App 7 - 21

7-2 Outline Design Drawings

List of Outline Design Drawings

No. Facility Title Page

A1 General General Facility Plan App 7 – 22

A2 General Planned Water Level Profile App 7 – 23

B1 Intake Intake Layout App 7 – 24

B2 Intake Intake Tower / Intake Pump App 7 – 25

B3 Intake Single Line Diagram (Intake Pump) App 7 – 26

C1 Water Treatment Plant Water Treatment Plant Layout App 7 – 27

C2 Water Treatment Plant Receiving Well / Flocculation (1) App 7 – 28

C3 Water Treatment Plant Receiving Well / Flocculation (2) App 7 – 29

C4 Water Treatment Plant Sedimentation (1) App 7 – 30

C5 Water Treatment Plant Sedimentation (2) App 7 – 31

C6 Water Treatment Plant Filtration (1) App 7 – 32

C7 Water Treatment Plant Filtration (2) App 7 – 33

C8 Water Treatment Plant Clear Water Reservoir (1) App 7 – 34

C9 Water Treatment Plant Clear Water Reservoir (2) App 7 – 35

C10 Water Treatment Plant Transmission Pump App 7 – 36

C11 Water Treatment Plant Single Line Diagram (Transmission

Pump)

App 7 – 37

C12 Water Treatment Plant Drying Bed App 7 – 38

C13 Water Treatment Plant Administration Building (1) App 7 – 39

C14 Water Treatment Plant Administration Building (2) App 7 – 40

C15 Water Treatment Plant Generator Plan App 7 – 41

D1 Reservoir Elevated Tank (700 m3) (1) App 7 – 42

D2 Reservoir Elevated Tank (700 m3) (2) App 7 – 43

D3 Reservoir Elevated Tank (600 m3) (1) App 7 – 44

D4 Reservoir Elevated Tank (600 m3) (2) App 7 – 45

E1 Pipelines (Main/Sub Mains) Air Valve, Blow Off, Sluice Valve App 7 – 46

E2 Pipelines (Main/Sub Mains) Pipe Bridge App 7 – 47

E3 Pipelines (Main/Sub Mains) Existing Structure Crossing App 7 – 48

App 7 - 22

PROJECT

SCALE

Pre

par

ator

y S

urv

ey o

n T

hak

hek

Wat

er S

up

ply

Dev

elop

men

t P

roje

ct in

Kh

amm

ouan

e P

rovi

nce

in  

Lao

Peo

ple

's D

emoc

rati

c R

epu

bli

cN

ON

E

DRAWING No

DATE

DATE

Pla

nned

Wat

er L

evel

Pro

file

DESCRIPTION

PREPARED BY

APPROVE BY

NIH

ON

SU

IDO

CO

NS

UL

TA

NT

S C

O.,

LT

D.

Note:

There is a difference, 4.83m, between National BM and Original BM obtained from NPKMN.

Hence, the surveyed elevations (ground levels) shown in the drawing are 4.83m higher

than the exact elevations.