Introduction
DPA
Ezekiel 33:1-6
Painting a picture of E-waste Management.
Advocacy/E-waste Wangari Mathias/mama Teresa/
political good will/governments.
Ministers of Environment/health/education/ information.
EACO is a good thing and in time to save Africa.
Deceases have increased in Africa.
Cancer/ Ebola/ Respiratory systems/
Policies/ NEMAS/Regulations/ organizations/?
Media/ museums/television/ Radio/ caravans/
Rwanda model planning with data/ placing the Infrastructures/ HR/ academia/
Waste into Wealth/ not/ death/health/
![Page 3: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/3.jpg)
Ezikiel 33:1-6
And the word of the Lord came to me, saying, 2"Son of man, speak to the sons of your people and say to them, 'If I bring a sword upon a land, and the people of the land take one man from among them and make him their watchman, 3and he sees the sword coming upon the land and blows on the trumpet and warns the people, 4then he who hears the sound of the trumpet and does not take warning, and a sword comes and takes him away, his blood will be on his own head. 5He heard the sound of the trumpet but did not take warning; his blood will be on himself. But had he taken warning, he would have delivered his life. 6But if the watchman sees the sword coming and does not blow the trumpet and the people are not warned, and a sword comes and takes a person from them, he is taken away in his iniquity; but his blood I will require from the watchman's hand.'"
![Page 4: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/4.jpg)
Digital Pipeline Africa - DPA
Incepted through partnership between CFSK & Digital Pipeline UK - a Microsoft sponsored program
Headquarters are in Nairobi, Kenya and is the implementing partner for the Microsoft program in African countries.
Partnered with WEEE Centre, Waste Electrical and Electronic Equipment Centre, to do E-waste management, http://weeecentre.com
Partnered with CFSK institute to offer ICT training offering number of courses to build ICT knowledge. We also offer an E-learning programme to individuals, corporate and institutions. http://cfskinstitute.ac.ke
Partnered with CFSK, Computers for Schools Kenya, to bridge the digital divide in Africa by equipping learning institutions, community centres and other institutions with ICT infrastructure. http://cfsk.org
![Page 5: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/5.jpg)
DPA - Vision and Mission
DPA's VisionOur Vision is to become the leader in ICT and e-waste Management in Africa.
MissionTo become the leading supporter of ICT and environment in Africa.
![Page 6: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/6.jpg)
DPA - organogram
Board of Directors
Digital Pipeline Africa
Computers for Schools Kenya
CFSK Institute of ICT WEEE Centre DPA in Africa
Namibia Uganda Botswana Tanzania Burundi South Sudan Zambia
![Page 7: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/7.jpg)
DPA presence in Africa
Uganda Tanzania Burundi Zambia Botswana Namibia South Sudan Kenya
![Page 8: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/8.jpg)
Services and products that we offer;
Supply of high quality refurbished and new computers
Refurbishment E - Waste Management E - Learning Training Management Information Systems
(MIS)
![Page 9: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/9.jpg)
Ewaste Processing Chain
![Page 10: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/10.jpg)
Capacity Building; training and benchmarking
Technical
Infrastructure
Building networks and collaborations
![Page 11: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/11.jpg)
Technical
Sensitization of the disposer of ewaste
Collection
Handling
Pre – processing locally
Storage
Export
First Aid
Firefighting
Work Safety
Personal protective gear
![Page 12: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/12.jpg)
Infrastructure
Necessary basic tools and equipment
Adequate operating space and storage
![Page 13: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/13.jpg)
Networks and Collaborations
Assist in getting local recyclers of some of the fractions that can be local recycled, eg metal.
Link local ewaste recyclers with European recyclers with capacity and capability to handle problematic fraction, eg CRT monitors, fractions containing lead and mercury.
Collaborate with the relevant Government agencies for trans boundary movement of ewaste
![Page 14: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/14.jpg)
Cable Stripper
![Page 15: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/15.jpg)
ABS plastic shredder
16
![Page 16: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/16.jpg)
CRT (Cathode Ray Tube) Cutter
![Page 17: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/17.jpg)
Our International Partners include:
![Page 18: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/18.jpg)
Conclusion
E-Waste represents the biggest and fastest growing industrial waste.
E-waste requires a special attention/policy
Formal and regulated management is the solution.
The WEEE Centre is a local initiative showing the opportunities
Awareness is a key factor by all stakeholders
Capacity building both human and infrastructure is key.
![Page 19: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/19.jpg)
Way Forward
Advocacy( DPA Regional Approach) First Lady's, Ministries of Health and Environment
EACOS Coordination Role/CA
Learning from each other( There is great hope listening to all of you for the last three days)
Human Resources/
Media Print/ Electronic/
Data management/Procurement rules/safety/ sensitivity/
Different Model( Safari Come and Rwanda case Study, DPA app)
Engaging stake holders( Government, Cooperates, Civil society, Academia,
![Page 20: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/20.jpg)
DPA – http://dpafrica.com
CFSK – http://cfsk.org
CFSKIICT - http://cfskinstitute.ac.ke
Contacts
![Page 21: Capacity building in e-waste management Presented By: Amb. Peter Gitau CEO, Digital Pipeline Africa](https://reader030.vdocuments.site/reader030/viewer/2022032707/56649e0f5503460f94af9bc2/html5/thumbnails/21.jpg)
Whose E-waste have we handled?