Download - Building our future

Transcript
Page 1: Building our future

C O U N T RY M O N T E S S O R I 2 0 1 3

BUILDING OUR FUTURE

Page 2: Building our future

WE HAVE TARGETED THIS DATE TO UNVEIL OUR NEW BUILDING PLANS

• A tremendous amount of planning and work has been done since the fall• Formal process was run to select our building partner• Selected Dempsey Construction and LPA(Both in attendance

tonight)

• Worked with all key constituents to develop a fantastic design• You will see it in a few minutes

• Submitted to the City of Poway and have received tentative approval

• Secured swing space• Revamped our marketing, which has driven significant

growth in 2013 and 2014 commitments

Page 3: Building our future

LPA

classroom classroom classroom

reading

flex space

elec

girls

boys

girls

boys

staff

outdoor learning

rain gardenrain garden

Page 4: Building our future

LPA

Page 5: Building our future

LPA

view from north play area

Page 6: Building our future

LPA

view from south play area

Page 7: Building our future

THE BUILDING WILL HAVE SEVERAL IMPORTANT FEATURES

• LEED design• Elements include energy conservation, water

conservation, use of natural light as well as thermal indoor comfort

• Ability to turn it into one large space for events

• Art room and a reading room

• Two lower elementary classrooms

Page 8: Building our future

WE WILL LEVERAGE THREE SOURCES TO FUND THE BUILDING

$1.3 million total project

Loan from California Bank and Trust

Cash in our development

account

Donations from our parents, alumni

Final approval due on Monday. Appraisal showed a significant increase in property value.

Fiscal discipline over the past few years has allowed us to accumulate a significant amount of money

This is why we’re here today

Page 9: Building our future

WHY GIVE?

• We need it to secure our future

• The government will give you a lot of it back

• Chance to be part of the legacy of CMS


Top Related