A Practical Approach to Institutional Risk Management
Getting Risk Right in an Era of Constrained Administrative Resources
Part II: Getting the House Focused on Institutional Risk Managementg gNovember 29, 2012
![Page 2: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/2.jpg)
25
Comprehensive, But Unrealistic
Challenge 1 – Governance
Average University Fails to Define “Risk” Leading to an Endless List of Risksp ,
University Attempts to be “Comprehensive” Leads to Unrealistic ResultsUniversity Attempts to be Comprehensive Leads to Unrealistic Results
University Risk Register (Illustrative)Pitfalls of Average University Risk Register
1. Sustainability of high‐cost/high‐discount pricing model
2. Inability to properly manage academic records3. Research misconduct4. Declining public perception of value of liberal
Inflated Risk RegisterAverage risk register identifies 200‐500 risks –more risks than can be addressed by the institution
4. Declining public perception of value of liberal arts degree
5. Laboratory safety lapses6. Misappropriation of research grant costs7. Unauthorized modification of data8 Sustainability of student indebtedness levels8. Sustainability of student indebtedness levels9. Inability to meet retention targets10. Improper use of motor vehicles by students11. Vandalism to university property12. Failure to meet institutional enrollment targets13 HIPAA compliance
Conflated RisksAttempts to be comprehensive lead to identifying risks of different “altitudes:”
• Sustainability of high‐cost/high‐discount 13. HIPAA compliance14. Inability to meet liquidity targets due to market
fluctuations……
300. Improper receipt/recording of gifts301 Failure to comply with faculty hiring processes
pricing model • Inadequate controls over cash receipts• Inability to meet enrollment targets
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
301. Failure to comply with faculty hiring processes302. Inappropriate use of university logo or insignia303. Lack of compliance with smoking regulations
![Page 3: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/3.jpg)
30
Leads to “Boil‐the‐Ocean” Approach to Identify Risks
Challenge 2 – Risk Identification
pp y
Average University Risk Identification Process
“What Keeps You Up at Night?”
Average University Risk Identification Process
A ff t t b i
How material are our lab safety lapses?
Are effort reports being submitted on time?
Do we conduct adequate background checks?
How many faculty and students do we have in Egypt?
Can we continue to recruit star PIs?
Are our researchers compliant with export control rules?
Why do we have low persistence rates among juniors?
Vice Provost
Are we prepared for a natural disaster?
Are cost transfers compliant with regulations?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
Average small institution has 10‐20 representatives on committee identifying risks
![Page 4: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/4.jpg)
31
Different from Our Corporate Brethren
What the Ideal Process Looks Like – A Page from the Private Sector Playbook
Private Sector More Focused on Risk Treatment than Identificationp
AVERAGE UNIVERSITYAVERAGE UNIVERSITY
20‐30 risks
Risk Identification Risk Identification
100‐300 risks
Risk Assessment & Prioritization
Risk Assessment & Prioritization
Prioritization3‐5 prioritized risks
50‐100 risks
Campaign fatigue fromFocus on narrow
Risk Treatment
Risk TreatmentCampaign fatigue from long identification and prioritization phases leaves little energy for risk treatment
Focus on narrow set of risks leaves ample time and resources for risk treatment
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051CSource: Atikinson, William, Enterprise Risk Management at Walmart, (Risk Management Magazine); Education Advisory Board interviews and analysis.
risk treatmenttreatment
![Page 5: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/5.jpg)
33
Difficult to Assess and Prioritize
Challenge 3 – Risk Assessment and Prioritization
Serious Doubts Over Effectiveness of the Risk Assessment and Prioritization Process
Common University Challenges
Rationalizing Resource Allocation
How do we ensure we’re allocating
Moving Past Personal Biases
Are our assessments of risk How do we ensure we re allocating administrative resources to our areas of greatest need?
Are our assessments of risk likelihood and impact objective enough to be of any use?
Getting Agreement on Definitions of Impact
How do we get past squabbles overHow do we get past squabbles over which university values are most important, and get to actual prioritization of risks?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 6: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/6.jpg)
35
What Risk?
Challenge 4 – Increasing Campus’s Risk Awareness
Local Units Fail to Understand Risk Implications of Local Decisions
Faculty Mean Well But Often Fail to Understand Risk Implications of DecisionsFaculty Mean Well But Often Fail to Understand Risk Implications of Decisions
New Academic Programs
Field Excursions Recruiting Top Researchers
• College of Professional and Continuing Studies launches new program expecting to
• Canadian university recruits star researcher, provides state‐of‐the‐art lab and a $0 5M
• Lebanese professor coordinates study abroad trip to Lebanon leveraging new program expecting to
generate 40% contribution margin
• Actual contribution margin is 92% failing to identify
the‐art lab and a $0.5M professorship
• Fails to conduct adequate employee background check
• National Science and Engineering
to Lebanon, leveraging personal knowledge and network
• Professor and students must be extracted from country is ‐92%, failing to identify
the risk that if courses are taught by FT faculty on overload, it would eliminate potential profit
• National Science and Engineering Research Council subsequently bars researcher from receiving grants indefinitely due to past plagiarism and $150K of
be extracted from country after Israel‐Lebanon conflict breaks out in 2006
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
potential profitplagiarism and $150K of misappropriated funds
![Page 7: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/7.jpg)
37
Not Winning the War
Challenge 5 – Incenting Risk Treatment
CBOs Struggle to Move Campus from Awareness to Actiong
Common Pitfalls that Stall Risk Treatment Efforts
Treatment Plans Lack Accountability
Incentives Are Insufficient to Spur Unit‐Level Action
Inability to Reallocate Resources to Institutional Risks
• Managers develop unachievable “pie in the sky” treatment plans
• Incentives and support offered by administration are not attractive enough
• Risk treatment efforts are not “costed out,” leaving administrators to guesssky treatment plans
without any checks for plausibility
• Lack of follow‐up means
are not attractive enough to persuade unit‐level leaders that mitigation plans are worth the effort
administrators to guess how much funding is needed and where
• Inflexible budgeting model treatment plans often sit on the shelf
complicates reallocation between risk areas
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 8: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/8.jpg)
39
Clarifying Our Terms
Before We Go Further – Defining Our Terms
Our Working Definition of Institutional Risk Managementy g
Institutional Risk Management
• Adoption of a risk framework (e.g., COSO or ISO 31000)
• Comprehensive assessment of institutional risk
Institutional Risk Management
• Periodic reports to Board on institutional risks
Systemic & Existential Risks Unit‐Level RisksInstitutional Risks
Uncontrollable (Contextual Factors) Controllable (Strategic & Organizational Factors)
k ll f k Idiosyncratic risks Risks impacting all of higher education
Unable to directly control
Idiosyncratic risks –generally risk is related to an existing, broken process
Idiosyncratic risks –generally risks are related to an inability to meet strategic objectives
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
Best addressed by divisional head
Best addressed by President’s cabinet
![Page 9: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/9.jpg)
40
Systemic & Existential Risks Institutional‐Level Risks Unit‐Level Risks
Decline of traditional 18‐21 student cohort
Inability to meet enrollment targets
Improper receipt/recording ofgifts
Sustainability of high‐cost/high‐discount pricing model
Inability to meet retention targets
Inability to properly manageadvising or academic records
Threat of emerging delivery models
Inability to offer competitive financial‐aid packages
Inability to account for property, plant, and equipment due to poor inventory controlsp y
Faculty talent shortage/misalignment of emerging PhDs
Inability to meet liquidity targets against market fluctuations
Improper use of motor vehicles by students
Sustainability of “excessive” student indebtedness
Inability to fully fund post‐retirement obligations
Vandalism to university property
Reduction in family financial capacity and its impact on demand of higher education
Inability to keep up with growth in data center capacity
Improper use of university logo or insignia
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
g
Source: Education Advisory Board interviews and analysis.
![Page 10: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/10.jpg)
41
Today’s Focus
The Solution – De‐averaging a Monolithic Initiative
De‐averaging Institutional Risk Management Creates a Manageable Processy
Roundtable Research Identifies Method for Universities to Avoid a Negative NPV Project
Progressive University
1 Sustainability of high cost/high discount
University Risk Register (Illustrative) Systemic &
Average University
• Sustainability of high‐cost/high‐discount pricing model1. Sustainability of high‐cost/high‐discount
pricing model2. HIPAA compliance3. Research misconduct4. Declining public perception of value of liberal
t d
&Existential Risks(>5%)
pricing model• Declining public perception of value of liberal arts
degree• Sustainability of student indebtedness levels
arts degree5. Laboratory safety lapses6. Misappropriation of research grant costs7. Unauthorized modification of data8. Sustainability of student indebtedness levels9 I bili i
Institutional Risks
• Research misconduct• Failure to meet institutional enrollment targets• Failure to meet retention targets
9. Inability to meet retention targets10. Improper use of motor vehicles by students11. Vandalism to university property12. Failure to meet institutional enrollment
targets
(20‐30%) • Inability to meet liquidity targets due to market fluctuations
l13. Inability to properly manage academic records14. Inability to meet liquidity targets due to
market fluctuations……
300. Improper receipt /recording of gifts
Unit‐Level Risks(65‐75%)
• HIPAA compliance• Laboratory safety lapses• Misappropriation of research grant costs• Unauthorized modification of data• Improper use of motor vehicles by students
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
301. Failure to comply with faculty hiring processes302. Inappropriate use of university logo or insignia303. Lack of compliance with smoking regulations
• Vandalism to university property• Improper receipt/recording of gifts
![Page 11: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/11.jpg)
45
A Practical Approach to Institutional Risk ManagementGetting Institutional Risk Management Right
in an Era of Constrained Resources
pp g
I II IIIGetting the House Focused on Institutional Risk Management
Structuring Ownership & Managing Board Oversight
Fast‐Cycling Risk Identification
Assessing andPrioritizing Risks
Embedding Institutional Risk Management in the Academy
IV V
Embedding Institutional Risk Management in the Academy
Increasing CampusRisk Awareness
Instilling Accountability & Incenting Action
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 12: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/12.jpg)
47
I. Structuring Ownership & Managing Board OversightWhat’s the governance structure we should deploy, and how
should we manage Board involvement in the process?
g p g g g
Practice #1: Targeted Risk Governance
Practice #2: Board‐Limiting Charter
Emory University Compilation of Institutions
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 13: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/13.jpg)
49
Practice #1: Targeted Risk Governanceg
Typical University
Most institutions have one risk management
Best Practitioner Approach
yp yProblem
Progressive institutions opt for targeted risk discussions with
Compilation of Institutions
risk management committee with representatives addressing everything from strategic risks to operational and
Progressive institutions opt for targeted risk discussions with key senior administrators to avoid a risk register that contains hundreds of “unit‐level” risks.
risks to operational and compliance risks. The committee’s sweeping mandate coupled with wide disparities in the
Key Animating Principle
disparities in the backgrounds of members lead to an unnecessarily slow vetting process and wasted time for both
Risk discussions grounded in the university’s strategic pillars ensures that initial risk identification discussions unearth systemicwasted time for both
executives and frontline staff.
ensures that initial risk identification discussions unearth systemic and institutional‐level risks.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 14: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/14.jpg)
51
The Monolithic Risk CommitteeLarge Universities Primarily Concerned Over Bypassing Large Risk Committee
Pathologies of Traditional (and Slow) Large University Risk Committee
Overemphasis on “Lowest Common Denominator” Risks Every Risk Gets Full Committee Hearingp
Risks with broad interest across the committee get more airtime than high‐level strategic risks with less universal appeal (e.g., liquidity risk), despite the latter’s importance
y g
Senior administrators must listen to details of operational risks, and frontline staff sit through discussions of strategic risks
Members Use Committee Implementation Time to Opine on Risks They Know Little About
Given the committee’s comprehensive mandate
Discussions Interest Only Frontline Staff
As the institution’s only risk forum the committeecomprehensive mandate,
members have little expertise to offer on many of the risks under discussion
risk forum, the committee is the only place to discuss granular details of risk controls, wasting executive’s time
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
executive’s timeTypical 25‐50 Member Risk Committee
![Page 15: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/15.jpg)
52
Where Do I Find My Risk Resources?Small Institutions Primarily Concerned Over Who Will Lead ERM Charge
y
Common CBO Questions When Launching ERM
Do we need a risk management office?
Should internal audit lead the ERM effort?g ff ff
Uni ersit CBOUniversity CBO
Should General Counsel lead the ERM effort?
Can I embed ERM with our strategic planning efforts?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
the ERM effort? strategic planning efforts?
![Page 16: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/16.jpg)
53
Who Leads the ERM Charge?Small Institutions Generally Assign ERM Charge
Based on Skill and Bandwidth
g
An Unscientific AnalysisEducation Advisory Board Audit
N = 25
12
5
Leverages strategic planning discussions to embed risk management discussions
• What are strategic objectives?
2
2
• How will objectives be implemented?
• What are risks of each objective?
2
1
11
Implemented ERM
Risk Management
Human Resources
Institutional Planning
General Counsel
Internal Audit Budget & Planning
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
g g g
![Page 17: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/17.jpg)
55
Different Questions, Same AnswerBoth Small and Large Progressive Universities UseTargeted Risk Interviews to Launch ERM Initiative
Q ,
Participants of Initial Risk Discussion
President VP, Human ResourcesVP, Information Technology
Provost
VP Finance and VP G l C l
VP, Student Affairs VP, Advancement
VPVP, Finance and Administration
VP, General Counsel VP, Communications
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 18: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/18.jpg)
56
Targeted Interviews… …Grounded in Strategic Objectives
Risk Discussion Overview
• Initial risk discussions limited to President’s Cabinet (8‐10 individuals)
• Risk discussions are limited to identifying key risks to strategic objectives1
• Individual interviews are conducted by VP of Institutional Planning (or risk officer)
• Interviews are one hour in length
• Strategic Objective: Increase 4‐year graduation rate from 70% to 75%
• Risk: Insufficient Gen Ed Courses to Meet Student Demand• Interviews are one hour in length Meet Student Demand
• Risk discussions are not limited to participant’s functional area
Initial risk register consists of 30‐40 risks
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
1 Progressive institutions recommend limiting list of strategic objectives to ~15. Otherwise, it becomes difficult to limit risk discussion to one hour of participant’s time
![Page 19: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/19.jpg)
57
Practice #2: Board‐Limiting Charterg
Typical University
CBOs are challenged to identify the right level of
Best Practitioner Approach
Typical University Problems
Progressive institutions clearly delineate in Board Committee
Emory University
y gBoard involvement, trying to manage the tension of keeping Board members abreast of institutional risks
Progressive institutions clearly delineate in Board Committee charters that the process of managing risks is central to the Board while actual management of risks remains in the hands of the university administrators.
abreast of institutional risks while also trying to prevent “over‐involvement” by Board.
Key Animating PrinciplesClearly‐written charter delineates Board responsibilities and university administration responsibilities.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 20: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/20.jpg)
59
Questions (and Concerns) On Both Sides of the AisleBoth CBO and Board Members Have Questions Over Board’s InvolvementQ ( )
’ i d’ i
• What are the Board’s responsibilities in the process?
CBO’s Questions Board’s Questions
• What are my duties and obligations once I’ve been p p
• How much information should I be sharing with them?
• What level of input should I
ginformed of a risk by university administrators?
• Will I be held legally ibl b b i i f d
f pseek from the Board?
responsible by being informed of risks by management?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 21: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/21.jpg)
61
Clearly Delineating Responsibilities Before It’s Too Latey g pEmory’s Audit Committee Charter Delineates Management and Board Responsibilities
Management Responsibilities
Management Manages Risk“Management is responsible for monitoring and managing risks.”
1
Management Determines When to Involve Board”Management will exercise its professional judgment in determining when to bring risks to Board attention, which may be
EMORY UNIVERSITY 2g g y
as risks evolve…”
Management Informs Audit Committee of Top Risks“M t ill id th A dit C itt ith lAUDIT COMMITTEE 3 “Management will provide the Audit Committee with a regular update on the ERM process including a ranked risk listing.”
AUDIT COMMITTEECHARTER
Audit Committee Responsibilities
3
Audit Committee Responsibilities
Audit Committee Oversees Risk Management Process“Audit Committee should review the [risk] listing and satisfy itself that management has an effe ti e approa h to identif ing and
4
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis;.
that management has an effective approach to identifying and managing risks.”
![Page 22: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/22.jpg)
63
Keeping the Audit Committee Informed of RisksEmory’s Three‐Step Process to Inform Its Audit Committee of Top Risks
p g
Selected Board CommitteesAudit CommitteeSteering Committee Selected Board CommitteesAudit CommitteeSteering Committee
Coming Soon in 2012!
• Audit Committee reviews risks annually (usually in
• Each of the key risks is mapped to one of eight Board Committees
• Steering Committee selects 50 k i k t t t risks annually (usually in
November)
• More periodic updates can be provided at Audit
one of eight Board Committees
• Individual meetings will be held with Board Committee to brief them on risk mitigation efforts
50 key risks to report to Executive and Audit Committees and to monitor throughout the year
be provided at Audit Committee’s request
them on risk mitigation efforts
• Charters for all Board Committees are currently being revised to l l d li t ibiliti
• Risk management owners are assigned to key risks
clearly delineate responsibilities, limited to oversight and awareness
• Steering and Executive Committees evaluate feasibility of risk mitigation plans
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis
Roundtable research identified average university reports 5‐10 risks
![Page 23: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/23.jpg)
65
II. Fast‐Cycling Risk IdentificationHow do we fast‐cycle risk identification?
y g
Practice #3: Peer‐Sourced Risk Registerg
Practice #4: Independent Risk Identification Forum
Practice #5: IT and Fixed Asset Interdependency Assessment
University of Alberta
Southern Methodist University
University of Ottawa
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 24: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/24.jpg)
67
Practice #3: Peer‐Sourced Risk Registerg
Typical University
Many institutions spend months or even years conducting an
Best Practitioner Approach
Typical University Problems
Progressive institutions fast cycle the risk identification process
University of Ottawa
y gexhaustive (and exhausting) risk identification process on their campus, only to come up with an unwieldy and overly‐detailed
Progressive institutions fast‐cycle the risk identification process by leveraging risk registers from peer institutions. The peer‐sourced risk register is used as an initial straw man with campus representatives, with the objective of winnowing out risks that are not applicable to the institution and adding in risks notan unwieldy and overly detailed
risk register. This is a very time‐consuming approach and generally does not uncover any new risks that CBOs were not
are not applicable to the institution and adding in risks not included in the straw man that are applicable to the institution.
Key Animating Principlesnew risks that CBOs were not already aware of.
By the end of the process the campus suffers from campaign
Risk registers pulled from peer institutions help engender trust and legitimacy among campus representatives about the initial tcampus suffers from campaign
fatigue, having spent significant time on risk identification, leaving little momentum for risk treatment
straw man.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
treatment.
![Page 25: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/25.jpg)
69
Don’t Try This at HomeyTraditional Risk Identification Efforts Require
Lots of Time but Lead to Few Insights
Traditional Risk Identification Process
Hundreds of Interviews… …Surfacing Hundreds of Risks …But Little Value Added
Little Value Added“We spent approximately 18 months conducting risk interviews and s r e s ith o er 100 camp s
• Institution spends 18‐24 months interviewing executives, directors, and frontline managers
• Lack of risk thresholds result in identification of risks of low magnitude (i e everything but the and surveys with over 100 campus
employees. While the process raised awareness among campus constituents about the prevalence of risks beyond their silos, it didn’t
and frontline managers, asking, “what keeps you up at night?”
(i.e., everything but the kitchen sink is identified as a risk) creating risk register inflation
of risks beyond their silos, it didn t surface any new institutional level risks – nothing that our President, Provost, and I couldn’t have identified on our own.”
• Institution surfaces 200‐500 risks at institution‐and unit‐level
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
Associate Vice ChancellorPublic, Research University
![Page 26: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/26.jpg)
71
Do Try This at HomeyPeer‐Sourced Risk Register Fast Cycles Risk Identification,
Leaving More Time for Risk Treatment
…And Vetting with StakeholdersCreating a Risk Register Straw Man…
Peer University A, Risk Register
Peer University B, Risk Register
U i i
Peer University F,Risk Register
Peer University C, Risk Register
UniversityRisk Register
Peer‐sourced risk register is used as a straw man for risk committee ith h i id tif iwith an emphasis on identifying:
Are there risks that aren’t applicable to our campus?
A h i k h
Peer University E, Risk Register
Peer University D, Risk Register
Are there risks that are idiosyncratic to our institution and not reflected on the initial straw man?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
UC System: 20 risk registersUniversity of Ottawa: 2 risk registers
![Page 27: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/27.jpg)
73
Practice #4: Independent Risk Identification Forump
Typical University
Institutions rely on internal stakeholders to identify
Best Practitioner Approach
yp yProblem
The University of Alberta holds an annual expert forum to review
University of Alberta
stakeholders to identify institutional risks, often missing or miscalculating key external risks not readily identifiable from
The University of Alberta holds an annual expert forum to review institutional strategy and risks. The experts, mostly from outside the university, bring a fresh set of eyes and unbiased perspective to key areas of university risk, in particular identifying important external developments that could affect the universityreadily identifiable from
within the four walls of the campus (e.g., liquidity risk before the financial meltdown)
external developments that could affect the university.
Key Animating Principlemeltdown).
The combination of expertise and outsider status means the forum can render both well‐informed and frank assessments of t t l i k t th i tit titop external risks to the institution.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 28: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/28.jpg)
75
Noise vs. NewsCampus Leaders Face Tough Task of Evaluating External Developments
Changes Afoot in Online Ed Providers
No Shortage of Headlines… …But Questions Remain
Critical Questions for the Institution
What’s just hype, and which external developments have the potential to significantly affect us (negatively or
Changes Afoot in Financial Aid Programs
Online Ed Providers React to New Legislation
Critical Questions for the Institution
?significantly affect us (negatively or positively)?
What are the big shifts in the industry that aren’t making the headlines??What are the major external threats to the success of our new programs?
Can we trust the economic and
Chinese Economy Closes Out Banner Year
Local Real Estate Market Remains Stagnant
?? demographic assumptions we’re
making in our short‐ and long‐term planning processes?
?
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 29: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/29.jpg)
77
Getting the Inside Scoop on Outside TrendsExpert Forum Provides Insight into Risks Beyond the Campus’s Four Walls
g p
Economic Experts Government Affairs Experts Private Sector Experts
Craig WrightChief Economist
David TrickFormer Assistant Deputy Minister for Postsecondary
Felix CheeChief Representative, China Investment
Royal Bank of CanadaMinister for Postsecondary Education, Ontario
Roger GibbinsLeo de BeverCEO
China Investment Corp., Toronto Office
Gordon HouldenDirector
President and CEOCanada West Foundation1
CEOAlberta Investment Management Corporation
DirectorUniversity of Alberta China Institute
Role
• Verify investment and interest income assumptions in budget
• Share information on
Role
• Verify provincial funding and regulatory assumptions
• Describe implications of latest
Role
• Opine on business trends (e.g., oil and gas price levels) affecting the province and university
macroeconomic trends globally and in the province
changes to national and provincial higher education policy
• Help build awareness in the business community of university activities
Private Sector Experts Rotate Year to Year Based on Institutional Objectives
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
p j
1 The Canada West Foundation is a non‐partisan think tank dedicated to researching and voicing issues of concern to western Canadians.
![Page 30: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/30.jpg)
78
Getting Them There“How To” Guide on Recruiting Experts
g
Cast a Wide Net Leverage Institution’s Limit Participants’ gSenior Leadership
pTime Obligation
InvitationInvitation
Invitation
• 20 to 25 invitations issued, with expectation
Depending on the prominence of the expert or
Forum requires only one day of participants’ timeissued, with expectation
that half will accept and two‐thirds will attend
• No honoraria are offered
prominence of the expert or existing relationships with campus personnel, the invitation may be issued by: • Provost,
day of participants time limiting time away from office
No honoraria are offered
• Compensation is limited to travel reimbursement and out‐of‐pocket
Provost, • VP for Finance and Administration
• Chief Development Officerand out of pocket
expensesOfficer
• President
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 31: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/31.jpg)
79
Win‐Win‐Win Value PropositionIndependent Risk Forum Unearths New Risks, Validates Assumptions,
Engenders Confidence
p
1 2 3Surfacing the “Known Unknowns”
Instilling Confidence at Unit and Board Level through Expert Vetting
Validating Risk Assumptions
New Risks (Illustrative)
Changes in adult studentFaculty Association
Budget Drivers
Interest Rates & Investment Income ImpactChanges in adult student
demographics could hurt enrollment in online courses
Changes to provincial Staff Administrators
Investment Income Impact
Construction Labor Shortage & Capital Cost Impact
support could help some research areas while cutting funds for others
Board of GovernorsOil Prices & Provincial Appropriation Impact
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 32: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/32.jpg)
81
Practice #5: IT & Fixed Asset Interdependency Assessmentp y
Typical University P bl
Few institutions have the ability to identify i d d i b
Best Practitioner Approach
Problem
Southern Methodist University conducted a business impact
Southern Methodist University
interdependencies between buildings or IT systems in case of an adverse event, leading to an inability to
f
Southern Methodist University conducted a business impact analysis of their IT and fixed assets, identifying interdependencies and predicting institutional costs of a major risk failure.
prioritize responses after a major event and a longer and more expensive recovery.
Key Animating PrincipleInstitution‐wide, centrally‐led approach means administrators can identify interdependent risks and are armed with sufficient i f ti t ti ll i iti t tinformation to rationally prioritize post‐event responses.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 33: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/33.jpg)
83
Not Enough Spots in the LifeboatSeemingly Sound Preparedness Plans for Fixed Assets Have Potential to Clash
g p
“What would we do if multiple buildings h t d t th ti ?”
Smith Hall
were shut down at the same time?”
Philosophy Department, Murphy HallSpace Contingency Plan
Economics Department, Wright HallSpace Contingency Plan
“In the event of a building shutdown, the Department of Philosophy will move classes and faculty offices to the vacant “In the event of a building shutdown, the Department of Philosophy will move classes and faculty offices to the vacant
Space Contingency Plan
“In the event of a building shutdown, the Department of Economics will move classes and faculty offices to the vacant “In the event of a building shutdown, the Department of Economics will move classes and faculty offices to the vacant
Space Contingency Plan
wings of Smith Hall until full service is restored.”wings of Smith Hall until full service is restored.” wings of Smith Hall until full service is restored.”wings of Smith Hall until full service is restored.”
Campus Space Crunch Adds New Urgency to An Old Problem“Coordinating contingency plans for space usage has always been an issue in higher ed. What’s different now is that, due to the growing “space crunch,” campuses have less and less free space
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
available to use in a pinch.” Risk ManagerPrivate University
![Page 34: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/34.jpg)
84
Who Gets “Re‐booted” First?When Information Technology Vulnerabilities Aren’t Quantified,
Campus Leaders Can’t Prioritize Recovery Efforts
Registrar
Financial AidAdmissions
“What would we do if multiple business
Limited IT Capacity to Recover Applications FundraisingResearch Administration
What would we do if multiple business applications went down at the same time?”
Not measured at most institutions:
• Operational and service impact on key functions if an application is down for 48 hours or more
• Per hour or per day cost to the institution for an outage of each business application
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
• “High impact periods” during the year in which outages would have greater negative effect on certain functions (e.g., Admissions in January)
![Page 35: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/35.jpg)
85
Business Impact Analysis: A Three‐Step ApproachSpotlighting the “First‐Recovery” Needs of Critical IT and Fixed Assets
p y p pp
Surfacing Weaknesses Analyzing Impacts
1 2 3Infrastructure Review Business Process Analysis Financial Analysis
Top 10 Fixed Assets• Main Administration Building• Heat Plant• Stadium
Operational impact of a major event on:
• Financial aid
• Property Damage• Lost Awards• Business Impact
• Number of studentsStadium• Library…
Top 20 IT Applications• PeopleSoft
• Admissions• Housing management• Cash disbursements• Research administration
Number of students directly impacted
• Enrollment impact• Restoration period of facility/process
• SIS• Library Software Applications…
• Existing business continuity plan
Infrastructure Weakness: Handful of servers that hold bulk of data
Processes Impacted: Dozens of units use SIS, including Admissions (with peak usage
Institutional Cost: Each day server down = $X inm
ple
of servers that hold bulk of data from Student Information Systems (SIS) vulnerable to outage
SIS, including Admissions (with peak usage in fall and early winter) and Financial Aid (with peak usage in winter and spring)
day server down $X in tuition lost from decrease in enrollment
Exam
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
Examples are illustrative only.
End Product: Recommendations for treatment prioritization based on size of potential financial loss and severity of process interruption
![Page 36: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/36.jpg)
87
Centrally‐Led Audit Identifies Conflicts and True CostsAllows Rational Discussion Beforehand and Avoids Scramble Later
y
Risk Risk Sub‐ Cost and Business Impact Assessment University DecisionCategory Category (Illustrative) (Illustrative)
Physical
Student Housing:‐$,$$$ to restore powerXXX students in affected
Research Labs:‐$,$$$ to restore power$$$ $$$ in lost research
Student housing receives backup power priority when classes are in session during hot weather months;
Physical Plant and Facilities
Plant‐XXX students in affected dorm
‐$$$,$$$ in lost research data‐X years of lost effort
hot‐weather months;Sensitive research labs always receive continuous power
School of Engineering:‐$ $$$ in research awards
College of Humanities and Sciences:
University negotiates on behalf of specialized lab and engineering buildings
Space Usage
$,$$$ in research awards lost from bldg shutdown‐XX research collaborations impacted from shutdown
Sciences:‐$,$$$ in research awards lost from bldg shutdown‐XX research collaborations impacted from shutdown
specialized lab and engineering buildings for contingency space at other nearby campuses;Humanities and sciences units are responsible for developing their own plans
Information Technology
Business Applications
Admissions Software:‐$,$$$ to recover‐XX accepted students lost, by season
Financial Aid Software:‐$,$$$ to recover‐XX accepted students lost, by season
Admissions receives top recovery priority in fall and early winter months;Financial Aid receives priority in winter and spring
Result: University decision makers have needed information
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
to intelligently reconcile conflicting priorities
![Page 37: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/37.jpg)
88
External Help for Conducting an IT and Fixed Asset Interdependency Audit
Provider ProfilesProvider Profiles
FM Global, a worldwide insurance and loss control services firm, offers Business Impact Analyses as part of their insurance package with some clients, including universities and colleges.
Business Continuity Consultants International provides analysis and advice on risk reduction and recovery planning around business continuity issues, including IT.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 38: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/38.jpg)
89
III. Assessing and Prioritizing RisksWith lean administrative resources to deploy towards risk treatment,
how do we prioritize the risks that need most attention?
g g
Practice #6: Multidimensional Impact Assessmentp
Practice #7: Targeted Likelihood and Impact Assessments
Practice #8: Risk Velocity Assessment
Yale University Brown University Private Sector
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 39: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/39.jpg)
91
Practice #6: Multidimensional Impact Assessmentp
Typical University
Institutions find it difficult to get common agreement
Best Practitioner Approach
Problems
As part of its risk assessment process Brown University moved
Brown University
on how to define low, medium, and high impact risks, considering the multiple “bottom lines”
As part of its risk assessment process, Brown University moved past the one‐dimensional “impact” analysis and developed three impact metrics – human, asset, and mission impact. This allows the risk committee to evaluate each risk along each impact dimensionp
higher education has compared to the private sector. This makes it difficult for risk committees
impact dimension.
Key Animating Principlesto find a common definition for impact as it relates to human, mission, or financial impact.
Clear identification of various institutional impacts (e.g., financial, human, and asset) alleviates committee debates over “what’s
t i t t t th i tit ti ?”p most important to the institution?”
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 40: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/40.jpg)
93
A Difference of OpinionUnlike Private Sector, Higher Ed Has Multiple “Bottom Lines”
p
Fierce Debates Over What’s a “Priority” in Risk Discussions
VP for Student AffairsCBO VP for Student Affairs“How can you put a dollar value on your most important assets, people—students, staff, and faculty?”
CBO“While not ideal, the financial cost to the university is the best way we have to quantify the impact of risk.”
VP for Facilities“We need to keep in mind
Provost“Our university’s teachingWe need to keep in mind
that some of the pieces of art in our buildings are priceless. How will we put
l th t?”
Our university s teaching mission doesn’t have a dollar value, so how can we put a number on
d i l i k ?”a value on that?” pedagogical risks?”
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 41: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/41.jpg)
95
Assessing Risks Based on Various ImpactsBrown’s Risk Prioritization Gives Weight (and Credence) to
Different‐in‐Kind Impacts
g p
Brown’s Institutional Impact MetricsBrown s Institutional Impact Metrics
HUMAN IMPACT
ASSET IMPACT
MISSION IMPACT
Pedestrian Safety Institutional
Risk RegisterRisk Register
Street Crime
Data Center
Alcohol Use
Data Center Capacity
(Human Impact + Asset Impact + Mission Impact + Preparedness)ProbabilityRi k [ ]© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
(Human Impact + Asset Impact + Mission Impact + Preparedness)
12100*
ProbabilityRisk Factor 3[ ]= *
Source: Education Advisory Board interviews and analysis.
![Page 42: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/42.jpg)
96
Clarifying “Impact” by Providing a Common Definitiony g p y g
Brown University’s Risk Assessment Definitions
Human Impact Asset Impact Mission Impact
Possibility of injury, illness or death to Brown community members, visitors or guests
Physical and/or financial losses and damages to campus facilities, infrastructure, reputation, and/or balance sheet
The disruption of and/or adverse impact of University operations, including the essential mission of research and teachingbalance sheet research and teaching
0 = Not Applicable1 = Injuries are treatable with first aid
0 = Not Applicable1 = Isolated, minimal damage or loss, or none at all
0 = Not Applicable1 = No disruption or adverse impact to University operations
2 = Injuries/illnesses treatable with medical care, injuries do not result in permanent disability or disfigurement
,2 = Sporadic damage or loss to building and facilities and/or other assets, including reputational damage
p y p2 = Faculty, students, staff temporarily unable to carry out University operations3 = Significant damage to campus g
3 = Injuries lead to permanent disability, disfigurement, and/or death
p g3 = Widespread, critical financial loss and/or damage to buildings, infrastructure, and/or other assets, including reputational
g g pand/or loss of other essential facilities or people requiring temporary or permanent suspension of normal daily
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
assets, including reputational damage
suspension of normal daily University operations
![Page 43: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/43.jpg)
97
Practice #7: Targeted Likelihood and Impact Assessmentsg p
Typical University Problem
Senior administrators on risk committees tend to underestimate likelihood of
Best Practitioner Approach
Problem
Yale University
underestimate likelihood of risks, while frontline staff tend to overestimate impact, burying important
ti l i k hil
Yale University asks frontline managers and staff to assess the likelihood of risk failures while senior administrators separately assess the institutional impact of those same risks.
operational risks while elevating unit‐level concerns.
Key Animating Principle
Staff are asked only to assess the aspect of risk with which they are most familiar.a e ost a a .
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 44: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/44.jpg)
99
No One’s An Expert in EverythingBiases in Traditional Risk Assessment Skew Results
p y g
ImpactLow HiSenior Administrators Frontline Staff
ikelihoo
dHi
LiLow
Overestimated Risk ImpactUnderestimated Risk Likelihood Risk Clustering
Frontline Staff• Assume that any risk that would significantly affect their
Senior Administrators• Not always familiar with details of how risk controls in their unit
Bias Towards Low Likelihood, High Impact Events
• Potential to miss important job duties is high impact
• Tend to overestimate impact of risks by conflating individual impact with institutional consequences
actually work “on the ground”• Tend to underestimate likelihood of risks in their unit, assuming written policies are being followed
risks or overemphasize minor threats
• Hard to begin mitigation initiatives, not knowing in what areas to focus
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
consequencesbeing followed what areas to focus investment
![Page 45: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/45.jpg)
101
Different Eyes for Different Risk ComponentsSenior Administrators and Frontline Staff Assess Only What They Know Best
y p
Risk Assessment
Yale University
F F tli St ff O l F S i Ad i i t t O lFor Frontline Staff Only For Senior Administrators Only
Likelihood Impact
• Prescription drug theft
• Staff injury
Health Services Risks1
• Prescription drug theft
• Staff injury
Health Services Risks1
j y• HIPAA breach• Unrestricted
access to biohazards
j y• HIPAA breach• Unrestricted
access to biohazards
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
1 Examples are illustrative only.
![Page 46: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/46.jpg)
102
Developing the Risk Likelihood Surveyp g yA Deeper Dive into the Likelihood Assessment Process
Survey Development Tips from Yale
Improve Outcomes
• Survey‐takers evaluate risks in their area only (ten total areas across the university)
• Survey includes an “I don’t know” option so survey‐takers aren’t forced to make up answers
Yale University
Survey includes an I don t know option so survey takers aren t forced to make up answers
Limit Time Responsibility
• Survey‐takers evaluate forty risks or less
Increase ParticipationIncrease Participation
• Area leaders (not Risk Management) send survey to all employees in their area
• Survey avoids use of first‐person to assure survey‐takers that they are not evaluating themselves
Identify Gaps in Risk Perspectives
• Individuals remain anonymous, but results can be analyzed by job type, including management, clerical, and student
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 47: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/47.jpg)
103
Priorities Set ArightTargeted Prioritization Model Re‐Orders Risk Register
g
Correcting Risk Likelihood Measurements
Correcting Risk Impact Measurements
Staff Injury1Health Services
Prescription Drug Theft1
Measurements Measurements
What Frontline Staff Miss: Staff are dissatisfied with new, larger bio waste receptacles, and conflate personal impact with institutional
Health ServicesRisk Register1
1.
2.
What Senior Administrators Miss:Assume cabinet and lab locking policies are being followed
What Survey Reveals: Frontline staff impact
What Survey Reveals: Senior administrators know workers’ comp claims have remained stable since
...
13.
14.
What Survey Reveals: Frontline staff know that valuable cancer treatment drugs are not properly safeguarded
Position After Reprioritization: M U (Hi h Lik lih d S ) introduction of new receptacles
Position After Reprioritization: Moves Down (Lower Impact Score)
...
26.
Moves Up (Higher Likelihood Score)
• What Moves Down: Risks that impact the satisfaction or safety of frontline employees but don’t require enterprise‐level attention
What Mo es Up Ri k f hi h i d i i t t d ti t lik lih d
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
1 Risks listed are for illustration purposes only.
• What Moves Up: Risks for which senior administrators underestimate likelihood because they assumed proper safeguards and controls were in place
![Page 48: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/48.jpg)
105
Practice #8: Risk Velocity Assessmenty
Colleges and universitiesBest Practitioner Approach
Typical University Problems
Private sector corporations include “risk velocity” on their risk
Private Sector
Colleges and universities overinvest in mitigating risk items which may naturally decrease over time, or miss risks that will likely trend up
Private sector corporations include risk velocity on their risk prioritization, which asks risk administrators to estimate those risks that have the highest speed of onset.
risks that will likely trend up in the future.
Key Animating PrinciplesRisk velocity factors are applied to a finite period, generally over a two to five year period.
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C
![Page 49: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/49.jpg)
107
When Everything Seems a PriorityUniversities’ Traditional Assessment Methods Fail to Highlight Risk Velocity
y g y
Average University’s Risk Assessment Metrics
1= low, 3 = high 1= low, 3 = high 1= low, 9 = high
Staff Succession Planning
Likelihood
3
Impact
2
Risk Score
6
, g 1 low, 3 high 1 low, 9 high
Risk estimated to materialize in g3‐5 years
Likelihood
3
Impact
2
Risk Score
6Inability to Meet
E ll
Risk estimated to
t i li i3 2 6Enrollment Targets
materialize in 1‐3 years
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
![Page 50: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/50.jpg)
109
Spotlighting UrgencyRisk Velocity Helps Identify Risks that Need Immediate Attention
p g g g y
Progressive University’s Risk Assessment MetricsProgressive University s Risk Assessment Metrics
1= low, 3 = high 1= low, 3 = high 1= low, 3 = high 1= low, 27 = high
Staff Succession Planning
Likelihood
3
Impact
2
Risk Factor
6
Velocity1
1g
Inability to Meet
Enrollment Targets
Likelihood
3
Impact
2
Risk Factor
18
Velocity1
3
Targets
End Product: Institution focuses scarce administrative
© 2012 The Advisory Board Company • www.educationadvisoryboard.com • 24051C Source: Education Advisory Board interviews and analysis.
resources on enrollment target risk.
1 Risk velocity is defined as speed of onset.
![Page 51: A Practical Approach to Risk Management the H… · Average risk register identifies 200‐500 risks – ... generate 40% contribution margin ... Large Universities Primarily Concerned](https://reader034.vdocuments.site/reader034/viewer/2022042415/5f2ff39256415b366e14755e/html5/thumbnails/51.jpg)
More Than a Year’s Work
P t III D 13th 1 2 ET C l t d bli ti tS l
Implementation Road Map and Tools
UpcomingWebinar Sessions Best Practice Report
• Part III: Dec 13th 1‐2 pm ET
• Increasing Campus’ Risk Awareness
• Instilling Accountability &
• Completed publication sent to all members in early October
• For additional copies, visit
• Sample governance structures from a spectrum of institutions
• Sample risk register• Instilling Accountability & Incenting Action
our website at http://www.eab.com/Research‐and‐Insights/Business‐Affairs‐Forum
• Illustrative Board reporting packages