CDM:CDM: PelletisationPelletisation of Municipalof MunicipalSolid WasteSolid Waste
TERI, New DelhiTERI, New Delhi
-
8/12/2019 3kusum 1 - SWP Pelletisation
2/13
Project briefProject brief
Processing of municipal solid wasteProcessing of municipal solid waste
Production of Refuse Derived Fuel pelletsProduction of Refuse Derived Fuel pellets
Production of soilProduction of soil--enricherenricher
Reduction of GHG emissions from theReduction of GHG emissions from thelandfilllandfill
Improvement in the environment,Improvement in the environment,economic and social conditionseconomic and social conditions
-
8/12/2019 3kusum 1 - SWP Pelletisation
3/13
Project BriefProject Brief
PromotorPromotor:: RenovaRenova Energy Ltd.Energy Ltd.
Capacity: 150 TPDCapacity: 150 TPD RDFpelletsRDFpellets/ 300 TPD soil/ 300 TPD soilenricherenricher
Location:Location: OkhlaOkhla, New Delhi, New Delhi
Quantum of MSW processed: 500 TPDQuantum of MSW processed: 500 TPDProject consortiaProject consortia
RenovaRenova Energy Ltd.Energy Ltd.
M/sM/sAmritAmrit NCES Ltd.NCES Ltd.M/s HiM/s Hi--Tech Agro Projects P LtdTech Agro Projects P Ltd
Municipal Corporation of DelhiMunicipal Corporation of Delhi
-
8/12/2019 3kusum 1 - SWP Pelletisation
4/13
Means of FinanceMeans of Finance
Project costProject cost RsRs. 11. 11 crorescrores
PromoterPromoters equitys equity 10%10%
Venture capitalVenture capital 20%20%
Term loanTerm loan 70%70%
-
8/12/2019 3kusum 1 - SWP Pelletisation
5/13
TechnologyTechnology
Indigenous technology and design developed byIndigenous technology and design developed by
M/SM/SAmritAmrit NCES Ltd., New Delhi forNCES Ltd., New Delhi for pelletisationpelletisationProcess descriptionProcess description
Screening of the wasteScreening of the waste
Primary shredding to 25Primary shredding to 25--40 mm size40 mm size Drying to 25% moisture byDrying to 25% moisture by sundryingsundrying or mechanicalor mechanical
dryerdryer
Sieving for separation of fine dirt and sandSieving for separation of fine dirt and sand Further drying to moisture content of 15%Further drying to moisture content of 15%
Conversion of RDF to pelletsConversion of RDF to pellets
-
8/12/2019 3kusum 1 - SWP Pelletisation
6/13
Project activityProject activity
-
8/12/2019 3kusum 1 - SWP Pelletisation
7/13
Project boundary and systemProject boundary and system
boundaryboundary
-
8/12/2019 3kusum 1 - SWP Pelletisation
8/13
Emission reductionEmission reduction
Present MSW handling and practice in Delhi isPresent MSW handling and practice in Delhi isdumping of 6500 TPD resulting in annualdumping of 6500 TPD resulting in annualemissions of 70,000 TPD of methaneemissions of 70,000 TPD of methaneThe project activity would result in 113943The project activity would result in 113943tonnestonnes of COof CO22 equivalent per annum (1equivalent per annum (1
stst year);year);
102529102529 tonnestonnes of COof CO22 equivalent (2equivalent (2--5 years)5 years)7969979699 tonnestonnes of COof CO22 equivalent (6equivalent (6--10 years)10 years)
-
8/12/2019 3kusum 1 - SWP Pelletisation
9/13
Baseline emissions estimationBaseline emissions estimationCHCH44_IPCC decay= MCF_IPCC decay= MCF DOCDOCDOCDOCFF FF 16/1216/12
DOCDOCFF == Fraction of the organic fraction that actually degrades (0.77Fraction of the organic fraction that actually degrades (0.77Default value)Default value)
MCFMCF == Methane correction factor (default for India 0.6)Methane correction factor (default for India 0.6)
FF == Fraction of methane in landfill gas (0.5 default value)Fraction of methane in landfill gas (0.5 default value)DOC = 0.4 (A)+0.17(B)+0.15 (C)+0.3(D)DOC = 0.4 (A)+0.17(B)+0.15 (C)+0.3(D)
AA (Paper and textiles)(Paper and textiles)BB -- ( garden waste, yard waste etc.)( garden waste, yard waste etc.)
CC (Food waste)(Food waste)DD ( Wood)( Wood)
BEBEyy = Q= QbiomassbiomassCHCH44_IPCC decay_IPCC decayGWP_CHGWP_CH44BEyBEy = Baseline methane emissions from biomass decay (tonnes of CO= Baseline methane emissions from biomass decay (tonnes of CO22
equivalent)equivalent)QQbiomassbiomass = Quantity of biomass treated under the project activity (tonnes= Quantity of biomass treated under the project activity (tonnes))GWP_CHGWP_CH44 = GWP for CH= GWP for CH44 (tonnes of CO(tonnes of CO22 equivalent/tonne of CHequivalent/tonne of CH44) = 21) = 21
-
8/12/2019 3kusum 1 - SWP Pelletisation
10/13
Monitoring methodologyMonitoring methodology
Type III: Other project activitiesType III: Other project activities III E Avoidance of methaneIII E Avoidance of methane
production from biomass decay through controlled combustionproduction from biomass decay through controlled combustion
The proposed methodology is based on the monitoring of WasteThe proposed methodology is based on the monitoring of Wastegenerated in the National Capital Territory of Delhigenerated in the National Capital Territory of Delhi
Number of treatment plants set up along with the capacityNumber of treatment plants set up along with the capacity
Amount of organic matter processed (Q biomass) by the projectAmount of organic matter processed (Q biomass) by the projectactivity in a yearactivity in a year
Waste compositionWaste composition
Amount of RDF producedAmount of RDF produced
Quantity of RDF sold per yearQuantity of RDF sold per year
-
8/12/2019 3kusum 1 - SWP Pelletisation
11/13
Environmental and socioEnvironmental and socio--economiceconomic
benefitsbenefitsConversion of waste into useful fuelConversion of waste into useful fuel
Reduced emissions from dumping as wellReduced emissions from dumping as wellas due to replacement of fuels with RDFas due to replacement of fuels with RDF
pelletspelletsEmployment opportunity for localEmployment opportunity for local
Improve the surroundings andImprove the surroundings and hygeinichygeinicenvironmentenvironment
-
8/12/2019 3kusum 1 - SWP Pelletisation
12/13
AdditionalityAdditionality
Existing practice in spite of requirement toExisting practice in spite of requirement to
comply with MSW rules, 2000.comply with MSW rules, 2000.Financial barrier in implementation of WTEFinancial barrier in implementation of WTE
projectsprojectsWould result in continuation of currentWould result in continuation of current
status of dumping of wastes although withstatus of dumping of wastes although with
gradual decreasing trendgradual decreasing trend
-