Session 2: Identification of Factors Affecting
How Much Back-up Power Is Required at a Remote Site
Session 2: Identification of Factors Affecting
How Much Back-up Power Is Required at a Remote Site
IEEECOMMUNICATIONS SOCIETY
Emergency Power Conference
Monday, November 22, 2004
Bell Labs Network Reliability & Security OfficeWashington, DC
Emergency Power Conference
Monday, November 22, 2004
Bell Labs Network Reliability & Security OfficeWashington, DC
![Page 2: C Q R](https://reader031.vdocuments.site/reader031/viewer/2022013004/56812fc2550346895d95434d/html5/thumbnails/2.jpg)
C Q R C Q R C Q R C Q R
Facilitator: John Stogoski, Sprint & NRIC
Scribe: Bill Hitchcock, Sprint & NRIC
IEEECOMMUNICATIONS SOCIETY
John Mardula, T-Mobile
Steven Dworkin, BatteryCorp
Dan McMenamin, VZW
Don Klinger, ATT
Rex Miller, Motorola
Darren Colvin, US Cellular
George Tong, Nextel
Rick Kemper, CTIA
Bob Saint, NRECA
Richard Kafka, PEPCO
Session 2: Identification of Factors Affecting
How Much Back-up Power Is Required at a Remote Site
![Page 3: C Q R](https://reader031.vdocuments.site/reader031/viewer/2022013004/56812fc2550346895d95434d/html5/thumbnails/3.jpg)
C Q R C Q R C Q R C Q R
• Critical Customers– Hospitals/Public Safety/Gov’t Facilities/Universities/Broadcast Media– Linkage between customers and associated network elements
• Grade of Service– Escalating Expectations of society
• Paradigm Shift (wireless/wireline)– What is an acceptable level of risk?
• Regulatory/Zoning/Property Mgt issues– Restrictions in code or lease regarding generators– Access (safety concern)– Floor loading– Requirements differ for tech types (Wireline, wireless, VoIP)– Tariffed vs. non-tariffed providers
• Budget $$$– Business Case (cost of equip vs. revenue loss)– Cost of technology
IEEECOMMUNICATIONS SOCIETY
Key Findings
Session 2: Identification of Factors Affecting
How Much Back-up Power Is Required at a Remote Site
![Page 4: C Q R](https://reader031.vdocuments.site/reader031/viewer/2022013004/56812fc2550346895d95434d/html5/thumbnails/4.jpg)
C Q R C Q R C Q R C Q R
• Design process for power plants– Role in telco network (Importance of site)
• Priority classes of sites (eg Hub Site vs. end cell)– Threat Assessment– Interdependencies (eg wireline backhaul)
• Robustness of network topology– Environmental factors
• Rural vs. urban location• Location within power grid (opportunity to work with pwr provider proactively)• Climate control• Proximity to disaster prone areas
• Coordination b/n Telco, Power Company, restoration coordinators– Proactive vs. reactive
• When/how do you build the relationships?– Mechanisms for coordination (elec co call center, acct rep, fire dept, State/Local EOC,
Federal agencies)– Escalation process to follow
• justification criteria– Ability of pwr company to map/DB critical sites
IEEECOMMUNICATIONS SOCIETY
Key Findings
Session 2: Identification of Factors Affecting
How Much Back-up Power Is Required at a Remote Site
![Page 5: C Q R](https://reader031.vdocuments.site/reader031/viewer/2022013004/56812fc2550346895d95434d/html5/thumbnails/5.jpg)
C Q R C Q R C Q R C Q R
• Obstacles to response efforts– Curfews / Roadblocks– Permits for transport (especially for interstate transport)– Confiscation of equipment
• Local police– Telco low on priority list for power restoration