BASSICK HIGH SCHOOLBRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATEOctober 11, 2018
![Page 2: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/2.jpg)
Project Schedule:
• Programming/Feasibility Studies
• Design
• Construction
• Occupation
BASSICK HIGH SCHOOL
![Page 3: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/3.jpg)
Programming/Feasibility study will investigate
three options for Bassick:
• Renovate existing building as-new
• Demolish old buildings, build new high
school
• Hybrid option
BASSICK HIGH SCHOOL
![Page 4: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/4.jpg)
BUILDING PLANS – EXISTING SCHOOL
1st floor Plan
![Page 5: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/5.jpg)
EXISTING SF• 1,050 Students—Grades 9-12
• 250,456 SF Existing
1st floor Plan
![Page 6: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/6.jpg)
EXISTING SF
1st floor Plan
• 1,050 Students—Grades 9-12
• 250,456 SF Existing
- 220,959 SF*= 29,497 SF Over State
maximum square footage
* Office of School Construction Grants sets maximum eligible square footage based on enrollment
![Page 7: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/7.jpg)
PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community
• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program
A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.
![Page 8: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/8.jpg)
PROGRAMMINGGoal: To develop a comprehensive Bassick High School Program serving future generations of students and faculty, and community
• 6 programming meetings/presentations• 3 days of Departmental interviews• Existing Building investigations and 3D modelling• Development of comprehensive space program
A Space Program captures the space requirements for all areas in the school, and addresses their organization and relationships.
![Page 9: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/9.jpg)
PROGAM ORGANIZATIONBassick program organization• Houses
• Freshman Academy• Advanced Manufacturing,
Automotive, Building technologies• Liberal Art/Humanities
• Distributed Administration• 3 Assistant Principal’s offices• Guidance, Student Support and
other administrative areas bundled with AP offices
![Page 10: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/10.jpg)
SELECTED PROGRAM AREAS
Program Areas• Core Academic Spaces• Administration• Freshman Academy• Advanced Manufacturing and
Automotive• Construction Technology• Culinary• Medical Health Careers• Art/Graphics• Performing Arts
• Observatory/Planetarium• Special Education• Health/Physical Education• Media Center• Food Service• Nursing• Community Health Clinic• Custodial/Maintenance and
Infrastructure
![Page 11: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/11.jpg)
Core Academic
![Page 12: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/12.jpg)
CORE ACADEMIC
![Page 13: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/13.jpg)
Advanced Manufacturing and Automotive
![Page 14: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/14.jpg)
ADVANCED MANUFACTURING AND AUTOMOTIVE
![Page 15: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/15.jpg)
Culinary and Medical HealthAcademy
![Page 16: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/16.jpg)
CULINARY AND MEDICAL HEALTH
![Page 17: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/17.jpg)
Performing Arts and Vocations and Technology
![Page 18: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/18.jpg)
PERFORMING ARTS AND VOCATIONS AND TECHNOLOGY
![Page 19: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/19.jpg)
Observatory/Planetarium
![Page 20: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/20.jpg)
OBSERVATORY/PLANETARIUM
![Page 21: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/21.jpg)
Health and Physical Education
![Page 22: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/22.jpg)
HEALTH AND PHYSICAL EDUCATION
![Page 23: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/23.jpg)
Dining and Food
![Page 24: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/24.jpg)
DINING AND FOOD
![Page 25: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/25.jpg)
Administration
![Page 26: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/26.jpg)
ADMINISTRATION
![Page 27: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/27.jpg)
Custodial and Maintenance
![Page 28: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/28.jpg)
CUSTODIAL AND MAINTENANCE
![Page 29: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/29.jpg)
SPACE PROGRAM TOTALS• 1,050 Students—Grades 9-12
• 220,489 SF Existing
- 220,959 SF*= 470 SF Under State
Maximum square footage
* Office of School Construction Grants sets maximum eligible square footage based on enrollment
![Page 30: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/30.jpg)
NEXT STEPS
• Develop three conceptual options
• Prepare schedules for each
• Develop project budgets
• Estimate state grant funding
• Select preferred option
• Submit updated SCG-049 to SCG&R by November 15, 2018
![Page 31: BRIDGEPORT PUBLIC SCHOOLS-PROGRAMMING UPDATE](https://reader033.vdocuments.site/reader033/viewer/2022042101/6256044478d68d7a6901c81a/html5/thumbnails/31.jpg)
Questions and Answers
BASSICK HIGH SCHOOLOctober 11, 2018