Download - +83.46 +81 - Orange Design Studio
+81.52
+79.36
+83.46
+81.03
+85.07
+78.67
+77.94
+77.19
+76.71
+75.91
+75.14
+74.35
+73.87
+73.27+72.89
+74.56
+83.46
+81.03
+81.52
+79.36
+85.07
+78.85
+75.33+75.23
+76.66
+77.47
+78.30+78.53
+78.70
+81.52
+79.36
+85.07
+78.67
+77.94
+77.19
+76.41
+73.27+72.89
FFO-03
FFO-04
FFO-05 FFO-06 FFO-07
FFO-08 FFO-09 FFO-10
RLO-01
RLO-02
RLO-03
RLO-04 RLO-05
+75.24+74.74
+79.36
+85.07
+78.85
+82.40
+80.277
+75.265
FFO-01
FFO-02 FFO-03
FFO-04
FFO-05 FFO-06 FFO-07
FFO-08 FFO-09 FFO-10
RLO-01
RLO-02
RLO-03
RLO-04 RLO-05
GFO-01
GFO-02
GFO-03 GFO-04
GFO-05 GFO-06
GFO-07
GFO-08
GFO-09 GFO-10
+76.24
+81.52
+79.36
+85.07
+78.85
+81.52
Multi Use RoomWC
Media Room
Lobby
Multi Use Room
KitchenWC
DiningEntrance HallLiving Area
En-Suite Bedroom Two
Bedroom ThreeHallBedroom ThreeHallBathroom
2418
- Fl
oor t
o C
eilin
g
2418
- Fl
oor t
o C
eilin
g
2303
- Fl
oor t
o C
eilin
g24
18 -
Floo
r to
Cei
ling
2354
- Ea
ves L
ine
2354
- Ea
ves L
ine
2354
- Ea
ves L
ine
L.F Level+73.655
G.F Level+76.24
F.F Level+78.94
L.F Level+73.655
G.F Level+76.24
F.F Level+78.94
L.F Level+72.680
G.F Level+75.265
F.F Level+77.965
2000
- Min
imum
Hea
d H
eigh
t
2303
- Fl
oor t
o C
eilin
g22
97 -
Floo
r to
Cei
ling
2303
- Fl
oor t
o C
eilin
g
Gravel Perimeter.
Line of Repose46 Hopton Lane
750
Multi Use RoomWC
Media Room
Lobby
Multi Use Room
KitchenWC
DiningEntrance HallLiving Area
En-Suite Bedroom Two
Bedroom ThreeHallBedroom ThreeHallBathroom
2418
- Fl
oor t
o C
eilin
g
2418
- Fl
oor t
o C
eilin
g
2303
- Fl
oor t
o C
eilin
g24
18 -
Floo
r to
Cei
ling
2354
- Ea
ves L
ine
2354
- Ea
ves L
ine
2354
- Ea
ves L
ine
L.F Level+73.655
G.F Level+76.24
F.F Level+78.94
L.F Level+73.655
G.F Level+76.24
F.F Level+78.94
L.F Level+72.680
G.F Level+75.265
F.F Level+77.965
2000
- Min
imum
Hea
d H
eigh
t
2303
- Fl
oor t
o C
eilin
g22
97 -
Floo
r to
Cei
ling
2303
- Fl
oor t
o C
eilin
g
DPC min 150mm Above ground level, With Cavity Lapped Tray.100mm Full-Fill Ecobead Platinum Insulation.Bituthene Bagged into DPC level.
25mm Jabfloor 70 Insulation.50mm Liquid poured screed with Underloor Heating.
Triangular Piece of Kingspan Styrozone H350 R.Bituthene 4000 Installed to Specialists Design & Specification.Alderburgh Drainage MembranceGeotextile Membrane100mm Minimum 7.3 N/mm2 Concrete Blockwork.200mm Reinforced Concrete Minimum grade C35.B785 Mesh, Large Bars at 100mm cTc Vertically.As Per Structural Engineers Design.Horizontal Galvanised Wall Ties.100mm Minimum 7.3 N/mm2 Concrete Blockwork.100mm Kingspan Styrozone H350 R.
Gravel Perimeter.Suspended MF Plasterboard Ceiling with 100mm Service Void.
100mm (on bed) Punched Face Stone by Whitehall Stone.
50mm Perimeter Insulation to screed around Window / Door Openings.
250 x 50 Timber Wall Plates.22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
Resin Bolted into Walls.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.100mm (On Bed) Punched Face Stone by Whitehall Stone.See Elevaions for Coursing.
100mm Full-Fill EcoBead Platinum Insulation.100mm Blockwork.12.5 + 3mm Plasterboard & Skim.12.5 + 3mm Plasterboard & Skim.Kitchen to Client's Specification.
Zinc Box Gutter. To Client's Specification.20mm Marine Plywood Sub-Strate75mm S/W Timber Studwork FrameTo Form Pitched Soffit.Suitable Zinc Lap as per Manufacturer's Spec'Zinc Soffit.
Black Tyvek Felt.100mm K7 to Cover Wall Plate.Treated 90x100mm Wall Plate.
Spanish Blue Slate.Over tannelised Battons.
150 x 50mm S/W Timber RaftersTo Structural Engineers Specficiation.
100mm K7 Kooltherm Kingspan.Foil Taped to Rafters.
50mm Vented Airgap to be maintained.
50mm +12.5mm K118 Kooltherm KingspanInsulated Plasterboard & Skim.
Line of Repose46 Hopton Lane
Kitchen Living Room
Bedroom One Bedroom Three Bedroom Two
Gym Utility Multi Use Room
Hopper
GROUND FLOOR TYPE TO BE CONFIRMED BY ENGINEERFOLLOWING GROUND INVESTIGATION REPORT.Detail to be confirmed by structural engineer prior to
constructionFoundation design and below ground design by Structural
Engineer
2418
- Fl
oor t
o C
eilin
g23
54 -
Eave
s Lin
e23
03 -
Floo
r to
Cei
ling
G.F Level+75.265
F.F Level+77.965
2100
- Fl
oor T
o H
ead
2100
- Fl
oor T
o H
ead
2145
- Fl
oor T
o H
ead
RHS Steel Frame to Structural Engineers Sepcification.100mm Kingspan K108 Insulation.
12.5mm Platerboard + 3mm Skim Ceiling.150 x 100mm (On Bed) Ashlar Stone Head with Jambs & Cill.
150 x 100mm (On Bed) Ashlar Stone Head with Jambs & Cill.
Alluminium Framed GlazingRAL Colour : 8008
50mm Perimeter Insulation around Window / Door Openings.100mm Kingspan K108 Insulation.
RHS Steel Frame to Structural Engineers Sepcification.Curtain Soffit with Conceiled Track.
Frameless Safety Glass Screen to En-Suite byWest Yorkshire Architectural Systems.
Ensuite Ceiling to be Formed with 100 x 50mm S/W Timber Battens.Eaves to be open over En-Suite.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
150 x 100mm (On Bed) Ashlar Stone Cill with Jambs & Head.50mm Perimeter Insulation to screed around Window / Door Openings.
100mm Full-Fill EcoBead Platinum Insulation.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
Triangular Piece of Kingspan Styrozone H350 R.Bituthene 4000 Installed to Specialists Design & Specification.
Alderburgh Drainage MembranceGeotextile Membrane
100mm Minimum 7.3 N/mm2 Concrete Blockwork.200mm Reinforced Concrete Minimum grade C35.B785 Mesh, Large Bars at 100mm cTc Vertically.
As Per Structural Engineers Design.Horizontal Galvanised Wall Ties.
100mm Minimum 7.3 N/mm2 Blockwork.
65mm Liquid poured screed with Underloor Heating.100mm Kingspan Styrozone H350 R.
100mm Kingspan Styrozone H350 R.
Minimum 1200 Gauge Polythene Visqueen DPM.100mm Reinforced Concrete Slab.
Minimum 2000 Gauge Polythene Visqueen DPM.A393 Mesh in top of Base.Well compacted Sub-Base.
Perbeable Gravel Fill around Land Drain.100mm Perforated Land Drain to nearest outlet.
Gravel wrapped in Geotextile membrane.
Gravel Perimeter.
Pre-Stressed Concrete Lintel. To Structural Engineers Specification.Cavity Closer at Head of Opening.
50mm Perimeter Insulation around Window / Door Openings.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
100mm (On Bed) Punched Face Stone by Whitehall Stone.
100mm Concrete Blockwork.
12.5mm Plasterboard Ceiling.
12.5mm Plasterboard Ceiling .
Pre-Stressed Concrete Lintel. To Structural Engineers Specification.
Zinc front Facias.Suitable ElZinco Seperation Layer.Barge Board form with Laddered OutriggersFrom supported Rafters.20mm Marine Plywood Sub-StrateZinc Soffit.S/W Timber Stud to Window Head.As per installers requirements.50mm +12.5mm K118 Kooltherm KingspanInsulated Plasterboard & Skim.
Cavity Tray over Stone Head.Minimum Two Weep Holes Per Opening.
150 x 100mm (On Bed) Ashlar Stone Head with Jambs & Cill.Acon or Similar Approved Single Leaf Relieving Lintel.
Cavity Tray over Stone Head.Minimum Two Weep Holes Per Opening.Acon or Similar Approved Single Leaf Relieving Lintel.
Spanish Blue Slate on Tannelised Battons.Black Tyvek Felt.
150 x 50mm S/W Timber RaftersTo Structural Engineers Specficiation.
100mm K7 Kooltherm Kingspan.Foil Taped to Rafters.
50mm Vented Airgap to be maintained.
20mm Cement Fibre Eaves Board.
Vented Dry Ridge.
Seamless Laminated Glass Balustrade over Stone Coping.To Specifalists Specification.75 x 400 (on bed) Stone Coping.Horizontal DPC under Stone Coping.Externally Drained Cavity Tray.Levato Mono Suspended Deck System. Supplier : www.thetiledeckco.co.ukGRP Waterproofing onto 20mm Marine Plywood Substrate.Below Ground Cavity filled with Weak mix concrete.100mm Kingspan Styrozone H350 R.
Bituthene 4000 Installed to Specialists Design & Specification.Lapped to Vertical Bituthene Layer.150mm Hollowcore Concrete Plank by Longley Group.Laid to 1:50 External Fall.Suspended MF Plasterboard Ceiling.Alluminium Framed Bi-Folding DoorRAL Colour : 8008
L.F Level+72.680
Bedroom Three
Utility Media Room
GROUND FLOOR TYPE TO BE CONFIRMED BY ENGINEERFOLLOWING GROUND INVESTIGATION REPORT.Detail to be confirmed by structural engineer prior to
constructionFoundation design and below ground design by Structural
Engineer
2418
- Fl
oor t
o C
eilin
g23
03 -
Floo
r to
Cei
ling
G.F Level+76.24
F.F Level+78.94
65mm Liquid poured screed with Underloor Heating.100mm Kingspan Styrozone H350 R.
Minimum 1200 Gauge Polythene Visqueen DPM.100mm Reinforced Concrete Slab.
Minimum 2000 Gauge Polythene Visqueen DPM.A393 Mesh in top of Base.Well compacted Sub-Base.
Perbeable Gravel Fill around Land Drain.100mm Perforated Land Drain to nearest outlet.
Gravel wrapped in Geotextile membrane.
KitchenDiningLiving Room
Bedroom One Bedroom One
2354
- Ea
ves L
ine
DPC min 150mm Above ground level, With Cavity Lapped Tray.100mm Full-Fill Ecobead Platinum Insulation.
Bituthene Bagged into DPC level.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
Triangular Piece of Kingspan Styrozone H350 R.Bituthene 4000 Installed to Specialists Design & Specification.
Alderburgh Drainage MembranceGeotextile Membrane
100mm Minimum 7.3 N/mm2 Concrete Blockwork.200mm Reinforced Concrete Minimum grade C35.B785 Mesh, Large Bars at 100mm cTc Vertically.
As Per Structural Engineers Design.Horizontal Galvanised Wall Ties.
100mm Minimum 7.3 N/mm2 Blockwork.100mm Kingspan Styrozone H350 R.
Gravel Perimeter.12.5mm Plasterboard Ceiling.
100mm (on bed) Punched Face Stone by Whitehall Stone.
150 x 150mm (On Bed) Ashlar Stone Cill with Jambs & Heads.
200 x 100mm (on bed) Ashlar Stone Surround by White Hall Stone
Movement Layer.ElZinco Brown Finish. All Joints to be welded.
20mm Marine Plywood Substrate.
100 x 100 SHS to Structural Engineers SpecificationVapour Control Layer between frame and 12.5mm Plasterboard.Alluminium Framed Glazing.RAL Colour : 8008
100mm TR27 Kingspan Insulation.
450
Floo
r To
Cill
2050
- C
ill T
o H
ead
2400
- Fl
oor T
o H
ead
200 x 100mm (on bed) Ashlar Stone Surround by White Hall Stone.50mm Perimeter Insulation around Window / Door Openings.100 x 100 SHS to Structural Engineers Specification.ElZinco Brown Finish on 20mm Marine Plywood Substrate.All Joints to be welded.100 x 50 S/W Timber Studwork Infillwith 100mm K3 Kooltherm Kingspan Insulation Fill.100 x 100 SHS to Structural Engineers Specification.
Tyvek Vapour Control Layer100mm K3 Kingspan Insulaiton22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
Zinc front Facias.Suitable ElZinco Seperation Layer.Barge Board form with Laddered OutriggersFrom supported Rafters.20mm Marine Plywood Sub-StrateZinc Soffit.Diagonal 150 x 100mm (on bed) Ashlar Stone Headby White Hall Stone50mm +12.5mm K118 Kooltherm KingspanInsulated Plasterboard & Skim.
Spanish Blue Slate on Tannelised Battons.Black Tyvek Felt.
150 x 50mm S/W Timber RaftersTo Structural Engineers Specficiation.
100mm K7 Kooltherm Kingspan.Foil Taped to Rafters.
50mm Vented Airgap to be maintained.
20mm Cement Fibre Eaves Board.
Vented Dry Ridge.
Hopper
2145
- Fl
oor T
o H
ead
Seamless Laminated Glass Balustrade over Stone Coping.To Specifalists Specification.75 x 400 (on bed) Stone Coping.Horizontal DPC under Stone Coping.Externally Drained Cavity Tray.Levato Mono Suspended Deck System. Supplier : www.thetiledeckco.co.ukGRP Waterproofing onto 20mm Marine Plywood Substrate.Below Ground Cavity filled with Weak mix concrete.100mm Kingspan Styrozone H350 R.
Bituthene 4000 Installed to Specialists Design & Specification.Lapped to Vertical Bituthene Layer.150mm Hollowcore Concrete Plank by Longley Group.Laid to 1:50 External Fall.Suspended MF Plasterboard Ceiling.Alluminium Framed Bi-Folding DoorRAL Colour : 8008
L.F Level+73.655
Bedroom Three
Cinema Room Media Room
2418
- Fl
oor t
o C
eilin
g
2303
- Fl
oor t
o C
eilin
g
G.F Level+76.24
F.F Level+78.94
Living RoomDiningKitchen
Bedroom One Bedroom One
2354
- Ea
ves L
ine
2100
- Fl
oor T
o H
ead
2100
- Fl
oor t
o C
eilin
g
Cavity Tray over Stone Head.Minimum Two Weep Holes Per Opening.
150 x 100mm (On Bed) Ashlar Stone Head with Jambs & Cill.Pre-Stressed Concrete Lintel. To Structural Engineers Specification.Cavity Closer at Head of Opening.
50mm Perimeter Insulation around Window / Door Openings.
22mm Film Coated Caberdek Chipboard with Perimeter Insulation.75mm Rockwoold between Joists.
WS250 (72 x 47) EasiJoists with 75mm Rockwool between.Alluminium Glazing.RAL Colour : 8008
2100
- Fl
oor T
o H
ead
GROUND FLOOR TYPE TO BE CONFIRMED BY ENGINEERFOLLOWING GROUND INVESTIGATION REPORT.Detail to be confirmed by structural engineer prior to
constructionFoundation design and below ground design by Structural
Engineer
65mm Liquid poured screedwith Underloor Heating.
100mm Kingspan Styrozone H350 R.Minimum 1200 Gauge
Polythene Visqueen DPM.100mm Reinforced Concrete Slab.
Minimum 2000 GaugePolythene Visqueen DPM.A393 Mesh in top of Base.Well compacted Sub-Base.
Perbeable Gravel Fillaround Land Drain.
100mm Perforated Land Drainto nearest outlet.
Gravel wrapped inGeotextile membrane.
150 x 100mm (On Bed) Ashlar StoneCill with Jambs & Head.
Perimeter Insulation .100mm Full-Fill EcoBead Platinum Insulation.
22mm Film Coated Caberdek Chipboard with Perimeter Insulation.
Triangular Piece of Kingspan Styrozone H350 R.Bituthene 4000 Installed .
Alderburgh Drainage MembranceGeotextile Membrane
100mm Blockwork.200mm Reinforced Concrete.
B785 Mesh, Large Bars at 100mm cTc Vertically.As Per Structural Engineers Design.
Horizontal Galvanised Wall Ties.100mm Blockwork.
100mm Kingspan Styrozone H350 R.
Gravel Perimeter.WS250 (72 x 47) EasiJoists with 75mm Rockwool between.
Alluminium Framed GlazingRAL Colour :8008
50mm Perimeter Insulation to screedaround Window / Door Openings.
50mm Kingpspan K108 Insulation behind glazed panel.WS250 (72 x 47) EasiJoists with 75mm Rockwool between.
50mm Ashlar Stone Coping with Stepped Detail.Horizontal DPC Linked to GRP Roof Finish.
GRP Upstand w' Corner Fillet.100mm TR27 Kingspan Insulation over Rafters.
Vapour Control Layer.100 x 50 S/W Timber Rafters.
Resin Bolted To walls.RHS Steel Frame to Structural Engineers Sepcification.
Parapet Water Outlet.
Spanish Blue Slate on Tannelised Battons.
Zinc front Facias.Suitable ElZinco Seperation Layer.Barge Board form with Laddered OutriggersFrom supported Rafters.20mm Marine Plywood Sub-Strate
Black Tyvek Felt.
Zinc Soffit.Flexible Cavity Stop.
150 x 50mm S/W Timber RaftersTo Structural Engineers Specficiation.
100mm K7 Kooltherm Kingspan.Foil Taped to Rafters.
50mm Vented Airgap to be maintained.
50mm +12.5mm K118 Kooltherm KingspanInsulated Plasterboard & Skim.
Acon or Similar Approved Single Leaf Relieving Lintel.
20mm Cement Fibre Eaves Board.
Vented Dry Ridge.
Hopper
2145
- Fl
oor T
o H
ead
Seamless Laminated Glass Balustrade over Stone Coping.To Specifalists Specification.75 x 400 (on bed) Stone Coping.Horizontal DPC under Stone Coping.Externally Drained Cavity Tray.Levato Mono Suspended Deck System. Supplier : www.thetiledeckco.co.ukGRP Waterproofing onto 20mm Marine Plywood Substrate.Below Ground Cavity filled with Weak mix concrete.100mm Kingspan Styrozone H350 R.
Bituthene 4000 Installed to Specialists Design & Specification.Lapped to Vertical Bituthene Layer.150mm Hollowcore Concrete Plank by Longley Group.Laid to 1:50 External Fall.Suspended MF Plasterboard Ceiling.Alluminium Framed Bi-Folding DoorRAL Colour : 8008
L.F Level+73.655
42
00
20
E
419080 N
LPLP
LP
GP
GP
TP
T
h
r
e
s
h
o
ld
7
5
.
4
3
MH
WM
WM
MH
SV
SV
G
G
G
GIN
CATV
V1
V2
V3
V4
7
5
.
2
0
7
5
.
2
7
7
5
.
3
4
7
5
.2
3
75.22
7
5
.
2
2
7
5
.1
8
7
5
.2
2
75.19
7
5
.
2
1
7
6
.0
6
7
6
.
0
8
7
6
.0
6
7
6
.6
6
7
6
.5
2
7
6
.7
6
76.42
7
6
.
4
3
7
6
.
7
9
7
7
.
2
6
7
7
.
5
5
77.61
7
7
.
7
0
7
7
.
6
0
7
7
.
7
3
7
7
.
6
3
77.47
77.48
77.0
9
77.2
5
77.0
6
76.15
76.04
7
6
.
0
3
7
6
.
5
0
76.5
4
77.0
4
77.1
3
76.36
76.19
75.2
6
75.2
8
75.3
0
75.9
9
75.9
7
76.34
76.15
76.48
76.32
76.62
76.29
77.10
77.06
78.53
7
8
.
5
1
7
8
.5
8
7
8
.3
0
77.40
78.56
78.72
78.70
79.69
79.91
7
9
.
4
8
79.85 78.69
7
8
.
9
2
7
9
.4
0
7
9
.
4
2
7
9
.2
7
78.40
78.63
7
8
.6
4
R
id
g
e
L
e
v
e
l
8
3
.
4
6
R
idge L
evel 85.0
7
R
idge Level 83.77
Eaves Level 81.76
7
3
.
8
6
7
4
.
0
5
7
4
.
1
3
7
4
.1
8
7
4
.
3
4
7
5
.
2
6
7
5
.
2
3
7
4
.
3
3
7
4
.
0
2
7
3
.9
6
7
3
.
9
2
7
3
.
7
6
7
3
.9
8
7
3
.
8
9
7
4
.1
5
7
4
.1
5
7
4
.
1
4
7
4
.
1
0
7
4
.
1
1
7
4
.
1
5
7
4
.2
1
7
4
.0
3
7
4
.3
2
7
4
.6
3
7
4
.2
1
7
4
.1
8
7
4
.
0
7
7
4
.5
9
7
4
.5
0
7
4
.
0
8
7
4
.1
8
7
4
.5
0
74.46
7
4
.5
4
7
4
.4
7
7
4
.9
2
7
5
.0
1
7
4
.6
3
7
4
.
6
8
74.97
74.66
7
4
.
6
0
7
4
.6
8
7
4
.
7
0
7
4
.
7
4
7
4
.
5
0
7
4
.
1
5
7
4
.
3
0
7
4
.
5
7
7
4
.0
7
7
4
.0
3
74.09
74.45
7
4
.1
0
7
4
.
7
6
7
5
.
0
7
7
5
.
3
0
7
5
.
4
5
7
5
.5
0
7
5
.
5
0
7
5
.
4
9
75.4
8
75.3
7
7
5
.2
4
75.25
7
5
.
2
0
76.1
3
7
6
.9
1
75.5
8
7
5
.6
1
7
5
.
5
8
75.56
7
5
.
3
7
7
4
.
9
5
7
5
.
5
7
7
5
.
9
0
7
6
.1
7
7
6
.
1
0
76.67
7
6
.
4
6
7
6
.
2
5
7
5
.
8
2
7
4
.
8
6
77.23
77.30
7
7
.
0
7
77.23
7
7
.
2
7
7
7
.
3
8
7
7
.3
9
77.53 77.32
7
7
.0
5
7
7
.2
2
7
6
.7
7
7
6
.
8
4
7
6
.
6
9
7
4
.
8
0
7
5
.
1
8
CL75.30
7
5
.3
3
7
4
.
3
7
7
5
.
2
1
7
5
.
2
4
75.55
7
5
.3
4
7
5
.
3
1
7
4
.4
0
7
4
.3
5
7
4
.3
7
7
4
.
5
4
7
4
.5
6
7
4
.4
6
74.28
7
3
.
9
7
7
3
.
4
2
7
3
.3
7
7
3
.5
3
7
3
.
6
5
E
a
v
e
s
L
e
v
e
l
7
9
.
3
6
75.2
5
74.9
3
7
4
.
1
4
7
4
.5
0
7
4
.
6
3
7
4
.
3
5
7
4
.4
7
7
4
.
5
5
7
5
.1
3
75.1
4
7
5
.
0
9
7
5
.
0
9
7
5
.
1
0
7
4
.5
7
7
4
.6
8
7
5
.0
2
7
5
.0
9
7
5
.0
9
7
4
.
7
5
7
4
.6
5
7
4
.5
6
7
4
.5
9
R
id
g
e
D
e
t
a
il
8
1
.
5
2
ToW 72.57
72.5
6
7
3
.2
7
7
3
.8
7
TE
L
7
3
.
8
3
73.92
74.1
4
74.2
1
75.3
3
75.2
9
75.2
2
76.3
9
76.4
3
76.4
7
C
AT
V
76.86
G
77.6
2
77.5
0
77.4
4
78.5
3
78.5
7
78.62
CL78.61
MH
CA
TV
CL76.45
WO
FH
7
2
.5
7
7
2
.7
2
73.1
4
7
3
.2
6
7
3
.
3
6
7
4
.5
5
7
5
.8
2
7
6
.9
2
78.1
7
78.86
78.6
7
77.94
7
7
.1
9
76.7
1
7
5
.9
1
7
5
.1
4
7
2
.8
9
7
4
.3
5
7
7
.9
9
7
7
.
8
2
7
7
.
7
1
H
O
P
T
O
N
L
A
N
E
7
6
.
0
2
75.9
6
75.3
4
7
6
.
9
0
7
7
.0
0
7
7
.1
7
77.1
5
77.0
2
419060 N
419040 N
42
00
40
E
42
00
60
E
42
00
80
E
42
01
00
E
42
00
20
E
42
00
40
E
42
00
60
E
42
00
80
E
42
01
00
E
419080 N
419060 N
419040 N
7
3
.
4
6
R
id
g
e
L
e
v
e
l 8
0
.4
6
E
a
v
e
s
L
e
v
e
l 7
7
.8
2
R
id
g
e
L
e
v
e
l 7
9
.6
5
E
a
v
e
s
L
e
v
e
l 7
6
.9
6
R
id
g
e
L
e
v
e
l 7
9
.5
2
E
a
v
e
s
L
e
v
e
l 7
.7
2
17384
19151
42
00
20
E
419080 N
LP
TP
WM
WM
MH
SV
SV
CATV
V3
R
idge L
evel 85.0
7
R
idge Level 83.77
Eaves Level 81.76
E
a
v
e
s
L
e
v
e
l
7
9
.
3
6
R
id
g
e
D
e
t
a
il
8
1
.
5
2
72.5
6
7
3
.2
7
TE
L
75.3
3
75.2
9
75.2
2
76.3
9
76.4
3
76.4
7
C
AT
V
76.86
G
77.6
2
77.5
0
77.4
4
78.5
3
78.5
7
78.62
CL78.61
MH
CA
TV
CL76.45
WO
FH
7
2
.5
7
7
2
.7
2
73.1
4
7
3
.2
6
7
3
.
3
6
7
4
.5
5
7
5
.8
2
7
6
.9
2
78.1
7
78.86
78.6
7
77.94
7
7
.1
9
76.7
1
7
5
.9
1
7
5
.1
4
7
2
.8
9
7
4
.3
5
H
O
P
T
O
N
L
A
N
E
419060 N
419040 N
42
00
40
E
42
00
60
E
42
00
80
E
42
01
00
E
42
00
20
E
42
00
40
E
42
00
60
E
42
00
80
E
42
01
00
E
419080 N
419060 N
419040 N
Plot Three
Plot Two
Plot One
1.8 Metre Fence
1.8 Metre Fence
1.5 Metre W
all
Bat Box
SorbusHepehensis
MalusEvereste
BetulaPendula
MalusEvereste
BetulaPendula
FagusSylvatica
FagusSylvatica
SorbusHepehensis
Bin Store
SorbusHepehensis
CarpinusBetulus
CarpinusBetulus
CarpinusBetulus
R
id
g
e
L
e
v
e
l 8
0
.4
6
E
a
v
e
s
L
e
v
e
l 7
7
.8
2
R
id
g
e
L
e
v
e
l 7
9
.6
5
E
a
v
e
s
L
e
v
e
l 7
6
.9
6
R
id
g
e
L
e
v
e
l 7
9
.5
2
E
a
v
e
s
L
e
v
e
l 7
.7
2
7
3
.
4
6
6033
49504500
1100
BetulaPendula
Bird Box
GFL+75.265
GFL+76.24
GFL+76.24
Intercom
Letter Box
SiteMeter Box
+75.265+76.24
+76.24
+75.264
+74.74
+74.50
+75.182+75.46
+75.978
+76.09
+76.09
+75.11
+74.965
74.28
7
3
.
9
7
7
3
.
4
2
7
3
.5
3
7
3
.
6
5
7
4
.5
0
7
5
.0
2
7
5
.0
9
7
4
.5
9
+74.565
+75.114
+75.114
+76.378
+75.86
+75.214
+76.578
+76.578
+75.414
+74.565
76.34
+77.40
+78.56
+78.72
+78.70
+79.69
+79.91
Vel
uxRo
of L
ight
CK04
Vel
uxRo
of L
ight
CK04
Velux
Roof LightCK
04
Velux
Roof LightCK
04
Vel
uxRo
of L
ight
CK04
Vel
uxRo
of L
ight
CK04
Vel
uxRo
of L
ight
CK04
Vel
uxRo
of L
ight
CK04
Velux
Roof LightCK
04
Velux
Roof LightCK
04
Vel
uxRo
of L
ight
CK04
Vel
uxRo
of L
ight
CK04
Velux
Roof LightCK
04
Velux
Roof LightCK
04
Vel
uxRo
of L
ight
CK04
Velux
Roof LightCK
04
Vel
uxRo
of L
ight
CK04
Velux
Roof LightCK
04
Velux
Roof LightCK
04