OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 1
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
1678MCC
Acceptance Test
-
8/14/2019 Atp Form 1678mcc
2/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 2
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
CONTENTS
1. INTRODUCTION..........................................................................................................4
1.1 Scope ..............................................................................................................................4
1.2 Reminder of Safe Working Practices .............................................................................4
1.3 Data Recording...............................................................................................................4
1.4 Special care.....................................................................................................................5
2. TEST PLAN...................................................................................................................6
3. PRE-REQUISITES ........................................................................................................7
3.1 Reference........................................................................................................................7
3.2 Status of NE....................................................................................................................7
3.3 Test Instruments .............................................................................................................7
3.4 Test configurations .........................................................................................................7
3.5 Example of Customer Network......................................................................................8
4. SECTION A : STANDALONE TEST........................................................................ 9
4.1 VISUAL INSTALLATION / CABLING INSPECTION..............................................9
4.2 POWER SUPPLY CHECK /POWER ON...................................................................10
4.3 NETWORK ELEMENT TEST SET-UP ..................................................................... 114.3.1 Supervision with ECT ............................................................................................ 11
4.3.2 Hardware Configuration of the Equipment ............................................................ 11
4.3.3 Equipment Configuration.............................................................................................12
4.4 OPTICAL PORT LOCAL TESTS............................................................................... 13
4.4.1 Laser Safety / Optical Output Power............................................................................13
4.4.2 OPTICAL RECEIVER SENSITIVITY........................................................................14
4.5 EPS PROTECTION OF THE HO MATRIX (MXXXX) BOARD.............................15
4.6 FLC REDUNDANCY CHECK...................................................................................16
4.7 PROTECTION OF THE PSF BOARD (IF APPLICABLE).......................................16
4.8 MSP PROTECTION functionality...............................................................................17
4.9 LOCAL BER TEST (OPTICAL/ELECTRICAL-E1, STM-1,4,16,64).......................18
5. SECTION B : SEGMENT TEST..............................................................................19
5.1 Rx OPTICAL LINE PORT .......................................................................................... 19
5.2 ENGINEERING ORDER WIRE (EOW) ....................................................................20
6. SECTION C : END TO END TEST............................................................................21
6.1 BER STABILITY END TO END TEST (OVER THE NETWORK)........................21
APPENDIX A: TEST SUMMARY........................................................................................22
-
8/14/2019 Atp Form 1678mcc
3/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 3
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX B: TEST INSTRUMENTS ................................................................................23
APPENDIX C: MEASUREMENT SHEETS.........................................................................24
APPENDIX C.1: VISUAL INSTALLATION / CABLING INSPECTION..........................25
APPENDIX C.2: POWER SUPPLY CHECK /POWER ON.................................................26APPENDIX C.3: NETWORK ELEMENT TEST SET-UP ...................................................27
APPENDIX C.4: NETWORK ELEMENT TEST SET-UP (INVENTORY) ........................28
APPENDIX C.4: NETWORK ELEMENT TEST SET-UP (INVENTORY) ........................29
APPENDIX C.5: OPTICAL PORT LOCAL TESTS............................................................30
APPENDIX C.6: EPS PROTECTION OF THE HO MATRIX (MX160) BOARD..............31
APPENDIX C.7: FLC REDUNDANCY CHECK ................................................................. 32
APPENDIX C.8: PROTECTION OF THE PSF BOARD (IF APPLICABLE).....................33
APPENDIX C.9: MSP PROTECTION FUNCTIONALITY.................................................34
APPENDIX C.10: LOCAL BER TEST (OPTICAL/ELECTRICAL- E1, STM-
1,4,16,64)......................................................................................................................35
APPENDIX C.11: Rx OPTICAL LINE PORT TESTS .........................................................36
APPENDIX C:12 SERVICE CHANNEL TEST (EOW)......................................................37
APPENDIX C.13: BER STABILITY TEST OVER THE NETWORK ................................38
APPENDIX D : TECHNICAL DATA [ OPTICAL CHARACTERISTIC] ........................ 39
-
8/14/2019 Atp Form 1678mcc
4/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 4
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
1. INTRODUCTION
1.1 Scope
The scope of this document is divided into 2 sections which are:
SECTION A : STAND-ALONE TEST
This section of the document describes the method used for acceptance testing a 1678MCC
after it has been installed on site.
The purpose of this test period is not to test the full functionality of the product or to reproduce
all of the tests performed in the factory acceptance test phase. The specific objectives of the
Stand Alone Test are as follows:
To verify that all required parts have been delivered (inventory check).
To verify that the installation of the product has been performed correctly.
To verify the functional integrity of the equipment following shipment and installation.
SECTION B : SEGMENT TEST
This section of the document describes the method used for Network Acceptance Test of
1678MCC after Stand-Alone-Test has been performed and all station is supervised.
The purpose of this test period is not to test the full functionality of the product or to reproduce
all of the tests performed in the factory acceptance test phase. The specific objectives of the
Segment Test are as follows:
Check the protection provided by the equipment (transmission and synchronization).
Check, over a 24 hours period (overnight), the error on the links chosen initially to evaluatetransmission quality on the network of the main and 24 hour for spare (protection path).
1.2 Reminder of Safe Working Practices
Observe anti-static precautions.
Ensure that the optical power has been turned off before viewing or inspecting any
optical material.
All optical fiber connectors must be treated with the utmost care and a very high
standard of cleanliness maintained as soon as an optical connector is disconnected, the
free ends must be protected with dust caps.
Before reconnection, all optical connectors must be inspected and cleaned ifnecessary.
1.3 Data Recording
Alcatel (Supplier) and CUSTOMER (Purchaser) representative should sign each test described
on one or more data sheets. In the case of a failed test, a Customer Incident Report have to be
filled in, giving details about the problem encountered as well as the test title and the testing
-
8/14/2019 Atp Form 1678mcc
5/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 5
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
conditions (software release, test equipment used...). At the end of the test period, the Test
Result Sheet, a summary of all tests covered by this procedure, will be filled in by the Supplier
representative and signed off by both parties.
1.4 Special care*Special cares to be taken when plugging boards in 1678MCC Subrack, in order not damage
back-panel connectors!
1- Before inserting the boards open the blocking levers
2- Insert the boards inside the guide without acting on the blocking levers. Push softly the front plate
until the mating of board and shelf connector.
3- Complete the insertion by locking the blocking levers
-
8/14/2019 Atp Form 1678mcc
6/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 6
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
2. TEST PLAN
Test Number Test Title
SECTION A : STANDALONE TEST
4.1 VISUAL INSTALLATION / CABLING INSPECTION
4.2 POWER SUPPLY CHECK /POWER ON
4.3 NETWORK ELEMENT TEST SET-UP
4.4 OPTICAL PORT LOCAL TESTS
4.5 EPS PROTECTION OF THE HO MATRIX (MX160) BOARD
4.6 EPS PROTECTION OF THE LO MATRIX (LAX20) BOARD (IF
APPLICABLE)
4.7 EPS MATRIX ON 1662 OED MATRIX
4.8 FLC REDUNDANCY CHECK
4.9 PROTECTION OF THE PSF BOARD (IF APPLICABLE)
4.10 CLOCK REFERENCE TEST
4.11 MSP PROTECTION FUNCTIONALITY
4.12 LOCAL BER TEST (OPTICAL/ELECTRICAL- E1, STM-1,4,16,64)
SECTION B : SEGMENT TEST
5.1 Rx OPTICAL LINE PORT CHECK
5.2 ENGINEERING ORDER WIRE (EOW)
SECTION C : END TO END TEST
6.1 BER STABILITY END TO END TEST
-
8/14/2019 Atp Form 1678mcc
7/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 7
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
3. PRE-REQUISITES
3.1 Reference As referenced within the procedure, the test results sheets in APPENDIX B
Site Installation and Configuration Handbook. 1678MCC Factory Acceptance Test Procedure and Results
3.2 Status of NE The equipment (or network element, NE) must be compliant with the basic configuration in
the site installation handbook.
The tests are to be conducted directly on the equipment ports if DDF is not available or if itcan not be done on DDF.
3.3 Test InstrumentsSee APPENDIX C
3.4 Test configurations
Each 1678MCC In Station Test refers to one of the Test Configurations shown below:
Figure 1( Configuration for Optical port local test)
Figure 2( Configuration for EPS test, BER test etc )
NE under test
STM-64
STM-1/4/16
VariableAttenuators
TestSet
STM-64
Optical
Power meter
Figure 1 Configuration for Optical Port local tests
-
8/14/2019 Atp Form 1678mcc
8/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 8
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
STM-64Line Port
STM-1 Ports
X
Matrix
Test setSTM-1
678MCC under test
Loop
Tx
Rx
STM-64
Line PortLoop
Tx
Rx
Test setSTM-16 STM-16
Ports
Variable
Attenuator
VariableAttenuator
PRE-AMP
Booster
Figure 2 : Configuration for EPS test, BER test
3.5 Example of Customer Network
Network sample
Figure 3: System Configuration.
-
8/14/2019 Atp Form 1678mcc
9/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 9
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
4.SECTION A : STAND-ALONE TEST
4.1 VISUAL INSTALLATION / CABLING INSPECTION
Purpose
The purpose is to verify that the Installation and the Cabling are done in accordance with the
Site Installation Handbook.
Test equipment
Multimeter
Procedure1. Check that the equipment is installed in accordance with the Site Installation Handbook:
Positioning of rows and racks (labeling),
Positioning of equipment in the rack,
Layout within the equipment rack and Subrack.2. Check the inventory of the installed equipment with the Site Installation Handbook.
Quantity and type of cards / modules provided,
Type (impedance) and cabling of external synchronization ports, if appropriate,
Connection of the LAN port of both FLCS and FLCC board to a router if theequipment is used as a GNE.
3. Inspect the quality of installation of all external connections:
Installation of the optical fibers, their positioning (adequate bending radius, 4 cm atleast) and labeling.
Installation of the electrical cables including earth bonding.
Installation of anti-static wrist strap bonding point on each rack and availability ofwrist straps.
4. Check the connection of the NGTRU to the equipment:
Connections of power supply from rectifier to A and B of NGTRU
Connections of power supply connector on the PSF boards in slots 24 and slot 25 tothe NGTRU.
Connection of the 9-way connector on the FLCC board in slot 20 to the NGTRU.
5. Check the mechanical installation of the equipment. For the stations where seismic bracing is required check that seismic bracing has
been installed in accordance with the Station Installation Handbook.
Check that racks are securely anchored and that the Subrack is securely mountedwithin the racks with all required bolts in place.
6. Perform a visual Inspection of the equipment and cards.
Check that equipment does not have any signs of mechanical damage.
Inspect carefully the back-panel connectors for all the slots and ensure that there areno broken or bent pins on the back-panel.
Inspect all card connectors to ensure they are not damaged or likely to causedamage to back-panel when inserted.
-
8/14/2019 Atp Form 1678mcc
10/39
-
8/14/2019 Atp Form 1678mcc
11/39
-
8/14/2019 Atp Form 1678mcc
12/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 12
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
Procedure
1. From the craft terminal, display in turn the SR78M (Main Shelf) views of the equipmentSubrack.
2. Check that:
The identity of the boards is correctly reported on the craft terminal in theircorresponding slots. Specifically check to ensure the absence of the following alarms
for each Subrack slot in the SR78M :
RUTM(Replaceable Unit Type Mismatch),
RUM(Replaceable Unit Missing)
RUP(Replaceable Unit Problem)
NOTE: Alarms other than the above may appear. Clicking the corresponding
slot in the SR78M views can dispel any ambiguity; the icons of the above
alarms will then become visible at the bottom of the resulting view. They
should be colored green.
That the identity of the SDH port modules is correctly reported on the craft terminal. Thecorrect correspondence can be determined by the absence of any of the above alarms,
which can be verified from the green color of the respective icons in the respective
interface displays (view IS11 - r01s01sl3/daughter#1for a STM1 port module for
example).
In the case of an alarm, the origin of the fault (installation in the NE or craft terminalconfiguration) can be determined by comparing the part numbers of the boards declared
and displayed the craft terminal with the information obtained from the remote inventory.
4.3.3 Equipment Configuration
Purpose
Verify the equipment configuration of the 1678MCC, compared to the Site Configuration
Handbook, and tests requirement.
Test equipment
Equipment Craft Terminal
Procedure
Run the 1320CT application and the from the menu bar of EML-USMview verify that the
parameters are configured as follows:
Subrack Configuration (open the equipment view and check thatsubrack configuration is in conformity with the Site Installation &
Configuration Handbook.
Write down serial number in column given.
Test paths are configuredin accordance with the test requirements forexample: SNCP Protection.
-
8/14/2019 Atp Form 1678mcc
13/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 13
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
4.4 OPTICAL PORT LOCAL TESTS
4.4.1 Laser Safety / Optical Output Power
Purpose
To check laser safety and to measure optical output power.
Test equipment
SDH Analyzer with the required SDH optical interfaces equipped for the ports under test
Optical power meter
1 Variable optical attenuator
Optical fiber FC/PC patch cords
Equipment Craft Terminal
Procedure
Establish the test configuration shown inFigure 1.
1. Enable ALS on the optical port under test and loop the optical port under test, using avariable attenuator if required.
2. Using the ECT, ensure that no LOS alarm exist and ALS Current State is Inactive3. Disconnect the transmit fiber from the receive port of the optical interface (or variable
attenuator if applicable) .
4. Using the ECT, confirm on the SDH port view that a LOS alarm is generated on the receive
port under test and that ALS Current State is active.5. Using the ECT, force the laser ON by selecting the "Laser Forced ON" option6. Measure optical output power on the power meter and records the results. Check results
with Appendix F.
IMPORTANT: Ensure that the power meter is set to the correct wavelength for the port under
test.
7. Using the ECT, force laser OFF by selecting the "Laser Forced OFF" option.8. Ensure that the laser turns OFF and that no power is measured on the power meter.9. Re-connect the transmit fiber and confirm that the LOS alarm remains on the optical port
and that ALS Current State is Inactive.
10.Perform the checking to all optical port and at the end of the test, ensure the configurationon the ports by setting ALS Enable.
-
8/14/2019 Atp Form 1678mcc
14/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 14
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
4.4.2 OPTICAL RECEIVER SENSITIVITY
Purpose
To verify the received optical sensitivity of STM-64 unit, tributary optical units and pre-amplifiers complies with the equipment specification.
Test equipment
STM-N SDH Analyzer
Optical power meter
Optical Variable attenuator
Optical fiber patch cords
Equipment Craft Terminal
Procedure
Figure 6 : Optical Port sensitivity test
1.Establish the test configuration shown in Figure 62.Perform the tests for all optical ports by creating AU_4 cross-connection for each port.3.Configure software loopback (matrix looped) or physical loop asfigure 2.4.Connect analyzer output to input of optical attenuator then to Rx of STM-N port.5.Connect the output STM-N port back to SDH analyzer then check for error freetransmission.
6.Increase the attenuation until errors are indicated on analyzer and decrease attenuation for 1dBm where the error is clear.
7.Measure the output from optical attenuator ( STM-N port Rx Side)8.Check, if sensitivity is in specific range by referring to Appendix F. If not, please check thetest setup, clean optical output on board or ODF, exchange board or optical module.
9.Record the result and continue with each port in sequence10.For STM 64, follow the configuration as Figure 2with no software loopback and pump-in the
signal from port on others STM-N trib.
-
8/14/2019 Atp Form 1678mcc
15/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 15
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
11.Perform the sensitivity test by increase and decrease the optical attenuator and monitor fromanalyzer the record the measurement of final receive power.
4.5 EPS PROTECTION OF THE HO MATRIX (MXXXX) BOARD
Purpose
To test the EPS protection functionality / performance of the HOMATRIX (MX160/320/640)
board in slot 10 protected by the HOMATRIX in slot 11.
Test equipment
SDH Analyzer
Equipment Craft Terminal
Procedure
1. Establish the test configuration shown in Figure 2 (no attenuation required for STM64ports).
2. Ensure that the test paths are configured.3. Configure the SDH Analyzer to transmit and monitor a VC-4 bulk payload within an STM-
1 / STM-16 / STM-64 using a 2E23-1 PRBS signal and ensure error free operation.
4. Press the reset button on protected MX160 board (slot 10). Wait for 20min for the SpareMX160 board to become active. Check the status of the MX160 in slot 11 is the following
(through its respective icon):
"EPS Protection Status Active", visible in the EML-USM views of this board.
5. At the end of the switchover period, check : That not more than 2ES, 2SES and 2AIS was registered on the SDH Analyzer.
The test path is error free after the switchover.6. Remove the protected MX160 (slot 10).
RUM (Replaceable Unit Missing) alarm occurred on ECT for the MX160 in slot 107. Replace the MX160 board in slot 10 (only after the transitional period). Wait for several
minutes for the board to initialize. Check:
That the status of the MX160 board in slot 10 is the following (through itsrespective icon): "EPS Protection Status Standby" visible in the EML-USM views
of this board.
That traffic is error free during and after replacement of MX160 board in slot 10.8. Press the reset button on the spare MX160 board (slot 11). Wait for 20 min for the MainMX160 board to become active. Check the status of MX160 board in slot 10 is the
following (through its respective icon):
"EPS Protection Status Active", visible in the EML-USM views of this board.9. At the end of the switchover period, check:
That not more than 2ES, 2SES and 2AIS was registered on the SDH Analyzerfollowing the switchover.
The test path is error free after the switchover.10.Remove the spare MX160 (slot 11).
RUM (Replaceable Unit Missing) alarm occurred on ECT for the MX160 in slot 11
-
8/14/2019 Atp Form 1678mcc
16/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 16
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
11.Replace the MX160 board in slot 11 (only after the transitional period). Wait for severalminutes for the board to initialize.
4.6 FLC REDUNDANCY CHECK
Purpose
To test the FLC redundancy of the FLCCongi and FLCService board.
Test equipment
SDH Analyzer
Equipment Craft Terminal
Procedure
1. Establish the test configuration shown in Figure 2.2. Ensure that the test paths are configured.3. Configure the SDH Analyzer to transmit and monitor a VC-4 bulk payload within an STM-
1 / STM-16 / STM-64 using a 2E23-1 PRBS signal and ensure error free operation.
4. Perform a software switch command
Verify the active FLC
Select equipmentprovisioning menu.
Select theEdit -> FLC EPS switch.
5. Verify that the test path is error free when the switching activity taken place.6. Wait a while after switch, until the FLC are synchronized again and verify that the active
PLC become standby and vice versa.
7. Record the result.
4.7 PROTECTION OF THE PSF BOARD (IF APPLICABLE)Purpose
Verify that the EPS protection of the PSF board in slot 24 by the PSF board in slot 25 is not
traffic affecting.
To verify that PSF boards have been connected to the correct circuit breakers.
Test equipment
SDH Analyzer
Equipment Craft Terminal
Procedure
1. Establish the test configuration shown in Figure 2.
-
8/14/2019 Atp Form 1678mcc
17/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 17
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
2. Ensure that the test paths are configured.3. Configure the SDH Analyzer to transmit and monitor a VC-4 bulk payload within an STM-
1 / STM-16 / STM-64 using a 2E23-1 PRBS signal and ensure error free operation.
4. Switch off Battery. A (for PSF slot 24) circuit breaker.
Check that no errors are registered on the analyzer. Alarms on ECT are recorded correctly.
5. Switch on Battery. A circuit breaker.
Check that no errors occurred on the analyzer.
Alarms cleared on ECT or alarm list.6. Switch off Battery. B (for PSF slot 25) circuit breaker.
Check that no errors occurred on the analyzer.
Alarms on ECT are recorded correctly.7. Switch on Battery. B circuit breaker.
Check that no errors occurred on the analyzer.
Alarms cleared on ECT or alarm list.8. Record the results.
4.8 MSP PROTECTION functionality
Purpose
To verify the functionality of the MSP 1+1 Standard protection mode when apply to STM-N
Optical or Electrical tributary.
Test Equipment
SDH Analyzer
Equipment Craft TerminalOptical fiber patch cords
Procedure
1. Setup the test circuit as shown infigure 2but using only STM-N tributary unit which arelower than STM-64 for the whole testing.
2. Setup the SDH Analyser to one of STM-N port (as drop) and loop-back first STM-N port(as Protected Path) and second STM-N port on the same or different board (as Protecting
Path).
3. Create a single cross connection and setting the not revertive MSP 1+1 on the selected port.4. Create fault at on the protected path by pulling out the optical patchcord .5. Check that no Errors occur after the transitional switchover period. There shall be only
burst error during the creation of the fault for the analyser and not more than 2ES, 2SES
6. Normalise the protected path by connect back the optical patchcord.7. Delete the MSP 1+1 setting and prepare another STM-N port with physical loopback.8. Repeat the step from step 4to step 8 then record all the result in measurement sheet.
-
8/14/2019 Atp Form 1678mcc
18/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 18
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
4.9 LOCAL BER TEST (OPTICAL/ELECTRICAL-E1, STM-1,4,16,64)
PurposeVerify the transmission integrity and stability of the installed equipment over a 24hours.
Test Equipment
SDH Analyzer
Fixed/Variable optical attenuator
Equipment Craft Terminal + Connecting Cord
Optical fiber patch cords
Procedure
1. Establish the test configuration shown in Figure 2.2. Configure the SDH Analyzer to transmit and monitor refer to the table below and ensure
error free operation for SDH Analyzer:
Bit rate Code Sequence
2048 Kbit/s 50 ppm HDB3 215 -1 pseudorandom
34368 Kbit/s 20 ppm HDB3 215 -1 pseudorandom
44736 Kbit/s 20 ppm B3ZS 215 -1 pseudorandom
139264 Kbit/s 15 ppm CMI 223 -1 pseudorandom
155520 Kbit/s CMI 223 -1 pseudorandom
155,520 kbit/s S1.1, L1.1 L1.2 223 -1 pseudorandom
622,080 kbit/s S4.1, L4.1, L4.2 223 -1 pseudorandom
3. Before starting the stability test, check all electrical & optical port for their continuity.Please make sure all cascade point is correct.
4. Activate all performance monitoring points (STM-64 MSTTP, STM-1 / 16 MSTTP), thenactivate event/error logging on the SDH analyzer so that any errors that occur are recorded
with a date and time stamp.
5. In the Diagnosis pulldown menu, select the Log Browsing option -> Alarm Log. Clear allthe alarms in the Alarm Log.6. Start (run) the BER stability test by pressing start button.7. At the end of the stability period, examine the NE PM registers, via the ECT, and confirm
that no spurious performance parameter counts have been recorded. Confirm that no errors
have been detected by the Test sets. Examine the alarm logs via the ECT and confirm that
no unexpected alarms (such as RUP alarm for example) were raised.
8. After the test, remove all the PM from the equipment.9. Repeat the test for all equipped optical and electrical ports and record the results.
-
8/14/2019 Atp Form 1678mcc
19/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 19
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
5. SECTION B : SEGMENT TEST
5.1 Rx OPTICAL LINE PORT
1678MMC 1678MMC
ODF ODF
RADIOMETER
STM-N STM-Nport port
Station - A Station - B
C.T.
Rx line optical cable
Purpose
Verify the optical power of the signal received from the remote 1660SM (Station B on the test
bench).
Test equipment
Power Meter
Equipment Craft Terminal + Connecting Cord
Optical fiber patch cords
Procedure
1. Disconnect the Rx optical cable line from the ODF and connect it to the Radiometer input.2. By means of the C.T. turn-on the laser.3. Wait for 180 sec. and then check that the Rx optical power complies with the expected
value.
Note: Rx power must be calculated on plant data. (PTx Theoretical line attenuation based
on Customer data).
4. Repeat the check on the other port with Line port function.
-
8/14/2019 Atp Form 1678mcc
20/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 20
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
5.2 ENGINEERING ORDER WIRE (EOW)
Purpose
To ensure all calls and selective calling are operational.
Test equipment
Equipment Craft Terminal
Handset (Engineering Order Wire)
Procedure
1. Follow the actual implementation plan for the set up.2. Create the overhead cross-connection and correct order wire number for all station.3. Push the call button and made selective call and general call.
Selective call (individual call)
After lifting the handset, dial the telephone number of the NE to be reached accordingto the EOW table. Check that the call is routed to the correct NE and that voice signals
are transmitted. Follow the procedure above to call all sites on the link and vice versa.
Omnibus call (general call)After lifting the handset, dial "00". Check that all sites are called and that the voice
signal is transmitted.
-
8/14/2019 Atp Form 1678mcc
21/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 21
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
6. SECTION C : END TO END TEST
6.1 BER STABILITY END TO END TEST (OVER THE NETWORK)
Purpose
The aim of these tests is to monitor the transmission quality on the circuits provided as per
Network Plan.
Test equipment
Equipment Craft Terminal
SDH Analyzer
Procedure
1. Create cross connection for each NE referring to Customer Network Diagram.2. Setup the SDH Analyser and connect to the port in the originating station and with a
physical loop back at the end station. The port to be tested is 1 E1 and 1 STM1 port as a
sample port.
3. Activated related performance monitoring on the equipment and ensure it should have noerrors over a five or less than a minute period on the test sets.
4. Clear all unnecessary alarm on the system for all station.5. Activate the SDH analyser of the 7 days BER test.6. Print-out the BER test results and attach in the Appendix E.
-
8/14/2019 Atp Form 1678mcc
22/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 22
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX A:TEST SUMMARY
STATION : NE NAME:
Test Test Title Passed* Failed* Comment
SECTION A : STANDALONE TEST
4.1 VISUAL INSTALLATION / CABLING INSPECTION
4.2 POWER SUPPLY CHECK /POWER ON
4.3 NETWORK ELEMENT TEST SET-UP
4.4 OPTICAL PORT LOCAL TESTS
4.5 EPS PROTECTION OF THE HO MATRIX (MX160)
4.6 EPS PROTECTION OF THE LO MATRIX (LAX20)
4.7 EPS MATRIX ON 1662 OED MATRIX
4.8 FLC REDUNDANCY CHECK
4.9 PROTECTION OF THE PSF BOARD (IF APPLICABLE)
4.10 MSP PROTECTION FUNCTIONALITY
4.11 BER TEST (OPTICAL/ELECTRICAL-STM-1,4,16,64)
SECTION B : SEGMENT TEST
5.1 Rx OPTICAL LINE PORT
5.2 ENGINEERING ORDER WIRE (EOW)
SECTION C : END TO END TEST
6.1 BER STABILITY END TO END TEST
Note: If a test failed, a Customer Incident Report has to be issued and its number must be filled in the Customer Incident
Report Number column. A customer incident report may also be established for a passed test if there are some comments tobe made.
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAILNote *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
23/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 23
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX B: TEST INSTRUMENTS
STATION : NE NAME:
Equipment Option Supplier Serial Number Cal Due DateSTM-1/4/16 Analyzer
Variable Opticalattenuators
Optical power meter
Multimeter
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
24/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 24
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C: MEASUREMENT SHEETS
STATION : NE NAME:
1678MCC ACCEPTANCE TEST FOR CUSTOMER PROJECT
CUSTOMER Representative........................................................
Signature ............................................................................... Date ..........................
ALCATEL Representative........................................................
Signature ............................................................................... Date ..........................
-
8/14/2019 Atp Form 1678mcc
25/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 25
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.1: VISUAL INSTALLATION / CABLING INSPECTION
STATION : NE NAME:
Item Pass
*
Fail
*
N/A
*
Comments
Row / Rack / Subrack and Grounding
-Rack and Subrack Grounding-DDF subrack and DDF grounding-Electrical (E1/E3/E4) port Grounding
Equipment installation compliance
-Power Cable (main and protection)-Electrical cable interface between NE
to DDF-Optical cable interface between NEto OTB/client
-HKU cable interface (optional)-DCN cable connection (optional)
Optical and electrical connections
Visual inspection for damage / back-plane
connectors / card connectors
Seismic bracing (if applicable)
Fiber labeling
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAILNote *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
26/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 26
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.2: POWER SUPPLY CHECK /POWER ON
STATION : NE NAME:
Item Pass* Fail* N/A* CommentsVoltage Measurement
A -48VNGTRU
connectionsB -48V
Voltage Measurement
Slot 24PSF connections
Slot 25
Power Supply Cabling-Cabling arrangement and type (2 power
cable main and protection) between NGTRU
and DCPDB and between DCPDB and
Rectifier
Check..Amp
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
27/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 27
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.3: NETWORK ELEMENT TEST SET-UP
STATION : NE NAME:
Item Pass* Fail* N/A* Comments
Supervision
Software version: Release :
Hardware configuration of the equipment
Equipment configuration
Local Confguration
Sys Id : ___________________________
___________________________
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAILNote *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
28/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 28
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.4: NETWORK ELEMENT TEST SET-UP (INVENTORY)
STATION : NE NAME:
1678MCC MAIN EQUIPMENT CONFIGURATION
SLOT NO: DESCRIPTIONSERIAL
NUMBER/QUANTITYSLOT NO: DESCRIPTION
SERIALNUMBER/QUANTIT
Y
1 FLCSERV 23 FAN
10 MX 24 PSF
11 MX 25 PSF
LAX20 26 FAN
LAX20
20 FLCCONGI
21 BUSTERM
22 BUSTERM
-
8/14/2019 Atp Form 1678mcc
29/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 29
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.4: NETWORK ELEMENT TEST SET-UP (INVENTORY)
STATION : NE NAME:
1678MCC MAIN EQUIPMENT CONFIGURATION (Continue)
SLOT NO: DESCRIPTIONSERIAL
NUMBER/QUANTITYSLOT NO: DESCRIPTION
SERIALNUMBER/QUANTIT
Y
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAILNote *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
30/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 30
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.5: OPTICAL PORT LOCAL TESTS
STATION : NE NAME:
SLOT(PORT) DESCRIPTION/TYPESafetyOK/KO
TX(dBm)
RXSensitivity
(dBm)PASS*
FAIL*
N/A* COMMENTS
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAILNote *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
31/39
-
8/14/2019 Atp Form 1678mcc
32/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 32
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.7: FLC REDUNDANCY CHECK
STATION : NE NAME:
Item Pass
*
Fail
*
N/A
*
Comments
Software switch to slot 1
Software switch to slot 20
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
33/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 33
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.8: PROTECTION OF THE PSF BOARD (IF APPLICABLE)
STATION : NE NAME:
Item Pass
*
Fail
*
N/A
*
Comments
Switch off Battery A breaker
Switch on Battery A breaker
Switch off Battery B breaker
Switch on Battery B breaker
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
34/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 34
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.9: MSP PROTECTION FUNCTIONALITY.
STATION : NE NAME:
Slot (Port) Description(Type)Error
CountPass Fail Comment/ CIR
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
-
8/14/2019 Atp Form 1678mcc
35/39
-
8/14/2019 Atp Form 1678mcc
36/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 36
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.11: Rx OPTICAL LINE PORT TESTS
STATION : NE NAME:
SLOT(PORT) DESCRIPTION/TYPERx
(dBm)PASS*
FAIL*
N/A* COMMENTS
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
-
8/14/2019 Atp Form 1678mcc
37/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 37
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
Note *: enter a cross in the appropriate column.
APPENDIX C:12 SERVICE CHANNEL TEST (EOW)
STATION NAMESTATION
NUMBER
PASS
*
FAIL
*Comments*/CIR
ADDITIONAL COMMENTS:
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
38/39
OPTICAL NETWORK DIVISION
Page1678MCC__ACCEPTANCE_TEST_ED4 38
All right s res erved. Passi ng o n and cop yin g of thi s do cum ent, u se and com mun icatio n of it s co nten ts n ot p ermi tted wi tho ut w rit ten au tho rizat ion .
APPENDIX C.13: BER STABILITY TEST OVER THE NETWORK
BER Link description: PASS* FAIL*BERNon
Compliant*
ADDITIONAL COMMENTS:
Alcatel Tester CUSTOMER Representative
Name: Name:
Signature: Signature:
Date: PASS FAIL Date: PASS FAIL
Note *: enter a cross in the appropriate column.
-
8/14/2019 Atp Form 1678mcc
39/39
OPTICAL NETWORK DIVISION
APPENDIX D : TECHNICAL DATA [ OPTICAL CHARACTERISTIC]
Mean TX Power(dBm)
Main Rx Power(dBm)
CUSTOMERtalSignal
ApplicationCode
Wavelength(nm)
Max Min Max(ovld) Min(stvty)
S-1.1 1261 - 1360 -8 -15 -8 -28
L-1.1 1280 - 1335 0 -5 -10 -34STM1
L-1.2 1480 - 1580 0 -5 -10 -34
S-4.1 1274-1356 -8 -15 -8 -28
L-4.1 1280-1335 +2 -3 -8 -28
L-4.2 1480-1580 +2 -3 -8 -28STM4
L-4.2JE 1530-1560 +2 -3 -8 -32
I-16.1 1266-1360 -3 -10 -3 -18
S-16.1 1270-1360 0 -5 0 -18
L-16.1 1280-1335 +2 -2 -8 -27
L-16.2 1500-1580 +2 -2 -8 -28
L-16.2JE2 1550-1560 +2 -2 -9 -29
L-16.2JE2 6400ps/nm +2 -3 -10 -23
STM16
L-16.2JE2 12800ps/nm +2 -3 -10 -23
I-64-1 1290-1330 -1 -6 -1 -11
S-64.2b 1530-1565 +2 -1 -1 -14
L-64.2b 1530-1565 +12 +10 -1 -14
L-64.2CF Colored +6.5 +2 -8 -20
V-64.2 1550.12 +6.5 +2 -13.5 -33
STM64
U-64.2 1550.12 +12 +10 -13 -34
Booster L-1.1 1530-1565 +12 +10 4 -6
62.5 m 770-860 N.A -9.5 N.A -171000 Base SXGbe 50 m 770-860 N.A -9.5 N.A -17
62.5 m 1270-1355 -3 -11.5 N.A -19
50 m 1270-1355 -3 -11.5 N.A -191000 Base LX
Gbe10 m 1270-1355 -3 -11.5 N.A -19
Reference: Alcatel Tech. H.book 1678MCC Rel. 3.1A (3AG24163ABAA Ed.02)