Transcript
Page 1: Analisa Sni 2010 Untk Rangka Baja Ringan Dan Atap

ANALISA SNI UNTUK PEKERJAAN RANGKA BAJA RINGAN DAN ATAP SPANDEK / METAL ROOF BANGUNAN RUMAH TINGGAL

C- 75, 0.8 1,488 M' 14.500 21.576

C- 75, 0.6 2,232 M' 12.500 27.900

Baut (Srew driver) 28,000 Bh 350 9.800

Dynabolt 1,600 Bh 3.500 5.600

Reng 3,600 M' 7.000 25.200

Talang Jurai 0,124 M' 48.000 5.952

Pekerja 0,200 Oh 43.000 8.600

Tukang besi 0,450 Oh 62.750 28.238

Kepala tukang 0,010 Oh 72.500 725

Mandor 0,050 Oh 75.000 3.750

137.341

C- 75, 0.8 1,488 M' 14.500 21.576

C- 75, 0.6 2,232 M' 12.500 27.900

Baut (Srew driver) 28,000 Bh 350 9.800

Dynabolt 1,600 Bh 3.500 5.600

Reng 5,400 M' 7.000 37.800

Talang Jurai 0,124 M' 48.000 5.952

Pekerja 0,200 Oh 43.000 8.600

Tukang besi 0,450 Oh 62.750 28.238

Kepala tukang 0,010 Oh 72.500 725

Mandor 0,050 Oh 75.000 3.750

149.941

1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK

Bahan

Upah

JUMLAH

1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL

Bahan

Upah

JUMLAH

Atap Spandek Zincalume 1,100 M2 55.000 60.500

Screw Cteks 12-4 x 50 6,000 Bh 1.200 7.200

Screw Cteks 10 x 16-16 2,000 Bh 750 1.500

Pekerja 0,02 Oh 43.000 645

Tukang atap 0,08 Oh 62.750 4.706

Kepala tukang 0,01 Oh 72.500 580

Mandor 0,006 Oh 75.000 450

75.581

Bahan Nok Zincalume tebal 0,35 mm 1,100 M' 65.000 71.500

Screw Cteks 10 x 16-16 6,000 Bh 750

Pekerja 0,02 Oh 43.000 645

Tukang atap 0,08 Oh 62.750 4.706

Kepala tukang 0,01 Oh 72.500 580

Mandor 0,006 Oh 75.000 450

77.881

1M2 PASANGAN ATAP SPANDECK ZINCALUME

Bahan

Upah

JUMLAH

1M' PASANGAN NOK ZINCALUME

Upah

JUMLAH

Top Related