Download - 3g Parameter
---------- Forwarded message ----------From: Anugya Jain <[email protected]>Date: Thu, 14 Aug 2014 10:59:40 +0530Subject: Fwd: Fwd: Fwd: RE: 3G New Sites / Sectors AuditTo: [email protected]
Hi Sir,As discussed please find the list of the check points for Upcoming new SCFT sites with below details and required inputs.
* License Check-by using the "Invh" command need to check all the necessary license are available with feature activated script are with enclosed report. * Nbr List audit need to be done post site on aired,ensure up to 3rd-Tire no missing Nbr captured based on MIPT & Handover matrices. * Golden Radio Parameter audit for Node-b & RNC level,Golden parameter with recommended values enclosed with report. * As per New PSC plan*(plan already shared with the respective team)*SCFT site must be have the updated PSC's, and up to the 3rd Tire wont be any PSC Conflict. * LAC/RAC/URA Audit as per Plan provided by the planing team must be same,during the SCFT LAC/RAC/URA must be same based on neighboring sites & Geographical location. * Major KPI(RRC CS/PS,RAB Speech/HSDPA,DCR,IRAT CS/PS & Traffic & Data Download must be >0) must be under threshold KPI tracker formate enclosed herewith KPI threshold values. * RSSI of the Cell must be>-90 (dBm).
Reporting format;
Site MO Type of Site RNC Status SCFT Completion Date LicenseStatus Nbr Audit Radio Parameter Audit PSC Audit LAC/RAC/URAAudit KPI RSSIRRC RAB DCR IRAT Traffic/Download7737 UDLFP3B New Site DLGGN01 SCFT Completed 10-Jul-14 activeok discrepancies found ok ok ok ok high ok ok ?
RNC Parameters;
*Parameter Name* *Recommonded Value*qhyst2 2nInSyncInd 3aseDlAdm 400
aseUlAdm 350pwrAdm 80sf8Adm 0sf4AdmUl 0usedFreqThresh2dEcno -15usedFreqThresh2dRscp -108sRatSearch 2numHsPdschCodes 5numHsScchCodes 2codeThresholdPdu656 1nOutSyncInd 10pwrOffset 15sf8AdmUl 8increasedRachCoverageEnabled 1eulServingCellUsersAdm According to license capacityhsdpaUsersAdm According to license capacityprimarycpichpower maximumtransmissionpower According to license capacitydlcodeadm 85
RBS Parameter
*Parameter Name* *Recommoneded Value*antennaSupervisionThreshold 50maxNumHsPdschCodes 14maxHsRate 400cqiAdjustmentOn TRUEfeatureState16Qam 1featureState64Qam 1featureStateHsdpaFlexibleScheduler 1featureStateHsdpaDynamicCodeAllocation 1queueSelectAlgorithm 1eulMaxShoRate 6016eDchCapability 1FeatureStateEnhancedLayer2 1featureStateEul2msTti 1featureStateDlPowerControlEul 1featureStateGrake 1eulMaxOwnUuLoad 80eulMaxAllowedSchRate 5760eulNonServHwRate 1024invh License Checkget . Maxtot Power Settingaltk Alarms checkget . numhscoderesources Codes Checklh ru fui get vswr VSWR Check
rbs Pwd
Major Radio KPI's;
** ** *1.6* *400 m-600 m* *Max 10% OFFSET WRT Neigh* *Max 10% OFFSET WRTNeigh* *Max 10% OFFSET WRT Neigh* *Max 10% OFFSET WRT Neigh* *Max 10%OFFSET WRT Neigh* *Max 10% OFFSET WRT Neigh* *>=98.5%* *>=98.5%**>=97.5%* *>=97.5%* *>=97.5%* *<=1.5%* *<=1.5%* *>=98%* *>25**>=94%* *>100* *>=94%* *<-80*MO Date SHO OVERHEAD PROP DELAY CS RRC ATT W.R.T NBRS PS RRC ATTW.R.T NBRS RAB ATT W.R.T NBRS CS TRAFFIC( ERLANGS) DATA DOWNLOADDATA UPLOAD CS RRC SUCCESS RATE PS RRC SUCCESS RATE RAB SUCCESS RATESPEECH RAB SUCCESS RATE HSDPA RAB SUCCESS RATE EUL DCR VOICE DCRHSDPA SHO SUCCESS RATE IRAT ATT CS(BBH) IRAT SUCCESS RATE CS IRATATT PS IRAT SUCCESS RATE PS RSSIMLCMRGX 3/19/2014
26 262 1116 2.04 506.02 *36.81* 100 97.71 100 81.33 77.560 1.18 99.73 8 62.5 0 #DIV/0
Regards..Aditya Pratap Singh
-------- Original Message --------Subject: RE: 3G New Sites / Sectors AuditDate: Fri, 1 Aug 2014 10:50:23 +0530From: Fasel Mustafa <[email protected]>To: Sandeep Bansal <[email protected]>, Aditya Pratap Singh<[email protected]>, Anugya Jain <[email protected]>CC: Sanjay Chawla <[email protected]>, Maninder Singh S<[email protected]>, Mukesh Somani <[email protected]>, Rupesh Shrivastav <[email protected]>, Praveen Kumar Tiwari P <[email protected]>, Prasoon Tiwari <[email protected]>, Sukisha Kanwar <[email protected]>, Sanjeev Mahrolia XM <[email protected]>
Can u share the details so that can be taken care of
Regards
*From:*Sandeep Bansal*Sent:* Thursday, July 31, 2014 7:46 PM*To:* Aditya Pratap Singh; Anugya Jain*Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar; Fasel Mustafa; Sanjeev Mahrolia XM*Subject:* RE: 3G New Sites / Sectors Audit
Hi Aditya,
Can you please share details of radio parameter discrepancies so that it will be taken care next time.
Site
MO
Type of Site
RNC
Status
SCFT Completion Date
Nbr Audit
Radio Parameter Audit
5451
UBURARE
New Site
DLEVK07
SCFT Completed
1-Jul-14
Nbrs missing
discrepancies found
5424
UDLTPURQ
Sector Addition
DLEVK07
SCFT Completed
17-Jul-14
Nbrs missing
discrepancies found
11021
UASVHHB
New Site
DLEVK07
SCFT Completed
16-Jul-14
ok
discrepancies found
602
UMUKNGRQ
Sector Addition
DLEVK07
SCFT Completed
22-Jul-14
Nbrs missing
discrepancies found
10967
URMGRJP
New Site
DLEVK07
SCFT Completed
18-Jul-14
ok
discrepancies found
1689
UMAYFLDQ
Sector Addition
DLEGN04
SCFT Completed
22-Jul-14
Nbrs missing
discrepancies found
4215
UINDRAPQ
Sector Addition
DLEVK08
SCFT Completed
23-Jul-14
ok
discrepancies found
1989
UGURS56Q
Sector Addition
DLEGN04
SCFT Completed
4-Jul-14
Nbrs missing
discrepancies found
Regards
Sandeep
*From:*Aditya Pratap Singh*Sent:* Thursday, July 31, 2014 5:03 PM*To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain*Cc:* Sandeep Bansal; Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari; Sukisha Kanwar*Subject:* Re: 3G New Sites / Sectors Audit
Hi Sir,Please find the enclosed new Sites audit report for DLEVK07,DLEVK08,DLEGN04RNC's site got on aired in July-14 month,details reports are enclosed here with.Item highlighted are being taking care by the Operation team.
@Sanjeev;Request you to please take care the site getting on aired onwards to avoid the such discrepancies.
Site
MO
Type of Site
RNC
Status
SCFT Completion Date
License Status
Nbr Audit
Radio Parameter Audit
PSC Audit
LAC/RAC Audit
KPI
RSSI
RRC
RAB
DCR
IRAT
Traffic/Download
5451
UBURARE
New Site
DLEVK07
SCFT Completed
1-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
5424
UDLTPURQ
Sector Addition
DLEVK07
SCFT Completed
17-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
11021
UASVHHB
New Site
DLEVK07
SCFT Completed
16-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
602
UMUKNGRQ
Sector Addition
DLEVK07
SCFT Completed
22-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
10967
URMGRJP
New Site
DLEVK07
SCFT Completed
18-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
1689
UMAYFLDQ
Sector Addition
DLEGN04
SCFT Completed
22-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
10979
USHBDDR
New Site
DLEVK07
SCFT Completed
24-Jul-14
active
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
4215
UINDRAPQ
Sector Addition
DLEVK08
SCFT Completed
23-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
ok
INDRAPQ 60% success
ok
ok
1989
UGURS56Q
Sector Addition
DLEGN04
SCFT Completed
4-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
EUL 80% success
ok
ok
ok
ok
Best Regards;
Aditya Pratap Singh
Specialist-Network Engineering
+91-8800894132
On 07/30/2014 05:55 PM, Fasel Mustafa wrote:
+ Sukisha
Regards
*From:*Aditya Pratap Singh *Sent:* Tuesday, July 29, 2014 5:29 PM *To:* Fasel Mustafa; Sanjeev Mahrolia XM; Anugya Jain; Sandeep Bansal *Cc:* Sanjay Chawla; Maninder Singh S; Mukesh Somani; Rupesh Shrivastav; Praveen Kumar Tiwari P; Prasoon Tiwari *Subject:* Re: 3G New Sites / Sectors Audit
Hi Sir, Please find the enclosed new Sites audit report for GGN cluster site got on aired in July-14 month,details reports are enclosed here with.
Item highlighted are being taking care by the Operation team.
Thanks to Anugya efforts putting on New Site to do the audit and get this corrected.
@Sanjeev;Request you to please take care the site getting on aired onwards to avoid the such discrepancies.
Site
MO
Type of Site
RNC
Status
SCFT Completion Date
License Status
Nbr Audit
Radio Parameter Audit
PSC Audit
LAC/RAC Audit
KPI
RSSI
RRC
RAB
DCR
IRAT
Traffic/Download
7737
UDLFP3B
New Site
DLGGN01
SCFT Completed
10-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
high
ok
ok
HIGH
3288
UFINANCY
Sector Addition
DLGGN02
SCFT Completed
2-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
7499
UUNTSEZ
Sector Addition
DLGGN02
SCFT Completed
10-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
7690
USREHME
New Site
DLGGN02
SCFT Completed
7-Jul-14
active
ok
ok
ok
ok
ok
ok
ok
ok
ok
ok
3465
UAMREXPQ
Sector Addition
DLGGN03
SCFT Completed
15-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
5919
UGURG40Q
Sector Addition
DLGGN03
SCFT Completed
18-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
7724
USRWTVH
New Site
DLGGN03
SCFT Completed
16-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
high
ok
ok
ok
10929
UDLFGN1
New Site
DLGGN03
SCFT Completed
12-Jul-14
active
Nbrs missing
discrepancies found
ok
ok
ok
ok
ok
DLFGN1Y 80% success
ok
ok
7392/1
UVPLTE1
New Site
DLGGN03
SCFT Completed
2-Jul-14
active
ok
discrepancies found
ok
ok
ok
ok
ok
ok
ok
ok
Best Regards;
Aditya Pratap Singh
Specialist-Network Engineering
+91-8800894132
On 07/25/2014 04:00 PM, Fasel Mustafa wrote:
As discussed , Pls provide the first cut analysis .
Start from GGN
Regards
*From:*Sanjay Chawla *Sent:* Friday, July 25, 2014 3:16 PM *To:* Fasel Mustafa; Praveen Kumar Tiwari P; Prasoon Tiwari *Cc:* Maninder Singh S; Aditya Pratap Singh; Sanjeev Mahrolia XM; Mukesh Somani; Rupesh Shrivastav *Subject:* RE: 3G New Sites / Sectors Audit
Dear Fasel,
SCFT is being taken as part of Cielo project.
Requesting Praveen, Prasoon for providing the same from team. If required, operations team will support as required.
Description: line
*Thanks & Regards*
**
*SANJAY CHAWLA NETWORK ENGINEERING*
Ericsson India Global Services Pvt Ltd Mobile +91 8800337876 [email protected] <mailto:[email protected]> www.ericsson.com <http://www.ericsson.com/>
For more information on our portfolio of learning services please go to:
http://www.ericsson.com/ourportfolio/ericsson-academy/learning-services This Communication is Confidential. We only send and receive email on the basis of the term set out at www.ericsson.com/email_disclaimer <http://www.ericsson.com/email_disclaimer>
*From:*Fasel Mustafa *Sent:* Friday, July 25, 2014 3:07 PM *To:* Sanjay Chawla *Cc:* Maninder Singh S; Praveen Kumar Tiwari P; Prasoon Tiwari; Aditya Pratap Singh; Sanjeev Mahrolia XM; Mukesh Somani *Subject:* 3G New Sites / Sectors Audit
Dear Sanjay ,
We need to have the audit of the new sites / sectors which came on air recently in terms of scft reports , parameters , features , KPIs , CS/PS Traffic and need to high light the deviations , if any .
Sanjeev Mahrolia will be sharing the list wef 1^st July , appreciate if we can get the response by EOD .
Aside to Sanjeev , As discussed Pls share the details
Regards , Fasel
--(¨`·.·´¨) *Always *`·.¸(¨`·.·´¨) *Keep*(¨`·.·´¨)¸.·´ *Smiling!* `·.¸.·´Cheers´¨) ¸ •´ ¸.•*´¨) ¸.•*¨) (¸.•´ (¸.•* ♥♥♥SanjayThanks and RegardsSanjay Sahni(+919311986783)[email protected]