Transcript
Page 1: 5.4. 3. 2. 1. - Ribble Valley · landscaped earth mounds landscaped earth mound 2no vehicle charging points & 2800mm wide parking bays energy centre electric 0 electric 2 p03 02/11/18

Escape

1.

2.

3.

4.

5. UP

UP

UP

1

2

3

4

5

6

7

8

A

B

D

D

E

F

C

C

G

Refu

se &

Recyclin

g

Cle

aners S

tore

Meetin

g 5

Meetin

g 6

Telepresence R

oom

Meeting 1

Bre

ak o

ut / F

lexib

le

Furn

iture

Sto

re

Com

ms

Meeting 7

Meetin

g 2

Meeting 3

Rise

r 2

Rise

r 4

Riser 1

Incoming S

ervices

Lift 1

Meetin

g 8

Fem

ale

WC

Male

WC

Acc. W

C

Meeting Lobby /

Corrid

or

WC

Lobby

Service

Corrid

or

Stair A

Sta

ir C

Sta

ir B

Lobby

Lift 3

Lift 2

Lift 1

Service Lift

Sto

re

Open P

lan Office

Mist B

ottle

Sto

re

Meeting 4

Clr

Lobby

N 431449696

E 362432653

9

10

11

8a

0b

C2

C3

1a

0a

C4

D1

C1

D2

A1

E1

Atrium

Atriu

m L

ink

Male

Shw

r/Ch

Fem

ale Shw

r/Ch

Sw

itch

Trilogy

Acce

ssible

WC

&

Show

er

AV

Equipm

ent

Furn

iture

Sto

re

DESIGN HAZARD IDENTIFICATION

No significant Hazards have been identified in this

drawing

P01 17/08/18 RD AS

Initial Issue

project

client

drawing title

date

scale@A1

drawn

checked

drawing stage

Job

No

Rev

Purpose of IssueStatus

Drawn by: -Date Checked by: -REV

NOTES All dimensions and levels are to be checked on site.

Any discrepancies are to be reported to the architect beforeany work commences.

This drawing shall not be scaled to ascertain any dimensions.Work to figured dims only.

This drawing shall not be reproduced without express writtenpermission from AEW.

Title overlay drawings and ownership boundaries areproduced using all reasonable endeavors. AEW cannot beresponsible for the accuracy or scale discrepancy of baseplans supplied to them.

S2

P07

B941

3-A

EW-X

X-SI

-DR-

A-0

502

AS

RD

1:500

August 2018

Proposed Site Plan

B9413 Office Building

BAE Systems

Planning

For Comment

N

P02 10/10/18 PMR RD

Amendments made to car park access and alignment toavoid services inspection chambers and enabling works,refer BJP mark up plan . Vehicle charge points added.Landscape mounds added. Accessible parking revised toentrance in accordance with Stakeholders meeting notesfrom meeting of 12/09/18. Drawing becomes Landscape.

PARKING PROVISION WITHIN APPLICATION DEMISE

EXISTING PROPOSEDSTANDARD STANDARDACCESSIBLE ACCESSIBLE

264 2651 15

LANDSCAPED EARTH MOUNDS

LANDSCAPED EARTH MOUND

2No VEHICLECHARGINGPOINTS & 2800mmWIDE PARKING BAYS

ENERGY CENTRE

ELECTRIC ELECTRIC0 2

P03 02/11/18 PMR RD

Vehicle charging spaces revised to 2800mm

TRAFFIC BOLLARDS TO MATCHEXISTING LANDSCAPING

BLOCK PAVING

BLOCK PAVING

TRAFFIC BOLLARDS TO MATCHEXISTING LANDSCAPING

RESIN BONDED PAVING

RESIN BONDEDPAVING

RESIN BONDED PAVING

NEW FOOTPATH WITH 8No.STEPS

P04 02/11/18 PMR RD

Hard landscape surface treatments and areas revised.Bollards added. Footpath and steps added

CYCLE SHELTER 60 BICYCLES

P05 07/12/18 PMR RD

Cycle shelter added for 60 Bicycles.

P06 18/06/19 NC RD

Updated Planning Issue

P07 10/07/19 NC RD

Updated Site Boundary

Top Related