Definition
• Scope is the sum of the
– Products
– Services and
– Results
• to be provided as a project
![Page 3: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/3.jpg)
![Page 4: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/4.jpg)
Requirements management
![Page 5: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/5.jpg)
The requirements problem
• The goal of project development is to develop quality products —on time and on budget—that meets customers real needs.
• Project success depends on good requirements management.
• Requirements errors are the most common type of systems development error and the most costly to fix.
• A few key skills can significantly reduce requirements errors and thus improve quality.
![Page 6: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/6.jpg)
What is requirement?
• A requirement is a capability that the system must
deliver.
– A capability needed by the user to solve a problem to
achieve an objective
– A capability that must be met or possessed by a system
or system component to satisfy a contract, standard,
specification, or other formally imposed documentation
– A documented representation of a condition or
capability as in (1) or (2).
![Page 7: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/7.jpg)
What is requirements management?
• Requirements management is a process of
systematically eliciting, organizing, and
documenting requirements for a complex
system.
• Our problem is to understand users‘ problems in
their culture and their language and to build
products that meet their needs.
![Page 8: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/8.jpg)
Why we need to manage
requirements? • How many requirements has a small product?
![Page 9: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/9.jpg)
Why we need to manage
requirements?
![Page 10: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/10.jpg)
Common questions
• Boeing 777 has to satisfy 300,000 requirements
• The questions are: – Which project team members are responsible for the wind speed
requirement (#278), and which ones are allowed to modify it or delete it?
– If requirement #278 is modified, what other requirements will be affected?
– How can we be sure that someone has written the code in a software system to fulfill requirement #278, and which test cases in the overall test suite are intended to verify that the requirements have indeed been fulfilled?
![Page 11: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/11.jpg)
The Life of a Requirement
Concept Phase
Business
Requirements
Need, Problem or
Opportunity
Justification
Project Charter
Funding:
Business
Requirements
Solution
Requirements
Describes the characteristics
that meet the business
and stakeholder requirements:
- Functional
- Non-Functional
- Implementation
Stakeholder
Requirements:
Needs of a
stakeholder and
their
interaction with the
system
How WHAT WHY
Requirements Phase
![Page 12: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/12.jpg)
Problems of requirements
management
12
• Stakeholders don’t know what they really want
• Stakeholders express requirements in their own terms
• Different stakeholders may have conflicting requirements
• Organizational and political factors may influence the system requirements
• The requirements change during the analysis process. New stakeholders may emerge and the business environment change
![Page 13: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/13.jpg)
The logical gap customer
End user contactor
![Page 14: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/14.jpg)
Requirements processes
• Enterprise Analysis
• Requirements Planning and Management
• Requirements Elicitation
• Requirements Analysis and Documentation
• Requirements Communication
• Solution Assessment and Validation
Guide to IIB Body of Knowledge, International
Institute of Business Analysis
http://www.theiiba.org/
![Page 15: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/15.jpg)
Requirements processes
![Page 16: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/16.jpg)
Enterprise Analysis
• Creating and maintaining the business architecture
• Conducting feasibility studies
• Identifying new business opportunities
• Scoping and defining new business opportunities
• Preparing the business case for new business opportunities
• Conducting the initial risk assessment for new business opportunities.
![Page 17: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/17.jpg)
17
Enterprise analysis Project
authorisation
• Projects are typically authorized as a result of one or more of the following:
– A market demand
– A business need
– A customer request
– A technological advance
– A legal requirement
– A social need
![Page 18: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/18.jpg)
A market demand (e.g., a car company authorizes a project to build more fuel efficient cars in response to gasoline shortages).
A business need (e.g., a training company authorizes a project to create a new course to increase its revenues).
A customer request (e.g., an electric utility authorizes a project to build a new substation to serve a new industrial park).
A technological advance (e.g., an electronics firm authorizes a new project to develop a video game player after advances in computer memory).
A legal requirement (e.g., a paint manufacturer authorizes a project to establish guidelines for the handling of toxic materials).
A social need (e.g., a nongovernmental organization in a developing country authorizes a project to provide potable water systems, latrines, and sanitation education to low-income communities suffering from high rates of cholera).
18
Project authorisation examples
![Page 19: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/19.jpg)
![Page 20: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/20.jpg)
05 20
CONCEPTION
FEASIBILITY
IMPLEMENTATION
OPERATION
TERMINATION
Define the Project
Design the Project Process
Deliver the Project
![Page 21: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/21.jpg)
05 21
Evaluation of
the Brief
Development
of a range of
options
Definition of
the product or
service
Broad brush
analysis filters
numbers of
options
Project Teams Actions
Simplistic Feasibility studies to
determine range of possibilities
Organisations
mission
Organisations
strategy
Organisations
goals &
objectives
Organisations
need to grow
or survive
Concept of a
new product
or service
Product or
new service
brief
Organisations Actions
Revision
![Page 22: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/22.jpg)
05 22
Evaluation of
the Brief
Development
of a range of
options
Definition of
the product or
service
Broad brush
analysis filters
numbers of
options
Project Teams Actions
Simplistic Feasibility studies
to determine range of
possibilities
Organisations
mission
Organisations
strategy
Organisations
goals &
objectives
Organisations
need to grow
or survive
Concept of a
new product
or service
Product or
new service
brief
Organisations Actions
Revision
Project Authorisation
gateway
![Page 23: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/23.jpg)
05 23
Reminder
• The PM role is to convert or break down the sponsors project brief into a form that everyone understands. OR - From concept into realism.
• Then to allocate resources (teams) to determine if it is possible produce what is needed, if it is feasible and if reality can be achieved within the projects budget costs at the desired level of quality.
![Page 24: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/24.jpg)
Generating Scenarios for Feasibility Evaluation
24
A project scenario is a brief description of a proposal, process or a set of procedures that should meet the identified objectives shown in the brief.
For every objective there are a number of possible strategies: e.g. the objective of eating can be met by the preparation of food, BUT, there are a number ways to do this, each is an option.
Developing scenarios can be a brainstorming activity, then each idea generated undergoes critical examination & modification. Then, selected or reject.
![Page 25: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/25.jpg)
25
Feasibility Analysis
Options can be evaluated and scored by using
STEEP factors.
S =
T =
E =
E =
P =
Social
Technological
Ecological
Economic
Political
![Page 26: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/26.jpg)
26
Feasibility Analysis
1. Technical Feasibility;
2. Financial Feasibility;
3. Risk & Uncertainty Feasibility.
4. Environmental feasibility
The most frequently used evaluates these three
key areas, BUT others might well be used!
![Page 27: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/27.jpg)
27
Process
Project Brief Generate Scenarios
Undertake Feasibility Studies for Each Scenario
Technical Feasibility Study
Financial Feasibility Study
Risk & Uncertainty Feasibility Study
Collate Results
and Select Best
Scenario by
Weighted Analysis
Comprising of:
![Page 28: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/28.jpg)
28
Project Brief
Generate Scenarios
Feasibility Study
Technical Feasibility
Financial Feasibility
Risk & Uncertainty
Feasibility
Feasibility Study Feasibility Study
Technical Feasibility Technical Feasibility
Financial Feasibility Financial Feasibility
Risk & Uncertainty
Feasibility
Risk & Uncertainty
Feasibility
Select Best Option by Weighted Analysis
Project Brief
Generate Scenarios
Feasibility Study
Technical Feasibility
Financial Feasibility
Risk & Uncertainty
Feasibility
Feasibility Study Feasibility Study
Technical Feasibility Technical Feasibility
Financial Feasibility Financial Feasibility
Risk & Uncertainty
Feasibility
Risk & Uncertainty
Feasibility
Select Best Option by Weighted Analysis
![Page 29: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/29.jpg)
29
Technical Feasibility
• A Technical feasibility study can only be based upon current
information concerning the product, material, or services life.
Information availability stages are:
– Fully mature – considerable data is available for evaluation of new
proposal.
– Semi-mature – limited data available to be used in feasibility study.
– New Technology – at prototype stage, limited information available.
![Page 30: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/30.jpg)
30
2. Financial Feasibility
• Questions asked:
– Will the investment of resources in a particular
project be worthwhile, then:
– How worth-while?
• Where there is a range of several alternative
opportunities for investing resources:
– which one gives the best rewards?
![Page 31: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/31.jpg)
31
Two Sets Finance!
• PM team have to consider:
• Development - The cost of the project to produce the product, some options will consume more resources than others, this reflects onto recovery time and product cost.
• Production -The cost to produce the project after hand-over to the sponsor (post-project).
![Page 32: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/32.jpg)
32
3. Risk & Uncertainty Feasibility.
Risk is an inherent and characteristic of all projects, some even claim that Project Management is really Risk Management.
Essentially there are two aspects of project risk control:
Risk
Risk Management Risk Identification &
Analysis
![Page 33: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/33.jpg)
![Page 34: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/34.jpg)
Requirements Planning and
Management • This is necessary to ensure:
– the set of requirements activities undertaken are the most appropriate,
given the unique circumstances of the project,
– the requirements work effort is coordinated with the other work being
done for the project,
– the whole requirements team on a project has a common understanding
of what activities they are undertaking,
– business analysts are able to monitor and react to requirements challenges
and slippage,
– the tools, resources and requirements contributors are available as needed
for the requirements activities,
– and, changes are captured correctly and consistently.
![Page 35: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/35.jpg)
Requirements Gathering
![Page 36: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/36.jpg)
Requirements Analysis and
Documentation • Analyze functional requirements
• Analyze non functional requirements
• Process/flow models – Workflow models
– Flow charts
• Usage models – Storyboards,
– Use cases
• Requirements attributes
• Requirements traceability
![Page 37: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/37.jpg)
Requirements quality
![Page 38: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/38.jpg)
![Page 39: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/39.jpg)
• Lightweight
• Availability <99%
• High quality
• Success ration 0.98
• Range >500 mL
• 100 reliable
Which of the following are valid
requirements ?
![Page 40: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/40.jpg)
Enduring and volatile requirements
40
• Enduring requirements. Stable requirements
derived from the core activity of the customer
organization. E.g. a hospital will always have
doctors, nurses, etc.
• Volatile requirements. Requirements which
change during project or when the product is in
use. In a hospital, requirements derived from
health-care policy
![Page 41: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/41.jpg)
Classification of Volatile
requirements
• Mutable requirements, requirements that change
due to the changing of system’s environment
• Emergent requirements, requirements that
emerge as understanding of the system develops
during the system development.
![Page 42: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/42.jpg)
Statement
of Needs
Functional
Requirements and
Statement of Services
Detailed requirements for the
system’s functionality and constraints
as required as a basis for individual component
development/acquisition
Requirements Explosion
Declaration of
required miracle
Operational View
formulation
Detailed
requirements
10
Requirements
100
Requirements
1000 Requirements
![Page 43: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/43.jpg)
Level of detail
Α.Cockburn, Writing Effective Use Cases
43
![Page 44: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/44.jpg)
Requirements Communication
• Determine the appropriate requirements format
• Create a requirements package
• Conduct requirements presentation
• Conduct a formal requirements review
• Obtain consensus and signoff on the
requirements
![Page 45: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/45.jpg)
Requirements validation
45
• Concerned with demonstrating that the requirements define the system that the customer really wants
• Requirements error costs are high so validation is very important
– Fixing a requirements error after delivery may cost up to 100 times the cost of fixing an implementation error
– Change requirement error means change system design and implementation
![Page 46: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/46.jpg)
Requirements checking (types of checks
should be carried out on requirements)
46
• Validity. Does the system provide the functions which best support the customer’s needs?
• Consistency. Are there any requirements conflicts?
• Completeness. Are all functions required by the customer included?
• Realism. Can the requirements be implemented given available budget and technology
• Verifiability. Can the requirements be checked? In order to reduce potential dispute نزاع between customers.
![Page 47: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/47.jpg)
Purpose of review
• The purpose of the review should be clearly stated and may encompass any of the following: – completeness of requirements (all requirements have been
captured)
– removal of superfluous requirements
– clarity of requirements (removal of ambiguity)
– correctness of requirements (the requirement reflects the business need or business rule)
– scope (the requirement fits within the stated scope of the project)
– conformance to project/organisational quality standards
– feasibility of requirements
– prioritization of requirements
![Page 48: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/48.jpg)
Roles in review
![Page 49: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/49.jpg)
Requirements Implementation
• Develop alternate solutions
• Evaluate technology options
• Facilitate the selection of a solution
• Ensure the usability of the solution
• Support the Quality Assurance process
• Support the implementation of the solution
• Communicate the solution impacts
![Page 50: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/50.jpg)
Effective requirements practice
• A clear understanding of the needs of users, customers and stakeholders
• A collaborative relationship between the users, customers and stakeholders
and the technical team
• A strong commitment of the requirements development team members to
project objectives
• Use of a repeatable requirements process that is continuously improved
• A system architecture that supports the users, customers and stakeholders
current and planned needs
• The ability to accommodate changes in requirements as they are
progressively elaborated
• System development cost savings, accurate schedules, customer satisfaction
![Page 51: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/51.jpg)
A small Example
![Page 52: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/52.jpg)
The Project Brief
• Your only child is turning three on Saturday and
is having a big party.
• Caters are arranged but we need a clown to
entertain the guests.
• It has been suggested you have contacts in this
area.
• Arrange a clown.
![Page 53: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/53.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow coloured pompom.
His shoes must be large with curly green ends
and he needs a red nose, big red glasses and
brown belt with a large gold buckle and if he can
talk he must tell jokes otherwise he must be able
to juggle balls or hoops.
The Clown Requirement
![Page 54: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/54.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow coloured pompom.
His shoes must be large with curly green ends
and he needs a red nose, big red TRICKY
glasses and brown belt with a large gold buckle
and if he can talk he must tell jokes otherwise he
must be able to juggle balls or hoops.
The Clown Requirement
Verification
![Page 55: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/55.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow colored pompom. His
shoes must be large with curly green ends and
he needs a red nose, big red OPTICAL glasses
and brown belt with a large gold buckle and if he
can talk he must tell jokes otherwise he must be
able to juggle balls or hoops.
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
REQUIREMENT DOWNSTREAM DELIVERABLES
![Page 56: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/56.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow colored pompom. His
shoes must be large with curly green ends and
he needs a red nose, big red TRICKY glasses
and brown belt with a large gold buckle and if he
can talk he must tell jokes otherwise he must be
able to juggle balls or hoops.
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
![Page 57: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/57.jpg)
CHANGE IN LEGISLATION
Green ACT
All Clowns must have GREEN Noses
![Page 58: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/58.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow colored pompom. His
shoes must be large with curly green ends and
he needs a GREEN nose, big red TRICKY
glasses and brown belt with a large gold buckle
and if he can talk he must tell jokes otherwise he
must be able to juggle balls or hoops.
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
![Page 59: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/59.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow colored pompom. His
shoes must be large with curly green ends and
he needs a GREEN nose, big red TRICKY
glasses and brown belt with a large gold buckle
and if he can talk he must tell jokes otherwise he
must be able to juggle balls or hoops.
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
![Page 60: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/60.jpg)
A Clown
A clown must:
Wear a bright red and white checked costume:
The clown costume must have big yellow buttons.
The clown must wear a hat:
The clowns hat must be pointy;
The end of the clowns hat must have a rainbow colored pompom.
The clowns must have shoes:
The clowns shoes must be large;
The end of the clowns shoes must be green;
The end of the clowns shoes must be curly.
The clown must have a red nose.
The clown must have big red TRICKY glasses.
The clown must have a brown belt:
The clowns belt must have a large gold buckle.
If a clown can talk the clown must tell jokes.
If a clown cannot talk the clown must be able to juggle balls or hoops.
![Page 61: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/61.jpg)
A Clown
A clown must:
Wear a bright red and white checked costume.
The clown costume must have big yellow buttons.
The clown must wear a hat:
The clowns hat must be pointy.
The end of the clowns hat must have a rainbow colored pompom.
The clowns must have shoes:
The clowns shoes must be large;
The end of the clowns shoes must be green;
The end of the clowns shoes must be curly.
The clown must have a red nose.
The clown must have big red TRICKY glasses.
The clown must have a brown belt;
The clowns belt must have a large gold buckle.
If a clown can talk the clown must tell jokes
If a clown cannot talk the clown must be able o juggle balls or hoops
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
![Page 62: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/62.jpg)
A Clown
A clown must:
Wear a bright red and white checked costume.
The clown costume must have big yellow buttons.
The clown must wear a hat:
The clowns hat must be pointy.
The end of the clowns hat must have a rainbow colored pompom.
The clowns must have shoes:
The clowns shoes must be large;
The end of the clowns shoes must be green;
The end of the clowns shoes must be curly.
The clown must have a GREEN nose.
The clown must have big red TRICKY glasses.
The clown must have a brown belt;
The clowns belt must have a large gold buckle.
If a clown can talk the clown must tell jokes
If a clown cannot talk the clown must be able o juggle balls or hoops
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
![Page 63: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/63.jpg)
A clown must wear a bright red and white
checked costume with big yellow buttons, a
pointed hat with a rainbow colored pompom. His
shoes must be large with curly green ends and
he needs a red nose, big red TRICKY glasses
and brown belt with a large gold buckle and if he
can talk he must tell jokes otherwise he must be
able to juggle balls or hoops.
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
ORPHAN REQUIREMENT
![Page 64: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/64.jpg)
A Clown
A clown must:
Wear a bright red and white checked costume.
The clown costume must have big yellow buttons.
The clown must wear a hat:
The clowns hat must be pointy.
The end of the clowns hat must have a rainbow colored pompom.
The clowns must have shoes:
The clowns shoes must be large;
The end of the clowns shoes must be green;
The end of the clowns shoes must be curly.
The clown must have a GREEN nose.
The clown must have big red TRICKY glasses.
The clown must have a brown belt;
The clowns belt must have a large gold buckle.
If a clown can talk the clown must tell jokes
If a clown cannot talk the clown must be able o juggle balls or hoops
Pants and
Jacket
Noses
Belts
Shoes
Hats
Bookings Transport Training
Business
Rules
pompom
TRACEABILITY
Automatic
Traceability in
DOORS
![Page 65: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/65.jpg)
![Page 66: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/66.jpg)
66
Requirements Prioritization
![Page 67: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/67.jpg)
The need
• When having tens, hundreds or even thousands of
requirements alternatives, decision-making becomes
much more difficult
• One of the keys to making the right decision is to
prioritize between different alternatives. It is often not
obvious which choice is better, because several aspects
must be taken into consideration
![Page 68: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/68.jpg)
Requirements Prioritization
• Ensures the functionality with the most value is
implemented when timelines become short
• Helps to manage competing demands
• Helps PM to manage time, cost and resources and move
lower-priority requirements to later phases, releases
TIP: “Avoid ‘decibel prioritization’, in which the loudest
voice heard get top priority, and ‘threat prioritization’, in
which stakeholders holding the most political power
always get what they demand.”
![Page 69: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/69.jpg)
69
Approaches to Prioritization
• Ask questions: – Is there some other way to satisfy the need that this requirement
addresses?
– What would happen if this requirement isn’t implemented right away?
– How would the deferral of the requirement affect the user community?
• Use Priority Scales – High – Must be in the first release
– Medium – The business needs the functionality however can wait if necessary – can be implemented in the next release
– Low – The user can live without the functionality and it can be implemented in later releases
![Page 70: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/70.jpg)
70
Prioritization – Value, Cost, Risk You can use a prioritization matrix.
Relative Weights: 1 1 1 1
Feature or Function (don't mix
them use either feature or
function or use case)
Relative
Benefit
Relative
Penalty
Total
Value
Value
%
Relative
Cost
Cost
%
Relati
ve
Risk
Risk
% Priority
<List each feature, requirement, or use
case to be prioritized 1 2 3 15.8 50 37.0 1 14.3 0.308
in these cells, one item per cell. Copy and
insert additional 3 1 4 21.1 22 16.3 3 42.9 0.356
rows as needed; the formulas will adjust
automatically.> 4 1 5 26.3 7 5.2 2 28.6 0.780
6 1 7 36.8 56 41.5 1 14.3 0.661
Totals 14 5 19 100.0 135 100.0 7 100.0 2.104
Source: http://www.processimpact.com/goodies.shtml
![Page 71: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/71.jpg)
71
Prioritization on Basis of Value • Have the business estimate the benefits that each requirement provides
them (e.g. rate 1-9)
• Working with the business and I.T. estimate the penalty if the requirement
isn’t included. Assess based on quality issues, legal, compliance, function
loss that would affect productivity, harder to add capability later, other
issues such as marketing, corporate communications
• Ask the business/I.T. to weight the requirements
• Ask, is the cost a factor?
• Calculate using spreadsheet
Value%
(cost% * cost weight) + (risk % * risk weight) Priority =
![Page 72: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/72.jpg)
Or other techniques
• Group voting
• 100 dollar method
– What you can buy with 100 dollar
– One should only perform the prioritization once on the same set of
requirements, since the stakeholders might bias their evaluation the
second time around if they do not get one of their favorite requirements
as a top priority
• Top-Ten Requirements
– In this approach, the stakeholders pick their top-ten requirements (from a
larger set) without assigning an internal order between the requirements
![Page 73: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/73.jpg)
73
Or You Could Use …
![Page 74: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/74.jpg)
Change management
![Page 75: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/75.jpg)
Change management
• Any stakeholder of <project> can submit the following types of issues to the change control system:
– requests for requirements changes (additions, deletions, modifications, deferrals) in software currently under development
– reports of problems in current production
– requests for enhancements in current production systems
– requests for new development projects
![Page 76: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/76.jpg)
Change
management
process
Submitted
Evaluated Rejected
Approved
Change Made
Verified
Closed
Verifier has confirmed the change
Modifier has installed modified work products
verification failed
Modifier has made the change and requested verification
no verification required; Modifier has installed modified work products
CCB decided to make the change
CCB decided not to make the change
Evaluator performed impact analysis
Originator submitted an issue
Canceled
change was canceled;
back out of modifications
change was canceled;
back out of modifications
change was canceled;
back out of modifications
![Page 77: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/77.jpg)
• The CCB decided to implement the request and allocated it to a specific future product release. The CCB Chair assigns Modifier. Approved
• The Originator or someone else decided to cancel an approved change. Canceled
• The Modifier has completed implementing the requested change. Change Made
• The change made has been verified (if required), the modified work products have been installed, and the request is now completed. Closed
• The Evaluator has performed an impact analysis of the request. Evaluated
• The CCB decided not to implement the requested change. Rejected
• The Originator has submitted a new issue to the change control system. Submitted
• The Verifier has confirmed that the modifications in affected work products were made correctly. Verified
![Page 78: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/78.jpg)
Change status severities
• Minor – Cosmetic problem, usability improvement, customer can live with
the problem (default)
• Major – Problem adversely affects product functioning, but a workaround
is available; customer will be annoyed; serious usability impairment;
• Critical – Product does not function at all; the wrong results are generated;
• Emergency – Anything that requires a change to be made immediately,
bypassing the change control process temporarily
![Page 79: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/79.jpg)
Project charter
![Page 80: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/80.jpg)
Project Charter
• Agreement between the organization providing
the product or service, and the customer
organization requesting and receiving the
project deliverable.
• Tool to obtain commitment from all affected
groups and individuals within a specific project.
• Does not change throughout the project life
cycle.
![Page 81: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/81.jpg)
Project Charter Structure
• The project typically consists of four primary
sections:
– Project identification and scope
– Authority and resource need definition
– Project roles and responsibilities
– Project structure and schedule
![Page 82: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/82.jpg)
Project Charter - Example
PROJECT SCOPE
• Project name/title: Membership Recruitment Task Force
• Background/Introduction/Purpose:
In the past two years, membership has decreased 5%. This team is being called together to develop a strategy to increase member retention and to add 100 new members in the next two years.
• Scope Statement (Expected results/desired outcomes):
The membership committee will develop a strategy and action plan to increase member retention and add at least 100 new members by June 2005.
![Page 83: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/83.jpg)
Project Charter – Example Contd.
AUTHORITY AND RESOURCES
• Who has the authority to make decisions and allocate funds?
The committee has the authority to spend up to $5,000 for this project. The committee is empowered to do what it takes to get the task done.
• What personnel resources are needed?
A consultant who is a specialist on membership retention and recruitment
One pro-active member from each of the regional chapters (8 people)
A marketing specialist from our membership (1 person)
Team leader (1 person)
• What is the budget?
Consultant ($2500), Marketing materials ($1500), Meetings ($1000)
• What is the time needed?
Six months
![Page 84: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/84.jpg)
Project Charter – Example Contd.
ROLES AND RESPONSIBILITIES
• Research and select a consultant to work with committee (Tom, Mary and Bill—by Jan 1st)
• Develop membership calling campaign in each region (8 regional committee persons responsible) Membership phone campaign in June
• Develop marketing material (Tom—by April 1st)
• Mail out marketing materials to all present and past members in May
PROJECT SCHEDULE
• January 15th – Consultant retained
• February 10th Survey completed for approval
• March 1st – Survey mailed out
• April 1st – Marketing material completed
• May 1st – Mail out marketing materials
• June – Conduct phone campaign
![Page 85: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/85.jpg)
Summary – Project Charter
![Page 86: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/86.jpg)
Work break down structure
![Page 87: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/87.jpg)
87
WBS Definition
•A deliverable-oriented grouping of project elements that
organizes and defines the total scope of the project work.
•Work not in the WBS is not in scope of the project.
•Each descending level represents an increasingly
detailed description of the project elements.
•Often used to develop or confirm a common
understanding of project scope.
![Page 88: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/88.jpg)
88
Where the WBS Fits
Initiate
Plan
Execute
Control
Close Strategic
Tactical
Physical
![Page 89: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/89.jpg)
Approaches to Developing WBSs
89
• Using guidelines: some organizations, like the DOD, provide guidelines for
preparing WBSs
• The analogy approach: review WBSs of similar projects and tailor to your
project
• The top-down approach: start with the largest items of the project and break
them down
• The bottom-up approach: start with the specific tasks and roll them up
• Mind-mapping approach: mind mapping is a technique that uses branches
radiating out from a core idea to structure thoughts and ideas
![Page 90: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/90.jpg)
Making Brownies 1. Prepreparation 1.1 Read recipe
1.2 Check ingredients at home
1.3 Make shopping list
1.4 Go on shopping trip 2. Preparation
2.1 Gather tools
2.2 Gather ingredients
2.3 Mix ingredients
2.3.1 Melt butter and chocolate
in microwave
2.3.2 Mix other ingredients in
bowl
WBS Examples
2.4 Grease pan
2.5 Preheat oven
2.6 Pour batter in pan 3. Baking Process
3.1 Bake in oven
3.2 Test with toothpick
3.3 Remove from oven
3.4 Turn off oven 4. Cleanup Process
4.1 Wash dishes
4.2 Cool brownies
Making Brownies 1. Prepreparation 1.1 Read recipe
1.2 Check ingredients at home
1.3 Make shopping list
1.4 Go on shopping trip 2. Preparation
2.1 Gather tools
2.2 Gather ingredients
2.3 Mix ingredients
2.3.1 Melt butter and chocolate
in microwave
2.3.2 Mix other ingredients in
bowl
WBS Examples
2.4 Grease pan
2.5 Preheat oven
2.6 Pour batter in pan 3. Baking Process
3.1 Bake in oven
3.2 Test with toothpick
3.3 Remove from oven
3.4 Turn off oven 4. Cleanup Process
4.1 Wash dishes
4.2 Cool brownies
Making Brownies 1. Prepreparation 1.1 Read recipe
1.2 Check ingredients at home
1.3 Make shopping list
1.4 Go on shopping trip 2. Preparation
2.1 Gather tools
2.2 Gather ingredients
2.3 Mix ingredients
2.3.1 Melt butter and chocolate
in microwave
2.3.2 Mix other ingredients in
bowl
WBS Examples
2.4 Grease pan
2.5 Preheat oven
2.6 Pour batter in pan 3. Baking Process
3.1 Bake in oven
3.2 Test with toothpick
3.3 Remove from oven
3.4 Turn off oven 4. Cleanup Process
4.1 Wash dishes
4.2 Cool brownies
How I should break down the
project? • Geographically separated areas for product or
activities
• Major chronological time periods
• By structural, process, system, or device components
• By “intermediate” deliverables required in the production of the “end” deliverables
• By separate areas of responsibility, departments, or functional areas
![Page 91: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/91.jpg)
Benefits of the WBS
91
WBS
Estimates
Schedule
Project Plan
Risk and Contingency
Plans
Progress Reports
Activity List
Risk Control
Project Control Change
Control
Communication Control
![Page 92: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/92.jpg)
92
Common Approaches
Brainstorming all work
to be done and then
grouping into a
hierarchy.
Bottom Up
Using a general-to-
specific structure to
progressively detail the
work.
Top Down
![Page 93: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/93.jpg)
Bottom up
WBS Development
NO
Yes
1. Create the “to-do”
list of work.
2. Organize the
“to-dos”.
3. Review and Adjust
with group.
4. Correct
and
Complete?
WBS Complete
16
![Page 94: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/94.jpg)
Top Down WBS
Development
1. Choose your
model.
2. Verify highest level
Deliverables/Phases.
4. Review, Verify and
or modify the
next subsequent level.
3.
Can adequate
ests. be made at
this level?
WBS Complete Yes
No
5. Confirm lowest
level.
25
![Page 95: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/95.jpg)
Top Down 1. Choose your model
• Review various:
life cycle models,
similar project’s WBS, or
life cycle templates.
• Choose a model closest to
your specific project.
26
![Page 96: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/96.jpg)
2. Verify highest level phases/deliverables Top Down
Start at the top of a model
- Deliverables
• Verify deliverables represent the major
phases of your project,
• Verify purpose/need of each major deliverable or phase,
• Determine if a previous project completed
a major deliverable, e.g. Feasibility.
• Choose to: eliminate or modify deliverable after review of
previous completed work
28
![Page 97: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/97.jpg)
Note* This step’s question means
- different levels of
decomposition are appropriate
for each
of the major deliverables/phases.
• Can it be completed within a
2 – 3 week period?
• Adequate may change over
the course of the project.
• Estimating a major work
package that will be produced
6 – 12 months out may not be
possible.
Top Down
“Yes” Decisions Guidelines
3. Can adequate estimates
be made at this level?
29
![Page 98: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/98.jpg)
Top Down 4. Review, verify and or modify the
next subsequent level.
• Verify, from the model, the next
subsequent level’s, more specific work detail.
• Choose the appropriate work elements.
elements should be described in tangible, verifiable results in
order to facilitate the
project progress.
• Repeat step 3 for each work element that you
have chosen necessary for the project.
30
![Page 99: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/99.jpg)
5. Confirm lowest level
Can the item be scheduled? Budgeted? Assigned
to a specific organizational unit (e.g., department,
team, or person)?
If no, combine items, add to,
delete, redefine.
If no, revise or expand the
descriptions
If no, the item must be modified,split,
redefined.
Top Down
Are the lower-level items both necessary
and sufficient?
Does the work item
description provide
a scope?
31
![Page 100: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/100.jpg)
100
Top Down
• Requires more up front discussion.
• Terminology & structure
can get in the way.
• Decreases participation.
• Slower to start.
Lesson Learned
Bottom Up
• Easy to start.
• No terminology issues.
• Higher participation.
• What do we do with this?
![Page 101: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/101.jpg)
What’s Next?
101
– Briefly describe each item
– Reference by number
– List associated activities
– List milestones
– List other information needed
to facilitate work
Further decomposition into a WBS Dictionary
![Page 102: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/102.jpg)
WBS Summary
• Defines the hierarchy of deliverables
• Supports the definition of all work required to implement
deliverables
• Graphical representation of project scope
• Framework for all deliverables
• Framework for schedule and cost calculations
• Facilitates assignment of resources
• Facilitates reporting
• Provides a framework for project evaluation
![Page 103: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/103.jpg)
Example
![Page 104: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/104.jpg)
Annotated example
![Page 105: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/105.jpg)
WBS representation
![Page 106: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/106.jpg)
An exercise
• Create a WBS for creating “brownies”
![Page 107: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/107.jpg)
Brownies WBS
![Page 108: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/108.jpg)
Example WBS/phase
![Page 109: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/109.jpg)
DETAILED WBS EXAMPLE
CUSTOM SYSTEM DEVELOPMENT
Develop
4.0
Online
Processes
4.1
Integration
Testing
4.5
System
Interfaces
4.3
User & Tech
Documentation
4.6
Screen
Development
4.1.1
Program
Development
4.1.2
Batch
Processes
4.2
Conversion
Programs
4.4
4.1.1.1.
Dev elop & Test
Screen A
4.1.1.2.
Dev elop & Test
Screen B
4.1.1.3.
Dev elop & Test
Screen C
4.1.2.1.
Dev elop & Test
Program A
4.1.2.2.
Dev elop & Test
Program B
4.1.2.3.
Dev elop & Test
Program C
4.1.2.4.
Dev elop & Test
Program D4.1.1.4.
Dev elop & Test
Screen D
4.3.1.
Dev elop & Test
Interf ace Pgm A
4.3.2
Dev elop & Test
Interf ace Pgm B
4.3.3
Dev elop & Test
Interf ace Pgm C
4.3.4
Dev elop & Test
Interf ace Pgm D
4.4.1.
Dev elop
Conv ersion Plan
4.4.2.
Dev elop & Test
XY Z Conv ersion
Programs
4.5.1.
Plan Test
4.5.2.
Establish Test
Ev ironment
4.5.3.
Implement Test
Tools
4.6.1.
Dev elop User
Manual
4.6.2.
Dev elop
Production
Documentation
4.6.3.
Dev elop Disaster
Recov ery
Documentation4.5.3.
Dev elop Test
Reports
4.5.3.
Execute Test
![Page 110: 2.requirements management](https://reader034.vdocuments.site/reader034/viewer/2022051610/549b10d5b479592e098b46b7/html5/thumbnails/110.jpg)
Other tools
• Scope Matrix – Requirements inventory