Download - 21-22

Transcript

From a group of 60 individual Sitooterie de-signs, 3 were chosen to be built by us, the students. Each group of 20 was spilt further into groups to help facilitate all required as-pects of the project. The university contrib-uted some money to the build but any deficit had to be raised by the group through sponsorship, raffles, donations etc. I was one of 4 chosen to lead a specific role in the proj-ect which was to oversee the documenta-tion of all work, to publicise the build and to produce a book which would explain how the project developed from concept through to final completion.

Top Related