BIM in Project Management: Keynote Speech
Mr. Kevin POOLEChairman
Committee on Environment, Innovation and TechnologyConstruction Industry Council
2
a. The global construction industry is undergoing a paradigm shift
b. Adoption of BIM is a national strategy in many countries/ economies
c. Long term commitment and investment on BIM by some governments and regional agencies
d. Hong Kong possible loss of competitiveness in Asia Pacific Region in long run if we do not catch up now
Global Perspective on BIM
U.S. GSAU.S. Army Corp of Engineers2008 : Mandatory BIM for government projects
SingaporeSingapore2013: BIM Submission for Regulatory Approval
2012: BIM as part of public sector building project procurement
Statsbygg, Norway2010: Requires IFC/BIM for new buildingsNorwegian Defence Estates Agency Is running 3 BIM pilots
Senate Properties (property services agency), Finland 2007: Requires IFC/BIM in its projects and intends to have integrated model-based operation in future
UK2016: Mandatory BIM for government projects > £5 million
Korea 2012: Public Procurement Service will fully adopt IFC-based open BIM
Hong Kong
Mainland ChinaMandatoryBIM has been included as part of the National 12th Five Year Plan (2011 – 2015) and is formulating a BIM framework.
Source: BCA
4
What BIM can do?
Source:
Housing Authority
BIM TODAY
BIM - Design Analysis
BIM - Design Visualisation
BIM – Clash Detection
BIM – Schedules and Quantities
BIM – Project Co-ordination
BIM – Project Collaboration
Source: CSI Global
BIM > Science > Management Science
http://radialinfo.com
6
Source: BIMSCORE
Source: BCA
Source: ENR 8
9
Source:
Source: DPR Construction Inc.
BIM & Integrated Practice in the United StatesDr. Calvin Kam30 July 2013
conventionaldesign method
FCD (128 cpu)
design method
PROCESS Design cycle time 4 hrs 3 sec Alternatives
evaluated 39 12,800
Total design time 216 hrs 151 hrs PRODUCT Total steel
weight2,728 met t 2,292 met t
Est. cost saving (USD)
- $4 M (-19%)
• Orders of magnitude reduction in design cycle time
• Evaluation of a greater number of design alternatives
• Improved product quality
Objective: Minimize steel weight
Constraints: Safety and serviceability
Possible design alternatives: ~ 102435
Variables: 1955 size and shape variables
Source: Stanford CIFE
Source: Stanford-CIFE
Lifecycle Management by BIMSource: veooz.com
Source: brownengineers.net
BIM + ERP
BIM + ERP
BIM from Asset Creation to Asset Management
Source: CSI Global
Sustainability Management - Safety:BIM-based Safety Management Plan
14
Safety management could form a part of BIM-based construction procedures.
BIM solutions can include construction process data such as activities and their logic – also widely called 4D models – additional dimension: time.
Source: BIM-based Safety Management and Communication for Building Construction (VTT Research Notes 2597)
15
Sustainability Management - Safety: BIM-based Safety Planning - Site Layout Planning
Optimise site layout plan by examination of the location of material storage area, machinery location, movement of machinery, access way, impact to site surroundings, etc.
Source: VTT Research Notes 2597
Sustainability Management - Safety: BIM-based Safety Planning - Crane Reach and Risk Zone
16
(i) BIM-based site planning to check crane reach and capability in construction works.
(ii) Examine risks in case of load fall.
(iii) Evaluate what the crane jib could hit.
(iv) The significant of this kind of examination increase if there is limited space around the construction site and clashes become possible.
Source: VTT Research Notes 2597
17
Sustainability Management - Safety: BIM-based Safety Planning - Verification of Method Statement
Source: VTT Research Notes 2597
18
In the virtual CAVE environment the movement in 3D scene was controlled with multi touch table.
Sustainability Management - Safety: BIM-based Risk Management – Locating Potential Safety Problem
Identify and locate potential safety problems by virtual site walk well before actual site work started.
Source: VTT Research Notes 2597
19
Sustainability Management - Safety: BIM-based Risk Management – Automatic Safety Analysis
Researchers are testing to use and integrate both BIM and Solibri Model Checker software (SMC) to automate or semi-automate safety analysis. The testing scope includes:
1. Detect different types of openings that could be potential fall hazard so as to automate to develop BIM-based falling prevention planning.
2. Examine existence and properties of site objects or safety required objects.
3. Check free space around site and within site.
4. Check required minimum distance between objects.
5. Detect collision of objects.
20
Examples of BIM-based material to be used in site communication sessions
Sustainability Management - Safety: BIM-based Safety Communication – Site Communication
Carefully prepared site communication sessions can provide valuable information to all site personnel. The BIM-based communication has promising opportunities to influence site personnel.
The use of visualisations in communication can reinforce safety messages. It helps to understand safety rules and practices esp language barriers (e.g. foreign workers and junior workers).
Source: VTT Research Notes 2597
21
How to leverage power of BIM?
22Source: NASA Presentation Idea: Dr. Calvin Kam
23
ChairpersonMs. Ada FUNG Hong Kong Housing Authority
Professionals / SpecialistsHong Kong Institute of Surveyors Hong Kong Institution of EngineersHong Kong Institute of ArchitectsHong Kong Institute of Building Information ModellingThe Association of Consulting Engineers of Hong KongThe Association of Architectural PracticesBritish Chamber of CommerceHong Kong Institute of Utility SpecialistbuildingSMART Hong Kong
ContractorsHong Kong Construction AssociationHong Kong General Building Contractors
AssociationThe Hong Kong Federation of Electrical and
Mechanical Contractors
ClientsThe Real Estate Developers
Association of Hong KongHousing AuthorityMTR CorporationDevelopment BureauArchitectural Services DepartmentBuildings DepartmentHighways Department
AcademicsUniversity of Hong KongThe Chinese University of Hong KongThe Hong Kong Polytechnic UniversityInstitute of Vocational Education
What CIC is Doing on BIM?Membership of the Working Group on Roadmap for BIM Implementation
24
Pursuing Industry-wide Implementation of BIM:The Initiatives
• The Working Group on BIM Implementation of the CIC, has come up with the Final Draft Report on the Roadmap for BIM Strategic Implementation in Hong Kong’s Construction Industry
• The 16 recommended initiatives in 9 areas:
1. Collaboration
2. Incentive and Proven Benefit
3. Standard and Common Practice
4. Legal and Insurance
5. Information Sharing and Handover
6. Promotion and Education
7. Compliant BIM Tool
8. Audit and Risk Management
9. Global Competitiveness
25
• Three Imminent Actions:
1. Local Standards
2. Promotion and Awareness Programme
3. BIM Training
Pursuing Industry-wide Implementation of BIM:Imminent Actions
26
The year for all BIM stakeholders to join hands to drive the BIM movement in Hong Kong
Pursuing Industry-wide Implementation of BIM:Imminent Actions - Promotion
27
CIC is collaborating and co-ordinating with stakeholders a series of promotional activities through out the whole year of 2014.
Activities include:
• Conference, Seminar, Exhibition, Regional Official Meetings
• Client Summit on BIM
• Stakeholders’ BIM Implementation Update and Knowledge Sharing
• Trainings for Professionals
• Demonstration and Fast Track Training on BIM for Novice
• BIM Show Cases for Tertiary Students
• Publications and Media Exposure
• Introduction of Draft Hong Kong’s BIM Standards
• Award for BIM Excellence
Pursuing Industry-wide Implementation of BIM:Imminent Actions - Promotion through BIM Year 2014
28
Date: 16 April, 2014 (Wednesday)
Venue: W Hong Kong
Target Group: Senior Government Officials and Decision Makers among the Construction Industry
Event Highlights: 1. Introduce:• BIM Year Plan• Client Summit – BIM Implementation Strategy Workshop• Hong Kong BIM Standards• CIC’s BIM Training Centre and Laboratory• Registration System for BIM professional• Accreditation to BIM Training Programmes
2. BIM ShowcaseBIM software vendors and solution providers showcase their state-of-the-art technology
BIM Year Event Highlight:Grand Launch Ceremony (16 April 2014)
29
30
BIM Year Event Highlight:Grand Launch Ceremony (16 April 2014)
All of you here are invitedplease contact:
Construction Industry Council
Mr. Ivan KO
T: 2100-9034 E: [email protected]
Ms. Stella LEUNG
T: 2100-9429 E: [email protected]
BIM Year Event Highlight:Client Summit – BIM Implementation Strategy (September 2014)
31
Aims: • Introduce Implementation strategy of the BIM • Bring international insight and expertise• Determine and customise BIM implementation
strategies for individual sectors
Target Group: Decision makers of Government, Employers from Public Sector, Employers from Public Sector
Event Highlights: Day 1 Workshop – overseas project clients’ implementation strategies, value proposition and sharing of current and future global practices.Day 2 / 3 Workshop – Separate workshops for project clients from public organisation sector, private sector and government to customise and tailor made their own BIM implementation strategy.
BIM Year 2014
32
33
BIM Year 2014
34
BIM Year 2014
35
Thank YouThank You
BIM Model of CIC’s ZCBSource: Ronald Lu & Partners