Download - BPP_Boiler Tube Leakage Analysis
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
1/30
Business Process Procedure
1
Boiler Tube Leakage Analysis
Prepared by:ERP – PM Team
R&D Building, NTPC-EOC ComplexSector-24, NOIDA
(For Internal Circulation Only)
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
2/30
Business Process Procedure
2
Contents
1. Process Overview: Boiler Tube Leakage Analysis……………………………3
2. Business Process Procedure: Boiler Tube Leakage Analysis
2.1 Creation of document by site BMD in DMS………………………………3
2.2 Creation of Notification by site BMD and attachment of document innotification…………………………………………………………………..12
2.3 Release of notification by Corporate OS………………………………….21
2.4 Creation of analysis report by NETRA in DMS and attachment tonotification…………………………………………………………………..22
2.5 Closure of notification by Corporate OS………………………………….26
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
3/30
Business Process Procedure
3
1. Process Overview: Boiler Tube Leakage Analysis
The process of Boiler Tube Leakage Analysis consists of the following steps:
a) Notification will be created in the system by authorized person of site BoilerMaint. Dept. (BMD). Supporting documents i.e. Form C1, Form C2 etc. will becreated in Document Management System (DMS) and attached to the notification.
b) After creation of the notification, it will be sent to Corporate OS through SAPmail. Print out of the notification along with the physical sample of the boiler tubewill be sent to Corporate OS.
c) Corporate OS will decide whether further analysis is required to be done by NETRA. If further analysis is not required to be done by NETRA, Corporate OSwill record its observations and recommendations in the notification. After that,notification will be closed and sent to site through SAP mail.If further analysis is required to be done by NETRA, Corporate OS will release
the notification and forward the same to NETRA through SAP mail. Boiler tubesample will also be sent to NETRA along with the print out of notification.
d) After analysis of failed boiler tube sample, NETRA will prepare theFailure/Condition Assessment Report and link the same to the notificationthrough Document Management System (DMS). NETRA will also record itsobservations and recommendations in the notification. After that, notification will
be sent to Corporate OS through SAP mail.e) Corporate OS will further record the final observations and
recommendations/action plan in the notification and close the same. After that,notification will be sent to site through SAP mail.
2. Business Process Overview: Boiler Tube Leakage Analysis
2.1 Creation of document by site BMD in DMS
SAP Menu Path:Logistics—Central Functions—Document Management System—Document—Create
Tcode: CV01N
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
4/30
Business Process Procedure
4
Press ENTER.
Put Description ofDIR.
Take ZDO fromdropdown againstDocument Type
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
5/30
Business Process Procedure
5
Attachment of original is shown in screen shot given below:
Take Lab/Officecorresponding to plantname and press ENTER.
Press "CreateOriginal" icon.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
6/30
Business Process Procedure
6
Select from dropdown, Application ofthe Original to beattached.
Enter descriptionof Original to be
attached.
Attach theoriginal.
Press Continue(Enter).
Original is attached to DIR.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
7/30
Business Process Procedure
7
Press SAVE button.
Go to Addnl.Data Tab.
Select from dropdownregarding Plant, Stage, Unitetc.
Message: Document has been created will bedisplayed.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
8/30
Business Process Procedure
8
Tcode: CV02N
Press ENTER.
Give Document No byselecting fromdropdown.
Give DocumentType.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
9/30
Business Process Procedure
9
Press SAVE.
Message as shown in screen shot given below will be displayed.
Select fromdropdownDocument Statusas “Reviewed”.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
10/30
Business Process Procedure
10
Tcode: CV02N
Press ENTER.
Give Document No byselecting fromdropdown.
Give Document
Type.
Message isdisplayed.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
11/30
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
12/30
Business Process Procedure
12
2.2 Creation of Notification by site BMD and attachment of documentin notification
SAP Menu Path:Logistics—Plant Maintenance—Maintenance Processing—Notification—Create(General)
Tcode: IW21
Message isdisplayed.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
13/30
Business Process Procedure
13
Press ENTER.
Fill in Functional location byselecting from dropdown.
Write detailed description inlong text.
Select Notificationtype “BT” fromdropdown.
Fill in Notificationshort text.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
14/30
Business Process Procedure
14
Defect Location and Defect can be selected from relevant dropdown by clicking on“Defect Location” Tab under the “Items” Tab of the notification as shown in screen shotgiven below:
Fill in unit S/D date &time.
Fill in unitsynchronizationdate & time.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
15/30
Business Process Procedure
15
Created document (as explained in section 2.1) is to be linked to the notification as shownin screen shot given below:
Defect location to beselected from dropdown.
Defect to beselected fromdrop down.
Defect Locationcan be describedin detail in shorttext.
After short text, DefectLocation can be further
described in Long Text.
Click onDefect
location Tab.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
16/30
Business Process Procedure
16
After linking the document to the notification, press SAVE button as shown in screenshot given below:
Link the created documentto notification. More than 1document can be linked.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
17/30
Business Process Procedure
17
Message as shown in screen shot given below will be displayed.
SAVE thenotification.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
18/30
Business Process Procedure
18
Print out of the notification:
Print out of notification can be taken by opening notification through Tcode IW23 or
IW29. The print out of notification is to be sent along with physical sample of the boilertube to Corporate OS.
After opening notification in display mode, print out can be taken as shown in screen shotgiven below:
Message isdisplayed.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
19/30
Business Process Procedure
19
Notification is to be sent through SAP mail to representative of Corporate OS as shownin screen shot given below:
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
20/30
Business Process Procedure
20
GiveRecipientname.
PressSEND.
Click onthis icon.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
21/30
Business Process Procedure
21
SAP mail will be sent by site BMD representative and received by Corporate OSrepresentative.
2.3 Release of notification by Corporate OS Notification will be opened in change mode through Tcode IW22 or IW28. SAP menu path is given below:
SAP Menu Path:
Logistics—Plant Maintenance—Maintenance Processing—Notification—Change (IW22)
Logistics—Plant Maintenance—Maintenance Processing—Notification—List Editing(IW28)
If further analysis is required to be done by NETRA, notification will be released byCorporate OS as shown in screen shot given below:
Notification is to be also sent to representative of NETRA through SAP mail. Screen shotexplaining the same is given below:
Press this icon torelease thenotification.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
22/30
Business Process Procedure
22
Print out of notification along with physical sample of boiler tube will also be sent to NETRA for analysis.
2.4 Creation of analysis report by NETRA in DMS and attachment tonotification
After receiving physical sample of boiler tube, analysis will be done by NETRA andanalysis report will be uploaded in Document Management System (DMS) as explainedin section 2.1. In this case, document type will be ZRD.
Document created as explained above will be linked to the notification in change modethrough Tcode IW22 or IW28. Screen shot showing linking of document to notification isshown below:
Click on thisicon.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
23/30
Business Process Procedure
23
Mechanism and Root Cause of boiler tube failure can be specified by clicking on“Mechanism/Root Cause” Tab under “Items” Tab. For Mechanism , relevant Tcode can
be selected from the dropdown. Root Cause can be mentioned in short text as well aslong text.
Action Plan can be mentioned by clicking on “Action Plan” Tab under “Items” Tab.Short text as well as long text has been provided for this purpose.More than 1 item under above mentioned heads can be entered.
Screen shot showing the procedure to enter Mechanism and Root Cause is given below:
Linking of “Boiler TubeAnalysis Report” tonotification in DMS
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
24/30
Business Process Procedure
24
Screen shot showing the procedure to enter Action plan is given below:
Relevant Mechanismcode can be selectedfrom drop down.
Click onMechanism/RootCause Tab.
Root Cause can be described indetail in shorttext.
After short text, Root Causecan be further described inLong Text.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
25/30
Business Process Procedure
25
SAVE the notification.
Notification is to be also sent to representative of Corporate OS through SAP mail.Screen shot explaining the same is given below:
Action Plan can be described indetail in shorttext.
After short text, ActionPlan can be furtherdescribed in Long Text.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
26/30
Business Process Procedure
26
2.5 Closure of notification by Corporate OS
After receiving the notification through SAP mail, Corporate OS will open thenotification in change mode through Tcode IW22 or IW28. Documents attached by
site/NETRA and other details e.g. mechanism, root cause, action plan entered by NETRAin the notification can be viewed by Corporate OS.
Screen shot showing the same is given below:
Click onthis icon.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
27/30
Business Process Procedure
27
Mechanism of failure, Root Cause of failure and Action Plan can be specified byCorporate OS under “Items” Tab. Procedure to enter above is same as given in section2.4 (Page nos. 23, 24 & 25). More than 1 item under above mentioned heads can beentered.
After mentioning all the details, notification is to be COMPLETED by Corporate OS.Screen shot showing the completion of notification is given below:
Select the row containingthe document to be viewed.
After selecting the documentas explained above, click on
this icon to view thedocument.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
28/30
Business Process Procedure
28
If analysis of boiler tube sample is not required to be done by NETRA, Corporate OS canCOMPLETE the notification without RELEASE to NETRA. Before completing thenotification, Corporate OS can enter their observations in the form of Mechanism of
failure , Root Cause of failure and Action Plan .
After completion of notification, notification can be viewed only in Display mode asshown in screen shot below:
Click on this icon tocomplete thenotification.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
29/30
Business Process Procedure
29
The notification can be sent to site BMD representative through SAP mail as shown inscreen shot below:
Message isdisplayed.
-
8/18/2019 BPP_Boiler Tube Leakage Analysis
30/30
Business Process Procedure
Click on thisicon.