AECOO-1 Testbed WebcastArchitects, Engineers, Construction, Owners & Operators Testbed 1
A Preliminary Overview by Michael Bordenaro
BIM Education Co-op, Co-founder [email protected]
![Page 2: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/2.jpg)
The buildingSMART alliance and the Open Geospatial Consortium conducted another demonstration of software and processes that are based on open standards.
![Page 3: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/3.jpg)
While arcane to most people, open standards are the foundation of productivity and profitability that can occur with coordinated application of advanced technology.
![Page 4: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/4.jpg)
Open standards are the underlying “rules of the road” that allow the ever increasing BIM software tools to transfer data back and forth in a seamless way.
![Page 5: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/5.jpg)
If the volunteers who assemble the open standards get the support of the building industry, data transfer is smooth and few people ever really worry about open standards.
![Page 6: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/6.jpg)
If open standards are not supported and the industry is bogged down, productivity will continue to decline, energy is wasted and the promise of advanced technology helping solve problems will turn into the creation of more problems.
![Page 7: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/7.jpg)
Many companies and individuals contributed to the AECOO Testbed - 1 and they will be listed on websites and in a final presentation.
This draft presentation is to show how a simple, follow-the-bouncing-ball overview can be created for people new to BIM when the final presentation is available.
![Page 8: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/8.jpg)
The presentation included four sections with five speakers in each section.
1
2
3
4
1 2 3 4 5
![Page 9: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/9.jpg)
This presentation will show slides from a few presenters.
A brief description will attempt to illicit interest in more details
![Page 10: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/10.jpg)
The need for integrated Open Standards was clearly stated
Many people participated in this demonstration of benefits
![Page 11: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/11.jpg)
More than 11 software programs successfully exchanged data
The data was for a significant GSA project that is reality based
![Page 12: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/12.jpg)
Industry Foundation Class data structures were validated
Industry Foundation Classes (IFCs) are the foundation of BIM
![Page 13: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/13.jpg)
The IFC data structure aids information sharing detailed in IFDs
The IFC data structure allows common Model View Definitions
![Page 14: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/14.jpg)
The creation of Open Standards follows a defined process
Participation from many is needed to assure quality
![Page 15: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/15.jpg)
Each data exchange process is carefully mapped
This Quantity Takeoff (QTO) map is key to cost estimating
![Page 16: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/16.jpg)
A software program to assist standards creation was used
Using technology to assist the use of technology is a good thing
![Page 17: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/17.jpg)
The Sofi System software helps map business relationships
Mapping business relationships can improve Open Standards
![Page 18: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/18.jpg)
Maps of relationships can guide important decision points
Improved understanding of decisions improve Open Standards
![Page 19: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/19.jpg)
Energy Model is one of the most important aspects of BIM
Buildings waste a lot of energy. Fixing this fixes many issues.
![Page 20: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/20.jpg)
Proper transfer of data to energy modelers is crucial
Successful energy data transfer was proven in the testbed
![Page 21: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/21.jpg)
Bentley’s participation assisted in a few ways
First, data transfer from Graphisoft to Bentley was validated
![Page 22: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/22.jpg)
Use of the Graphisoft data in Bentley was effective
Bentley was able to use the data as if it originated internally
![Page 23: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/23.jpg)
Typical Bentley reports and processes functioned normally
The IFC compliant data was shown to be seamlessly transfered
![Page 24: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/24.jpg)
Bentley was able to transfer IFC data out to a Model Checker
Solibri Model Checker was able to use IFC rules on the data
![Page 25: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/25.jpg)
Using IFC rules validated that the data was in place properly
While much more complex than described here. . . It worked.
![Page 26: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/26.jpg)
Validated data was shared with a new web-based BIM program
Construction cost estimating was accurately conducted
![Page 27: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/27.jpg)
Tokmo provides BIM cost estimating and scheduling features
It also support use of the data by facility managers after construction
![Page 28: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/28.jpg)
The IFC compliant data contributed to many cost models
Project decisions can be made based on validated data
![Page 29: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/29.jpg)
Many levels of cost analysis can be assessed by executives
Web-based capabilities allows many people to participate
![Page 30: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/30.jpg)
Accurate information provided early saves significant costs
Costs can be analyzed in many ways - such as energy savings
![Page 31: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/31.jpg)
Mapping decision making contributes on multiple levels
Both building makers and standards makers benefit
![Page 32: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/32.jpg)
Good decisions can be repeated if mapped properly
Building proffessional increase productivity and profitability
![Page 33: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/33.jpg)
Standards makers understand what standard processes to use
Properly mapped standards processes improve the next class
![Page 34: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/34.jpg)
Complex energy analysis provides valuable decision data
Having many programs provide analysis on valid data is the goal
![Page 35: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/35.jpg)
With valid IFC compliant data transfered, analysis is also valid
Many types of detailed analysis can occur from Day 1
![Page 36: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/36.jpg)
Many software programs saved significant decision making time
This level of demonstration will accelerate BIM adaption
![Page 37: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/37.jpg)
Accelerating BIM adaption will save significant costs
Quality will also be improved and waste will be reduced
![Page 38: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/38.jpg)
Steve Hagan, FAIA represented the General Services Adminstration
The demonstration provided “real, positive outcomes.”
![Page 39: AECOO-1 Testbed overview](https://reader035.vdocuments.site/reader035/viewer/2022081515/557ef408d8b42ad17d8b4d9e/html5/thumbnails/39.jpg)
AECOO-1 Testbed WebcastArchitects, Engineers, Construction, Owners & Operators Testbed 1
This Preliminary Overview by Michael Bordenaro, BIM Education Co-op, Co-founder, is in no way intended to represent the full impact of the work conducted for the AECOO-1 Testbed. It is a draft summary of some issues and is not endorsed nor approved by the buildingSMART alliance, the Open Geospatial Consortium or any of the participants.
But it is hoped that it made a couple connections for you and maybe clarified an issue or two.