Buford-Spring ConnectorCorridor Study
Stakeholder Meeting
June 6, 2018
9:30 – 11:30 AM
GDOT – Room 403
Daniel Dolder
GDOT PM
Garth Lynch, PE, AICP
HNTB PM
![Page 2: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/2.jpg)
Introductions
![Page 3: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/3.jpg)
STUDY PURPOSE & STAKEHOLDERS
• Purpose of Today’s Meeting– To review existing conditions and get feedback from
Stakeholders
• Roles & Responsibilities– Provide Insight on Related Study Efforts and Developments
– Identify Transportation / Land Use Opportunities
– Review Technical Findings and Recommendations
– Coordinate with Your Constituents
![Page 4: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/4.jpg)
AGENDA
• Study Overview– Study Area
– Study Process
– Schedule
• Needs Assessment– Previous Studies
– Data Collection / Existing Conditions
– ARC Model / Demographics
• Next Steps
• Breakout Discussion
![Page 5: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/5.jpg)
Study Overview
![Page 6: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/6.jpg)
STUDY AREA
Source: HNTB 2017
![Page 7: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/7.jpg)
STUDY OBJECTIVES
• Analyze Existing and Future Travel Conditions on Buford-Spring Connector
• Develop a Comprehensive Plan of the Buford-Spring Connector
– Set of Potential Strategies to Accommodate Future Travel Needs
![Page 8: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/8.jpg)
STUDY PROCESS
• Task 1 - Data Collection
• Task 2 - Existing & Future Condition Analysis and Needs Assessment
• Task 3 - Development of Improvement Options
• Task 4 - Evaluation of Potential Improvement Options
• Task 5 - Recommendations
• Task 6 - Coordination and Documentation
![Page 9: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/9.jpg)
AugJulJune
STUDY SCHEDULE
MayAprMarFebJanDecNovOctSeptAugJulJunMayAprMar
2018
Evaluation of Potential
Improvements Options
Data Collection
Existing & Future
Conditions & Needs
Assessment
2017
Development of
Improvement Options
Recommendations
Coordination &
Documentation
Sept Oct Nov Dec
- Stakeholder Meeting
![Page 10: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/10.jpg)
Previous Studies
![Page 11: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/11.jpg)
PREVIOUS STUDIES
• ARC Buford Hwy Study (2007)
– Intersection Improvements• Sidney Marcus Blvd
• Lenox Rd
• North Druid Hills Rd
![Page 12: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/12.jpg)
PREVIOUS STUDIES
• Buckhead CID Piedmont Area Transportation Study (2008)
![Page 13: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/13.jpg)
PREVIOUS STUDIES
• GDOT Radial Freeway Study (2010)
– Lane reconfiguration to I-85 and SR 400 SB merge
![Page 14: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/14.jpg)
• Connect Atlanta (2011)
– I-85 / SR 400 ramps
– Buford-Spring Connector @ Monroe Dr.
– Roadway realignments
PREVIOUS STUDIES
![Page 15: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/15.jpg)
• GDOT Metro OPS (2014)
– Buford-Spring Connector NB @ Monroe Dr
– I-85 SB from SR 400 Merge I-75• Active Traffic Management
– I-85 @ N Druid Hills Rd• Re-stripe SB approach to 2 exclusive Left Turn Lanes
and 1 exclusive Thru Lane
• Re-stripe Buford Hwy adding NB and SB Dual Left Turn Lanes
• Re-stripe On-Ramp to add NB Decision Lane
– Piedmont Rd @ Buford Connector SB• Add Ramp Meter to Armour Dr On-Ramp
PREVIOUS STUDIES
![Page 16: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/16.jpg)
• Midtown Transportation Plan (2018)
– Reconfigure Monroe and Piedmont Ramps
– North Midtown Multi-Use Path
– 17th Street Redesign
– North Midtown Street Grid
PREVIOUS STUDIES
![Page 17: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/17.jpg)
http://www.atlantastransportationplan.com/
EX-001Buford-Spring Connector @ Peachtree Reconfiguration
EX-010 Monroe Dr/I-85 Interchange
EX-012 I-85/Lindbergh Dr HOV ramps (south facing)
NS-028 Garson Dr Bridge / Extension
NS-030 Armour Place Dr Extension
OP-022Buford Hwy / Sidney Marcus Blvd Intersection Improvement
OP-079 Buford –Spring Interchange/Monroe Dr Extension
SA-024 Monroe Dr Improvements
SA-036 Piedmont Road Diet 2 (3SB / 2 NB w/ TWLTL)
BI-015 PATH 400
BI-021 Northeast BeltLine Trail
BI-026 Midtown - BeltLine Trail
BI-042 Lenox Rd Bike Lanes
BI-043 Cheshire Bridge Rd Bike Lanes
TR-003Northwest Regional Light Rail/High Capacity Transit Corridor
TR-004Peachtree Streetcar (Buckhead to Midtown segment)
TR-017 Clifton Corridor Transit Initiative
CURRENT STUDY
• Atlanta’s Transportation Plan (CTP Update)
![Page 18: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/18.jpg)
Any other studies?
![Page 19: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/19.jpg)
Data Collection / Existing Conditions
![Page 20: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/20.jpg)
TRAFFIC COUNTS
Source: Reliable Traffic Data Services, 2017
![Page 21: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/21.jpg)
TRAVEL SPEEDS
Source: RITIS, NPMRDS, 2015
AM Peak PM Peak AM Peak PM Peak
Southbound Northbound
LENOX RD
SIDNEY
MARCUS BLVD
I-85
SR 237/
PIEDMONT RD
I-85
US 19/SR 9/ W
PEACHTREE ST
![Page 22: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/22.jpg)
FIELD OBSERVATIONS
• Worn Pavement Markings
• Worn / Misplaced Signs
• Potential for Left Turn Signal Phases
• Maintenance for Street Lights under Bridges
• Missing Guard Rails at Bridges and Ditches
• Substandard Shoulder Width
• Existing Bridge Columns are at Median Barrier
![Page 23: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/23.jpg)
BRIDGE INVENTORY36 Bridges
• 16 on I-85
• 10 on SR 13
• 3 on SR 400
• 2 on SR 237 / Piedmont Rd
• 2 on SR 42 / N Druid Hills Rd
• 1 on SR 19 / Peachtree St
• 1 on SR 236 / Lindberg Dr
• 1 on Lenox Rd
Source: National Bridge Inventory System, 2017
![Page 24: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/24.jpg)
CRASH SUMMARY
Source: GEARS 2014-2016
- Buford-Spring Segments higher than SW Average
- I-85 Segments higher than SW Average
- N. Druid Hills
- Lenox
- Lindbergh
- Piedmont
- Midtown
![Page 25: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/25.jpg)
TRANSIT ROUTES (BUFORD-SPRING, BUFORD HWY)
Transit Route Inbound Outbound
GCT 103ABuford-Spring Connector
Buford-Spring Connector
GRTA 411 I-85Buford-Spring Connector
GRTA 412 I-85Buford-Spring Connector
MARTA 39Local roads, Buford Hwy NE
Local roads, Buford Hwy NE
Source: Transit Routes, ARC, GTFS
![Page 26: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/26.jpg)
TRANSIT ROUTES (I-85)
Source: ARC 2015 Travel Demand Model
Transit Route Inbound Outbound
GCT 101 I-85 I-85
GCT 102 I-85 I-85
GCT 103 I-85 I-85
GRTA 400 I-85 I-85
GRTA 410 I-85 I-85
GRTA 411 I-85Buford-Spring Connector
GRTA 412 I-85Buford-Spring Connector
GRTA 413 I-85 I-85
GRTA 416 I-85 I-85
Source: Transit Routes, ARC, GTFS
![Page 27: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/27.jpg)
Bicycle / Pedestrian Trails
Source: Atlanta BeltLine
![Page 28: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/28.jpg)
ARC Model /Demographics
![Page 29: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/29.jpg)
2015 AM LEVEL OF SERVICE
Source: ARC 2015 Travel Demand Model
61%14%
14%
11%
Level of Service
C or Better
D
E
F
![Page 30: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/30.jpg)
2015 PM LEVEL OF SERVICE
Source: ARC 2015 Travel Demand Model
52%
18%
13%
17%
Level of Service
C or Better
D
E
F
![Page 31: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/31.jpg)
LAND USE
Source: LandPro 2012, ARC
50%
12%
11%
9%
5%
6%6%
1% Land UseResidential
Commercial
Institution
Industrial
TCU
Agriculture
Open Space/Leisure
Water
![Page 32: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/32.jpg)
2015 2040
POPULATION DENSITY
Source: ARCSource: ARC
![Page 33: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/33.jpg)
EMPLOYMENT DENSITY
Source: ARC
2015 2040
![Page 34: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/34.jpg)
ARC RTP PROJECTS
Source: ARC
![Page 35: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/35.jpg)
2024 PM LEVEL OF SERVICE
RoadwaysAnnual Growth Rate
(2015 – 2024)Study Corridor, Interstate, Ramps 1.00%
Side Roads 1.40%
Source: ARC 2024 Travel Demand Model
43%
17%
16%
24%
Level of Service
C or Better
D
E
F
![Page 36: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/36.jpg)
2040 PM LEVEL OF SERVICE
RoadwaysAnnual Growth Rate
(2015 – 2040)Study Corridor, Interstate, Ramps 0.70%
Side Roads 1.10%
Source: ARC 2040 Travel Demand Model
32%
18%17%
33%
Level of Service
C or Better
D
E
F
![Page 37: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/37.jpg)
BUFORD HWY @ N. DRUID HILLS RD
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 273
LOS AM PM
Existing D D
2024 D D
2044 F F
![Page 38: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/38.jpg)
N. DRUID HILLS RD @ I-85 FRONTAGE RD
Manner of Collision (NB Ramps):Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 231
Manner of Collision (SB Ramps):
Total Crashes: 254
LOS AM PM
Existing C C
2024 D D
2044 D E
LOS AM PM
Existing E D
2024 F E
2044 F F
![Page 39: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/39.jpg)
BUFORD HWY @ LENOX RD
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 247
LOS AM PM
Existing E F
2024 F F
2044 F F
![Page 40: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/40.jpg)
BUFORD HWY @ SIDNEY MARCUS BLVD
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 171
LOS AM PM
Existing D E
2024 F F
2044 F F
![Page 41: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/41.jpg)
PIEDMONT RD @ LAMBERT DR / PIEDMONT CIR
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 97
LOS AM PM
Existing C B
2024 C B
2044 D C
![Page 42: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/42.jpg)
PIEDMONT RD @ CHESHIRE BRIDGE RD
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 157
LOS AM PM
Existing D E
2024 E E
2044 F F
![Page 43: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/43.jpg)
PEACHTREE ST @ SPRING ST
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 96
LOS AM PM
Existing A A
2024 A B
2044 C C
![Page 44: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/44.jpg)
W. PEACHTREE ST @ 17TH ST
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 113
LOS AM PM
Existing C D
2024 C E
2044 D F
![Page 45: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/45.jpg)
PEACHTREE ST @ 17TH ST
Manner of Collision:Angle
Head OnNot A Collision with Motor Vehicle
Rear EndSideswipe – Opposite Direction
Sideswipe – Same Direction
Total Crashes: 70
LOS AM PM
Existing C B
2024 C B
2044 D F
![Page 46: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/46.jpg)
What issues are you aware of?
![Page 47: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/47.jpg)
NEXT STEPS
• Develop Improvement Options
• Evaluate Potential Improvements
• Future Meetings• #2 Development of Improvements and Preliminary Results
and Recommendations
Preliminary Results and Recommendations
![Page 48: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/48.jpg)
Breakout Discussion
![Page 49: Buford-Spring Connector Corridor Study Stakeholder Meeting€¦ · Corridor Study Stakeholder Meeting June 6, 2018 ... •1 on SR 236 / Lindberg Dr ... Transit Route Inbound Outbound](https://reader033.vdocuments.site/reader033/viewer/2022042811/5fa36633f4f2be2fc374bdbd/html5/thumbnails/49.jpg)
CONTACT INFORMATION
Georgia Department of Transportation
Daniel Dolder, Project Manager
Phone: (404) 631-1798
Email: [email protected]
Study Website: www.dot.ga.gov/BufordSpringConnector