ASHFORK-BAINBRIDGE STEEL DAM STRUCTURAL
EVALUATION PROJECTDWP Engineering
Diwei Chen Wen Cui
Paul Garrett
![Page 2: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/2.jpg)
VIEW OF STEEL DAM
![Page 3: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/3.jpg)
Background
Original drawings of Ashfork-Bainbridge Dam (Bureau of Reclamation)
![Page 4: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/4.jpg)
• Designed by Francis H. Bainbridge and built in 1898 by the Atchison, Topeka, and Santa Fe Railway Co.
• First large steel dam in the United States
• 46 feet high, 300 feet long and has the elevation of 5,402 feet.
• It was designed as a cantilever truss with anchorage at the upstream toe.
• 26 square miles drainage area and a gross capacity of 400 acre-feet
![Page 5: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/5.jpg)
PurposeThe goal of the project is to evaluate the structure health of the Ashfork-Bainbridge Steel Dam in order to classify the current hazard potential of the dam.
![Page 6: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/6.jpg)
Stakeholders
• The National Forest Service
• Community of Ash Fork, Arizona and occupants of Monte Carlo Truck Service.
• Arizona Department of Transportation
![Page 7: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/7.jpg)
• Studies completed as recent as 2009, by Technical Service Center, rated the dam as low hazard. 1
• No maintenance has been performed on the dam in recent years.
2
• Recommendations made by previous analyses may be outdated3
Existing Conditions
![Page 8: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/8.jpg)
Service Details• Task 1- Research
• Task 2- Site Visit
• Task 3- Evaluation Methods
• Task 4- Technical Evaluation
• Task 5- Reevaluation Of Hazard Potential
• Task 6- Report Findings
![Page 9: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/9.jpg)
• Task 1 - ResearchExisting materials provided by National Forest Service:
• original design drawings
• maintenance records
• emergency action plans
• and engineering studies
![Page 10: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/10.jpg)
• Task 2 - Site visit
1. All existing concerns previously noted will be located and confirmed.
2. Any issues will be documented with pictures and a detailed description.
3. major rust locations and reservoir water levels will be documented and recorded.
4. Check for signs of scour and seepage.5. A detailed as-built sketch will be created.
![Page 11: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/11.jpg)
• Task 3 – Evaluation Method
Reference Codes: – Arizona Dam Safety– U.S Army Corps of Engineering
These evaluation guidelines will provide the design team with a proper methodology for
evaluating the dam.
![Page 12: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/12.jpg)
• Task 4 – Technical Evaluation
1. Hydraulic Analysis– Overtopping– 100- year flood– Normal loading
![Page 13: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/13.jpg)
Task 4 – Technical Evaluation
2. Geotechnical Analysis– Bearing capacity analysis
3. Seismic Analysis– Seismic analysis will be
based on evaluation guidelines
![Page 14: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/14.jpg)
Task 4 – Technical Evaluation
4. Structural Analysis– SAP 2000 Analysis :
overall dam deflection and individual member maximum loads.
– Testing rusted steel and broken parts
![Page 15: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/15.jpg)
Task 5 – Reevaluation of Hazard Potential
According to definition of hazard potential mode, written on the old reports, different potential hazard failure mode will be checked by calculation and model analysis.
A hazard potential rating will be developed.
![Page 16: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/16.jpg)
• Task 6 – Report Finding
Final report prepared for the Client:
1. Suggested hazard classification2. Potential failure modes : cost estimation for
repair/restoration of most eminent failure.3. Model analysis and calculation results will be provided
to support the recommendation.
![Page 17: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/17.jpg)
Potential Challenges• Modeling the steel
dam for analysis• Assessing scour on
dam• Quoting for
accurate cost
![Page 18: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/18.jpg)
Project Duration:
![Page 19: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/19.jpg)
Tasks Duration Detail
![Page 20: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/20.jpg)
Questions?
![Page 21: Ashfork -Bainbridge Steel Dam Structural Evaluation Project](https://reader033.vdocuments.site/reader033/viewer/2022051420/56815e1f550346895dcc7b2c/html5/thumbnails/21.jpg)
THANKS FOR LISTENING