![Page 1: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/1.jpg)
Case Studies: Using Signal Performance Metrics to Optimize Traffic Signal OperationsMarch 6, 2018
![Page 2: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/2.jpg)
![Page 3: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/3.jpg)
WHAT ARE SPMs?
Traffic Signal Performance Measures
- Modernize traffic signal management
- Provide high-resolution data
- Support performance-based maintenance and ops
- Improve safety and efficiency
- Cut congestion and cost
![Page 4: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/4.jpg)
TRADITIONAL:● Complaint driven● Resource constrained● Reactive signal operations & maintenance● Improvement is project based, not continuous
AN EVOLUTION IN SIGNAL MANAGEMENT
RECOMMENDED:● Continuous Improvement● Measurement Driven● Proactively planning and management● Prove the impact of your work● Secure funds with data driven arguments
![Page 5: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/5.jpg)
BENEFITS OF PERFORMANCE MEASURES WHAT GETS MEASURED GETS DONE
High resolution data collection
Data analysis and performance report tools
Data-driven improvements
![Page 6: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/6.jpg)
BENEFITS OF SIGNAL PERFORMANCE MEASURES WHAT GETS MEASURED GETS DONE
High resolution data collection
Data analysis and performance report tools
Data-driven improvements
![Page 7: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/7.jpg)
PERCEIVED CHALLENGES
TECHNICAL LOGISTICS
“How do we get started?”
Communications Modern controllers & detectionData security Support from IT departmentImplementation consulting
I have to solve it all to try this!
ADOPTION
“How do we get started?”
Data isn’t accessible ExpensiveAnother tool I have to learn What do these graphs mean?I don’t have time to figure this out
How do I explain this to my boss?
![Page 8: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/8.jpg)
THE SMARTLINK STACK
Spectrum HardwareCommunicate data securelyUnlock data from infrastructureEnhance detection
Spectrum SignalsReceive traffic incident alerts Gain visibility of traffic networkIntegrate data with existing software
Spectrum Traffic InsightsMeasure traffic performancePrioritize resources Share data
Insights
Inform
Monitor
Communicate
Acquire
![Page 9: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/9.jpg)
THE FULL TRAFFIC PICTURE
1: Intersection ViewDetector and signal performance data at the intersection
2: Corridor ViewAggregate intersection data and augment with travel time data
3: Network ViewAggregate corridor data with maintenance details, origin destination analysis, computer vision and summary reports
![Page 10: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/10.jpg)
Improving Maintenance and Operations
![Page 11: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/11.jpg)
Maintenance & Operations
REGION OF WATERLOO
CHALLENGES:
● Rural railway crossing
● 22 minute commute each direction
● 37 Rail Preempt Threshold Exceeded in one year
![Page 12: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/12.jpg)
![Page 13: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/13.jpg)
Maintenance & Operations
PRIOR TO MIOVISION:● Complaint driven ● Time consuming communication and resolution
WITH ATSPMs:● Minimum 75 hours saved (~2 person weeks/year)● Resolution at the click of a button to inform rail company● Fewer citizen complaints● Safer road
“With Spectrum you have streaming video and real-time alertscoming back to essentially do the fieldwork from the trafficmanagement center, and get issues cleared more quickly.”
Mark Liddell, Region of Waterloo Traffic Analyst
REGION OF WATERLOOREGION OF WATERLOOREGION OF WATERLOOREGION OF WATERLOO
![Page 14: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/14.jpg)
Improving Maintenance and Operations
![Page 15: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/15.jpg)
PIMA COUNTY
Maintenance & Operations
WEST INA ROAD CONSTRUCTION
● Construction at West Ina Rd and I-10
● On / Off Ramp closure expected for 24 months
● Goal: measure and manage impact on Ina Rd corridor
![Page 16: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/16.jpg)
W INA ROAD STUDY CORRIDOR
● 4 Intersections equipped with Miovision Spectrum along W Ina Rd ● Before / During / After data used to measure impact of closures and new timing plans
PIMA COUNTY CORRIDOR ANALYSIS OVERVIEWPIMA COUNTY
![Page 17: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/17.jpg)
TRAVEL PATTERN CHANGES
PIMA COUNTY CORRIDOR ANALYSIS OVERVIEW
● OD (Origin-Destination) changes before and after the interchange closure● Corridor length trips decreased significantly, but N La Cañada Dr and N La Cholla still used heavily
Feb 1st, 2016 May 4th, 2016
PIMA COUNTY
![Page 18: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/18.jpg)
N LA CAÑADA DR NB AND SB● Small effect of interchange closure on the number of split failures on the NB traffic ● Significant improvement after the signal retiming
SPLIT TREND ANALYSIS
BeforeClosure
AfterClosure
AfterRetiming
PIMA COUNTY
![Page 19: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/19.jpg)
EFFECTS ON PROGRESSION
● Significant improvement in progression after retiming on the NB movement using Arrivals on Red
After:
Before:
ARRIVALS ON REDPIMA COUNTY
![Page 20: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/20.jpg)
EFFECTS ON PROGRESSION
● Significant improvement in progression after retiming on the NB movement using Purdue Coordination
After:
Before:
PURDUE COORDINATION DIAGRAMPIMA COUNTY
![Page 21: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/21.jpg)
TRAVEL TIME
EFFECT ON TRAVEL TIME● Non-optimal cycles can increase the travel time/delay● A before and after travel time analysis reveals minimal impact of signal retiming on corridor travel time
After:
Before:
PIMA COUNTY
![Page 22: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/22.jpg)
Improving Traffic Performance
![Page 23: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/23.jpg)
SPECTRUM CAMERA360ENABLES DETECTION
● Detection is key to ATSPMs
● Leverage detection zones and computer vision for greater accuracy
● SmartView 360 fisheye camera provides split approach view
![Page 24: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/24.jpg)
SPECTRUM CAMERA360MULTI-MODAL STUDIES
● 24/7, 365 video analyzer product in cabinet
● On-demand TMC and classification studies with 95% accuracy (including ped and bike)
● Remote video monitoring and review
![Page 25: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/25.jpg)
THE PROBLEM:Eastbound Joy - Left Turn
- Queue failing to empty at afternoon rush hour- Causing a backup so far back that it blocks the thru traffic
Quick Case Study: City of DetroitCITY OF DETROIT
![Page 26: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/26.jpg)
Quickly identify top offending intersections on the Intersection Report Card
CITY OF DETROIT
![Page 27: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/27.jpg)
Requirements: Requires stopbar presence detection
OCCUPANCY RATIOa.k.a. Green Occupancy, Red Occupancy
SPLIT FAILURESa.k.a. Purdue Split Failure
Requirements: Requires stopbar presence detection
CITY OF DETROIT
![Page 28: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/28.jpg)
CITY OF DETROIT
Split Trend Analysis - Drilldown to analyze the problem
![Page 29: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/29.jpg)
THE SOLUTIONReallocate 3s of green time from the NB/SB movements to the EB/WB movements during the PM Peak
CITY OF DETROIT
![Page 30: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/30.jpg)
Verify change didn’t negatively impact other movements
CITY OF DETROIT
![Page 31: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/31.jpg)
Visually assess impact of changeBEFORE AFTER
CITY OF DETROIT
![Page 32: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/32.jpg)
The result…41.7% reduction in Split Failures at Intersection
CITY OF DETROIT
![Page 33: Case Studies: Using Signal Performance Metrics to Optimize](https://reader033.vdocuments.site/reader033/viewer/2022061614/62a080be96ee604ce051efdb/html5/thumbnails/33.jpg)
MIOVISION ATSPM ADOPTION MODELProblem Discovery
Integration Planning
Procurement Support Implementation
Continuous Improvement
Translate challenges into requirements
Provide expertise on securing funding
Ensure deployment is timely & success
Continue to understand and innovate based on your evolving needs
▸ Problem discovery▸ Stakeholder involvement
▸ Technical planning document▸ Business case development
▸ Grant application writing▸ Technical specifications
▸ Project management▸ Detailed installation instructions
▸ Product discovery managers▸ Product roadmaps
Work to understand your challenges
MIO
VISI
ON
R
ESO
UR
CES
WH
AT W
E PR
OVI
DE
Provide technical details about existing infrastructure
Support grants applications or vying for internal funding
Access to relevant staff for installation and training
Feedback about how Miovision products can better meet your needs
Engagement from relevant stakeholders
WH
AT W
E AS
K O
F YO
U