Blueprint Lessons Learned 5 Cities Plus Conference August 16, 2017 Jason Sanson and Kathleen Smith
Agenda
• Blueprint Columbus
• Lessons Learned – Planning and Design
– Communication
– Costs
• Steps Forward
Blueprint Columbus
• Integrated Plan approved by Ohio EPA December 2015
• Addresses the source of the overflows and basement backups: I/I
• Over 18,000 acres planned
• 2 projects have been designed and are constructed/under construction
• 4 subsequent rounds of design are underway
• GI implementation first
Gree
n In
fras
truc
ture
Late
ral L
inin
g
Volu
ntar
y Su
mp
Pum
p
Roof
Red
irect
ion
Blueprint Program
18,404 acres total
6,514 acres in progress
11,890 more to go!
Clintonville
Hilltop James Livingston
Near South
Miller Kelton
5th by Northwest
North Linden
West Franklinton
South Linden
Near East
Plum Ridge
Blueprint Planning
• Neighborhood Variability – Housing Density
– Occupancy Rates
– Neighborhood Involvement
– Topography
– Existing infrastructure
• No two neighborhoods are the same
Blueprint Planning
• Project sequencing for minimum customer disruptions – Construction of GI prior to redirection efforts
– Combining lateral lining and roof redirection
– Voluntary sump pump installations
• Pilot area testing for roof redirection and lateral lining
• Pilot area for sump pump installations
• Carefully consider construction sequencing, pilots can help gain insight to performance and construction
Blueprint Planning
• Area Information – Parking
– Trees
– Fences
– Driveways
– Intersections
– Utilities
• All of these (and more) impact location of GI
Blueprint Planning
• Maximize Utilization of Available Data – LIDAR data
– Critical data for modeling
– Detailed site survey
– CCTV
• Creation of detailed modeling guidelines
• Streamline the process, understand what the project needs to move forward
Blueprint Design
• Standardization of drawings – Internal reviews
– Contractor bidding
• Design Guideline documents
• Design coordination meetings including all teams
• Consistency can ease reviews and will help lower costs in the long-run
Communication • Customer communication and education
– Social media (area dependent)
– CAP Meetings
– Door-to-door
– Public Meetings
• Not well attended in the beginning
• When construction was eminent 200 people showed up, 10% upset, most curious
• People are not concerned unless it impacts their property
• Should have kicked outreach into a higher gear initially
Communication
• Need to promote the positive
• Need to address the truly unhappy
• Develop a recruitment plan for successes and a clear process for complaints
Communication – Voluntary Sump Pump Programs
• Clintonville Pilot – Goal of 750 volunteers
– Approximately 150 installations
• Planning for additional outreach and education
• Social media will be utilized to help solicit volunteers
Design Communication
More communication is better, especially in understanding competing standards/interests, being able to adapt and compromise
BLUEPRINT Private Utilities
Department of Public Service
Department of Public Safety
City Forester
Recreation and Parks
Land Redevelopment
Office
Division of Water
Program Cost
• Green Infrastructure bids are coming in close to engineer’s estimates
• Sump pumps have been close to the original planning-level costs $6500/home
• Downspout redirection and lateral lining pilot project had to be re-bid – Original estimate 30% higher
– Re-bid within 10%, after prices increased
Program Cost
• Program just starting up, too early to understand how the costs will impact overall affordability
• Consider where program will have most initial success
Steps Forward
• Take the lessons learned during planning / design and apply them during construction and maintenance phases
• Communication is critical
• Continue to streamline the process and create SOPs and standard materials to lower costs and communicate expectations
City Recommended Schedule
• The recommended schedule is completion in 2035 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Clintonville 1 CEPT North Linden 1 Hilltop 1 + Miller Kelton Fifth by NW + W Franklinton + Hilltop 4 Clintonville 3 LOT 1 + LOT 2 Near South Clintonville 2 James Livingston 5 + Plum Ridge Hilltop 2 North Linden 2 James Livingston 3 South Linden James Livingston 2 James Livingston 4 Hilltop 3 James Livingson 1 Near East