Download - Battery Watering Technologies
![Page 1: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/1.jpg)
Battery Watering Technologies
![Page 2: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/2.jpg)
• And now introducing…
The Centurion Valves!
![Page 3: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/3.jpg)
•Low profile design.
•Reinforced barbs eliminate the need for clamps.
•Push in style valve for easy installation and removal.
•All working parts are above the cell.
Centurion Valve
![Page 4: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/4.jpg)
•Indicator eye visible from top and side.
•Angled barbs to help navigate around connectors.
•Solid polypropylene float.
•No more flip top lid.
•Ample spacing between the float and encapsulation.
Centurion Valve
![Page 5: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/5.jpg)
Widest Pressure Range in the
Business.
Centurion Valve
![Page 6: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/6.jpg)
Solid Polypropylene float
Won’t allow Electrolyte to leach Into the float
Technology
![Page 7: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/7.jpg)
Part #: DF72G (Direct Fill Gun)
![Page 8: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/8.jpg)
Part # NT2000G (5 gallon gravity tank) Part #: NT2212GF (2.5 gallon gravity tank)
![Page 9: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/9.jpg)
Part #: NC5080P (8 gallon aqua sub) Part #: NC5250P (25 gallon push cart)
![Page 10: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/10.jpg)
Part #: PW-1800 Deionizer
![Page 11: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/11.jpg)
Superior Warranty
We offer a full five year warranty that covers all aspects of a failure.
If the cell fails due to a defect in our product, we pay for the repair!
![Page 12: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/12.jpg)
MADE IN THE USA!
Manufactured in the USA
Manufacturing
![Page 13: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/13.jpg)
• We Control the Process.
• Better Products.
• Superior Manufacturing.
• Highest Quality Standards.
![Page 14: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/14.jpg)
State of the art ISO 9000 certified Manufacturing Facility
ISO/TS 16949 Approved 2010 ISO14001 Approved 2010
![Page 15: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/15.jpg)
•170 Employees• 24 Hour Operation• 85 To 1000 Ton Injection Molding Machines• Ford Tier 1 Supplier• Chrysler Tier 1 Supplier• GM Tier 1 Supplier• Mercedes Approved Source
Diversified
![Page 16: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/16.jpg)
Filling pressure:
•When using a BWT Direct Fill Gun/Link: 20-100 PSI
•Recommended fill pressures (into quick connect) 2-25 PSI. Up to 35 PSI can be used if recommendations below are followed. Recommendations:
•Avoid pulsating water supply (pump rapidly cycling on and off)•Always remove air from the line before filling
Product Update
![Page 17: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/17.jpg)
Filling outside of recommended pressure:
•If below 2 PSI: Valves will continue to perform but filling time increases.
•If above 25 PSI: Filling time will be reduced. It is possible that the final valve/cell to complete filling may close prematurely.
Product Update
![Page 18: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/18.jpg)
Filling Flow Rate Chart:
Filling Flow Rate
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 2 4 6 8 10 12 14 16 18 20
PSI
BWT Valve flowl/min
Single valve filling flow rate vs. fill pressure
![Page 19: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/19.jpg)
• Valve String flow rate:
Total flow rate depends on number of valves in string, Filling pressure and connection method.
Typically 2-3 gallons/Minute at 20 PSI.
Many different delivery options can be utilized.
Filling Flow Rate
![Page 20: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/20.jpg)
Manufacturing is ISO-9001, ISO/TS-16949 certified.
• Each component part has a specific molding specification and testing procedure used during manufacture.
• Each valve tested for shutoff, flow and mechanical freedom during the assembly process.
•Sampling and water testing performed on each box of valves at manufacturing. • Incoming sampling and testing done on each box at BWT. Inventory is in quarantine until released by QC. • Valves visually inspected during kit assembly.
Quality Control
![Page 21: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/21.jpg)
Spark Propagation/Spark Arresting
All valves have built in water trap (P Trap) to avoid cell-to-cell vapor transfer/Spark propagation.
Valves for electric vehicles have spark arrestor to avoid external spark from involving cell.
![Page 22: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/22.jpg)
Technology
![Page 23: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/23.jpg)
Technology
![Page 24: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/24.jpg)
Technology
![Page 25: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/25.jpg)
Technology
![Page 26: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/26.jpg)
Technology
![Page 27: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/27.jpg)
BWT carries a five million dollar product liability policy.
Other Required Documents?
Indemnification
![Page 28: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/28.jpg)
• The Highest Quality Products
• Exceptional, personal customer service
• Unmatched Support
• Five Year Cell Replacement Warranty
• Private Label Options
Thank You
Great Customers, Great Partners
![Page 29: Battery Watering Technologies](https://reader036.vdocuments.site/reader036/viewer/2022081511/568151a3550346895dbfd32f/html5/thumbnails/29.jpg)