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 5900 mts
Length of State Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Length of National
HighwayNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3770 mts
Length of Road side drains
Pucca (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Length of Natural drains
(Nallah)
Pucca/Channelized (Mts)
560 200 400 120 60 200 50 400 200 0 150 100 200 300 800 3740
Length of Natural drains
(Nallah) Kuttcha (Mts)10 0 40 0 0 0 0 0 0 0 0 0 0 900 600 1550
No. of Streetlights NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 597
No. of Electricity
connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1241
Name of Tourist site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Name of Heritage site if
anyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Bus stop (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Bus stand(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Parks (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Playground(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Residential
propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
No. of Commercial
propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Total Property tax
collection (in Rs.)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Property tax coverage(in
%)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Available Government
land (Sq kms)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Remarks NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.
3
-
SourceTubewell/Ha
ndpumpWell River/Lake/Talab
No. of Tubewell / River / Well
9 Tube wells /
492
Handpump
Tamas river
Water Supplied by Tubewell /
River / Well in MLDNA
0.19 MLD (River: 0.09 MLD & Ground
water: 0.1 MLD)
17.8 lpcd
Rs. 60/-
32%
Yes, WTP with 2 chambers each of capacity
45,000 L
NA
0.15 MLD
No
374
NA
NA
NA
NA
Khakkha nallah and Senarwar gram nallah
NA
Tamas river
NA
NA
Either in low lying area or in Tamas river
No
~70 gram per capita per day
34.07 Tons
NA
25%
No
No
No
No
No
No
1 Tractor / 1 Trolley / 4-6 Dust bins / 7
Handpull cart /4 Tricycle
Yes
Ph
ysi
cal
Infr
ast
ru
ctu
re
Existing Source
Frequency of Cleaning Individual Septic tanks
% Coverage under paid water supply
Is the existing site Dumping site or allotted site for
Scientific disposal
Area of allotted landfill site for Scientific disposal
No. of Tractor trolleys/vehicles available with the ULB for
carrying Solid waste to the LF site
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the ULB
Frequency of Cleaning Community Septic tanks
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Sectoral Analysis
Frequency of SW collection by the ULB (1 time per day/2
times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
Any initiative for scientific disposal of waste
Name of dumping/ landfill site
Distance of the Dumping site/landfill site from main
settlement area (Kms)
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Per capita Solid waste generation (Considering Standards)
(in gms)
Total SW generation (in Tons)
Total water supply in the town (MLD)
Existing Supply rate (LPCD) considering distribution
losses
Water Charges per household per month (Rs.)
Flat/Metered
Whether any treatment plant exists (Y/N),If yes mention
capacity (MLD)
Proposed source (Surface)
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes mention
capacity
Total no. of individual septic tanks
Wate
r S
up
ply
Sew
erage
Drain
age
Ultimate disposal point of nallah
If site for Scientific disposal is not allotted then whether
formally requested by the ULB
SW
M
4
-
Sectoral Analysis
NH-27
NA
NA
NA
CC 14 km
WBM NA
Total (kms) 14 km
(kms) 5.90 km
(kms) 13.35 km till the year 2035
~1400 vehicles including pvt. And IPT
mode
Yes
yes (under private operates)
1 Galla mandi
2 Vegitable & fruit market, Grain market
3 Old Chauraha
NA
597
597
450
125
-
3
15
4
33/11KV
1241 HH
NA
NA
NA
Ph
ysi
cal
Infr
ast
ru
ctu
re
Duration of Electricity supply per day (in Hrs)
Name of National Highway passing from or nearby from
the town (NH-XYZ)
Distance of National Highway if nearby from the town
(NH-XYZ) in Kms
Name of State Highway passing from or nearby from the
town (SH-XYZ)
Any intracity mass transport mode (yes/no)
Name of locations facing major traffic issues
Name of the street beautified as per the
instructions of UADD
Bus stand (yes/No)
Traff
ic &
tran
sporta
tion
Str
eet
ligh
tin
gP
ow
er
Distance of State Highway if nearby from the town (SH-
XYZ) in Kms
Total length of Pucca roads (Kms)
Total length of Kuccha roads (kms)
Gap w.r.t Standards
Total no. of vehicles in the town
No. of Streetlights having LPS
Location of Substation
http://www.mptransco.nic.in
Total no. of residential connections
Total no. of Commercial connections
Total no. of street lights
No. of Streetlights having Sodium lights
Road
s
No. of Streetlights under working condition
No. of Streetlights having Tubes
No. of Streetlights having CFL
No. of Streetlights having Incandescent bulbs
No. of Streetlights having LED
Any subsidy for BPL (Y/N)
5
-
Sectoral AnalysisNA
-
-
-
-
NA
Tamas river
NA
water bodies
3 PHC in surroundin panchayat
Government NA
Beds NA
Private NA
Beds NA
NA
Name of
townAllahabad
Distance
(Kms)~50 km
3
31 high school for boys, 1 secondary school
for girls and 1 private higher sec. school
2 1 Pharmacy & 1 Art & science college
0 -
NA
NA
NA
NA
NA
The social security pension scheme for old
age, physically challenged and widows etc.
No. of ITI
No. of Hospitals
Multispeciality hospital if any (Y/N)
Name of Nearby town reffered for Treatment
No. of Primary schools
No. of Secondary/High schools
No. of Colleges
Ownership/agency
Total no. of Pilgrims/ Tourists visiting town per day
Name of River/Lake/Forest range/Any specific species
Prevailing Environmental Act/s
Areas facing threats
No. of Primary Health centres/Dispensary
Socia
l se
cu
rit
y s
ch
em
es
No. of Rain Basera/Night Shelter
No. of Beneficiaries under Gharelu Kamkaji Mahila
Yojana
Ownership of Rain Basera (with ULB/Rental)
Name of other Social security schemes
No. of Beneficiaries under SJSRY (Street Vendor)
No. of Beneficiaries under Haath thela/Rickshaw chalak
yojna
Socia
l In
frast
ru
ctu
re
Ed
ucati
on
Healt
h
Herit
age &
tou
ris
m
Herit
age &
tou
ris
mE
nvir
on
men
t
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s
Name of Tourist site/s
6
-
Ward
No
Name of Slum
pocket/
reference
name
Notified/ Un-
notified
Ward
population
Slum
population
of Notified
slums
Slum
population
Individual
water
connections
No. of
Communit
y taps
No. of
Handpump
s
No. of
Individual
toilets
No. of
Communit
y toilets
No. of
Pucca
houses
No. of Semi
pucca
houses
No. of
Kuccha
houses
No. of
Permanent
pattas
distributed
No. of
Temporary
pattas
distributed
No. of
Primary
school in
the slum
pocket
No. of
Primary
Health
centres in
the slum
pocket
Beneficiari
es under
social
security
schemes
Any
interventio
ns under
IHSDP
(Y/N)
1 Ward no. 1 NA 667 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
2 Ward no. 2 NA 784 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
3 Ward no. 3 NA 588 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
4 Ward no. 4 NA 445 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
5 Ward no. 5 NA 347 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
6 Ward no. 6 NA 426 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
7 Ward no. 7 NA 643 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
8 Ward no. 8 NA 665 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
9 Ward no. 9 NA 689 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
10 Ward no. 10 NA 810 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
11 Ward no. 11 NA 589 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
12 Ward no. 12 NA 675 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
13 Ward no. 13 NA 597 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
14 Ward no. 14 NA 505 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
15 Ward no. 15 NA 675 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Total 9105 3207
Slums & Urban Poor
Sectoral Analysis
Note: Box shows ward having slum population
7
-
Components 2015 2025 2035 City specific Strategies Preliminary estimate Implementing agency Mode of Implementation (PPP etc.)
Network coverage to households 40% 100% 100% CNP, UADD, Govt. of M.P. Contract basis
Per capita supply as per norms (135 lpcd) 135 135 135 CNP, UADD, Govt. of M.P.
24/7 water supply 40% 100% 100% CNP, UADD, Govt. of M.P.
Quality of waterAs per WHO
Standards
As per WHO
Standards
As per WHO
StandardsCNP, UADD, Govt. of M.P.
Non revenue water 25% 15% 5% CNP, UADD, Govt. of M.P.
Consumer metering 80% 100% 100% CNP, UADD, Govt. of M.P. Contract basis
Cost recovery 100% 100% 100% CNP, UADD, Govt. of M.P.
Roof water harvesting 40% 80% 100% CNP, UADD, Govt. of M.P.
Private sector participation 10% 70% 100% Yes
Storm water drainage network coverage 80% 100% 100% CNP, UADD, Govt. of M.P. PPP
Rehabilitation of existing pucca drains 100% 100% 100% CNP, UADD, Govt. of M.P. PPP
Rehabilitation of existing primary nallahs and water
bodies100% 100% 100% CNP, UADD, Govt. of M.P. PPP
Flood prone areas 100% 100% 100% CNP, UADD, Govt. of M.P.
Sewer network coverage to households 60% 100% 100% CNP, UADD, Govt. of M.P. PPP
Sewage Treatment and disposal arrangements 80% 100% 100% CNP, UADD, Govt. of M.P. PPP
Sewage Recycling and reuse 60% 80% 100% CNP, UADD, Govt. of M.P. PPP
Cost recovery (as a % of O&M )As per WHO
Standards
As per WHO
Standards
As per WHO
StandardsCNP PPP
Safe sanitation facilities (with focus on Urban poor) 80% 100% 100% CNP, UADD, Govt. of M.P. PPP
Door-to-door collection system 80% 100% 100% CNP
Source segregation 100% 100% 100% CNP
Improve waste collection efficiency 100% 100% 100% CNP
Mechanized waste handling Partial Full Full CNP
Scientific waste disposal Partial Full Full CNP
Landfill site adequacy Partial Full Full CNP
Cost recovery of O&M 80% 100% 100% CNP
Private sector participation 70% 100% 100% CNP, PWD
671 Lakhs Including
slum area
246 Lakhs Including
slum area
338 Lakhs
Including slum area
245 Lakhs Including
slum area
To provide 100%
sewerage system with
low cost sanitation
projects, proper
treatment before
disposal with Root zone
treatment system and
DEWATS.
Preparation of master
plan, rehabilitation and
improvement
programmes.
Implementation of
Integrated waste
management system.
PPP
SECTORIAL GOALSYEAR
PH
YSI
CA
L IN
FRA
STR
UC
TUR
E
WA
TER
SU
PP
LYD
RA
INA
GE
SEW
ERA
GE
& S
AN
ITA
TIO
NSW
M
By 2035, 24x7 hours
water supply as per the
standard and full
network coverage,
water harvesting,
consumer metering and
low cost water
treatment plant (Rapid
Sand filteration).
8
-
New road formations - 100% 100% CNP, PWD BOOT
Road upgradations 50% 100% 100% CNP, PWD PPP
Widening/ strengthening 50% 100% 100% CNP, PWD PPP
ROBs/flyovers - - - CNP, PWD -
Development of bus terminus 60% 100% 100% CNP, PWD BOOT
Development of truck terminus 70% 100% 100% CNP, PWD BOOT
Junctions and traffic signal improvements 100% 100% 100% CNP, PWD PPP
Mass transit system 30% 60% 100% CNP, PWD BOOT
Parking facilities 100% 100% 100% CNP, PWD Contract
New Installation 30% 70% 100% CNP Contract
Upgradation 100% 100% 100% CNP Contract
Underground cabling - 70% 100% CNP Contract
Energy savings 70% 100% 100% CNP Contract
24/7 electricity supply CNP
100 % electricity supply CNP
Development of alternative energy sources CNP PPP
100% Fire safety coverage 100% 100% 100% CNP
Fully equipped fire station 100% 100% 100% CNP
Identify archaeological resources in the city
(Heritage listing)CNP, State tourism Dept., CNP & State Tourism Dept.
Development of green areas as per norms CNP, State tourism Dept., PPP
Water bodies preservation/Conservation CNP, State tourism Dept., PPP
Tourist accommodation adequacy CNP, State tourism Dept.,
Tourist attraction and circuits regional and city level CNP, State tourism Dept., PPP
Clean and healthy environment CNP
Conserved natural environment - water bodies PPP
Eco-friendly vehicles CNP, GoMP PPP
Disposal of treated sewage in nallahs CNP
Desilting of nallahs CNP PPP
Incineration of bio-medical waste CNP PPP
Implementation of norms/standards for pollution
controlCNP CNP
393 Lakhs
Including slum area
435 Lakhs
NA
1925 Lakhs
Including slum area
Road upgradation and
development,
development of bus &
truck terminal,
signalised junctions,
provision of parking
facilities and
strenthening Public
transport.
Installation of solar
street lights with CFL &
LED lights to save
energy.
Development of
underground cabling.
provision of well
equipped fire station.
Development of
Chakghat as transit
point for surrounding
tourist points,
development of water
fronts, improvement of
connectivity of tourist
places.
Development of water
bodies, plantation,
checking of pollution
level, use of eco-
friendly vehicles,
treatment facilities for
wastes etc.
NA
NA
NA
NA
NA
NA
100% *
100% *
NA
FIR
E
FIG
H
TIN
G
HER
EITA
GE
& T
OU
RIS
M
HER
ITA
GE
& T
OU
RIS
MEN
VIR
ON
MEN
T
100% *
100% *
CNP
State dovt.
PH
YSI
CA
L IN
FRA
STR
UC
TUR
E
RO
AD
S &
TR
AFF
IC M
AN
AG
EMEN
TST
REE
T
LIG
HTN
ING
PO
WER
100% *
100% *
9
-
100% doctor-patient ratio CNP, health dept. Recruitment
100% patient-bed ratio CNP, health dept. Contract
Effective implementation of health programmes and
related services in the slum areas of the cityCNP, health dept. Contract
Regular checks for water contamination in all water
bodies of the cityCNP, health dept. Contract
Literacy rates
Ensure 100% enrollment in primary schools Edu. Dept of M.P. and CNP
100% Teacher student ratio Edu. Dept of M.P. and CNP Recruitment
Technical, engineering & medical education in the
cityEdu. Dept of M.P. and CNP PPP
Developed existing parks CNP Contract / PPP
Area coverage under recreational facilities CNP
Playing facilities CNP
Provision for green-belts in future development
plansCNP
Sufficient infrastructure at mela/exhibition ground CNP contract
Security of tenure for urban poor MPHB, CNP
Inclusion of 100% urban poor population under
various central and state govts social sectors
schemes like old-age pension schemes, Scheme for
handicapped persons, deen-dayal antyoday yojana,
mid-day meals schemes, etc
- -
Pucca housing for urban poor 4000 Lakhs PPP
Access to water connection CNP
Access to public toilets and urinal facilities for all
slum householdsCNP Contract / PPP
Access to dustbins and secondary storage points CNP Contract / PPP
Upgradation of kutcha roads to PCC roads in slums CNP PPP
Improved drainage systems CNP PPP
Adequate street lighting facilities CNP PPP
Education facilities CNP PPP
Community halls etc. CNP PPP
Adequate health facilities CNP PPP
Security of tenure for urban poor MPHB, CNP
Note:
1140 Lakhs
Including slum area
Included in tourism
NA100% *
100% *
100% *
100% *
100% *
100% *
100% *
100% *
100% *
100% *
275 Lakhs Including
slum area
Provision of Land
ownership,
improvement schemes,
relocation of hazardous
slums, pucca drain
network, financial
support for the
construction of houses
Strenthening
infrastructures in health
centers and to run
health initiative
programs.
Provision of co-
education, strengthning
of education
infrastructures and
opening of vocational
training centres.
Development of water
bodies, mini-stadium,
exibition ground,
community halls, public
library etc.
100% *
100% *
100% *
* Marks - project has to be done till year 2035 by CNP, depending upon city need and available resources.
100% *
100% *
100% *
100% *
included in other
sectors
100% *
100% *
100% *
100% *
100% *
100% *
100% *
SLU
MS
& U
RB
AN
PO
OR
SLU
MS
& U
RB
AN
PO
OR
SOC
IAL
INFR
AST
RU
CTU
RE
HEA
LTH
EDU
CA
TIO
NR
ECR
EATI
ON
AL
Soci
al s
ecu
rity
sch
em
es
10
-
2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Rates and Tax Revenue - - - - - -
Assigned Revenues & Compensation - - - - - -
Rental Income from Municipal Properties - - - - - -
Fees & User Charges - - - - - -
Sale & Hire Charges - - - - - -
Revenue Grants, Contribution and Subsidies - - - 364165 1473313 8815183
Income from Investments - - - - - -
Interest Earned - - - - - -
Tax - - - 4689514 4029878 6959783
Non-Tax - - - 2782376 6616183 686207
Other Income - - - - - -
- - - 7836055 12119374 16461173
Grants, Contribution for specific purposes - - - - - -
Secured Loans - - - - - -
Unsecured Loans - - - - - -
Deposits - - - - - -
Deposit works - - - - - -
- - - - - -
Establishment Expenses - - - 8984968 5187511 10062985
Administrative Expenses - - - - - -
Operations & Maintenance - - - 263337 4181738 2628174
Interest & Finance Charges - - - - - 541772
Programme Expenses - - - - - -
Revenue Grants, Contribution and Subsidies - - - - - -
Miscellaneous Expenses - - - - - -
Transfer to Fund - - - - - -
- Other - - - 1315533 590422 -
- - - 10563838 9959671 13232931
Fixed Assets - - - - - -
Capital Work-in-Progress - - - - - -
Investments -General Fund - - - - - -
Investments-Other Funds - - - - - -
Stocks/Inventory - - - - - -
Loans, Advances and Deposits - - - - - -
Other Assets - - - - - -
Miscellaneous Expenditure - - - - - -
- - - - - -
- - - - - -
- - - - - -
Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.
Year
Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumptionR
even
ue
Inco
me
Total - Revenue Income
Total Income
Total Expenditure
Ca
pit
al
Rec
eip
ts
Total Capital Receipts
Rev
enu
e E
xp
end
itu
re
Total - Revenue Expenditure
Cap
ital
Exp
end
itu
res
Total Capital Expenditure
11
-
Reforms Achieved (Y/N)
Any City specific
Strategies
adopted
Preliminary
estimate (if any)
for
implementation
Implementing
agency
2012-13 2013-14 2014-15 2015-16
Full migration of double accounting
System
N25% 50% 75% 100% No Not Available UADD
Property tax reforms, 85% coverage ratio
and 90% collection ratio
N25% 50% 75% 100% No Not Available Nagar Parishad
Levy of user charges : full recovery of O
& M charges for sewerage, water supply
and SWM
N
25% 50% 75% 100% No Not Available Nagar Parishad
Internal earmarking of basic services to
urban poor
N25% 50% 75% 100% No Not Available
Nagar Parishad &
UADD
E-governance & Capacity Building N - 67% 33% 100% No 30 lakh UADD
Provision of basic services to urban poor
including security of tenure at affordable
prices, improved existing housing, water
supply, sanitation
N
25% 50% 75% 100% No Not AvailableNagar Parishad &
UADD
Reforms Action Plan
Timeline to achieve reforms till 2015
12
-
City Development Plan, Chakghat, M.P.
i | P a g e DMG Consulting Pvt. Ltd., Noida
City Development Plan
Chakghat, Madhya Pradesh
SUBMITTED TO:-
Urban Administration and Development
Department, GoMP
PROJECT CO-ORDINATION:-
City Managers' Association Madhya Pradesh
CONSULTANT:-
DMG Consulting Pvt. Ltd.
A-81, Sector- 65, NOIDA (UP)
Chief Municipal Officer Sub Engineer
Chakghat Chakghat
-
City Development Plan, Chakghat, M.P.
ii | P a g e DMG Consulting Pvt. Ltd., Noida
LIST OF TABLES -------------------------------------------------------------------------------------------------------------- IX
LIST OF FIGURES ------------------------------------------------------------------------------------------------------------ X
LIST OF GRAPHS----------------------------------------------------------------------------------------------------------- XIV
LIST OF MAPS -------------------------------------------------------------------------------------------------------------- XV
1. INTRODUCTION --------------------------------------------------------------------------------------------- 12
1.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 12
1.2 CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN ------------------------------------------------------------- 12
1.3 OBJECTIVE OF THE ASSIGNMENT --------------------------------------------------------------------------------------- 13
1.4 UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY --------------------------- 13
1.5 APPROACH AND METHODOLOGY FOR PREPARATION OF CDP ------------------------------------------------------ 14
1.6 SCOPE OF WORK -------------------------------------------------------------------------------------------------------- 15
2. INTRODUCTION TO CHAKGHAT -------------------------------------------------------------------------- 23
2.1 ADMINISTRATIVE BOUNDARY ------------------------------------------------------------------------------------------ 23
2.2 LOCATION AND CONNECTIVITY ----------------------------------------------------------------------------------------- 24
2.3 STUDY AREA ------------------------------------------------------------------------------------------------------------- 26
2.4 PHYSICAL CHARACTERISTICS -------------------------------------------------------------------------------------------- 27
2.4.1 TOPOGRAPHY & GEOLOGY --------------------------------------------------------------------------------------------- 27
2.4.2 CLIMATE ------------------------------------------------------------------------------------------------------------------ 28
2.5 AGRICULTURE, INDUSTRY, MINERALS & FLORA FAUNA ------------------------------------------------------------- 28
2.6 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 29
3. DEMOGRAPHIC PROFILE OF THE TOWN ---------------------------------------------------------------- 31
3.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 31
3.2 POPULATION TREND AND URBANIZATION ---------------------------------------------------------------------------- 31
3.3 POPULATION DENSITY -------------------------------------------------------------------------------------------------- 33
3.4 POPULATION PROJECTIONS --------------------------------------------------------------------------------------------- 34
3.5 METHODOLOGY ADOPTED TO ESTIMATE POPULATION -------------------------------------------------------------- 35
3.5.1 ARITHMETIC PROGRESSION METHOD --------------------------------------------------------------------------------- 35
3.5.2 GEOMETRICAL PROGRESSION METHOD ------------------------------------------------------------------------------- 36
3.5.3 INCREMENTAL INCREASE METHOD ------------------------------------------------------------------------------------- 36
3.6 SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS ----------------------------------------- 37
3.7 SCHEDULE CASTE & SCHEDULE TRIBE POPULATION ------------------------------------------------------------------ 38
3.8 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 38
3.9 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 40
3.10 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 42
TABLE OF CONTENTS
-
City Development Plan, Chakghat, M.P.
iii | P a g e DMG Consulting Pvt. Ltd., Noida
4. SOCIO-ECONOMIC PROFILE OF THE TOWN ------------------------------------------------------------- 44
4.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 44
4.2 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 44
4.3 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 44
4.4 AVERAGE HOUSEHOLD SIZE -------------------------------------------------------------------------------------------- 44
4.5 WORKFORCE PARTICIPATION ------------------------------------------------------------------------------------------- 45
4.6 WORKFORCE DISTRIBUTION -------------------------------------------------------------------------------------------- 45
4.7 DEPENDENCY RATIO ----------------------------------------------------------------------------------------------------- 46
4.8 INDUSTRIAL ACTIVITIES ------------------------------------------------------------------------------------------------- 48
4.8.1 INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ---------------------------------------------- 49
4.8.2 WHOLESALE TRADE ----------------------------------------------------------------------------------------------------- 49
4.9 ISSUES -------------------------------------------------------------------------------------------------------------------- 51
4.10 HERITAGE AND TOURISM ----------------------------------------------------------------------------------------------- 51
5. PHYSICAL PLANNING AND GROWTH MANAGEMENT ------------------------------------------------ 55
5.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 55
5.2 SPATIAL GROWTH TRENDS --------------------------------------------------------------------------------------------- 55
5.3 SPATIAL DISTRIBUTION OF POPULATION ------------------------------------------------------------------------------ 55
5.4 LANDUSE ANALYSIS ----------------------------------------------------------------------------------------------------- 57
5.5 MASTER PLAN PROVISION ---------------------------------------------------------------------------------------------- 59
5.5.1 REVIEW OF PROPOSED DRAFT MASTER PLAN-2021 ----------------------------------------------------------------- 61
5.6 HOUSING SCENARIO ----------------------------------------------------------------------------------------------------- 61
5.6.1 INTRODUCTION ---------------------------------------------------------------------------------------------------------- 61
HOUSING STOCK -------------------------------------------------------------------------------------------------------------------------- 62
DISTRIBUTION OF HOUSES BY TYPES ----------------------------------------------------------------------------------------- 62
CATEGORIES OF HOUSING STRUCUTRE -------------------------------------------------------------------------------------- 62
DISTRIBUTION OF HOUSES BY USE ------------------------------------------------------------------------------------------- 64
OWNERSHIP STATUS ---------------------------------------------------------------------------------------------------------- 64
5.6.2 PRESENT AND FUTURE HOUSING DEMAND --------------------------------------------------------------------------- 64
5.6.3 HOUSING GAP ASSESSMENT ------------------------------------------------------------------------------------------- 66
5.7 FUTURE GROWTH POSSIBILITIES --------------------------------------------------------------------------------------- 66
5.8 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 67
5.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------ 68
6. URBAN INFRASTRUCUTRE SERVICES -------------------------------------------------------------------- 70
6.1 INTRODUCTION ---------------------------------------------------------------------------------------------------------- 70
6.2 PHYSICAL INFRASTRUCUTRE -------------------------------------------------------------------------------------------- 70
6.2.1 WATER SUPPLY ---------------------------------------------------------------------------------------------------------- 70
SOURCES OF WATER SUPPLY ------------------------------------------------------------------------------------------------- 70
WATER DISTRIBUTION SYSTEM----------------------------------------------------------------------------------------------- 70
OTHER SOURCES --------------------------------------------------------------------------------------------------------------- 71
WATER DISTRIBUTION ARRANGEMENTS ------------------------------------------------------------------------------------ 71
-
City Development Plan, Chakghat, M.P.
iv | P a g e DMG Consulting Pvt. Ltd., Noida
INTERNAL DISTRIBUTION NETWORK ----------------------------------------------------------------------------------------- 72
WATER TREATMENT FACILITIES ---------------------------------------------------------------------------------------------- 73
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 74
COMPARATIVE ANALYSIS WITH UDPFI, CPHEEO GUIDELINES ----------------------------------------------------------- 75
SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 76
CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------------ 77
LOW COST WATER TREATMENT PLANT ------------------------------------------------------------------------------------- 80
PROJECT IDENTIFICATION & COSTING --------------------------------------------------------------------------------------- 81
6.2.2 SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------- 82
EXISTING SEWERAGE SYSTEM ------------------------------------------------------------------------------------------------ 82
MEANS OF SEWAGE DISPOSAL ----------------------------------------------------------------------------------------------- 82
HOUSEHOLD TOILETS (DRY LATRINES AND FLUSH LATRINES) -------------------------------------------------------------- 83
PUBLIC TOILETS ---------------------------------------------------------------------------------------------------------------- 83
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 84
COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ------------------------------------------------------ 85
SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 86
CITY SPECIFIC STRATEGIES AND ACTION PLANS ----------------------------------------------------------------------------- 86
BEST PRACTICES --------------------------------------------------------------------------------------------------------------- 88
LOW COST WASTE WATER TREATMENT OPTIONS ------------------------------------------------------------------------- 89
LOW COST SANITATION OPTION --------------------------------------------------------------------------------------------- 93
PROJECT IDENTIFICATION & COSTING --------------------------------------------------------------------------------------- 95
6.2.3 DRAINAGE SYSTEM ------------------------------------------------------------------------------------------------------ 96
EXISTING DRAINAGE SYSTEM ------------------------------------------------------------------------------------------------- 96
MAJOR WATER BODIES ------------------------------------------------------------------------------------------------------- 97
PRIMARY, SECONDARY AND TERTIARY DRAINS ----------------------------------------------------------------------------- 97
FLOOD-PRONE AREAS --------------------------------------------------------------------------------------------------------- 98
FLOODING IN CATCHMENT AREA OF MAJOR NALLAHS --------------------------------------------------------------------- 98
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 98
COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ------------------------------------------------------ 98
SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 98
CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------------ 99
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 100
6.2.4 SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------- 101
SOLID WASTE GENERATION ------------------------------------------------------------------------------------------------- 101
CONSTITUENT OF MUNICIPAL WASTE -------------------------------------------------------------------------------------- 101
CURRENT PRACTICE OF SOLID WASTE MANAGEMENT -------------------------------------------------------------------- 102
PRIMARY AND SECONDARY COLLECTION ----------------------------------------------------------------------------------- 102
WASTE STORAGE AND SEGREGATION --------------------------------------------------------------------------------------- 102
PROCESSING AND DISPOSAL ------------------------------------------------------------------------------------------------- 103
RESUSE AND RECYCLING ----------------------------------------------------------------------------------------------------- 103
VEHICLES FOR SOLID WASTE COLLECTION AND TRANSPORTATION ------------------------------------------------------ 103
ESTIMATION OF WASTE COLLECTION --------------------------------------------------------------------------------------- 104
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------------- 104
COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ----------------------------------------------------- 105
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 105
-
City Development Plan, Chakghat, M.P.
v | P a g e DMG Consulting Pvt. Ltd., Noida
CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 106
GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 106
STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 106
BEST PRACTICES -------------------------------------------------------------------------------------------------------------- 109
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 110
6.2.5 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 111
EXISTING TRAFFIC AND TRANSPORTATION SCENARIO --------------------------------------------------------------------- 111
VEHICLE POPULATION -------------------------------------------------------------------------------------------------------- 112
AGENCIES IN TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------------- 112
TRAVEL CHARACTERISTICS --------------------------------------------------------------------------------------------------- 113
PUBLIC TRANSPORT/MASS TRANSIT---------------------------------------------------------------------------------------- 113
TRAFFIC MANAGEMENT AND CIRCULATION -------------------------------------------------------------------------------- 113
INTER-CITY BUS TRANSPORT ------------------------------------------------------------------------------------------------ 117
INTERMEDIATE PUBLIC TRANSPORT ----------------------------------------------------------------------------------------- 118
PARKING REQUIREMENT ----------------------------------------------------------------------------------------------------- 118
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------------- 119
COMPARATIVE ANALYSIS WITH UDPFI AND OTHER GUIDELINES -------------------------------------------------------- 120
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 120
CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 122
GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 122
STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 122
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 123
6.2.6 STREET LIGHTING AND FIRE FIGHTING -------------------------------------------------------------------------------- 124
EXISTING SITUATION OF STREET LIGHTS ------------------------------------------------------------------------------------ 124
FIRE SERVICE ------------------------------------------------------------------------------------------------------------------ 125
VEHICLE AND EQUIPMENTS FOR FIRE FIGHTING AND RESCUE OPERATIONS --------------------------------------------- 125
OPERATIONAL SYSTEM ------------------------------------------------------------------------------------------------------- 125
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS STREET LIGHTING ------------------------------------------------ 125
PRESENT AND FUTURE DEMAND AND SUPPLY GAPS FIRE FIGHTING --------------------------------------------------- 126
COMPARATIVE ANALYSIS WITH THE UDPFI AND OTHER GUIDELINES --------------------------------------------------- 127
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 127
OTHER SOURCES OF ENERGY ------------------------------------------------------------------------------------------------ 128
ISSUES ------------------------------------------------------------------------------------------------------------------------- 128
CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 129
GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 129
STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 129
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 130
6.2.7 URBAN POOR AND THEIT ACCESSIBILITY TO BASIS SERVICES ------------------------------------------------------- 131
POVERTY IN THE TOWN ------------------------------------------------------------------------------------------------------ 131
SEPARATE INFORMATION ON BPL POPULATION AND SLUM POPULATION ---------------------------------------------- 131
SLUMS IN THE TOWN --------------------------------------------------------------------------------------------------------- 131
GENERAL CHARACTERISTICS OF SLUM -------------------------------------------------------------------------------------- 132
STATUS OF SLUMS (NOTIFIED/ UN-NOTIFIED) ----------------------------------------------------------------------------- 132
LAND OWNERSHIP AND TENURE STATUS ----------------------------------------------------------------------------------- 132
URBAN BASIC SERVICES IN SLUMS (IN LINE WITH JNNURMS 7 POINT CHATER) --------------------------------------- 133
-
City Development Plan, Chakghat, M.P.
vi | P a g e DMG Consulting Pvt. Ltd., Noida
STATUS OF PHYSICAL INFRASTRUCTURE IN SLUMS------------------------------------------------------------------------- 133
HOUSING ---------------------------------------------------------------------------------------------------------------------- 133
WATER SUPPLY --------------------------------------------------------------------------------------------------------------- 133
DRAINAGE --------------------------------------------------------------------------------------------------------------------- 133
SANITATION ------------------------------------------------------------------------------------------------------------------- 133
SEWERAGE -------------------------------------------------------------------------------------------------------------------- 133
RAOD & STREET LIGHTING --------------------------------------------------------------------------------------------------- 133
SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------------- 134
STATUS OF SOCIAL INFRASTRUCTURE IN SLUMS --------------------------------------------------------------------------- 134
EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------------- 134
HEALTH FACILITIES ------------------------------------------------------------------------------------------------------------ 134
SOCIAL SECURITY SCHEMES AND BENEFICIARIES --------------------------------------------------------------------------- 134
PRESENT AND FUTURE HOUSING DEMAND -------------------------------------------------------------------------------- 134
HOUSING GAP ASSESSMENT ------------------------------------------------------------------------------------------------- 135
COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ----------------------------------------------------- 135
SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 136
ISSUES ------------------------------------------------------------------------------------------------------------------------- 137
CITY SPECIFIC STATEGIES AND ACTION PLANS ----------------------------------------------------------------------------- 137
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 137
6.3 SOCIAL INFRASTRUCUTRE ---------------------------------------------------------------------------------------------- 138
6.3.1 HEALTH ------------------------------------------------------------------------------------------------------------------ 138
OVERALL HEALTH FACILITIES------------------------------------------------------------------------------------------------- 138
BASIC HEALTH INDICATORS -------------------------------------------------------------------------------------------------- 138
MEDICAL FACILITY PROVIDED BY MUNICIPAL BODY ---------------------------------------------------------------------- 138
ROLE OF MUNICIPAL BODY IN HEALTH PROGRAMMES ------------------------------------------------------------------- 138
6.3.2 EDUCATION ------------------------------------------------------------------------------------------------------------- 139
OVERALL EDUCATIONAL FACILITIES AND TEACHERS IN THE TOWN ------------------------------------------------------- 139
BASIC EDUCATION AND LITERACY INDICATORS ---------------------------------------------------------------------------- 140
EDUCATIONAL FACILITIES PROVIDED BY MUNICIPAL BODY --------------------------------------------------------------- 141
6.3.3 RECREATION AND ENTERTAINMENT ---------------------------------------------------------------------------------- 142
RECREATIONAL FACILITIES (PARKS, PLAYGROUNDS ETC) ------------------------------------------------------------------ 142
SPORTS FACILITIES ------------------------------------------------------------------------------------------------------------ 142
6.3.4 FIRE FIGHTING SERVICES ----------------------------------------------------------------------------------------------- 142
6.3.5 COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ----------------------------------------------------------- 143
6.3.6 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 146
6.3.7 ISSUES ------------------------------------------------------------------------------------------------------------------- 147
6.3.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 148
PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 149
HEALTH FACILITIES ------------------------------------------------------------------------------------------------------------ 149
EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------------- 149
6.3.9 FLORA AND FAUNA ----------------------------------------------------------------------------------------------------- 150
6.3.10 POLLUTION LEVELS (AIR, WATER AND SOIL) ------------------------------------------------------------------------- 151
6.3.11 CITY GREEN SPACES ---------------------------------------------------------------------------------------------------- 151
6.3.12 WATER FRONT DEVELOPMENT AND CONSERVATION --------------------------------------------------------------- 151
6.3.13 ISSUES ------------------------------------------------------------------------------------------------------------------- 152
-
City Development Plan, Chakghat, M.P.
vii | P a g e DMG Consulting Pvt. Ltd., Noida
6.3.14 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 152
6.3.15 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 152
6.4 HERITAGE AND CONSERVATION --------------------------------------------------------------------------------------- 152
6.4.1 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 152
6.4.2 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 153
6.4.3 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 156
6.4.4 EXISTING REGULATIONS/HERITAGE GUIDELINES AT THE ULB AND STATE LEVEL --------------------------------- 156
6.4.5 HERITAGE ISSUES ------------------------------------------------------------------------------------------------------- 157
6.4.6 TOURISM POTENTIAL OF THE TOWN ---------------------------------------------------------------------------------- 157
6.4.7 POSSIBILITY OF TOURISM CIRCUITS ----------------------------------------------------------------------------------- 157
6.4.8 COMPARATIVE ANALYSIS WITH THE UDPFI & UNESCO GUIDELINES -------------------------------------------- 158
6.4.9 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 158
6.4.10 ISSUES ------------------------------------------------------------------------------------------------------------------- 159
6.4.11 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 159
6.4.12 SECTOR WISE PROJECT IDENTIFICATION AND COSTING: ------------------------------------------------------------- 160
7. SPECIAL PAPER: TRAFFIC AND TRANSPORTATION SYSTEM ---------------------------------------- 162
7.1 BACKGROUND ---------------------------------------------------------------------------------------------------------- 162
7.2 EXISTING TRAFFIC AND TRANSPORTATION SCENARIO --------------------------------------------------------------- 162
7.3 VEHICLE POPULATION -------------------------------------------------------------------------------------------------- 162
7.4 AGENCIES IN TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------- 163
7.5 TRAVEL CHARACTERISTICS --------------------------------------------------------------------------------------------- 163
7.6 PUBLIC TRANSPORT/MASS TRANSIT --------------------------------------------------------------------------------- 164
7.7 TRAFFIC MANAGEMENT AND CIRCULATION -------------------------------------------------------------------------- 164
7.8 INTER-CITY BUS TRANSPORT ------------------------------------------------------------------------------------------ 168
7.9 INTERMEDIATE PUBLIC TRANSPORT ----------------------------------------------------------------------------------- 168
7.10 PARKING REQUIREMENT ----------------------------------------------------------------------------------------------- 169
7.11 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------- 170
7.12 COMPARATIVE ANALYSIS WITH UDPFI AND OTHER GUIDELINES -------------------------------------------------- 171
7.13 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 172
7.14 ISSUES ------------------------------------------------------------------------------------------------------------------- 172
7.15 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 173
7.16 PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 175
7.17 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 175
8. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ------------------------------------ 173
8.1 URBAN LOCAL BODY STRUCTURE ------------------------------------------------------------------------------------- 173
8.2 TOWN AND COUNTRY PLANNING DEPARTMENT -------------------------------------------------------------------- 174
8.3 DEVELOPMENT AUTHORITY ------------------------------------------------------------------------------------------- 175
8.4 PUBLIC HEALTH ENGINEERING DEPARTMENT ------------------------------------------------------------------------ 175
8.1 MADHYA PRADESH HOUSING AND INFRASTRURE BOARD ---------------------------------------------------------- 175
8.5 MADHYA PRADESH POLLUTION CONTROL BOARD ------------------------------------------------------------------ 176
8.6 ROLE OF PRIVATE SECTOR IN INFRASTRUCUTRE SERVICE PROVISION ---------------------------------------------- 176
8.7 ISSUES ------------------------------------------------------------------------------------------------------------------- 176
-
City Development Plan, Chakghat, M.P.
viii | P a g e DMG Consulting Pvt. Ltd., Noida
8.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 176
9. INVESTMENT PLAN AND FINANCING STRATEGIES -------------------------------------------------- 179
9.1 REVENUE ACCOUNTS --------------------------------------------------------------------------------------------------- 179
9.1.1 KEY ASSUMPTIONS ----------------------------------------------------------------------------------------------------- 179
9.1.2 NON TAX SOURCES ----------------------------------------------------------------------------------------------------- 179
9.2 REVENUE INCOME ------------------------------------------------------------------------------------------------------ 179
9.3 GROWTH IN INCOME --------------------------------------------------------------------------------------------------- 180
9.4 REVENUE EXPENDITURE ------------------------------------------------------------------------------------------------ 180
9.5 CAPITAL ACCOUNT ----------------------------------------------------------------------------------------------------- 181
9.5.1 CAPITAL INCOME ------------------------------------------------------------------------------------------------------- 181
9.5.2 CAPITAL EXPENDITURE ------------------------------------------------------------------------------------------------- 182
9.6 KEY FINANCIAL INDICATORS ------------------------------------------------------------------------------------------- 182
9.6.1 REVENUE INDICATORS ------------------------------------------------------------------------------------------------- 182
9.6.2 EXPENDITURE INDICATORS -------------------------------------------------------------------------------------------- 183
9.7 INCOME, EXPENDITURE AND SURPLUS DEFICIT ANALYSIS ---------------------------------------------------------- 183
9.7.1 FINANCIAL STATUS AT A GLANCE-------------------------------------------------------------------------------------- 183
9.8 KEY ISSUES AND CONCLUSION ----------------------------------------------------------------------------------------- 184
9.9 CITY SPECIFIC STATEGIES AND ACTION PLAN------------------------------------------------------------------------- 185
10. INVESTMENT PRIORITIZATION PLAN ------------------------------------------------------------------ 187
10.1 PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 187
10.2 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 187
10.3.1 WATER SUPPLY --------------------------------------------------------------------------------------------------------- 187
10.3.2 DRAINAGE --------------------------------------------------------------------------------------------------------------- 187
10.3.3 SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------ 188
10.3.4 SOLID WASTE MANAEMENT ------------------------------------------------------------------------------------------ 188
10.3.5 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 189
10.3.6 URBAN POOR ----------------------------------------------------------------------------------------------------------- 190
10.3 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 191
10.4.1 HEALTH FACILITES ------------------------------------------------------------------------------------------------------ 191
10.4.2 EDUCATIONAL FACILITES ----------------------------------------------------------------------------------------------- 191
10.4.3 RECREATION AND ENTERTAINMENT ---------------------------------------------------------------------------------- 192
10.4.4 HERITAGE AND TOURISM ---------------------------------------------------------------------------------------------- 192
10.4 BASIS FOR PROJECT IDENTIFICATION ---------------------------------------------------------------------------------- 193
10.5 PROJECTS FOR SYSTEM AND INFRASTRUCTURE AUGMENTATION -------------------------------------------------- 194
10.6 PROJECTS FOR SYSTEM AND INFRASTRUCTURE REFURBISHMENT -------------------------------------------------- 195
10.7 OTHER DEVELOPMENT PROJECT -------------------------------------------------------------------------------------- 195
10.8 SECTOR WISE PROJECT IDENTIFICATION AND COSTING ------------------------------------------------------------- 195
10.9.1 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 195
WATER SUPPLY --------------------------------------------------------------------------------------------------------- 195
SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------ 196
SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------- 197
STORM WATER DRAINAGE -------------------------------------------------------------------------------------------- 197
-
City Development Plan, Chakghat, M.P.
ix | P a g e DMG Consulting Pvt. Ltd., Noida
TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 198
STREET LIGHTING AND FIRE FIGHTING -------------------------------------------------------------------------------- 198
URBAN POOR ----------------------------------------------------------------------------------------------------------- 199
10.9.2 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 199
HEALTH FACILITIES ----------------------------------------------------------------------------------------------------- 199
EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------- 200
TOURISM ---------------------------------------------------------------------------------------------------------------- 201
OTHER COMPONENTS -------------------------------------------------------------------------------------------------- 201
URBAN REFORMS & CAPACITY BUILDING ---------------------------------------------------------------------------- 202
SECTOR WISE TOTAL COST -------------------------------------------------------------------------------------------- 202
10.10 CITY INVESTMENT PLAN ----------------------------------------------------------------------------------------------- 203
10.10.1 CITY INVESTMENT PLAN FOR 2012- 2015 (PHASE I) --------------------------------------------------------------- 203
10.10.2 CITY INVESTMENT PLAN FOR 2016- 2020 (PHASE II) -------------------------------------------------------------- 205
10.10.3 CITY INVESTMENT PLAN FOR 2021- 2025 (PHASE III) ------------------------------------------------------------- 206
10.10.4 CITY INVESTMENT PLAN FOR 2026- 2030 (PHASE IV) ------------------------------------------------------------- 207
10.10.5 CITY INVESTMENT PLAN FOR 2031- 2035 (PHASE V) -------------------------------------------------------------- 208
10.11 FINANCING PLAN:------------------------------------------------------------------------------------------------------- 209
11. URBAN REFORMS ---------------------------------------------------------------------------------------- 220
11.1 BACKGROUND ---------------------------------------------------------------------------------------------------------- 220
11.2 OBJECTIVES OF REFORMS: --------------------------------------------------------------------------------------------- 220
11.3 NEED FOR REFORM INITIATIVES --------------------------------------------------------------------------------------- 220
11.4 STRUCTURE OF REFORMS ---------------------------------------------------------------------------------------------- 221
11.5 MANDATORY REFORMS: ------------------------------------------------------------------------------------------ 221
11.6 OPTIONAL REFORMS (STATE AND ULB/PARA-STATAL LEVEL) ------------------------------------------------- 222
11.7 STATUS OF MANDATORY & OPTIONAL REFORMS: ------------------------------------------------------------------ 222
11.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 224
11.9 TOWN SPECIFIC STRATEGIES AND ACTION PLAN--------------------------------------------------------------------- 225
12. TOWN VISION --------------------------------------------------------------------------------------------- 227
12.1 SUMMARY OF SECTORAL STRATEGIES: ------------------------------------------------------------------------------- 227
12.2 TOWN VISION: ---------------------------------------------------------------------------------------------------------- 237
12.3 TOWN POSITIONING: -------------------------------------------------------------------------------------------------- 238
ANNEXURES- ------------------------------------------------------------------------------------------------------------- 240
-
City Development Plan, Chakghat, M.P.
x | P a g e DMG Consulting Pvt. Ltd., Noida
LIST OF TABLES
Table 2-1: Study Area ............................................................................................................................ 26
Table 2-2: Average Annual Rainfall in Chakghat ................................................................................... 28
Table 3-1: Comparative Assessment of Urban Population ................................................................... 31
Table 3-2: Population Growth Trends .................................................................................................. 32
Table 3-3: Population Density Trends ................................................................................................... 33
Table 3-4: Demographics of the Town - Chakghat ............................................................................... 33
Table 3-5: Trend of Population Growth in Chakghat Town .................................................................. 35
Table 3-6: Projected Population Arithmetic Progression Method .................................................... 35
Table 3-7: Projected Population Geometrical Progression Method .................................................. 36
Table 3-8: Calculation of Population Projection Incremental Increase Method ............................... 37
Table 3-9: Projected Population Incremental Increase Method ....................................................... 37
Table 3-10: Comparative Assessment of Urban SC & ST Population .................................................... 38
Table 3-11: Comparative Assessment of Literacy Rate Chakghat, M.P. ............................................ 38
Table 3-12: Ward Wise Comparative Assessment of Literacy Rate Chakghat, M.P. ......................... 39
Table 3-13: Comparative Assessment of Sex Ratio .............................................................................. 40
Table 3-14: Ward Wise Comparative Assessment of Sex Ratio Chakghat, M.P. ............................... 41
Table 4-1: Comparative Assessment of Household Size ....................................................................... 44
Table 4-2: Comparative Assessment of WFPR ...................................................................................... 45
Table 4-3 Ward Wise Comparative Assessment of WFPR & Work Force Distribution ......................... 46
Table 4-4 Comparative Assessment of Non-working Population ......................................................... 47
Table 4-5: Ward Wiae Comparative Assessment of Dependent Population & Dependency Ratio...... 47
Table 4-6: List of Important Industries in Rewa District and in its surrounding Districts .................... 48
Table 4-7: List of Important Centers/Spots for Tourists in Town and in its Proximity ......................... 51
Table 5-1: Ward Wise Distribution of Population Density .................................................................... 56
Table 5-2: Existing Landuse Distribution; 2011 Chakghat .................................................................. 57
Table 5-3: Comparision between Existing (2011) and Proposed Landuse (2021) Distribution
Chakghat ............................................................................................................................................... 60
Table 5-4: Comparative Assessment of Household Size ....................................................................... 62
Table 5-5: Ward Wise Present Housing Demand and Gap ................................................................... 65
Table 5-6: Present and Future Housing Demand and Gap ................................................................... 65
Table 6-1: Main Sources of Water Supply ............................................................................................ 70
Table 6-2: Silent Feature of Water Supply System in Chakghat ........................................................... 71
Table 6-3: Projected Future demand Water Supply .......................................................................... 74
-
City Development Plan, Chakghat, M.P.
xi | P a g e DMG Consulting Pvt. Ltd., Noida
Table 6-4: Present and Future Requirement/Demand and Gap Assessment Water Supply ............. 75
Table 6-5: Performance Indicators Water Supply .............................................................................. 75
Table 6-6: Goals & Services Outcomes for different Horizon Years ..................................................... 77
Table 6-7: Present and Future Demand and Supply Gaps Sewerage System .................................... 84
Table 6-8: Performance Indicators Sewerage System ....................................................................... 85
Table 6-9: Goals & Services Outcomes for different Horizon Years ..................................................... 87
Table 6-10: Length of Drains in Town ................................................................................................... 96
Table 6-11: List of Major Water Bodies and Drains .............................................................................. 98
Table 6-12: Present and Future Demand and Supply Gaps for Drainage System ................................ 98
Table 6-13: Goals & Services Outcomes for different Horizon Years ................................................... 99
Table 6-14: Ward Wise Municipal Solid Waste Generation Chakghat Town .................................. 101
Table 6-15: List of Vehicles and Equipments available with CNP for Solid Waste Collection &
Transportation .................................................................................................................................... 104
Table 6-16: Present and Future Demand and Supply Gaps of Waste Collection Chakghat Town... 104
Table 6-17: Performance Indicators Solid Waste Management ...................................................... 105
Table 6-18: Goals & Services Outcomes for different Horizon Years ................................................. 106
Table 6-19: List of Transport Agencies for Inter City Goods Transport .............................................. 112
Table 6-20: Types of Raods and Lengths in Chakghat Town............................................................... 114
Table 6-21: Ward Wise Detail of Road Length in Chakghat Town ...................................................... 114
Table 6-22: Major Roads of the Town ................................................................................................ 115
Table 6-23: Present and Future Demand and Supply Gaps Traffic and Transportation .................. 119
Table 6-24: Space Standards of Roads ................................................................................................ 120
Table 6-25: Desirable of Footpaths..................................................................................................... 120
Table 6-26: Goals & Services Outcomes for Different Horizon Years ................................................. 122
Table 6-27: Street Lighting in Chakghat Nagar Parishad .................................................................... 124
Table 6-28: Present and Future Demand and Supply Gaps Street Lighting ..................................... 126
Table 6-29: Present and Future Demand of Equipment (vehicles) and Man Power for Street Lighting
and Fire Fighting ................................................................................................................................. 126
Table 6-30: Performance Indicators Street Lighting ........................................................................ 127
Table 6-31: Sources of Lighting at Household Level in Chakghat ....................................................... 128
Table 6-32: Type of Cooking Fuel Used at Household Level in Chakghat ........................................... 128
Table 6-33: Goals & Services Outcomes for Different Horizon Years ................................................. 129
Table 6-34: Ward Wise Distribution of Slum and BPL Population ...................................................... 131
Table 6-35: Present and Future Housing Demand and Gap for Slum Population .............................. 134
-
City Development Plan, Chakghat, M.P.
xii | P a g e DMG Consulting Pvt. Ltd., Noida
Table 6-36: Comparative Assessment of Literacy Rate ...................................................................... 140
Table 6-37: Ward Wise Comparative Assessment of Literacy Rate - Chakghat ................................. 140
Table 6-38: Comparative Analysis with UDPFI Guidelines Social Infrastructure ............................. 143
Table 6-39: Present and Future Demand and Supply Gaps Social Infrastructure ........................... 143
Table 6-40: List of Important Tourist Spots in Town .......................................................................... 153
Table 6-41: List of Important Tourist/Destination Spots at Regional Level ........................................ 154
Table 7-1 List of Transport Agencies for Inter City Goods Transport ................................................. 163
Table 7-2 : Types of Roads and Lengths in Chakghat Town ................................................................ 164
Table 7-3: Ward Wise Detail of Road Length in Chakghat Town ........................................................ 165
Table 7-4: Major Roads of the Town .................................................................................................. 166
Table 7-5: Present and Future Demand and Supply Gaps Traffic and Transportation .................... 170
Table 7-6: Space Standards of Roads .................................................................................................. 171
Table 7-7: Desirable of Footpaths....................................................................................................... 171
Table 7-8: Goals & Services Outcomes for Different Horizon Years ................................................... 173
Table 8-1: Power and Functions of Chakghat Nagar Parishad ............................................................ 174
Table 9-1: Year Wise Income of Chakghat Nagar Parishad from Various Sources ............................. 181
Table 9-2: Year Wise Expenditure of Chakghat Nagar Parishad ......................................................... 182
Table 9-3: Total Revenue Income and Expenditure of CNP ................................................................ 183
Table 10-19: Overall financing plan of investment plans: .................................................................. 213
-
City Development Plan, Chakghat, M.P.
xiii | P a g e DMG Consulting Pvt. Ltd., Noida
LIST OF FIGURES
Figure 1.5-1: Specific Objectives of CDP ............................................................................................... 15
Figure 1.6-2: Stage 1: Inception ............................................................................................................ 17
Figure 1.6-1 Kick-off Workshops at Chakghat Nagar Parishad ............................................................. 17
Figure 1.6-3: Stage 2: Sector Assessment and City Profile ................................................................... 18
Figure 1.6-4: Stage 3: City Vision and Development Objectives ........................................................... 19
Figure 1.6-5: Stage 4: Draft CDP ........................................................................................................... 20
Figure 1.6-6: Schematic Diagram for Methodology of City Development Plan Preparation ............... 21
Figure 4.8-1: Informal Business Activites along the Major Roads of the Town .................................... 49
Figure 4-4.8-2 Major Market Areas (Chak Bazar) in Town ................................................................... 50
Figure 6.2-1: Water Supply Distribution Arrangements ....................................................................... 72
Figure 6.2-2: Condition of Major Roads in Town ................................................................................ 116
Figure 6.2-3: Unorganised On-street parking in Town ....................................................................... 118
Figure 6.2-4: Street Light at Old Chowk - Chakghat ............................................................................ 125
Figure 6.2-5: Slums in Chakghat Town ................................................................................................ 132
Figure 6.3-1: Health Facilities at CHC in Chakghat Town .................................................................... 138
Figure 6.3-2: Schools in Chakghat Town ............................................................................................. 139
Figure 6.3-4: NSPG College in Chakghat Town ................................................................................... 140
Figure 6.3-3: Building Structure and Basic Infrastructure Ser