Basic PriceMWH GLOBALDETAIL ENGINEERING DESIGN/PERENCANAAN TEKNIS TERINCIPALEMBANG TOWN WASTEWATER TREATMENT PLANT PROJECT/PROYEK INSTALASI PENGOLAHAN AIR LIMBAH KOTA PALEMBANGBASIC PRICE OF WAGES, RENT EQUIPMENT AND BUILDING MATERIALHARGA DASAR UPAH, SEWA ALAT DAN BAHAN BANGUNANNoDescription/UraianUnitUnit PriceNoDescription/UraianUnitUnit PriceSatuanHarga SatuanSatuanHarga Satuan(Rp.)(Rp.)ABasic Price of Wages/Harga Dasar Upah3.9523,000.005,826.581Chief of Skill Labour/kepala tukanghk/day121,000.00206Wood Plank grade IV/Kayu Papan kelas IVPieces/Keping18,150.006.1736,000.005,836.712Handyman/Tukanghk/day99,000.00207wood Racuk/Kayu Racukm31,815,000.008.8856,000.006,305.093Foreman/Mandorhk/day121,000.00208wood battens/Kayu RengStem/batang33,000.004Labour/Pekerja tidak terlatihhk/day71,500.00209Ceramic floor/wall 20 x 20/25 cm plain white / Keramik lantai/dinding 20 x 20/25 cm putih polosBox/Kotak63,800.005Skill Labour/Pekerja terlatihhk/day82,500.00Ceramic floor/wall 20 x 20/25 cm plain white / Keramik lantai/dinding 20 x 20/25 cm putih polosPiece/buah2,552.006Machinist/Masinishk/day82,500.00210Ceramic floor / wall 20 x 20 cm color, quality C/Keramik lantai/dinding 20 x 20 cm warna, mutu CBox/Kotak57,200.007Operators/Operatorhk/day165,000.00Ceramic floor / wall 20 x 20 cm color, quality C/Keramik lantai/dinding 20 x 20 cm warna, mutu CPiece/buah2,288.008Driver/Sopirhk/day110,000.00211Ceramic floor / wall 20 x 20 cm color, quality B/Keramik lantai/dinding 20 x 20 cm warna, mutu BBox/Kotak68,200.009Machinist helper/Pembantu Masinishk/day82,500.00Ceramic floor / wall 20 x 20 cm color, quality B/Keramik lantai/dinding 20 x 20 cm warna, mutu BPiece/buah2,728.0010Supervisorhk/day82,500.00212Ceramic wall 20 x 25 cm color/Keramik dinding 20 x 25 cm warnaBox/Kotak74,800.0011Cookers asphalt/Pemasak aspalhk/day49,500.00Ceramic wall 20 x 25 cm color/Keramik dinding 20 x 25 cm warnaPiece/buah3,740.0012Guard/Penjagahk/day44,000.00213Ceramic floor 20 x 25 cm color, quality B/Keramik lantai 20 x 25 cm warna, mutu BBox/Kotak51,260.0013Driver helper/pembantu Sopirhk/day82,500.00Ceramic floor 20 x 25 cm color, quality B/Keramik lantai 20 x 25 cm warna, mutu BPiece/buah2,563.0014Mechanics/Mekanikhk/day148,500.00214Ceramic floor 30 x 30 cm color/Keramik lantai 30 x 30 cm warnaBox/Kotak52,800.0015Surveyorhk/day82,500.00Ceramic floor 30 x 30 cm color/Keramik lantai 30 x 30 cm warnaPiece/buah4,752.48215Ceramic floor 30 x 30 cm white plain/Keramik lantai 30 x 30 cm putih polosBox/Kotak52,800.00BBasic Price of Building Material/Harga Dasar BahanCeramic floor 30 x 30 cm white plain/Keramik lantai 30 x 30 cm putih polosPiece/buah4,752.481Fine aggregate / Agregat Halusm3518,850.62216Ceramic floor 40 x 40 color quality C/Keramik lantai 40 x 40 warna mutu CBox/Kotak57,200.002Coarse aggregates / Agregat Kasarm3518,850.62Ceramic floor 40 x 40 color quality C/Keramik lantai 40 x 40 warna mutu CPiece/buah9,152.003Aluminium Foilm220,350.00217Ceramic floor 40 x 40 color quality B/Keramik lantai 40 x 40 warna mutu BBox/Kotak71,500.004Alcubondm2715,000.00Ceramic floor 40 x 40 color quality B/Keramik lantai 40 x 40 warna mutu BPiece/buah11,440.005sandpaper Ordinary / Amplas BiasaSheet/Lembar3,850.00218Ceramic floors wood motif (rough) quality A/Keramik lantai motif kayu (kasar) mutu ABox/Kotak55,000.006sandpaper Niken / Amplas NikenSheet/Lembar7,150.00219Gutter Clamps paralon/Klem Talang ParalonPiece/buah3,025.007Roof Aluminium Zinc Coated (zinc) 0.25 mm thick / Atap Aluminium Zink Coated (seng) tebal 0.25 mmSheet/Lembar47,300.00220Regular electric cable clamps/Klem kabel listrik biasaPiece/buah154.008Roof Aluminium Zinc Coated (zinc) 0.3 mm thick / Atap Aluminium Zink Coated (seng) tebal 0.3 mmSheet/Lembar66,000.00221Electric cable clamps/Klem kabel listrikPiece/buah3,300.009Roof Aluminium Zinc Coated (zinc) 0.4 mm thick / Atap Aluminium Zink Coated (seng) tebal 0.4 mmSheet/Lembar91,300.00222Korosinliter2,200.0010Aluminium roof Zincalume, 0.25 mm thick / Atap Aluminium Zincalume, tebal 0.25 mmSheet/Lembar68,200.00223Water faucet/Kran AirPiece/buah11,000.0011Aluminium roof Zincalume, 0.3 mm thick / Atap Aluminium Zincalume, tebal 0.3 mmSheet/Lembar68,750.00224Brush 3 "- 4"/Kuas 3" - 4"Piece/buah13,750.0012Aluminium roof Zincalume, 0.4 mm thick / Atap Aluminium Zincalume, tebal 0.4 mmSheet/Lembar83,600.00225key Padlock/Kunci GembokPiece/buah9,350.0013Aluminium roof Zincalume, 0.5 mm thick / Atap Aluminium Zincalume, tebal 0.5 mmSheet/Lembar110,000.00226key Cabinets/Kunci LemariPiece/buah8,800.0014Fiber roof color "Polycarbonate" thick 4-5mm / Atap Fiber warna "Plycarbonat" tebal 4-5 mmm288,000.00227Bedroom Door Locks (Hotel)/Kunci Pintu Kamar Tidur (Hotel)Piece/buah440,000.0015Local Concrete roof tiles / Atap Genteng Beton LokalPiece/buah4,620.00228The bathroom door lock (lux)/Kunci Pintu KM/WC (lux)Piece/buah385,000.0016Concrete roof tiles / Atap Genteng BetonPiece/buah6,270.00229key Slot/Kunci SelotPiece/buah14,300.0017Concrete roof tiles Cisangka / Atap Genteng Beton CisangkaPiece/buah8,250.00230Planting usual key quality C/Kunci Tanam biasa mutu CPiece/buah27,500.0018Tile roof Buleleng / Atap Genteng BulelengPiece/buah2,530.00231Key Plant 2 regular slaag/Kunci Tanam 2 slaag biasaPiece/buah71,500.0019Ceramic glazed plain roof tiles / Atap Genteng Keramik biasa berglazurPiece/buah8,800.00232Key Plant 2 slaag quality B/Kunci Tanam 2 slaag mutu BPiece/buah99,000.0020Ceramic glazed roof tiles Natural / Atap Genteng Keramik berglazur NaturalPiece/buah13,200.00233Key Plant Bathroom/Kunci Tanam Kamar MandiPiece/buah29,700.0021Glazed ceramic roof tiles similar color / Atap Genteng keramik sejenis Berglazur warnaPiece/buah18,700.00234Elbow electricity/L. bow listrikPiece/buah2,750.0022Ordinary Metal roof tiles (88 cm x 77 cm) / Atap Genteng Metal Biasa (88 cm x 77 cm)m240,700.00235lamp Downlight/Lampu Down LightPiece/buah46,750.0023Color Metal roof tiles (120 cm x 76 cm) / Atap Genteng Metal Warna (120 cm x 76 cm)m244,000.00236Hologen 50 watt bulbs/Lampu Hologen 50 wattPiece/buah13,750.0024Zincalume roofing Metal tiles 2x4 (38.5 cm x 80 cm) / Atap Genteng Metal Zincalume 2x4 (38.5 cm x 80 cm)m2176,000.00237Hologen 150 watt bulbs/Lampu Hologen 150 wattPiece/buah27,500.0025Sandy Zincalume roofing Metal tiles (77 cm x 100 cm) / Atap Genteng Metal Zincalume berpasir (77 cm x 100 cm)m293,500.00238Lights Hologen Box/Lampu Hologen BoxPiece/buah110,000.0026Metal roof tiles Zincalume sandy plain/Atap Genteng Metal Zincalume berpasir biasam266,000.0023910 watt fluorescent lamp/Lampu TL 10 wattPiece/buah7,700.0027Roof tiles frog/Atap Genteng kodokPiece/buah1,100.0024020 watt fluorescent lamp/Lampu TL 20 wattPiece/buah11,000.0028Onduline roof/Atap Ondulinem274,800.0024140 watt fluorescent lamp (bamboo)/Lampu TL 40 watt (bambu)Piece/buah115,500.0029Asbestos Plain 100 x 100 thickness: 4 mm/Asbes polos 100 x 100 tebal : 4 mmSheet/Lembar26,400.0024225 Watt Incandescent White/Lampu Pijar 25 Watt PutihPiece/buah5,500.0030Asbestos Small wave, width 80 cm/Asbes Gelombang kecil, lebar 80 cmm227,500.0024340 Watt Incandescent White/Lampu Pijar 40 Watt PutihPiece/buah6,050.0031Asbestos Small wave, width 105 cm/Asbes Gelombang kecil, lebar 105 cmm235,200.00244Granite Floor 30/30/Lantai Granit 30/30Piece/buah22,550.0032Asbestos Great Wave, a width of 105 cm/Asbes Gelombang Besar, lebar 105 cmm238,500.00245Granite Floor 40/40Lantai Granit 40/40Piece/buah48,400.0033Motive waves asbestos tile/Asbes Gelombang motif gentengm236,850.00246Granite Floor 60/60Lantai Granit 60/60Piece/buah128,700.0034asphalt/Aspal Curahkg13,200.00247Wood Floor Panil Gracewood/Lantai Kayu Panil Gracewoodm2387,750.0035asphalt Drum/Aspal Drumkg13,200.00248Lasdop electricity/Las dop listrikPiece/buah550.0036Aquaproofkg286,000.00249Wood glue/Lem Kayuliter22,000.0037Stainless Steel Sink/Bak Cuci Stainless SteelPiece/buah212,300.00250glue Vinyl/Lem Vinylkg9,350.0038Terrazzo Sink/Bak Cuci TerasoPiece/buah357,500.00251Big Gypsum list/List Gypsum Besarm124,200.0039Fibreglass tub/Bak FibreglassPiece/buah198,000.00252Small Gypsum list/List Gypsum Kecilm113,200.0040Terrazzo bathtub/Bak TerasoPiece/buah198,000.00253Bowl of electric switch/Mangkok Saklar listrikPiece/buah1,980.0041Bamboo diameter of 6-8 cm / 6 meter / Bambu diameter 6-8 cm/ 6 meterStem/batang55,000.00254MCBPiece/buah48,400.0042brick/BatakoPiece/buah2,860.00255MCB Box contents of the 4 groups/MCB Box isi 4 grupPiece/buah27,500.0043Brownish black aggregates/Batu Andesit hitam kecoklatanm2209,000.00256MCB Box contents of the 8 groups/MCB Box isi 8 grupPiece/buah60,500.0044Natural Stone brownish (Sangarong)/Batu Alam kecoklatan (Sangarong)m2203,500.00257Melamic Clearkg66,000.0045Bricks hole/Batu Bata lobangm3563,200.00258Melamic Gloss/dop (Finishing)kg66,000.0046Small Bricks/Batu Bata kecilPiece/buah1,375.00259Millkg36,300.0047Bricks hole/Batu Bata lobangPiece/buah797.50260Formwork oil/Minyak Bekistingliter13,200.0048Stone Temple Black/Batu Candi hitamm2247,500.00261oil Paint/Minyak Catliter6,600.0049stone/Batu Kalim3385,000.00262Diesel oil for industrial / Oil asphalt/Minyak solar untuk industri / Minyak aspalliter6,050.0050Stone outboard/Batu Kali tempelm2102,300.00263Wood mosaic floor size of 30 x 30 cm/Mozaik kayu lantai ukuran 30 x 30 cmPiece/buah8,250.0051Rock Pilang/Batu Karang Pilangm2653,400.00264BRC Fence, size 240 cm x 120 cm, diameter 5.5 mm/Pagar BRC, ukuran 240 cm x 120 cm, diameter 5.5 mmunit379,500.0052Gravel/Batu Kerikilm3440,000.00265BRC Fence, size 240 cm x 90 cm, diameter 6 mm/Pagar BRC, ukuran 240 cm x 90 cm, diameter 6 mmunit412,500.0053Coral Stone broken concrete split 0-5 mm/Batu Koral beton pecah split 0-5 mmm3518,850.62266Ordinary nails of various sizes 2 "- 5"/Paku Biasa bermacam ukuran 2" - 5"kg16,500.0054Coral stone and concrete breaking 5-10 split 10-20 mm/Batu Koral beton pecah split 5-10 dan 10-20 mmm3518,850.62267Ordinary nail 1/2 "- 1"/Paku Biasa 1/2" - 1"kg19,800.0055Cut stone / gravel/Batu Belah/Kerakalm3385,000.00268nails Stoppers/Paku SumbatPiece/buah660.0056Stone Palimanan yellow / green/Batu Palimanan kuning/hijaum2184,800.00269Concrete nails/Paku BetonPiece/buah770.0057Stone Palimanan yellow / green + bevel/Batu Palimanan kuning/hijau + bevelm2184,800.00270nails Gypsum/Paku Gypsumkg27,500.0058stone Marble/Batu Marmerm2330,000.00271Nails Zinc, Asbestos/Paku Seng, Asbeskg24,200.0059Stone Roster / Overlay ordinary/Batu Roster/Terawang biasaPiece/buah4,675.00272nails Asbestos/Paku AsbesPiece/buah660.0060Iron diameter of 5 mm/Besi diameter 5 mmStem/batang24,200.00273Nails Screws 3.5 "/Paku Sekrup 3.5"kg49,500.00616 mm diameter iron KS/Besi diameter 6 mm KSStem/batang27,500.00274Nails Screws 3.5 "/Paku Sekrup 3.5"Piece/buah495.0062Iron diameter of 8 mm KS IT/Besi diameter 8 mm KS TIStem/batang56,100.00275Teak parquet/Parquet Jatim2423,500.0063Iron diameter of 10 mm KS IT/Besi diameter 10 mm KS TIStem/batang88,000.00276Concrete Sand / Install/Pasir Beton / Pasangm3101,750.0064Iron diameter of 12 mm KS IT/Besi diameter 12 mm KS TIStem/batang121,000.00277sand Urug/Pasir Urugm371,500.0065Iron diameter of 14 mm KS IT/Besi diameter 14 mm KS TIStem/batang203,500.00278grout colorant/Pewarna natbungkus11,000.0066Iron diameter of 16 mm KS IT/Besi diameter 16 mm KS TIStem/batang214,500.00279Aluminium doors/Pintu Alluminiumm2704,000.0067Iron diameter of 19 mm KS IT/Besi diameter 19 mm KS TIStem/batang302,500.00280Steel Door/Pintu Besi Bajam22,145,000.0068Iron Plain Concrete/Besi Beton Poloskg20,900.00281Fold doors/Pintu Lipatm2418,000.0069Iron Steel Profile WF, I and H/Besi Baja Profil WF, I dan Hkg18,700.00282PVC door + installation complete/Pintu PVC lengkap + pemasanganunit231,000.0070Steel Construction (CNP, IVI, and iron L)/Besi Baja Konstruksi (CNP, INP, dan besi L)kg16,500.00283Medium iron pipe 2 mm & 1/2 ", length 6 m/Pipa besi medium 2 mm & 1/2", panjang 6 mm120,350.0071Iron Beam Clamp and Plate Elbow/Besi Beam Clamp dan Plat Sikum224,750.00284Medium iron pipe 2 mm & 3/4 ", length 6 m/Pipa besi medium 2 mm & 3/4", panjang 6 mm125,740.0072Hollow iron steel 20 x 40, 2 mm thick/Besi Hollow baja 20 x 40, tebal 2 mmStem/batang154,000.00285Medium iron pipe 2 mm and 1 ", length 6 m/Pipa besi medium 2 mm & 1", panjang 6 mm132,092.5073Hollow iron steel 40 x 40, 2 mm thick/Besi Hollow baja 40 x 40, tebal 2 mmStem/batang176,000.00286Medium iron pipe 2 mm & 1.5 ", length 6 m/Pipa besi medium 2 mm & 1.5", panjang 6 mm145,870.0074Hollow iron steel 30 x 60, 2 mm thick/Besi Hollow baja 30 x 60, tebal 2 mmStem/batang209,000.00287Medium iron pipe 2 mm & 2 ", length 6 m/Pipa besi medium 2 mm & 2", panjang 6 mm157,750.0075Hollow Iron Ceiling 2 x 4/Besi Hollow Plafond 2 x 4Stem/batang27,500.00288Medium iron pipe 2 mm & 2.5 ", length 6 m/Pipa besi medium 2 mm & 2.5", panjang 6 mm175,350.0076iron Strip/Besi Stripkg11,000.00289Medium iron pipe 2 mm & 3 ", length 6 m/Pipa besi medium 2 mm & 3", panjang 6 mm1119,350.0077Iron Strip 2 x 3/Besi Strip 2 x 3m5,500.00290Medium iron pipe 2 mm and 4. "Length 6 m/Pipa besi medium 2 mm & 4". Panjang 6 mm1155,540.0078Ready Mix Concrete K - 125/Beton Ready Mix K - 125m3880,000.00291Electrical PVC pipe 5/8 "/Pipa paralon listrik 5/8"Stem/batang6,600.0079Ready Mix Concrete K - 175/Beton Ready Mix K - 175m3935,000.00292PVC pipe and 1/2 "A quality (and similar Wavin)/Pipa PVC & 1/2" mutu A (Wavin dan sejenis)m14,400.0080Ready Mix Concrete K - 225/Beton Ready Mix K - 225m3990,000.00293Ordinary PVC pipe and 1/2 "quality B/Pipa PVC biasa & 1/2" mutu Bm14,125.0081Ready Mix Concrete K - 250/Beton Ready Mix K - 250m31,045,000.00294PVC pipe & 3/4 "A quality (and similar Wavin)/Pipa PVC & 3/4" mutu A (Wavin dan sejenis)m16,050.0082Ready Mix Concrete K - 275/Beton Ready Mix K - 275m31,100,000.00295PVC pipe & 3/4 "quality B/Pipa PVC & 3/4" mutu Bm15,060.0083Ready Mix Concrete K - 300/Beton Ready Mix K - 300m31,155,000.00296PVC pipe & 1 "A quality (and similar Wavin)/Pipa PVC & 1" mutu A (Wavin dan sejenis)m18,250.0084Ready Mix Concrete K - 350/Beton Ready Mix K - 350m31,100,000.00297PVC pipe and 1 "Quality B/Pipa PVC & 1" mutu Bm15,225.0085Ready Mix Concrete K - 400/Beton Ready Mix K - 400m31,265,000.00298PVC pipe & 1.5 "A quality (and similar Wavin)/Pipa PVC & 1.5" mutu A (Wavin dan sejenis)m114,300.0086Asbestos ridge Great Wave/Bubungan Asbes Gelombang Besarm126,400.00299PVC pipe & 1.5 "Quality B/Pipa PVC & 1.5" mutu Bm18,800.0087Asbestos ridge Small Waves/Bubungan Asbes Gelombang Kecilm125,850.00300PVC pipe & 2 "A quality (and similar Wavin)/Pipa PVC & 2" mutu A (Wavin dan sejenis)m118,012.5088Ridge / Nok concrete tiles/Bubungan/Nok Genteng BetonPiece/buah6,600.00301PVC pipe & 2 "Quality B/Pipa PVC & 2" mutu Bm111,550.0089Ridge tiles Buleleng/Bubungan Genteng BulelengPiece/buah5,720.00302PVC pipe & 3 "A quality (and similar Wavin)/Pipa PVC & 3" mutu A (Wavin dan sejenis)m135,337.5090Ridge / Nok plain glazed Ceramic Tile/Bubungan/Nok Genteng Keramik biasa berglazurPiece/buah11,000.00303PVC pipe & 3 "quality B/Pipa PVC & 3" mutu Bm119,250.0091Ridge / Nok kind of glazed Ceramic Tile/Bubungan/Nok Genteng Keramik sejenis berglazurPiece/buah22,000.00304PVC pipe & 4 "A quality (and similar Wavin)/Pipa PVC & 4" mutu A (Wavin dan sejenis)m157,200.0092Ridge similar color glazed Ceramic Tile/Bubungan Genteng Keramik sejenis warna berglazurPiece/buah27,500.00305PVC pipe & 4 "quality B/Pipa PVC & 4" mutu Bm133,000.0093Bubungan/Nok Genteng Metal/aluminiumm133,000.00306PVC pipe and 6 "(15 cm) A quality (and similar Wavin)/Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis)m1136,125.0094Ridge tiles Frog/Bubungan Genteng KodokPiece/buah4,400.00307Stainless Pipe 2 ", 1mm thick/Pipa Stainless 2", tebal 1mmm182,500.0095Basic paint/Cat Dasarkg35,200.00308Stainless Pipe 2 ", 0.8mm thick/Pipa Stainless 2", tebal 0.8mmm173,920.0096Between Cat/Cat Antarakg27,500.00309Stainless Pipe 2.5 ", 1mm thick/Pipa Stainless 2.5", tebal 1mmm1104,720.0097Wood and Iron paint Termite/Cat Kayu dan Besi Anti Rayapkg49,500.00310Stainless Pipe 2.5 ", 1.2mm thick/Pipa Stainless 2.5", tebal 1.2mmm192,400.0098Special paint Glassy and Quick Drying/Cat Khusus Glassy dan Quick Dryingkg33,000.00311plamir Wall/Plamir Tembokkg8,800.0099Oil paint colors (regular) quality C/Cat Minyak warna (biasa) mutu Ckg44,000.00312plamir Wood/Plamir Kayukg18,700.00100Oil paint quality BOil paint quality B/Cat Minyak mutu Bkg52,800.00313Stainless plate, 1 mm thick, the size of 244cm x 122cm/Plat Stainless, tebal 1 mm, ukuran 244cm x 122cmSheet/Lembar1,870,000.00101Oil Paint Spray/Cat Minyak Semprotkg46,200.00314Plint ceramic 10 x 30 cm color/Plint keramik 10 x 30 cm warnaPiece/buah4,400.00102Meni paint Iron/Cat Meni Besikg40,700.00315Plint ceramic 10 x 40 cm color/Plint keramik 10 x 40 cm warnaPiece/buah14,520.00103Meni paint Iron / Wood / Flincote/Cat Meni Besi/Kayu/Flincotekg46,200.00316Plint PC Grey Tile 15 x 20 cm/Plint Ubin PC Abu-abu 15 x 20 cmPiece/buah880.00104Cover paint/Cat Penutupkg90,200.00317Plint PC Grey Tile 10 x 30 cm/Plint Ubin PC Abu-abu 10 x 30 cmPiece/buah935.00105Wall paint quality C (Vinotex, Q-luc, and the like)/Cat Tembok mutu C (Vinotex, Q-luc, dan sejenis)kg13,750.00318Plint PC Grey Tile 10 x 40 cm/Plint Ubin PC Abu-abu 10 x 40 cmPiece/buah962.50106Wall paint quality B (Catylac, Vinilex, and similar)/Cat Tembok mutu B (Catylac, Vinilex, dan sejenis)kg28,600.00319Plywood color / Jabarwood/Plywood warna/JabarwoodSheet/Lembar121,000.00107Wall paint quality B Anti Moss and Mushrooms/Cat Tembok mutu B Anti Lumut dan Jamurkg30,250.00320Teak Plywood 3 mm/Plywood Jati 3 mmSheet/Lembar121,000.00108A quality wall paint (Mowilex, Kemtone, Dulux, etc.)/Cat Tembok mutu A (Mowilex, Kemtone, Dulux, dll)kg104,500.00321Plywood Sungkay 3 mm / Megatick/Plywood Sungkay 3 mm / MegatickSheet/Lembar121,000.00109Equivalent closet seat (standard type KIA)Closed duduk Setara (sejenis standar KIA)Units/Unit605,000.00322Plywood 3 mmSheet/Lembar46,200.00110Closed sit Standards (Ex kind. TOTOC721FV1)/Closed duduk Standar (sejenis Ex. TOTOC721FV1)Units/Unit2,475,000.00323Plywood 4 mmSheet/Lembar74,800.00111Sitting Closet Halmar/Closet Duduk HalmarUnits/Unit3,520,000.00324Plywood 6 mmSheet/Lembar96,800.00112Sitting Closet quality C/Closet Duduk mutu CUnits/Unit2,062,500.00325Plywood 9 mmSheet/Lembar137,500.00113Sitting Closet quality A/Closet Duduk mutu AUnits/Unit4,840,000.00326Plywood 12 mmSheet/Lembar176,000.00114Sitting Closet quality B/Closet Duduk mutu BUnits/Unit2,992,000.00327Plywood 20 mmSheet/Lembar231,000.00115Sitting Closet standards/Closet Duduk standarUnits/Unit2,530,000.00328camphor basic/Politur dasarliter53,900.00116Closet Sitting / Monoblock/Closet Duduk / MonoblokPiece/buah594,000.00329Camphor ready-made/Politur Jadiliter58,300.00117Closet squat Porcelain / regular/Closet jongkok Porselen / biasaPiece/buah176,000.00330White porcelain 10 x 10 cm/Porselin Putih ukuran 10 x 10 cmPiece/buah770.00118Closet Squatting Terrazzo/Closet Jongkok TerasoPiece/buah35,200.00331The color porcelain size 10 x 10 cm/Porselin Warna ukuran 10 x 10 cmPiece/buah1,100.00119Closet Squatting Standard / type (B quality)/Closet Jongkok Standart / sejenis (mutu B)Units/Unit198,000.00332Order for light steel roof tile roof, tile/Rangka Atap baja ringan untuk atap genteng, gentengm2313,500.00120Closet Squatting kind (quality A)/Closet Jongkok sejenis (mutu A)Units/Unit297,000.00ceramics, concrete, etc + installation/keramik, beton, dll + pemasangan121Shower Spray TX 403 SV 3Piece/buah357,500.00333Lightweight steel roof framework for zinc metal roofing, roof/Rangka Atap baja ringan untuk atap seng metal, atapm2237,820.00122Conblock usual 6 cm thick/Coneblock biasa tebal 6 cmPiece/buah1,980.00asbestos, aluminum, shingles, etc. + installation/asbes, aluminium, sirap, dll + pemasangan123Conblock color 6 cm thick/Coneblock warna tebal 6 cmPiece/buah2,640.00334Lightweight steel roof framework forms joglo / special + stacked installation/Rangka Atap baja ringan bentuk joglo/bertumpuk khusus + pemasanganm2309,870.00124Conblock usual 8 cm thick/Coneblock biasa tebal 8 cmPiece/buah2,695.00125Conblock color 8 cm thick/Coneblock warna tebal 8 cmPiece/buah3,300.00335Lightweight steel roof framework "Pryda" for a saddle roof, Metal and Ceramic + installation/Rangka Atap baja ringan "Pryda" untuk atap Pelana, Metal dan keramik + pemasanganm2281,050.00126Cornice (white cement powder for gypsum)/Cornice (bubuk Semen putih untuk gypsum)kg7,700.00127Putty ready-made/Dempul Jadikg22,000.00336Lightweight steel roof framework "Pryda" for roof Shield, Metal and Ceramic + installation/Rangka Atap baja ringan "Pryda" untuk atap Perisai, Metal dan keramik + pemasanganm2309,870.00128Ross putty Polac/Dempul Ross Polackg30,800.00129putty Isamu/Dempul Isamukg52,800.00337Lightweight steel roof framework "Pryda" for Joglo roof, Metal and Ceramic + installation/Rangka Atap baja ringan "Pryda" untuk atap Joglo, Metal dan keramik + pemasanganm2360,360.00130Wood dolken diameter. 8 - 10/400 cm/Dolken Kayu dia. 8 - 10/400 cmm3319,000.00131Door CloserPiece/buah264,000.00338Push the door rails/Rel Pintu DorongUnits/Unit264,000.00132Door HolderPiece/buah33,000.00339Rolling Door Standard, t = 4 mm, (minimum of 7 pairs m2)/Rolling Door Standar, t = 4 mm, (minimal pasangan 7 m2)m2643,500.00133Door StoperPiece/buah33,000.00340Rolling Door Standard, t = 5 mm, (minimum of 7 pairs m2)/Rolling Door Standar, t = 5 mm, (minimal pasangan 7 m2)m2693,000.00134Door StopPiece/buah24,200.00341Sanding Sealer Impra (Primer)/Sanding Sealer Impra (Cat dasar)kg41,800.00135black bucket/Ember hitamPiece/buah7,150.00342Seal TapePiece/buah3,850.00136Regular hinge/Engsel BiasaPiece/buah19,800.00343Cement (50 kg)/Semen (50 kg)zak68,750.00137Yellow Hinge 4 "/Engsel Kuning 4"Piece/buah33,000.00344Portland cement (PC)/Semen Portland (PC)kg1,375.00138Door hinge/Engsel PintuPiece/buah19,800.00345White cement (40 kg)/Semen Putih (40 kg)zak93,500.00139Epoxikg55,000.00346cement White/Semen Putihkg2,200.00140Plasterboard 100 x 100 2.7 mm thick/Eternit 100 x 100 tebal 2.7 mmSheet/Lembar25,300.00347cement Red/Semen Merahm341,800.00141Plasterboard 100 x 100 3.5 mm thick/Eternit 100 x 100 tebal 3.5 mmSheet/Lembar29,700.00348Nat cement/Semen Natkg13,200.00142Fillerm31,375.00349Zinc Wave, a width of 70 cm/Seng Gelombang, lebar 70 cmm28,167.50143Electrical ceiling fittings/Fitting plafond listrikPiece/buah9,900.00350Zinc Plate 120 cm x 240 cm/Seng Plat 120 cm x 240 cmSheet/Lembar116,600.00144Glass BlockPiece/buah26,400.00351Zinc Plate 33 cm/Seng Plat 33 cmm114,520.00145Grendel / Slot Plant 4 "/Grendel/Slot Tanam 4"Piece/buah82,500.00352Zinc Plate 38 cm/Seng Plat 38 cmm120,350.00146Grendel ordinary/Grendel biasaPiece/buah17,600.00353Zinc Plate 45 cm/Seng Plat 45 cmm122,000.00147Gypsum Board (120 x 240 x 9) mmSheet/Lembar74,800.00354Zinc Plate 55 cm/Seng Plat 55 cmm128,600.00148Hordeng Horizontal Blind (aluminium)m2101,200.00355Zinc Plate 88 cm/Seng Plat 88 cmm136,300.00149Hordeng Vertikal Blindm3104,500.00356Zinc Plate 92 cm/Seng Plat 92 cmm138,500.00150fibers/Ijukkg9,900.00357soap/Sabunkg12,320.00151Aluminum + Glass Window Reyband 5 mm/Jendela Aluminium + Kaca Reyband 5 mmm2902,000.00358Caustic Soda/Soda Apikg33,000.00152Iron window/Jendela Besim2330,000.00359Soft Board (120 x 240) mmlebar74,250.00153Window Frame Nako 100 cm x 70 cm/Jendela Bingkai Nako 100 cm x 70 cmUnits/Unit99,000.00360Single switch normal/Saklar Tunggal biasaPiece/buah6,600.00154Window Frame Nako/Jendela Bingkai Nakom2148,500.00361Double switch normal/Saklar Ganda biasaPiece/buah14,850.00155Cable N Y A 1.5 mm/Kabel NYA 1.5 mmm14,290.00362Switches Single National/Saklar Tunggal NationalPiece/buah19,140.00156Cable N Y A 2.5 mm/Kabel NYA 2.5 mmm15,720.00363Switch Double National/Saklar Ganda NationalPiece/buah33,000.00157Cable N Y A 4.0 mm/Kabel NYA 4.0 mmm16,600.00364Scaffolding tag. 1.77 x 1.77 m/Scafolding tg. 1.77 x 1.77 mUnits/Unit880,000.00158NYM cable 2 x 1.5 mm/Kabel NYM 2 x 1.5 mmm111,000.00365Smartruss Aluminium Magnesium159NYM cable 2 x 2.5 mm/Kabel NYM 2 x 2.5 mmm114,300.00- Lysaght Smartruss C 75.100m124,750.00160NYM cable 2 x 4.0 mm/Kabel NYM 2 x 4.0 mmm119,800.00- Lysaght Smartruss C 75.75m120,680.00161Mirror 3 mm cable/Kabel Cermin 3 mmm2136,400.00- - Batten U T S 40/Reng U T S 40m117,930.00162Mirror Cable 5 mm/Kabel Cermin 5 mmm2212,300.00- Screw / DynaboltPiece/buah2,090.00163Stained Glass/Kaca Patrim21,760,000.00- Valery Gutter Talang Juraim1137,940.00164Transparent glass 3 mm/Kaca Bening 3 mmm271,500.00- Strap Bracingm113,750.00165Transparent glass 4 mm/Kaca Bening 4 mmm282,500.00366Contact Stop usual/Stop Kontak biasaPiece/buah18,700.00166Transparent glass 5 mm/Kaca Bening 5 mmm2121,000.00367Contact Stop usual/Stop Kontak ACPiece/buah82,500.00167Transparent glass 8 mm/Kaca Bening 8 mmm2220,000.00368Sunscreen Aluminiumm2412,500.00168Transparent glass 10 mm/Kaca Bening 10 mmm2260,700.00369T. electric Duss/T. Duss listrikPiece/buah1,320.00169Transparent glass 12 mm/Kaca Bening 12 mmm2429,000.00370Gutters gutter, length 4 m/Talang Paralon, panjang 4 mbatang52,800.00170Glass Rayband 5 mm/Kaca Rayband 5 mmm2110,000.00371ropes Ijuk/Tali Ijukkg12,540.00171Opaque glass / Ice 5 mm/Kaca Buram/Es 5 mmm2118,800.00372fibers/Ijukm326,400.00172Glass Frame Nako/Bingkai Kaca Nakoset15,400.00373Clay / Urug/Tanah Liat / Urugm355,000.00173Glass Nako 6 leaf/Kaca Nako 6 daunset59,400.00374Soil types Puru/Tanah Purum360,500.00174Glass Nako 8 leaf/Kaca Nako 8 daunset68,200.00375Soil types Sirtu/Tanah Sirtum388,000.00175Nako glass Rayben 5 mm, 6 leaves/Kaca Nako Rayben 5 mm, 6 daunset59,400.00376Teakwood 3 mmm239,600.00176Nako glass Rayben 5 mm, 8 leaves/Kaca Nako Rayben 5 mm, 8 daunset67,100.00377Teakwood 4 mm plain/Teakwood 4 mm biasam244,000.00177Hooks wind window/Kait angin JendelaPiece/buah16,500.00378Ter/Residuliter49,500.00178Kalsiboard 3.5 mm (120 cm x 240 cm)Pieces/Keping60,500.00379Textil Taperoll7,535.00179Kalsiboard 4.5 mm (120 cm x 240 cm)Pieces/Keping63,800.00380thinner ordinary/Thinner biasaliter13,200.00180Lime/Kapurkg6,600.00381Glossy Paint Thinner (Cobra and similar)/Thinner Cat Glossy (Cobra dan sejenis)liter38,500.001816 mm thick carpet/Karpet tebal 6 mmm282,500.00382urinal/UrinoirPiece/buah154,000.00182Concrete wire/Kawat Betonkg19,800.00383A quality urinal/Urinoir mutu AUnits/Unit181,500.00183Bird wire/kawat Burungm222,000.00384Vernisliter27,500.00184wire Thorns/Kawat Durim116,500.00385Rock varnish/Vernis Batukg71,500.00185wire Harmonica/Kawat Harmonikam242,900.00386Wallpaperm2308,000.00186Net Wire Fence/Kawat Jaring PagarSheet/Lembar30,800.00387regular sink/Wastafel biasaPiece/buah291,500.00187wire Gauze/Kawat Kassam216,500.00388sink Halmar/Wastafel HalmarUnits/Unit308,000.00188Welding Wire/Kawat Lasdos110,000.00389A quality sink/Wastafel mutu AUnits/Unit495,000.00189wire Mosquitoes/Kawat Nyamukm219,800.00390Wood Filler Impra (putty)/Wood Filler Impra (dempul)cans/kaleng35,200.00190Zinc Wire Plain/Kawat Seng Poloskg20,900.00391Wood Stain Impra (paint color)/Wood Stain Impra (cat pewarna)cans/kaleng66,000.00191Diameter softwood 6-8/Kayu gelam diameter 6-8Stem/batang8,800.00192diameter softwood 10-12/kayu gelam diameter 10-12Stem/batang9,900.00193wood Hek/Kayu HekStem/batang9,900.00CBasic Price of Rent of Equipment/Harga Dasar Sewa Peralatan194wood Lis/Kayu Lis 1/3m111,550.00$1Concrete Pumphour/jam99,187.50195wood Lis/kayu Lis 1/4m112,650.00$2Dump Truck 3.5 Tonhour/jam264,500.00196Wood Lis Profile Medium/Kayu Lis Profil kecilm12,750.00$3Dump Truck 10 Tonhour/jam165,312.50197Wood Lis Profile Medium/Kayu Lis Profil Sedangm13,850.00$4Generator/Gensethour/jam99,187.50198Lis Large Wood Profile/Kayu Lis Profil Besarm18,250.00$5Flatbed Truck 3.5 ton/ Wheel roller machine /Mesin Gilas Rodahour/jam330,625.00199Wood Mosaic 30 x 30 cm/Kayu Mosaik 30 x 30 cmPiece/buah6,875.00$6Tools/Alat Bantuhour/jam126,500.00200Wooden rafters 5/7 grade III (Meranti and similar)/Kayu Kaso 5/7 kelas III (Meranti dan sejenis)Stem/batang60,500.00$7Sprayer, Selfprofhour/jam79,350.00201Wood Class I (Unglen, Teak)/Kayu Kelas I (Unglen, Jati)m39,075,000.00$8Scaffolding 177cm x 177cm, Tg. 177cmsets/Month / set/Bulan231,437.50202Wood Class II (Petanang and similar)/Kayu Kelas II (Petanang dan sejenis)m36,600,000.00$9Concrete Mixer/Pengaduk Beton /Mollenhour/jam297,562.50203Class III Wood (Meranti and similar)/Kayu Kelas III (Meranti dan sejenis)m33,630,000.00$10Water Pumphour/jam19,837.50204Wood Board 3/20 Class III/Kayu Papan 3/20 Kls. IIIm33,630,000.00205Wood Class IV (Racuk and similar)/Kayu Kelas IV (Racuk dan sejenis)m31,650,000.00DBasic Price of Installation/Harga Dasar Instalasi$1Electrical Installation/Instalasi ListrikLs99,187.501)Source : Decree of Mayor of Palembang N0. 518.a Tahun 2013Sumber : Keputusan Walikota Palembang N0. 518.a Tahun 20132)to antiscipate the price changes of material, wages and equipment rental prices, due to oil price increasing, pricelist above will be added about 15-20%Untuk mengantisipasi perubahan harga material upah dan sewa alat, akibat kenaikan BBM, daftar harga diatas ditambahkan sekitar 15-20%3)For Building Material including transportation cost to the siteUntuk bahan bangunan sudah termasuk biaya transportasi ke lokasi

Price Analysis (PU. CK) (2)UNIT PRICES ANALYS/ANALISA HARGA SATUAN PEKERJAANA. 2.2.1 PREPARATION WORK UNIT PRICE/ HARGA SATUAN PEKERJAAN PERSIAPANA. 2.2.1.1 Preparation of 1 m2 of temporary wooden fence 2 meters high/Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meterNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.200$82,500$16,500Carpenter/Tukang KayuL.02Manday0.400$99,000$39,600Chief of Skill Labour/Kepala TukangL.03Manday0.020$121,000$2,420Foreman/MandorL.04Manday0.020$121,000$2,420MANPOWER TOTAL / JUMLAH TENAGA KERJA$60,940BMATERIALS/BAHAN wood dolken/Dolken kayu 8-10/400 cmBatang1.250$319,000$398,750Portland Cement/Semen portlandKg1.200$1,375$1,650Concrete sand/Pasir betonM30.005$101,750$509Coral concrete/Koral betonM30.009$518,851$4,670Wood/Kayu 5/7M30.072$3,630,000$261,360common nails/Paku biasa 2" - 5"Kg0.060$16,500$990Residue/ResiduLiter0.450$49,500$22,275MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$690,203CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$751,143EOverhead & Profit (Contoh 15%)15% x D112,671.51FUnit Price Work/Harga Satuan Pekerjaan (D+E)863,814.92A. 2.2.1.2 Preparation of 1 m2 of corrugated iron fence while a height of 2 meters/Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meterNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.200$82,500$16,500Carpenter/Tukang KayuL.02Manday0.400$99,000$39,600Chief of Skill Labour/Kepala TukangL.03Manday0.020$121,000$2,420Foreman/MandorL.04Manday0.020$121,000$2,420MANPOWER TOTAL / JUMLAH TENAGA KERJA$60,940BMATERIALS/BAHAN wood dolken/Dolken kayu 8-10/400 cmBatang1.250$319,000$398,750Portland Cement/Semen portlandKg1.200$1,375$1,650Concrete sand/Pasir betonM30.005$101,750$509Coral concrete/Koral betonM30.009$518,851$4,670Wood/Kayu 5/7M30.072$3,630,000$261,360common nails/Paku biasa 2" - 5"Kg0.060$16,500$990Meni iron/Meni besiLiter0.450$46,200$20,790MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$688,718CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$749,658EOverhead & Profit (Contoh 15%)15% x D112,448.76FUnit Price Work/Harga Satuan Pekerjaan (D+E)862,107.17A. 2.2.1.3 Preparation of 1 m2 of temporary fence wire height of 1.8 meters/Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meterNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.200$82,500$16,500Carpenter/Tukang KayuL.02Manday0.300$99,000$29,700Chief of Skill Labour/Kepala TukangL.03Manday0.020$121,000$2,420Foreman/MandorL.04Manday0.020$121,000$2,420MANPOWER TOTAL / JUMLAH TENAGA KERJA$51,040BMATERIALS/BAHAN wood dolken/Dolken kayu 8-10/400 cmBatang1.000$319,000$319,000Portland cement/Semen portlandKg2.000$1,375$2,750Wire/Kawat duriM125.000$16,500$412,500Concrete Sand/Pasir betonM30.005$101,750$509Concrete coral/Koral betonM30.009$518,851$4,670Common nails/Paku biasa 2" - 5"Kg0.060$16,500$990MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$740,418CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$791,458EOverhead & Profit (Contoh 15%)15% x D118,718.76FUnit Price Work/Harga Satuan Pekerjaan (D+E)910,177.17A. 2.2.1.4 Measurement and installation of 1 m1 Bouwplank/Pengukuran dan pemasangan 1 m1 BouwplankNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.100$82,500$8,250Carpenter/Tukang KayuL.02Manday0.100$99,000$9,900Chief of Skill Labour/Kepala TukangL.03Manday0.010$121,000$1,210Foreman/MandorL.04Manday0.005$121,000$605MANPOWER TOTAL / JUMLAH TENAGA KERJA$19,965BMATERIALS/BAHANWood beams/Kayu balok 5/7Batang0.120$60,500$7,260Nail/Paku 2" - 3"Kg0.020$16,500$330Saw timber/Kayu papan 3/20M30.007$3,630,000$25,410MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$33,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$52,965EOverhead & Profit (Contoh 15%)15% x D7,944.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)60,909.75A. 2.2.1.5 Preparation of 1 m2 of office floor while plastering/Pembuatan 1 m2 kantor sementara lantai plesteranNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday2.000$82,500$165,000Carpenter/Tukang KayuL.02Manday2.000$99,000$198,000Mason/Tukang BatuL.02Manday1.000$99,000$99,000Chief of Skill Labour/Kepala TukangL.03Manday0.300$121,000$36,300Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$504,350BMATERIALS/BAHANDolken wood/Dolken kayu diameter 8-10/400 cmBatang1.2500.0Wood/KayuM30.180$1,650,000$297,000Common nails/Paku biasaKg0.080$19,800$1,584Iron strips/Besi stripKg1.100$11,000$12,100Portland cement/Semen portlandKg35.000$1,375$48,125Sand plug/Pasir pasangM30.150$101,750$15,263Concrete sand/Pasir betonM30.100$101,750$10,175Coral concrete/Koral betonM30.150$518,851$77,828Red Brick/Bata merahBh30.000$798$23,925Zinc plate/Seng platLbr0.250$116,600$29,150Naco window/Jendela nacoBh0.200$99,000$19,800Glass shaft/Kaca polosM20.0800.0Key planting/Kunci tanamBh0.150$27,500$4,125Plywood 4mmLbr0.060$74,800$4,488MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$543,562CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$1,047,912EOverhead & Profit (Contoh 15%)15% x D157,186.81FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,205,098.91A. 2.2.1.6 Making 1m2 guard house (wood construction)/Pembuatan 1 m2 rumah jaga (konstruksi kayu)Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.000$82,500$82,500Carpenter/Tukang KayuL.02Manday1.500$99,000$148,500Chief of Skill Labour/Kepala TukangL.03Manday0.150$121,000$18,150Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$255,200BMATERIALS/BAHANWood dolken/Dolken kayu 8-10/400 cmBatang3.0000.0Wood/KayuM30.276$1,650,000$455,400Common nails/Paku biasaKg0.700$19,800$13,860Zinc wave/Seng gelombangKg1.5000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$469,260CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$724,460EOverhead & Profit (Contoh 15%)15% x D108,669.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)833,129.00A. 2.2.1.7 Preparation of 1 m2 warehouse cement and equipment/Pembuatan 1 m2 gudang semen dan peralatanNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.000$82,500$82,500Carpenter/Tukang KayuL.02Manday2.000$99,000$198,000Chief of Skill Labour/Kepala TukangL.03Manday0.200$121,000$24,200Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$310,750BMATERIALS/BAHANWood dolken/Dolken kayu diameter 8-10/400 cmBatang1.7000.0Wood/KayuM30.210$1,650,000$346,500Common nails/Paku biasaKg0.300$19,800$5,940Portland cement/Semen portlandKg10.500$1,375$14,438Concrete sand/Pasir betonM30.030$101,750$3,053Concrete coral/Koral betonM30.050$518,851$25,943Zinc wave/Seng gelombangLbr1.5000.0Zinc plate/Seng platLbr0.250$116,600$29,150MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$425,023CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$735,773EOverhead & Profit (Contoh 15%)15% x D110,365.88FUnit Price Work/Harga Satuan Pekerjaan (D+E)846,138.41A. 2.2.1.8 Preparation of 1 m2 plots worker/Pembuatan 1 m2 bedeng pekerjaNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.000$82,500$82,500Carpenter/Tukang KayuL.02Manday2.000$99,000$198,000Chief of Skill Labour/Kepala TukangL.03Manday0.200$121,000$24,200Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$310,750BMATERIALS/BAHANWood dolken/Dolken kayu diameter 8-10/400 cmBatang1.2500.0Wood/KayuM30.186$1,650,000$306,900Common nails/Paku biasaKg0.300$19,800$5,940Portland cement/Semen portlandKg18.000$1,375$24,750Concrete sand/Pasir betonM30.030$101,750$3,053Concrete coral/Koral betonM30.050$518,851$25,943Zinc Wave/Seng gelombangLbr1.5000.0Zinc plate/Seng platLbr1.350$116,600$157,410MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$523,995CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$834,745EOverhead & Profit (Contoh 15%)15% x D125,211.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)959,956.79A. 2.2.1.9 Cleaning 1 m2 field and leveling/Pembersihan 1 m2 lapangan dan perataanNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.100$82,500$8,250Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$14,300BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHANCEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$14,300EOverhead & Profit (Contoh 15%)15% x D2,145.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)16,445.00A. 2.2.1.10 Preparation of 1 m2 steger/scaffolding of bamboo / Pembuatan 1 m2 steger/perancah dari bambuNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.000$82,500$82,500Labour/Tukang KayuL.02Manday2.000$99,000$198,000Chief of Skill Labour/Kepala TukangL.03Manday0.200$121,000$24,200Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$310,750BMATERIALS/BAHANBamboo/Bambu diameter 6-8/600 cmBatang1.250$55,000$68,750Rope ijuk/Tali ijukM30.186$26,400$4,910MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$73,660CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$384,410EOverhead & Profit (Contoh 15%)15% x D57,661.56FUnit Price Work/Harga Satuan Pekerjaan (D+E)442,071.96A. 2.2.1.11 Preparation of 1 piece box 40cm x 50cm x mix 25cm/Pembuatan 1 buah kotak adukan 40cm x 50cm x 25cmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGACarpenter/Tukang KayuL.02Manday0.300$99,000$29,700Chief of Skill Labour/Kepala TukangL.03Manday0.030$121,000$3,630MANPOWER TOTAL / JUMLAH TENAGA KERJA$33,330BMATERIALS/BAHANWooden board class III/Kayu papan kelas IIIM30.036$3,630,000$130,680Wood beams 5/7 class III/Kayu balok 5/7 kelas IIIM3Common nails/Paku biasaKg0.080$16,500$1,320MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$132,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$165,330EOverhead & Profit (Contoh 15%)15% x D24,799.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)190,129.50A. 2.2.1.12 Preparation of 1 m2 of temporary road/Pembuatan 1 m2 jalan sementaraNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.011.000$82,500$82,500Foreman/MandorL.040.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$88,550BMATERIALS/BAHANRock split/Batu belahM30.150$385,000$57,750Crushed stone/Batu pecahM30.090$518,851$46,697Sand plug/Pasir pasangM30.010$101,750$1,018MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$105,464CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$194,014EOverhead & Profit (Contoh 15%)15% x D29,102.11FUnit Price Work/Harga Satuan Pekerjaan (D+E)223,116.16A. 2.2.1.13 Demolition of 1 m3 of reinforced concrete/Pembongkaran 1 m3 beton bertulangNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.0113.334$82,500$1,100,055Foreman/MandorL.040.666$121,000$80,586MANPOWER TOTAL / JUMLAH TENAGA KERJA$1,180,641BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHANCEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$1,180,641EOverhead & Profit (Contoh 15%)15% x D177,096.15FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,357,737.15A. 2.2.1.14 Demolition of concrete walls 1m3/Pembongkaran 1 m3 dinding tembok betonNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.016.667$82,500$550,028Foreman/MandorL.040.333$121,000$40,293MANPOWER TOTAL / JUMLAH TENAGA KERJA$590,321BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHANCEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$590,321EOverhead & Profit (Contoh 15%)15% x D88,548.08FUnit Price Work/Harga Satuan Pekerjaan (D+E)678,868.58A. 2.2.1.15 Installation of 1 m2 of galvanized mesh fence wire length of 240 cm/Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.010.042$82,500$3,465Labour/TukangL.020.004$99,000$396Chief of Skill Labour/Kepala TukangL.030.002$121,000$242Foreman/MandorL.040.042$121,000$5,082MANPOWER TOTAL / JUMLAH TENAGA KERJA$9,185BMATERIALS/BAHANWire netting/Kawat JaringLbr0.143$30,800$4,417MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$4,417CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$13,602EOverhead & Profit (Contoh 15%)15% x D2,040.26FUnit Price Work/Harga Satuan Pekerjaan (D+E)15,641.98A. 2.2.1.16 Installation of 1 m2 of precast concrete panels 5x50x213 cm/Pemasangan 1 m2 panel beton pracetak 5x50x213 cmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.010.375$82,500$30,938Skill labour/TukangL.020.125$99,000$12,375Chief of Skill Labour/Kepala TukangL.030.012$121,000$1,452Foreman/MandorL.040.019$121,000$2,299MANPOWER TOTAL / JUMLAH TENAGA KERJA$47,064BMATERIALS/BAHANPrecast concrete panels/Panel beton pracetakLbr0.9860.0Precast concrete columns/ Kolom beton pracetakBtg0.5250.0Portland cement/Semen PCKg$45$1,375$61,875Concrete sand/Pasir betonM30.074$101,750$7,530Coral/KoralM30.146$518,851$75,752MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$145,157CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$192,220EOverhead & Profit (Contoh 15%)15% x D28,833.03FUnit Price Work/Harga Satuan Pekerjaan (D+E)221,053.22A. 2.3.1 GROUND WORK UNIT PRICE/HARGA SATUAN PEKERJAAN TANAHA. 2.3.1.1 1 m3 of ordinary soil excavation depth of 1 m/Penggalian 1 m3 tanah biasa sedalam 1 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.750$82,500$61,875Foreman/MandorL.04Manday0.025$121,000$3,025MANPOWER TOTAL / JUMLAH TENAGA KERJA$64,900BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$64,900EOverhead & Profit (Contoh 15%)15% x D9,735.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)74,635.00A. 2.3.1.2 1 m3 of ordinary soil excavation depth of 2 m/Penggalian 1 m3 tanah biasa sedalam 2 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.900$82,500$74,250Foreman/MandorL.04Manday0.045$121,000$5,445MANPOWER TOTAL / JUMLAH TENAGA KERJA$79,695BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$79,695EOverhead & Profit (Contoh 15%)15% x D11,954.25FUnit Price Work/Harga Satuan Pekerjaan (D+E)91,649.25A. 2.3.1.3 1 m3 of ordinary soil excavation depth of 3 m/Penggalian 1 m3 tanah biasa sedalam 3 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.050$82,500$86,625Foreman/MandorL.04Manday0.067$121,000$8,107MANPOWER TOTAL / JUMLAH TENAGA KERJA$94,732BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$94,732EOverhead & Profit (Contoh 15%)15% x D14,209.80FUnit Price Work/Harga Satuan Pekerjaan (D+E)108,941.80A. 2.3.1.4 1m3 digging hard soil as deep as 1 m/Menggali 1 m3 tanah keras sedalam 1 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.000$82,500$82,500Foreman/MandorL.04Manday0.032$121,000$3,872MANPOWER TOTAL / JUMLAH TENAGA KERJA$86,372BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$86,372EOverhead & Profit (Contoh 15%)15% x D12,955.80FUnit Price Work/Harga Satuan Pekerjaan (D+E)99,327.80A. 2.3.1.5 1m3 Digging deep rocky soil 1m3 1 m/Menggali 1 m3 tanah cadas sedalam 1 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Foreman/MandorL.04Manday0.060$121,000$7,260MANPOWER TOTAL / JUMLAH TENAGA KERJA$131,010BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$131,010EOverhead & Profit (Contoh 15%)15% x D19,651.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)150,661.50A. 2.3.1.6 Digging deep rocky soil 1m3 1 m/Menggali 1 m3 tanah lumpur sedalam 1 mNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.200$82,500$99,000Foreman/MandorL.04Manday0.045$121,000$5,445MANPOWER TOTAL / JUMLAH TENAGA KERJA$104,445BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$104,445EOverhead & Profit (Contoh 15%)15% x D15,666.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)120,111.75A. 2.3.1.7 Work soil stripping 1m2 1 meter high cliff/Pengerjaan stripping 1m2 tanah tebing setinggi 1 meterNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.050$82,500$4,125Foreman/MandorL.04Manday0.005$121,000$605MANPOWER TOTAL / JUMLAH TENAGA KERJA$4,730BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$4,730EOverhead & Profit (Contoh 15%)15% x D709.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)5,439.50A. 2.3.1.8 Disposal of 1m3 of land as far as 30 meters/Pembuangan 1 m3 tanah sejauh 30 meterNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.330$82,500$27,225Foreman/MandorL.04Manday0.010$121,000$1,210MANPOWER TOTAL / JUMLAH TENAGA KERJA$28,435BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$28,435EOverhead & Profit (Contoh 15%)15% x D4,265.25FUnit Price Work/Harga Satuan Pekerjaan (D+E)32,700.25A. 2.3.1.9 Return 1 m3 of excavation backfill soil/Pengurukan kembali 1 m3 galian tanah1 m3 of excavation backfill back calculated from the third times the coefficient of excavation work/Pengurukan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galianNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.500$82,500$41,250Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$47,300BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$47,300EOverhead & Profit (Contoh 15%)15% x D7,095.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)54,395.00A. 2.3.1.10 1 m3 of soil compaction (per 20 cm)/Pemadatan tanah 1 m3 tanah ( per 20cm )Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.500$82,500$41,250Foreman/MandorL.04Manday0.050$121,000$6,050MANPOWER TOTAL / JUMLAH TENAGA KERJA$47,300BMATERIALS/BAHANMATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$47,300EOverhead & Profit (Contoh 15%)15% x D7,095.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)54,395.00A. 2.3.1.11 Hoarding 1 m3 of sand urug/Pengurugan 1 m3 dengan pasir urugNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.300$82,500$24,750Foreman/MandorL.04Manday0.010$121,000$1,210MANPOWER TOTAL / JUMLAH TENAGA KERJA$25,960BMATERIALS/BAHANPasir UrugM31.200$71,500$85,800MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$85,800CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$111,760EOverhead & Profit (Contoh 15%)15% x D16,764.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)128,524.00A. 2.3.1.12 Installation of 1 m3 layer poodle mix 1KP: 3PP: 7TL/Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TLNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.800$82,500$66,000Skill Labour/TukangL.02Manday0.400$99,000$39,600Chief of Skill Labour/Kepala TukangL.03Manday0.040$121,000$4,840Foreman/MandorL.04Manday0.080$121,000$9,680MANPOWER TOTAL / JUMLAH TENAGA KERJA$120,120BMATERIALS/BAHANLime outages/Kapur PadamM30.1350.0Sand plug/Pasir PasangM30.400$101,750$40,700Clay/Tanah LiatM30.948$55,000$52,140MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$92,840CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$212,960EOverhead & Profit (Contoh 15%)15% x D31,944.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)244,904.00A. 2.3.1.13 Installation of 1 m2 10 cm thick layer of fibers for leach field/Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapanNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.150$82,500$12,375Foreman/MandorL.04Manday0.015$121,000$1,815MANPOWER TOTAL / JUMLAH TENAGA KERJA$14,190BMATERIALS/BAHANFibers/IjukM36.000$26,400$158,400MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$158,400CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$172,590EOverhead & Profit (Contoh 15%)15% x D25,888.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)198,478.50A. 2.3.1.14 hoarding 1 m3 of solid gravel/Pengurugan 1 m3 sirtu padatNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.250$82,500$20,625Foreman/MandorL.04Manday0.025$121,000$3,025MANPOWER TOTAL / JUMLAH TENAGA KERJA$23,650BMATERIALS/BAHANGravel soil/SirtuM31.200$88,000$105,600MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$105,600CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$129,250EOverhead & Profit (Contoh 15%)15% x D19,387.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)148,637.50A. 3.2.1 WORK UNIT PRICE FOUNDATION/HARGA SATUAN PEKERJAAN PONDASIA. 3.2.1.1 Laying the foundation stone of 1 m3 sides mixture 1SP: 3PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg202.000$1,375$277,750Sand plug/Pasir pasangM30.485$101,750$49,349MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$789,099CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$1,005,249EOverhead & Profit (Contoh 15%)15% x D150,787.31FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,156,036.06A. 3.2.1.2 Laying the foundation stone of 1 m3 sides mixture 1SP: 4PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg163.000$1,375$224,125Sand plug/Pasir pasangM30.520$101,750$52,910JUMLAH HARGA BAHAN$739,035CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$955,185EOverhead & Profit (Contoh 15%)15% x D143,277.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,098,462.75A. 3.2.1.3 Laying the foundation stone of 1 m3 sides mix 1 SP: 5 PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg136.000$1,375$187,000Sand plug/Pasir pasangM30.544$101,750$55,352MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$704,352CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$920,502EOverhead & Profit (Contoh 15%)15% x D138,075.30FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,058,577.30A. 3.2.1.4 Laying the foundation stone of 1 m3 sides mixture 1SP: 6PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg117.000$1,375$160,875Sand plug/Pasir pasangM30.561$101,750$57,082MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$679,957CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$896,107EOverhead & Profit (Contoh 15%)15% x D134,416.01FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,030,522.76A. 3.2.1.5 Laying the foundation stone of 1 m3 sides mixture 1SP: 8PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg91.000$1,375$125,125Sand plug/Pasir pasangM30.584$101,750$59,422MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$646,547CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$862,697EOverhead & Profit (Contoh 15%)15% x D129,404.55FUnit Price Work/Harga Satuan Pekerjaan (D+E)992,101.55A. 3.2.1.6 Laying the foundation stone of 1 m3 sides mixture 1SP: 1KP: 2PP/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Lime/KapurM30.1700.0Portland cement/Semen portlandKg0.170$1,375$234Sand plug/Pasir pasangM30.340$101,750$34,595MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$496,829CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$712,979EOverhead & Profit (Contoh 15%)15% x D106,946.81FUnit Price Work/Harga Satuan Pekerjaan (D+E)819,925.56A. 3.2.1.7 Laying the foundation stone of 1 m3 sides mixture 1SP: 3KP: 10pp/Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3KP : 10PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg61.000$1,375$83,875Lime/KapurM30.1470.0Sand plug/Pasir pasangM30.492$101,750$50,061MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$595,936CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$812,086EOverhead & Profit (Contoh 15%)15% x D121,812.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)933,898.90A. 3.2.1.8 Laying the foundation stone of 1 m3 sides mix 1/4 SP: 1 KP: 4PP / Pemasangan 1 m3 pondasi batu belah campuran 1/4SP : 1KP : 4PPNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.500$82,500$123,750Mason/Tukang BatuL.02Manday0.750$99,000$74,250Chief of Skill Labour/Kepala TukangL.03Manday0.075$121,000$9,075Foreman/MandorL.04Manday0.075$121,000$9,075MANPOWER TOTAL / JUMLAH TENAGA KERJA$216,150BMATERIALS/BAHANRock split/ Batu belahM31.200$385,000$462,000Portland cement/Semen portlandKg41.000$1,375$56,375Lime/KapurM30.1310.0Sand plug/Pasir pasangM30.523$101,750$53,215MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$462,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$678,150EOverhead & Profit (Contoh 15%)15% x D101,722.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)779,872.50A. 3.2.1.9 Installation of 1 m3 of empty stone (aanstamping)/Pemasangan 1 m3 batu kosong (anstamping)Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.780$82,500$64,350Mason/Tukang BatuL.02Manday0.390$99,000$38,610Chief of Skill Labour/Kepala TukangL.03Manday0.039$121,000$4,719Foreman/MandorL.04Manday0.039$121,000$4,719MANPOWER TOTAL / JUMLAH TENAGA KERJA$112,398BMATERIALS/BAHANRock split/Batu belahM31.200$385,000$462,000Sand pile/Pasir urugM30.432$71,500$30,888MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$492,888CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$605,286EOverhead & Profit (Contoh 15%)15% x D90,792.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)696,078.90A. 3.2.1.10 Laying the foundation Cyclops 1 m3, 60% of concrete mix 1 SP: 2 PB: 3 Kr and 40% split stone / Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3 Kr dan 40% batu belahNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.780$82,500$64,350Mason/Tukang BatuL.02Manday0.390$99,000$38,610Chief of Skill Labour/Kepala TukangL.03Manday0.039$121,000$4,719Foreman/MandorL.04Manday0.039$121,000$4,719MANPOWER TOTAL / JUMLAH TENAGA KERJA$112,398BMATERIALS/BAHANRock split/Batu belahM30.480$385,000$184,800Portland cement/Semen portlandKg194.000$1,375$266,750Concrete sand/Pasir betonM30.312$101,750$31,746Gravel/KerikilM30.468$440,000$205,920Concrete steel/Besi betonKg126.000$20,900$2,633,400Concrete wire/Kawat betonKg1.800$19,800$35,640MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$3,358,256CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$3,470,654EOverhead & Profit (Contoh 15%)15% x D520,598.10FUnit Price Work/Harga Satuan Pekerjaan (D+E)3,991,252.10A. 3.2.1.11 Laying the foundation sinks 1 m3, diameter 100 cm/Pemasangan 1 m3 pondasi sumuran, diameter 100 cmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday2.400$82,500$198,000Mason/Tukang BatuL.02Manday0.800$99,000$79,200Chief of Skill Labour/Kepala TukangL.03Manday0.080$121,000$9,680Foreman/MandorL.04Manday0.119$121,000$14,399MANPOWER TOTAL / JUMLAH TENAGA KERJA$301,279BMATERIALS/BAHANRock split/Batu belahM30.450$385,000$173,250Portland cement/Semen portlandKg194.000$1,375$266,750Concrete sand/Pasir betonM30.312$101,750$31,746Gravel/KerikilM30.468$440,000$205,920MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$677,666CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$978,945EOverhead & Profit (Contoh 15%)15% x D146,841.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,125,786.75A. 4.1.1 CONCRETE WORK UNIT PRICE/HARGA SATUAN PEKERJAAN BETONA. 4.1.1.1 Makes 1 m3 of concrete quality f'c = 7.4 MPa (K 100), slump (12 2) cm, w / c = 0.87 / Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0.87Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg$247$1,375$339,625Concrete sand/Pasir betonKg$8690.0gravel/Kerikil (Maks. 30mm)Kg$9990.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$339,625CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$516,406EOverhead & Profit (Contoh 15%)15% x D77,460.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)593,866.90A. 4.1.1.2 Makes 1 m3 of concrete quality f'c = 9.8 MPa (K 125), slump (12 2) cm, w / c = 0.78 / Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 2) cm, w/c = 0.78Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg276.000$1,375$379,500Concrete sand/Pasir betonKg$828$101,750$84,249,000Gravel/Kerikil (Maks. 30mm)Kg$1,0120.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$84,628,500CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$84,805,281EOverhead & Profit (Contoh 15%)15% x D12,720,792.15FUnit Price Work/Harga Satuan Pekerjaan (D+E)97,526,073.15A. 4.1.1.3 Makes 1 m3 of concrete f'c = 12.2 MPa quality (K150), slump (12 2) cm, w / c = 0.72 / Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150), slump (12 2) cm, w/c = 0.72Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg299.000$1,375$411,125Concrete sand/Pasir betonKg$7990.0gravel/Kerikil (Maks. 30mm)Kg$1,0170.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$411,125CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$587,906EOverhead & Profit (Contoh 15%)15% x D88,185.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)676,091.90NOTE/CATATANBulk density = 1400 kg/m3 sand, gravel content Weight = 1350 kg/m3, Buckling factor = 20% sand / Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%A. A. 4.1.1.4 Makes 1 m3 of concrete floor quality work f'c = 7.4 MPa (K 100), slump (3-6) cm, w / c = 0.87 / Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3 - 6)cm, w/c = 0.87Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.200$82,500$99,000Mason/Tukang BatuL.02Manday0.200$99,000$19,800Chief of Skill Labour/Kepala TukangL.03Manday0.020$121,000$2,420Foreman/MandorL.04Manday0.060$121,000$7,260MANPOWER TOTAL / JUMLAH TENAGA KERJA$128,480BMATERIALS/BAHANPortland cement/Semen portlandKg230.000$1,375$316,250Concrete sand/Pasir betonKg$8930.0Gravel/Kerikil (Maks. 30mm)Kg$1,0270.0Water/AirLiter$2000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$316,250CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$444,730EOverhead & Profit (Contoh 15%)15% x D66,709.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)511,439.50A. A. 4.1.1.5 Makes 1 m3 of concrete f'c = 14.5 MPa quality (K 175), slump (12 2) cm, w / c = 0.66 / Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 2)cm, w/c = 0.66Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg326.000$1,375$448,250Concrete sand/Pasir betonKg$7600.0Gravel/Kerikil (Maks. 30mm)Kg$1,0290.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$448,250CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$625,031EOverhead & Profit (Contoh 15%)15% x D93,754.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)718,785.65A. A. 4.1.1.6 Makes 1 m3 of concrete f'c = 16.9 MPa quality (K 200), slump (12 2) cm, w / c = 0.61 / Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 2)cm, w/c = 0.61Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg352.000$1,375$484,000Concrete sand/Pasir betonKg$7310.0Gravel/Kerikil (Maks. 30mm)Kg$1,0310.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$484,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$660,781EOverhead & Profit (Contoh 15%)15% x D99,117.15FUnit Price Work/Harga Satuan Pekerjaan (D+E)759,898.15A. 4.1.1.7 Makes 1 m3 of concrete f'c = 19.3 MPa quality (K 225), slump (12 2) cm, w / c = 0:58 / Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 2)cm, w/c = 0.58Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg371.000$1,375$510,125Concrete sand/Pasir betonKg$6980.0Gravel/Kerikil (Maks. 30mm)Kg$1,0470.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$510,125CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$686,906EOverhead & Profit (Contoh 15%)15% x D103,035.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)789,941.90A. 4.1.1.8 Makes 1 m3 of concrete f'c = 21.7 MPa quality (K 250), slump (12 2) cm, w / c = 0:56 / Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 2)cm, w/c = 0.56Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg384.000$1,375$528,000Concrete sand/Pasir betonKg$6920.0Gravel/Kerikil (Maks. 30mm)Kg$1,0390.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$528,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$704,781EOverhead & Profit (Contoh 15%)15% x D105,717.15FUnit Price Work/Harga Satuan Pekerjaan (D+E)810,498.15A. 4.1.1.9 Makes 1 m3 of concrete f'c = 24.0 MPa quality (K 275), slump (12 2) cm, w / c = 0:53 / Membuat 1 m3 beton mutu f'c = 24.0 Mpa (K 275), slump (12 2)cm, w/c = 0.53Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg406.000$1,375$558,250Concrete sand/Pasir betonKg$6840.0Gravel/Kerikil (Maks. 30mm)Kg$1,0260.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$558,250CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$735,031EOverhead & Profit (Contoh 15%)15% x D110,254.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)845,285.65A. 4.1.1.10 Makes 1 m3 of concrete f'c = 26.4 MPa quality (K 300), slump (12 2) cm, w / c = 0:52 / Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K 300), slump (12 2)cm, w/c = 0.52Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday1.650$82,500$136,125Mason/Tukang BatuL.02Manday0.275$99,000$27,225Chief of Skill Labour/Kepala TukangL.03Manday0.028$121,000$3,388Foreman/MandorL.04Manday0.083$121,000$10,043MANPOWER TOTAL / JUMLAH TENAGA KERJA$176,781BMATERIALS/BAHANPortland cement/Semen portlandKg413.000$1,375$567,875Concrete sand/Pasir betonKg$6810.0Gravel/Kerikil (Maks. 30mm)Kg$1,0210.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$567,875CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$744,656EOverhead & Profit (Contoh 15%)15% x D111,698.40FUnit Price Work/Harga Satuan Pekerjaan (D+E)856,354.40A. 4.1.1.11 Makes 1 m3 of concrete f'c = 28.8 MPa quality (K 325), slump (12 2) cm, w / c = 0:49 / Membuat 1 m3 beton mutu f'c = 28.8 Mpa (K 325), slump (12 2)cm, w/c = 0.49Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday2.100$82,500$173,250Mason/Tukang BatuL.02Manday0.350$99,000$34,650Chief of Skill Labour/Kepala TukangL.03Manday0.035$121,000$4,235Foreman/MandorL.04Manday0.105$121,000$12,705MANPOWER TOTAL / JUMLAH TENAGA KERJA$224,840BMATERIALS/BAHANPortland cement/Semen portlandKg439.000$1,375$603,625Concrete sand/Pasir betonKg$6700.0Gravel/Kerikil (Maks. 30mm)Kg$1,0060.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$603,625CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$828,465EOverhead & Profit (Contoh 15%)15% x D124,269.75FUnit Price Work/Harga Satuan Pekerjaan (D+E)952,734.75A. 4.1.1.12 Makes 1 m3 of concrete f'c = 31.2 MPa quality (K 350), slump (12 2) cm, w / c = 0:48 / Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K 350), slump (12 2)cm, w/c = 0.48Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday2.100$82,500$173,250Mason/Tukang BatuL.02Manday0.350$99,000$34,650Chief of Skill Labour/Kepala TukangL.03Manday0.035$121,000$4,235Foreman/MandorL.04Manday0.105$121,000$12,705MANPOWER TOTAL / JUMLAH TENAGA KERJA$224,840BMATERIALS/BAHANPortland cement/Semen portlandKg448.000$1,375$616,000Concrete sand/Pasir betonKg$6670.0Gravel/Kerikil (Maks. 30mm)Kg$1,0000.0Water/AirLiter$2150.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$616,000CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$840,840EOverhead & Profit (Contoh 15%)15% x D126,126.00FUnit Price Work/Harga Satuan Pekerjaan (D+E)966,966.00A. 4.1.1.13 Makes 1 m3 of concrete with a water-resistant strorox - 100 / Membuat 1 m3 beton kedap air dengan strorox - 100Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday2.100$82,500$173,250Labour/Tukang BatuL.02Manday0.350$99,000$34,650Chief of Skill Labour/Kepala TukangL.03Manday0.035$121,000$4,235Foreman/MandorL.04Manday0.105$121,000$12,705MANPOWER TOTAL / JUMLAH TENAGA KERJA$224,840BMATERIALS/BAHANPortland cement/Semen portlandKg400.000$1,375$550,000Concrete sand/Pasir betonm30.480$101,750$48,840Gravel/Kerikil (2cm / 3cm)m30.800$518,851$415,080Strorox - 100Liter1.2000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$1,013,920CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$1,238,760EOverhead & Profit (Contoh 15%)15% x D185,814.07FUnit Price Work/Harga Satuan Pekerjaan (D+E)1,424,574.57A. 4.1.1.14 Installation of 1 m PVC. Waterstop width of 150 mm/ Pemasangan 1 m PVC Waterstop lebar 150 mmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.060$82,500$4,950Masons/plumbers/Tukang Batu/PipaL.02Manday0.030$99,000$2,970Chief of Skill Labour/Kepala TukangL.03Manday0.003$121,000$363Foreman/MandorL.04Manday0.003$121,000$363MANPOWER TOTAL / JUMLAH TENAGA KERJA$8,646BMATERIALS/BAHANWidth of waterstop/Waterstop lebar 150 mmM1.0500.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$8,646EOverhead & Profit (Contoh 15%)15% x D1,296.90FUnit Price Work/Harga Satuan Pekerjaan (D+E)9,942.90A. 4.1.1.15 Installation of 1 m width 200 mm PVC waterstop / Pemasangan 1 m PVC Waterstop lebar 200 mmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.070$82,500$5,775Masons/plumbers/Tukang Batu/PipaL.02Manday0.035$99,000$3,465Chief of Skill Labour/Kepala TukangL.03Manday0.004$121,000$484Foreman/MandorL.04Manday0.007$121,000$847MANPOWER TOTAL / JUMLAH TENAGA KERJA$10,571BMATERIALS/BAHANWidth of waterstop/Waterstop lebar 200 mmM1.0500.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$10,571EOverhead & Profit (Contoh 15%)15% x D1,585.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)12,156.65A. 4.1.1.16 Installation of 1 m PVC waterstop width 230 mm - 320 mm / Pemasangan 1 m PVC Waterstop lebar 230 mm - 320 mmNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.080$82,500$6,600Mason/Tukang BatuL.02Manday0.040$99,000$3,960Chief of Skill Labour/Kepala TukangL.03Manday0.004$121,000$484Foreman/MandorL.04Manday0.004$121,000$484MANPOWER TOTAL / JUMLAH TENAGA KERJA$11,528BMATERIALS/BAHANWidth of waterstop/Waterstop lebar 230 mm - 320 mmM1.0500.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN0.0CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$11,528EOverhead & Profit (Contoh 15%)15% x D1,729.20FUnit Price Work/Harga Satuan Pekerjaan (D+E)13,257.20A. 4.1.1.17 10 kg of steel reinforcement with plain or threaded iron / Pembesian 10 kg with a plain iron or steel threaded / Pembesian 10 kg dengan besi polos atau besi ulirNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.070$82,500$5,775Vulcan/Tukang BesiL.02Manday0.070$99,000$6,930Chief of Skill Labour/Kepala TukangL.03Manday0.007$121,000$847Foreman/MandorL.04Manday0.004$121,000$484MANPOWER TOTAL / JUMLAH TENAGA KERJA$14,036BMATERIALS/BAHANReinforced concrete (plain/threaded)Besi beton (polos/ulir)Kg10.500$20,900$219,450Concrete wire/Kawat betonKg0.150$19,800$2,970MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$222,420CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$236,456EOverhead & Profit (Contoh 15%)15% x D35,468.40FUnit Price Work/Harga Satuan Pekerjaan (D+E)271,924.40A. 4.1.1.18 Installation cable 10 kg presstressed plain / strands / Pemasangan 10 kg kabel presstressed polos/strandsNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.050$82,500$4,125Labour/Tukang BesiL.02Manday0.050$99,000$4,950Chief of Skill Labour/Kepala TukangL.03Manday0.005$121,000$605Foreman/MandorL.04Manday0.003$121,000$363MANPOWER TOTAL / JUMLAH TENAGA KERJA$10,043BMATERIALS/BAHANReinforced concrete (plain/threaded)/Besi beton (polos/ulir)Kg10.500$20,900$219,450Concrete wire/Kawat betonKg0.100$19,800$1,980MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$221,430CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$231,473EOverhead & Profit (Contoh 15%)15% x D34,720.95FUnit Price Work/Harga Satuan Pekerjaan (D+E)266,193.95A. 4.1.1.19 Installation of 10 kg of steel wire (wiremesh)/Pemasangan 10 kg jaring kawat baja (wiremesh)Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.025$82,500$2,063Vulcan/Tukang BesiL.02Manday0.025$99,000$2,475Chief of Skill Labour/Kepala TukangL.03Manday0.025$121,000$3,025Foreman/MandorL.04Manday0.001$121,000$121MANPOWER TOTAL / JUMLAH TENAGA KERJA$7,684BMATERIALS/BAHANWelded steel wire mesh/Jaring kawat baja di lasKg10.2000.0Concrete wire/Kawat betonKg0.050$19,800$990MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$990CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$8,674EOverhead & Profit (Contoh 15%)15% x D1,301.03FUnit Price Work/Harga Satuan Pekerjaan (D+E)9,974.53A. 4.1.1.20 Installation of 1 m2 of formwork for the foundation/Pemasangan 1 m2 bekisting untuk pondasiNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.520$82,500$42,900Carpenter/Tukang KayuL.02Manday0.260$99,000$25,740Chief of Skill Labour/Kepala TukangL.03Manday0.026$121,000$3,146Foreman/MandorL.04Manday0.026$121,000$3,146MANPOWER TOTAL / JUMLAH TENAGA KERJA$74,932BMATERIALS/BAHANTimber class III/Wood Kayu kelas IIIM30.040$3,630,000$145,200Nail/Paku 5 - 10 cmKg0.300$16,500$4,950Formwork oil/Minyak bekistingLiter0.100$13,200$1,320MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$151,470CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$226,402EOverhead & Profit (Contoh 15%)15% x D33,960.30FUnit Price Work/Harga Satuan Pekerjaan (D+E)260,362.30A. 4.1.1.21 Installation of 1 m2 of formwork for sloof/Pemasangan 1 m2 bekisting untuk sloofNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.520$82,500$42,900Carpenter/Tukang KayuL.02Manday0.260$99,000$25,740Chief of Skill Labour/Kepala TukangL.03Manday0.026$121,000$3,146Foreman/MandorL.04Manday0.026$121,000$3,146MANPOWER TOTAL / JUMLAH TENAGA KERJA$74,932BMATERIALS/BAHANTimber class III/Kayu kelas IIIM30.045$3,630,000$163,350Nail/Paku 5 - 10 cmKg0.300$16,500$4,950Formwork oil/Minyak bekistingLiter0.100$13,200$1,320MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$169,620CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$244,552EOverhead & Profit (Contoh 15%)15% x D36,682.80FUnit Price Work/Harga Satuan Pekerjaan (D+E)281,234.80A. 4.1.1.22 Installation of 1 m2 of formwork for columns/Pemasangan 1 m2 bekisting untuk kolomNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.660$82,500$54,450Carpenter/Tukang KayuL.02Manday0.330$99,000$32,670Chief of Skill Labour/Kepala TukangL.03Manday0.033$121,000$3,993Foreman/MandorL.04Manday0.033$121,000$3,993MANPOWER TOTAL / JUMLAH TENAGA KERJA$95,106BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.040$3,630,000$145,200Nail/Paku 5 - 12 cmKg0.400$16,500$6,600Formwork oli/Minyak bekistingLiter0.200$13,200$2,640Wooden blocks class II/Balok kayu kelas IIM30.015$6,600,000$99,000Plywood tebal 9 mmLbr0.350$137,500$48,125Wood dolken/Dolken kayu 8-10cm long/panjang 4 meterBatang2.0000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$301,565CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$396,671EOverhead & Profit (Contoh 15%)15% x D59,500.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)456,171.65A. 4.1.1.23 Installation of 1 m2 of formwork for the beams/Pemasangan 1 m2 bekisting untuk balokNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.660$82,500$54,450Carpenter/Tukang KayuL.02Manday0.330$99,000$32,670Chief of Skill Labour/Kepala TukangL.03Manday0.033$121,000$3,993Foreman/MandorL.04Manday0.033$121,000$3,993MANPOWER TOTAL / JUMLAH TENAGA KERJA$95,106BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.040$3,630,000$145,200Nail/Paku 5 - 12 cmKg0.400$16,500$6,600Formwork oil/Minyak bekistingLiter0.200$13,200$2,640Wooden blocks class/Balok kayu kelas IIM30.018$6,600,000$118,800Plywood tebal 9 mmLbr0.350$137,500$48,125Galam wood dolken/Dolken kayu galam 8-10cm long/panjang 4 meterBatang2.0000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$321,365CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$416,471EOverhead & Profit (Contoh 15%)15% x D62,470.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)478,941.65A. 4.1.1.24 Installation of 1 m2 of formwork for floor/Pemasangan 1 m2 bekisting untuk lantaiNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.660$82,500$54,450Carpenter/Tukang KayuL.02Manday0.330$99,000$32,670Chief of Skill Labour/Kepala TukangL.03Manday0.033$121,000$3,993Foreman/MandorL.04Manday0.033$121,000$3,993MANPOWER TOTAL / JUMLAH TENAGA KERJA$95,106BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.040$3,630,000$145,200Nail/Paku 5 - 12 cmKg0.400$16,500$6,600Formwork oil/Minyak bekistingLiter0.200$13,200$2,640Wooden blocks class/Balok kayu kelas IIM30.015$6,600,000$99,000Plywood tebal 9 mmLbr0.350$137,500$48,125Galam wood dolken/Dolken kayu galam 8-10cm long/panjang 4 meterBatang6.0000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$301,565CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$396,671EOverhead & Profit (Contoh 15%)15% x D59,500.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)456,171.65A. 4.1.1.25 Installation of 1 m2 of formwork for walls / Pemasangan 1 m2 bekisting untuk dindingNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.660$82,500$54,450Labour/Tukang KayuL.02Manday0.330$99,000$32,670Chief of Skill Labour/Kepala TukangL.03Manday0.033$121,000$3,993Foreman/MandorL.04Manday0.033$121,000$3,993MANPOWER TOTAL / JUMLAH TENAGA KERJA$95,106BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.030$3,630,000$108,900Nail/Paku 5 - 12 cmKg0.400$16,500$6,600Formwork oil/Minyak bekistingLiter0.200$13,200$2,640Wooden blocks class/Balok kayu kelas IIM30.020$6,600,000$132,000Plywood tebal 9 mmLbr0.350$137,500$48,125Dolken wood/Dolken kayu, 8-10cm long/panjang 4 meterBatang3.0000.0Distance formwork guard/spacer / Penjaga jarak bekisting/spacerBuah4.0000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$298,265CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$393,371EOverhead & Profit (Contoh 15%)15% x D59,005.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)452,376.65A. 4.1.1.26 Installation of 1 m2 of formwork for stairs/Pemasangan 1 m2 bekisting untuk tanggaNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.660$82,500$54,450Carpenter/Tukang KayuL.02Manday0.330$99,000$32,670Chief of Skill Labour/Kepala TukangL.03Manday0.033$121,000$3,993Foreman/MandorL.04Manday0.033$121,000$3,993MANPOWER TOTAL / JUMLAH TENAGA KERJA$95,106BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.030$3,630,000$108,900Nail/Paku 5 - 12 cmKg0.400$16,500$6,600Formwork oil/Minyak bekistingLiter0.150$13,200$1,980Wooden block class/Balok kayu kelas IIM30.015$6,600,000$99,000Plywood tebal 9 mmLbr0.350$137,500$48,125Dolken wood/Dolken kayu, 8-10cm long/panjang 4 meterBatang2.0000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$264,605CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$359,711EOverhead & Profit (Contoh 15%)15% x D53,956.65FUnit Price Work/Harga Satuan Pekerjaan (D+E)413,667.65A. 4.1.1.27 Installation of 1 m2 for casting concrete bridge/Pemasangan 1 m2 jembatan untuk pengecoran betonNr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday0.150$82,500$12,375Carpenter/Tukang KayuL.02Manday0.050$99,000$4,950Chief of Skill Labour/Kepala TukangL.03Manday0.005$121,000$605Foreman/MandorL.04Manday0.008$121,000$968MANPOWER TOTAL / JUMLAH TENAGA KERJA$18,898BMATERIALS/BAHANTimber class/Kayu kelas III (papan)M30.026$3,630,000$95,832Nail/Paku 5 - 12 cmKg0.600$16,500$9,900Dolken wood/Dolken kayu, 8-10cm long/panjang 4 meterBatang0.5000.0MATERIAL PRICE TOTAL / JUMLAH HARGA BAHAN$105,732CEQUIPMENT/PERALATANPRICE TOOLS TOTAL / JUMLAH HARGA ALAT0.0DTotal/Jumlah (A+B+C)$124,630EOverhead & Profit (Contoh 15%)15% x D18,694.50FUnit Price Work/Harga Satuan Pekerjaan (D+E)143,324.50A. 4.1.1.28 Makes 1 m3 of reinforced concrete foundation (150 kg iron + formwork)/Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)Nr./No.Description/UraianCodeUnitCoefficientUnit PriceTotal PriceKodeSatuanKoefisienHarga SatuanTotal Harga(Rp.)(RP.)AMANPOWER/TENAGALabour/PekerjaL.01Manday5.300$82,500$437,250Mason/Tukang BatuL.02Manday0.275$99,000$27,225Carpenter/Tukang KayuL.02Manday1.300$99,000$128,700Vulcan/Tukang BesiL.02Manday1.050$99,000$103,950Chief of Skill Labour/Kepala TukangL.03Manday0.262$121,000$31,702Foreman/MandorL.04Manday0.265$121,000$32,065MANPOWER TOTAL / JUMLAH TENAGA KERJA$760,892BMATERIALS/BAHANTimber class/Kayu kelas IIIM30.200$3,630,000$726,000Nail/Paku 5 - 12 cmKg1.500$16,500$24,750Formwork oil/Minyak bekistingLiter0.400$13,200$5,280Plain concrete iron/Be


Top Related