![Page 1: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/1.jpg)
ALAMO COLLEGESFACILITIES ANNUAL UPDATE
John Strybos, PEKyle LeBlanc, PE, CFM, LEED GA
OCTOBER 11, 2016
![Page 2: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/2.jpg)
ALAMO COLLEGES FACILITIES DEPARTMENT
2FACILITIES DEPARTMENT UPDATE
10/11/2016
· More Service, Reduced Resources
· Service = Students, Faculty, Staff, Buildings
· Resources = Personnel, Budget
· Student Support Activities
· Presentations, Awards & Recognition
· Major Design and Construction Projects (2015 – 2016)
· Facility Conditions, Preventive Maintenance
· Energy and Sustainability
· Personnel Staffing
Mission Statement: To provide reliable, cost-effective, and excellent
facilities operations and construction services to the Alamo Colleges.
![Page 3: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/3.jpg)
STUDENT SUPPORT ACTIVITIES
3FACILITIES DEPARTMENT UPDATE
10/11/2016
· Mobile Go Center Events
· Shuttle events
· UPS Store printing and mailing
· Switch board
· College Accreditation data and reports
![Page 4: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/4.jpg)
PRESENTATIONS, AWARDS & RECOGNITION
4FACILITIES DEPARTMENT UPDATE
10/11/2016
· Presenter· 2015 Energy Solutions Exchange
· National Association of College Auxiliary Services (NACAS) Annual Conference
· 96th Annual American Meteorological Society (AMS) Conference
· International District Energy Association (IDEA) Campus Energy 2016
· 2016 TACCBO Annual Meeting and Conference
· 2017 Bond Information at the August Meeting of the San Antonio Chapter of the Institute for Leadership in Capital Projects
· Awards & Recognition· Bill Sinkin Solar Award by the City of San Antonio
· Project Owner of the Year (under $5 MM) at the 2016 Diversity Awards Gala
· General Contractor of the Year for the St. Philip’s College TurbonCenter Renovation (Skanska)
![Page 5: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/5.jpg)
MAJOR DESIGN & CONSTRUCTION PROJECTS (2015 – 2016)
5FACILITIES DEPARTMENT UPDATE
10/11/2016
· PAC – Natatorium HVAC
· SPC – Turbon Building Renovation
· SPC – Veterans Outreach and Transition Center
· SAC – Veterans Outreach Center
· DSO – New Building
· District Wide – May 2017 CIP support
· Eastside Education and Training Center
· CTTC – New Building
· DSO – TAPE application support
![Page 6: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/6.jpg)
FACILITIES PROFILE (2016)
6FACILITIES DEPARTMENT UPDATE
10/11/2016
· 206 Buildings in Inventory (Owned)
· 5.2 MM Square Feet of Facilities
· ~$1.05 B total asset Replacement Value
· Current Facility Condition Index of 12.7% (District-Wide)
· Annual Portfolio Updates (2015, 2016)
· Buildings Added
· Renovation Projects
· Planned Projects for 2017 Annual Update
· Renovation Projects
· Demolition, Removal from Inventory
![Page 7: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/7.jpg)
7FACILITIES DEPARTMENT UPDATE
10/11/2016
Facility Condition Index (FCI)
Importance:
· Relative “score” for portfolio comparison
· Focus effort, prioritize attention
· Objective approach
Keep it Current:
· Living database
· Real-time information for facility decisions, future planning
· Continuously measure building “performance”
Defined: FCI is an index of facility condition based on the cost of deferred
maintenance requirements relative to the building replacement value.
FCI =requirement costs
building replacement value
Low FCI = GoodIndicates a facility is in
“better” condition than
others with a higher FCI.
![Page 8: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/8.jpg)
8FACILITIES DEPARTMENT UPDATE
10/11/2016
FCI and Requirement Index (RI)
Defined: RI is an index of facility condition based on the cost of deferred
maintenance requirements + requirements anticipated in a 5 year outlook relative
to the building replacement value.
RI =all requirement costs + 5 year outlook
building replacement value
Low RI = GoodAnticipate which buildings will be
in “better “ condition compared to
others with a higher RI.
![Page 9: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/9.jpg)
FCI and Requirements Metrics (History)
9FACILITIES DEPARTMENT UPDATE
Campus Abbreviation Legend
DIS-DistrictNLC-Northeast Lakeview College
NVC-Northwest Vista CollegePAC-Palo Alto College
SAC-San Antonio CollegeSPC-St. Philips College
SWC-Southwest Campus
10/11/2016
DIS 156,513 9.1% 10.1% 10.4% 13.6%
NLC 393,296 0.8% 1.1% 1.1% 1.1%
NVC 838,485 1.3% 1.1% 1.1% 1.3%
PAC 565,161 5.7% 6.2% 6.2% 21.3%
SAC 2,009,228 12.4% 12.8% 12.8% 14.7%
SPC 783,699 12.8% 13.8% 13.7% 17.3%
SWC 467,633 9.4% 11.9% 11.7% 12.8%
Total 5,214,015 8.3% 8.9% 8.9% 12.7%
Campus
Size (SF)
2016
FCI
2013 2014 2015 2016
![Page 10: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/10.jpg)
REQUIREMENTS: By Priority
10FACILITIES DEPARTMENT UPDATE
1-Currently Critical (Address Now)
2-Potentially Critical(0-2 Years)
3-Not Yet Critical(3-5 Years)
Not Time Critical
$66K
$222.9 MM
$6.3 MM
$2.5 MM
$231.8 MM Total Identified Requirements
10/11/2016
![Page 11: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/11.jpg)
REQUIREMENTS: By System Types
11FACILITIES DEPARTMENT UPDATE
$231.8 MM Total Identified Requirements
10/11/2016
Structural / Envelope
12.4%
Interiors / Finishes19.2%
Mechanical / Electrical / Plumbing
66.3%
Furniture, Fixtures & Equipment
1.8%
System Types Priority 1 & 2 Priority 3Total Estimated
Cost
Structural / Envelope $ 4,958,981 $ 23,742,441 $ 28,701,422
Interiors / Finishes $ 1,640,594 $ 42,794,237 $ 44,434,831
Mechanical / Electrical /
Plumbing $ 2,195,294 $ 151,457,577 $ 153,652,871
Furniture, Fixtures &
Equipment $ 219 $ 4,180,790 $ 4,181,009
Special Construction $ - $ 804,255 $ 804,255
Total $ 8,795,088 $ 222,979,300 $ 231,774,388
![Page 12: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/12.jpg)
Top 30 Buildings vs. Requirements Total
12FACILITIES DEPARTMENT UPDATE
$231.8 MM Total Identified Requirements
206 Buildings
176 Buildings
85% of Inventory(Owned)
Top 30 Buildings
62%$144.8 MM
38%$87.0 MM
$231.8 MM
10/11/2016
![Page 13: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/13.jpg)
PREVENTIVE MAINTENANCE: Funding Progression
Flattened Funding: $14.5 MM budget for FYE15 – FYE17
13FACILITIES DEPARTMENT UPDATE
10/11/2016
FYE06-FYE17 PM Funding vs. 1% to 5% range of total Building Replacement Value
![Page 14: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/14.jpg)
PREVENTIVE MAINTENANCE: Funding Scenarios & FCI
14FACILITIES DEPARTMENT UPDATE
10/11/2016
Funding levels and FCI
includes Alamo Colleges' facilities which are Owned,
Leased, or are part of a Partnership.
![Page 15: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/15.jpg)
PREVENTIVE MAINTENANCE & FCI: Summary
· Asset value increase of ~$41 MM (since Dec 2014 )
· Campus FCI at PAC and SPC show largest increase
· Requirements increase to $231.8 MM from $191.4 MM (since
Dec 2014 )
· FCI is updated annually to measure impact of completed
projects on overall Alamo Colleges facilities.
· 2017 Annual Update to include Demolition and Renovation
Projects (see Appendix).
15FACILITIES DEPARTMENT UPDATE
10/11/2016
![Page 16: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/16.jpg)
ENERGY AND SUSTAINABILITY – Cumulative Savings
16FACILITIES DEPARTMENT UPDATE
10/11/2016
![Page 17: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/17.jpg)
ENERGY AND SUSTAINABILITY – Annual Savings
17FACILITIES DEPARTMENT UPDATE
10/11/2016
![Page 18: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/18.jpg)
ENERGY AND SUSTAINABILITY – Major Accomplishments
18FACILITIES DEPARTMENT UPDATE
10/11/2016
· Updated Sustainability Policy and Procedure
· Environmental Defense Fund (EDF) Fellow
· Four day work week
· CPS energy demand response
· Installation of Hand Dryers
· Recycled water at NVC and NLC
· Xeriscaping District Wide
· Installation of Solar Panels
· NVC – Carpet removal
· EPA Green Power Partnership
![Page 19: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/19.jpg)
PERSONNEL TRAINING
19FACILITIES DEPARTMENT UPDATE
10/11/2016
· Building Operator Certification – Level 1
· Building Operator Certification – Level 2
· Irrigation Systems and Design Training
· Forklift Training (Warehouse and Boom Lift)
· OSHA Confined Space Training
![Page 20: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/20.jpg)
PERSONNEL – Alamo Colleges FTE versus Contract
20FACILITIES DEPARTMENT UPDATE
10/11/2016
![Page 21: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/21.jpg)
PERSONNEL – Projected Efficiencies
21FACILITIES DEPARTMENT UPDATE
10/11/2016
Projected
Efficiency
Housekeeping GSF / FTE 5,410,572 29,566 22,500
Grounds Keeping Acre / FTE 970 18 20
General Maintenance GSF / FTE 5,410,572 52,025 50,000
APPA
Recommended
FY16
(Size)
FY2016
Category Metric
· 157 In-House Personnel
· 184 Contract Personnel
Total building size listed includes Alamo Colleges' facilities which are Owned and Leased.
![Page 22: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/22.jpg)
APPENDIX
22FACILITIES DEPARTMENT UPDATE
10/11/2016
· Portfolio Updates
· Top 30 Buildings
· Non-Owned Buildings – FCI Metrics
![Page 23: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/23.jpg)
PORTFOLIO UPDATES (2015, 2016): Buildings Added
23FACILITIES DEPARTMENT UPDATE
10/11/2016
Central Texas Technology Center Phase II
Judson ISD Facilities (NLC Campus)
SPC Brackenridge Building
WETC Campus – Classroom Building
Kerrville JM Auld Building (Welding)
EETC Campus – Six (6) Buildings
![Page 24: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/24.jpg)
PORTFOLIO UPDATES (2015, 2016): Renovation Projects
24FACILITIES DEPARTMENT UPDATE
10/11/2016
NVC Buildings: Carpet RemovalPAC Natatorium HVAC Renovation SAC Fletcher 3rd Floor Remodel
Pat Booker 7980 RenovationSAC Candler Re-Roof SPC Central Plant Chillers
![Page 25: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/25.jpg)
Top 30 Buildings (Poorest Condition)
25FACILITIES DEPARTMENT UPDATE
10/11/2016
Sched. Demolition (2017)
Sched. Demolition (2017)
Sched. Demolition (2017)
Renovation by SPC
![Page 26: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/26.jpg)
NON-OWNED BUILDINGS – FCI Metrics
26FACILITIES DEPARTMENT UPDATE
Campus Abbreviation Legend
NLC-Northeast Lakeview CollegeNVC-Northwest Vista College
SAC-San Antonio CollegeSPC-St. Philips College
10/11/2016
Regional Centers (Leased)
Partnership
NLC 52,269 7.3% 7.7% 7.5% 3.5%
NVC 71,159 36.3% 43.9% 43.4% 44.3%
SPC 73,129 6.8% 92.6% 92.2% 37.8%
Total 196,557 26.2% 35.4% 35.2% 28.8%
2016
Parent
Campus
FCI
2013 2014 2015
Size (SF)
2016
NLC 56,768 N/A N/A 0.0%
SAC 298,725 0.0% 0.0% 0.0%
SPC 5,700 N/A N/A 10.3%
Total 361,193 0.0% 0.0% 0.3%
2016
Parent
Campus
FCI
2014 2015
Size (SF)
2016
Regional Centers Facilities
1. WETC Edgewood Building 2. WETC Classroom Addition
3. WETC Lincoln Addition 4. EETC Early Childhood Facility
5. EETC Library EETC Main Building 6. EETC Main Building Boiler Room EETC Library Boiler Room
7. EETC Gym GKC Greater Kerrville Center 8. GKC Primary Annex Boiler Room
9. GKC Kerrville Welding Facility 10. GKC J.M. Auld Adult & Community Center
11. CTT Central Texas Technology Center 12. CTT Central Texas Technology Center Phase II
Partnership Facilities
1. NLC JISD_JECA_Administration Building2. NLC JISD_JECA_Classroom Building
3. SAC Tobin Lofts (Phase 1-South Complex)4. SAC Tobin Lofts (Phase 2-North Complex)
5. SPC Brackenridge Education & Training Center
*Listed facilities added at various times during years shown.
![Page 27: ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, …pacweb.alamo.edu/SACSinterim/submission/documents/10959.pdf · ALAMO COLLEGES FACILITIES ANNUAL UPDATE John Strybos, PE Kyle](https://reader035.vdocuments.site/reader035/viewer/2022081400/5f1497d2aac7ba468d6a45f0/html5/thumbnails/27.jpg)