5TH ASEAN SMART GRID CONGRESS3-4 DECEMBER 2019LE GRANDEUR PALM RESORT HOTEL, SENAI JOHOR, MALAYSIA
TEMBURONG MICROGRID AS POTENTIAL DEMONSTRATION
FOR SMART MICROGRID
DR ROMEO PACUDAN
INTERIM CEO AND CHIEF RESEARCHER, BRUNEI NATIONAL ENERGY
RESEARCH INSTITUTE (BNERI)
ASSOCIATE PROFESSOR, UNIVERSITI BRUNEI DARUSSALAM
3
1. Background
Easternmost district in
Brunei. Area of 1,306 square
km1.
Separated from the rest of Brunei
(an exclave)
Over 500 sq. km of pristine
rainforest located south.
Main town is Bangar Town
(Pekan Bangar in Malay)1
Electricity is 100% generated
from a diesel power station
Population density of 6.8
person per square km (2014)3
Population of8,900 persons
(2015)2
1Temburong District: Information Department, Prime Minister’s Office, Second Edition, 20112Brunei Darussalam Key Indicators 2015, Release 2: Annual: Department of Economic Planning and Development, 20163Brunei Darussalam Statistical Yearbook 2014: Department of Economic Planning and Development, 2015
Bangar Town
Ulu Temburong National Park
Temburong Boat Terminal
4
• Electricity in Temburong is currently beingsupplied by a 12 MW diesel power station atBelingus village, about 5 to 6 km away fromPekan Bangar.
• Power station comprises four 4 MW-rateddiesel engines, with three runningsimultaneously and one acting as a spare.
• A total of 42,381 MWh of electricity wassupplied in 2015 consuming a total of 13.85million litres of diesel fuel.
10.27 10.73 10.30 10.54
7.90
12.3413.58
0
2
4
6
8
10
12
14
16
2009 2010 2011 2012 2013 2014 2015
Die
sel C
on
sum
pti
on
/ m
illio
n li
tre
s
Diesel Consumption (million litres)
4.8% annual growth
36556 37919
31053
37837 3814839636
42381
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
2009 2010 2011 2012 2013 2014 2015
Ele
ctri
city
Ge
ne
rati
on
/ M
Wh
Electricity Generation (MWh)
Diesel engines of Belingus Power StationSource: Department of Electrical Services (DES)
1. Background
5
2. Smart Micro-grid in the Context of a Smart EcoTownKey Project Studies
1. Development of Ecotown Model in ASEAN Region through Adoption of Energy
Efficient Building Technologies, Smart Grid and Transportation. Published as ERIA
Research Project Report 2015, number 2.
2. Simulation Study on Energy Mix for Power Generation in Temburong Eco Town.
Published as ERIA Research Project Report 2017, number 2.
• Normal demand: 12 MW (diesel) + 24 MWp (solar) + 78 MWh (storage)
• Eco demand: 12 MW (diesel) + 5 MWp (solar) + 48 MWh (storage)
3. Formulation of Temburong Eco Town Master Plan in Brunei Darussalam.
Published as ERIA Research Project Report 2017 number 11.
4. Temburong Solar and Battery Project. Berakas Power Management Company
and Shell International. Unpublished confidential document. 2017.
• 5 MWp (solar PV) + 3 MW, 1.7 MWh (battery storage)