Download - Atelier Nairobi - Arebik Project
![Page 1: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/1.jpg)
Atelier Nairobi
![Page 2: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/2.jpg)
Angelica Vidal Helton Onose Marina Cardoso
Reilly Algodoal Ricardo Shoji
GROUP
![Page 3: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/3.jpg)
a brief introduction
And our Concept
![Page 4: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/4.jpg)
Largest city of the country
One of the most important hubs in the continent
Capital of kenya
NairoBI
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 5: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/5.jpg)
The project area
CITY CENTER : 15 minutes by car
KIBERA: Biggest slum of
the country <<< BETWEEN >>>
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 6: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/6.jpg)
Project
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 7: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/7.jpg)
VISION
THE AREBIK PROJECT TO BE A PLACE WHERE PEOPLE
CAN LIVE WITH DIGNITY IN A NEIGHBORHOOD WITH
SAFETY AND SOCIAL
COHESION, AND THE
AREA OF AReBIK BEING AN EXAMPLE OF A
SUSTAINABLE AND
GREEN NEIGHBORHOOD IN THE CITY OF NAIROBI.
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 8: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/8.jpg)
ACCESSIBILITY Enable the residents of the AREBIK settlement to be properly connected to the city (roads, bike paths, public transport, etc.)
JOBS Create opportunities for employment for at least 30% of all-income people living in the project area
EDUCATION Provide a sustainable atmosphere to enable the education of all children and families living in the project area
BASIC SERVICES and WELL BEING Enable all the residents of the new area to have access to basic services and an environment that provides good quality of life.
ObjectivES
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
01
02
03
04
![Page 9: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/9.jpg)
Let’s introduce
you the
planned area
![Page 10: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/10.jpg)
Golf
camp
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 11: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/11.jpg)
Preserve green areas
around the golf club
house and part of the
original course
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 12: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/12.jpg)
Creation of
Roads connecting to
existing
transport system
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 13: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/13.jpg)
NESTS: Services and
commercial
areas in the most
accessible point
CONNECTED BY A
MAIN boulevard
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 14: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/14.jpg)
HOTEL Close to the
city center
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 15: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/15.jpg)
SELLABLE
PLOTS
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 16: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/16.jpg)
Zeis
(social housing)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
![Page 17: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/17.jpg)
SEASIDE
CAPER
VilLAGEs
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
FIRST VILLAGE:
![Page 18: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/18.jpg)
Strategies To make it happen
![Page 19: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/19.jpg)
zeis QUALITY OF LIFE AS A NEW STANDARD “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 20: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/20.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
WHAT?
SPECIAL AREA OF
SOCIAL
INTEREST
SOCIAL HOUSES TO MOVE PEOPLE FROM
RISK AREAS (QUICKLY)
ONLY
SOCIAL
HOUSING
![Page 21: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/21.jpg)
Zeis
(social housing)
CITY CENTER
KIBERA
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 22: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/22.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT SKETCHES
![Page 23: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/23.jpg)
Smooth way to make a
TRANSITION between Kibera and Arebik
Increase the quality of life from people living in risk areas through
the provision of
DECENT AND
SUSTAINABLE
HOUSES
Avoid
GENTRIFICATION
WHY?
*
*
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 24: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/24.jpg)
HOW?
Legislation to ensure the use for
only low
income people
Use of
CONTAINERS to speed up the construction
Construction of
PUBLIC SPACES and
GREEN AREAS
*
*
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Crossed subsidies with sellable plots
*
![Page 25: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/25.jpg)
PROJECT REPRESENTATION: CONTAINER HOUSES
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Day vision
![Page 26: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/26.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
KIBERA
CITY CENTER
![Page 27: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/27.jpg)
PROJECT REPRESENTATION: CONTAINER HOUSES
![Page 28: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/28.jpg)
PROJECT REPRESENTATION: CONTAINER HOUSES
ONE CONTAINER
TWO CONTAINERS
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 29: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/29.jpg)
Yes, but WHY containers?
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
FAST Understand the
urgent need from people living in
risk areas
![Page 30: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/30.jpg)
Yes, but WHY containers?
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
FAST
Containers
already being used in Nairobi as
health centers
LOW COST
![Page 31: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/31.jpg)
Yes, but WHY containers?
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
FAST
LOW COST
WORLD
TREND
Trend DESIGN in different developed countries, for
middle and high income people
![Page 32: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/32.jpg)
wetlands Sustainability and design
walking together “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 33: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/33.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
KIBERA
CITY CENTER
![Page 34: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/34.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: how wetlands works
![Page 35: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/35.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
SUSTAINABLE
way to treat sewage
Decentralization of
PUBLIC SERVICES
Create
GREEN AREAS to public use
![Page 36: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/36.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
SUSTAINABLE
way to treat sewage
Decentralization of
PUBLIC SERVICES
Create
GREEN AREAS to public use
![Page 37: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/37.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
SUSTAINABLE
way to treat sewage
Decentralization of
PUBLIC SERVICES
Create
GREEN AREAS to public use
![Page 38: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/38.jpg)
infrastructuRe How daily life should work “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 39: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/39.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Basic services provision
Division of Arebik in
Smart streets Which get connected in the
main boulevard
CITY CENTER
KIBERA
Connect
water pipes,
electricity lines,
public lights and
sewage system
through the main road
![Page 40: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/40.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Basic services provision
Use the
current transport
system
Passing through the main road of AREBIK
REDUCE COSTS
BY USING EXISTING MODE OF TRANSPORT
CONNECT
AREBIK
TO THE REST OF THE CITY
MATATU
![Page 41: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/41.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Basic services provision
Implementation of
bike paths and
large sidewalks to make AREBIK pedestrian and
bike friendly
INCENTIVE
SUSTAINABLE WAYS OF LOCOMOTION
COVER THE POPULATION
WHO CANNOT AFFORD PRIVATE WAYS OF TRANSPORTATION
INCREASE SENSE OF BELONGGING OF THE
LOCAL POPULATION BY INCENTIVATING
PEOPLE OCCUPING
THE STREETS
![Page 42: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/42.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Basic services provision
Implementation of
bike paths and
large sidewalks to make AREBIK pedestrian and
bike friendly
INCENTIVE
SUSTAINABLE WAYS OF LOCOMOTION
COVER THE POPULATION
WHO CANNOT AFFORD PRIVATE WAYS OF TRANSPORTATION
INCREASE SENSE OF BELONGGING OF THE
LOCAL POPULATION BY INCENTIVATING
PEOPLE OCCUPING
THE STREETS
![Page 43: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/43.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Basic services provision
Implementation of
bike paths and
large sidewalks to make AREBIK pedestrian and
bike friendly
INCENTIVE
SUSTAINABLE WAYS OF LOCOMOTION
COVER THE POPULATION
WHO CANNOT AFFORD PRIVATE WAYS OF TRANSPORTATION
INCREASE SENSE OF BELONGGING OF THE
LOCAL POPULATION BY INCENTIVATING
PEOPLE OCCUPING
THE STREETS
![Page 44: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/44.jpg)
villages Living with diversity “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 45: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/45.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
SEASIDE
CAPER
VilLAGEs
CITY CENTER
KIBERA
![Page 46: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/46.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
WHat?
Division of the planned area in different
“Villages”, each one with a
different developer
and project
![Page 47: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/47.jpg)
WHY?
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 48: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/48.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
ASSUMING A RISK:
SEPARATE
SEGREGATE
WHY?
INCREASE DIVERSITY
Incentive
public
participation
EASIER TO ORGANIZE
COMMUNITY
mixed INCOME
PEOPLE (LOW AND MIDDLE CLASS)
MIXED USE (RESIDENTIAL AND
COMMERCIAL) ALSO NEED HOUSING
DEVELOPERS CAN
MAKE
PROFIT
START TRYING TO MAKE
DIFFERENT INCOMES LIFE TOGETHER
![Page 49: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/49.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
HOW?
DIFFERENT
PROJECTS FOR EACH VILLAGE
01 FIRST VILLAGE (MODEL):
SEASIDE CAPER
DEVELOPERS BUY THE LAND TO BE
DEVELOPED (BY AUCTION)
![Page 50: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/50.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
HOW?
But HOW they will guarantee the
QUALITY OF EACH
VILLAGE?
CREATE
LEGISLATION TO MAKE IT MIXED
USE AND INCOME AND
ALSO SUSTAINABLE
*LEGISLATION IN ANNEX
![Page 51: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/51.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
01 FIRST VILLAGE (MODEL):
SEASIDE CAPER
SEASIDE
CAPER
KIBERA
CITY CENTER
UNITS 132 PEOPLE 660
582 UNITS 2.112 PEOPLE
(SOCIAL HOUSING) (OTHER UNITS)
![Page 52: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/52.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: SEASIDE CAPER (FIRST VILLAGE)
GREEN ROOF
RESIDENTIAL
COMMERCIAL
PUBLIC SPACE
CONSTRUCTED WETLAND
![Page 53: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/53.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: SEASIDE CAPER (FIRST VILLAGE)
MIDDLE CLASS LOW INCOME &
![Page 54: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/54.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: SEASIDE CAPER (FIRST VILLAGE)
VIDEO
REPRESENTATION
![Page 55: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/55.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: SEASIDE CAPER (FIRST VILLAGE)
![Page 56: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/56.jpg)
PRESERVED AREA Preserve to keep growing “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 57: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/57.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
PRESERVED AREA
![Page 58: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/58.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PRESERVE PART OF THE
GOLF COURSE
(2 HOLES)
PRESERVE
HISTORICAL BUILDING
AS A MUSEUM OPEN TO PUBLIC
PRESERVED AREA
USE FOR CHILDREN: NEXT GENERATION OF PLAYERS
PROTECT
VEGETATION OF THE AREA
BUILDING A PARK
![Page 59: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/59.jpg)
NESTS WHERE PEOPLE GATHER TOGETHER “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 60: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/60.jpg)
Management Of the area
MUNICIPALITY
DEVELOPERS
COMMUNITY
AT FIRST: After community approach:
MUNICIPALITY DEVELOPERS COMMUNITY
COLABORATIVE PROCESS
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 61: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/61.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
HAVE TWO
“NEIGHBORHOOD NESTS”
CONNECTED BY A
MAIN BOULEVARD
Transition
and
connecting
CITY CENTER
KIBERA
WHAT?
TRANSITION AREA smooth
![Page 62: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/62.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Most central
Area Of arebik why?
CITY
CENTER
KIBERA
Most services & facilities
INCLUDE A MORE DENSIFIED
COMMERCIAL AREA
GET TOGETHER
SERVICES
& COMMERCIAL
![Page 63: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/63.jpg)
Nest “a”
WOMEN’S CENTER
Police station for woman
Health care center for woman
Bath station for woman
SPORT CENTER
POLICE STATION
HEALTH CARE CENTER
COMMERCIAL UNITS
BATH STATION
Space for street market
PUBLIC TOILETS
PARK GARAGE
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
THE CLOSEST TO
KIBERA:
COMMUNITY CAN USE IT TOO
![Page 64: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/64.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
how
IT WILL LOOK LIKE?
WO
MEN
’S C
ENTE
R
PLACE FOR STREET MARKET
HEA
LTH
CEN
TER
![Page 65: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/65.jpg)
Nest “b”
EDUCATIONAL CENTER
• Public Library
• Training center
• Baby care
• Elementary school
JOBS OPPORTUNITIES BUREAU
COMMERCIAL UNITS
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
THE CLOSEST TO
THE HOTEL
JOB OPPORTUNITIES
![Page 66: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/66.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
how
IT WILL LOOK LIKE?
EDU
CAT
ION
AL
CEN
TER
COMMERCIAL UNITS
EDU
CAT
ION
AL
CEN
TER
![Page 67: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/67.jpg)
PROJECT REPRESENTATION: Arebik boulevard
CITY CENTER
KIBERA
The main
boulevard
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 68: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/68.jpg)
PROJECT REPRESENTATION: Arebik boulevard
The main
boulevard
SPACE FOR NEW DEVELOPMENT TO
GROW WITH TIME
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 69: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/69.jpg)
Educational centEr The heart of AREBIK “ ”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 70: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/70.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
KIBERA
CITY CENTER
![Page 71: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/71.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
WHAT?
THE
OF ARABIK
MULTIFUNCTIONAL
EDUCATIONAL CENTER
why?
Place to provide
all levels of
education
to all families living in the area
Provide a good environment to the community get connected and
increase their
sense of belonging
with Arebik
Provide a
safe place
where children can have all kind of
activities
![Page 72: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/72.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
WHAT?
THE
OF ARABIK
MULTIFUNCTIONAL
EDUCATIONAL CENTER
why?
Place to provide
all levels of
education
to all families living in the area
Provide a good environment to the community get connected and
increase their
sense of belonging
with Arebik
Provide a
safe place
where children can have all kind of
activities
![Page 73: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/73.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
How?
Now try to imagine…...……
![Page 74: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/74.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
A place THAT HAS…...
A FRIENDLY DESIGN
WITH ALL NEEDS FOR FAMILIES
AND PEOPLE CAN FEEL HOME
…...IN A
MULTIFUNCTIONAL
PLACE
![Page 75: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/75.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
A place where…... CHILDREN CAN STUDY DURING THE DAY
TEENAGERS CAN STUDY DURING THE AFTERNOON
ADULTS CAN STUDY DURING THE NIGHT
…...WITH
SUSTAINABLE
USE OF SPACE
![Page 76: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/76.jpg)
Primary School
Secondary School
Technical Courses
Public Library
Theater and Auditorium (open to the public)
Community Garden
Bathhouse (for students and staff)
Sport Center
Playground and open air areas (for children)
TECHNICAL COURSES
Hotel Management and Tourism Construction
Rate of employment
Partnership with the Hotel
How?
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 77: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/77.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
PROJECT REPRESENTATION: EDUCATIONAL CENTER
![Page 78: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/78.jpg)
Financing how to match private & public
in a win-win situation
![Page 79: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/79.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
SUBSIDIES FROM CLIMATE INNOVATION CENTER (subsidies up to 100.000 USD)
Kick Start
TO GREEN AND SUSTAINABLE PROJECTS
01
![Page 80: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/80.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
DEVELOPMENT RIGHTS EQUIVALENT TO THE AREA OF THE GOLF COURSE USED BY THE PROJECT (to be converted in floor of the hotel, up to 30 floors)
COMPENSATION TO THE GOLF CLUB STAKEHOLDERS
CITY CENTER
KIBERA
HOTEL
PLOT TO DEVELOP A HOTEL
LAND VALUE
JOBS OPPORTUNITIES
INCENTIVE TOURISM
![Page 81: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/81.jpg)
HO
TEL
AReBIK
Echo Design and Architecture‘s Greenscraper
PROJECT REPRESENTATION: ECO-FRIENDLY HOTEL
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 82: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/82.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
CITY CENTER
KIBERA
Sellable plots
SELL MOST VALUE PLOTS TO HIGH INCOME PEOPLE
LAND VALUE
High-income housing
Possibility to cross-subsidize
the affordable units.
FINANCING STRATEGIE
![Page 83: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/83.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
FINANCING STRATEGIE
Parking garage
INCOME GENERATION FOR
MAINTENANCE
FISCALIZATION
CHANGE THE BEHAVIOR
OF PEOPLE (To use less private transport)
USE FOR THE COMMERCIAL ZONE
CITY CENTER
KIBERA
NOT ONLY A PARKING SPACE
ALSO FOR PUBLIC USE
![Page 84: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/84.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
Parking garage
PROJECT REPRESENTATION:
New World Center 1111 Lincoln road
PROJECT REPRESENTATION: MULTIFUNCTIONAL PARKING GARAGE
![Page 85: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/85.jpg)
PROSPECT OF A
BETTER FUTURE
![Page 86: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/86.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
abetterfuture
AREBIK PROJECT
ZEIS
SEASIDE CAPER OTHER VILAS
HIGH INCOME
672 UNITS 3360 PEOPLE
UNITS 132 PEOPLE 660
582 UNITS 2.112 PEOPLE
UNITS 643 PEOPLE 3.215
2.572 UNITS 10.288 PEOPLE
84 UNITS 336 PEOPLE
QUALITY
OF LIFE
SAFETY
DECENT HOUSING
& BASIC SERVICES
COMMUNITY
FEELING
FUTURE
GENERATIONS
(SOCIAL HOUSING) (OTHER UNITS) (SOCIAL HOUSING) (OTHER UNITS)
![Page 87: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/87.jpg)
KENYA VISION 2030
TOURISM “Kenya aims to be among the top 10 long-haul tourist destinations in the world offering a high-end, diverse, and distinctive visitor experience that few of her competitors can offer”
ENERGY “The Government is committed to continued institutional reforms in the energy sector, including a strong regulatory framework, encouraging more private generators of power, and separating generation from distribution”.
“The country, therefore, aims to conserve water sources and start new ways of harvesting and using rain and underground water. The 2030 vision for water and sanitation is to ensure that improved water and sanitation are available and accessible to all.”
WATER AND SANITATION
HOUSING AND URBANIZATION
“The medium-term goal for 2012 is to increase the annual production of housing units from the current 35,000 annually to over 200,000. In addition, an initiative for high quality urban planning will be undertaken”
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
![Page 88: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/88.jpg)
GROUP 03
![Page 89: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/89.jpg)
Annexes
![Page 90: Atelier Nairobi - Arebik Project](https://reader034.vdocuments.site/reader034/viewer/2022042602/55c3466bbb61ebda438b4812/html5/thumbnails/90.jpg)
1. CONCEPT 2. PLANNED AREA 3.STRATEGIES 4.FINANCING 5.A BETTER FUTURE
HOUSING UNITS
ESTIMATED FAMILY SIZE
TOTAL of PEOPLE
ZEIS 672 5 3360
SEASIDE CAPER (SOCIAL HOUSING)
132 5 660
SEASIDE CAPER (OTHER UNITS)
582 4 2.112
OTHER VILAS* (SOCIAL HOUSING)
643 5 3.215
OTHER VILAS* (OTHER UNITS)
2.572 4 10.288
HIGH INCOME 84 4 336
TOTAL OF UNITS 4.685
POPULATION 19.971
SOCIAL HOUSING POPULATION 7.235
abetterfuture
Project overview