![Page 1: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/1.jpg)
2017 NER 300 Info Day
15 December 2017
Climate Action
![Page 2: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/2.jpg)
EU Climate and Energy Framework
2020
2030
Energy Union governance
-20 % Greenhouse
Gas Emissions
20% Renewable
Energy
20 % Energy
Efficiency
≤-40 % Greenhouse Gas
Emissions (domestic)
27 % Renewable
Energy
27%* Energy Efficiency
10 % Interconnection
15 % Interconnection
* To be reviewed by 2020, having in mind an EU level of 30%
In October 2014 the European Council gave guidance on how to implement the 2030
climate and energy framework
Policy context
2
![Page 3: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/3.jpg)
Progress towards meeting Europe 2020 and 2030 targets (total EU GHG emissions)
3 000
3 500
4 000
4 500
5 000
5 500
6 000
1990 1995 2000 2005 2010 2015 2020 2025 2030
Mt
CO
2 eq
uiv
alen
t
Historic emissions
Projections with existing measures -WEM- (based on MS submissions)
Proposed greenhouse gas emissions trajectory
-40% compared to 1990
-20%
compared to
1990
-23%
in 2016
-20% compared to 1990
-40%compared to 1990
Mitigation
![Page 4: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/4.jpg)
2030 Climate and Energy Framework
≤-40 % Greenhouse Gas Emissions (domestic)
Max 280 MtCO2eq
Emission Trading System (ETS)
-43 % Including:
Power/Energy Sector and Industry,
Aviation
Land Use, Land Use
Change and Forestry
≤ 0 % "No-Debit"
Non-ETS ≤-30% Including: road transport, buildings, waste, agriculture,
Land Use, Land Use Change and Forestry
Effort Sharing Regulation
-30 %
Full flexibility Max
100 MTCO2eq
New!!
4
Mitigation
![Page 5: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/5.jpg)
NER 300: Highlights from 2017
• 6 projects in operation:
• BEST (2013)
• Verbiostraw (2014)
• Windpark Blaiken (2015)
• 3 new projects enter in operation:
• Veja Mate: 01/07/2017
• Windpark Handalm: 03/10/2017
• Nordsee One: 31/12/2017
Climate Action
![Page 6: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/6.jpg)
Veja Mate
Offshore windpark of 402 MW capacity 95 km north west of Borkum, Germany 6MW turbines on monopile foundations Own substation Project sponsor Highland Group Holding (59,293%), Siemens Financial Services (40,707%) and Copenhagen Infrastructure II K/S (0,001%) www.vejamate.de Max. NER 300 funding: €112.6 million
Climate Action
![Page 7: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/7.jpg)
Windpark Handalm
13 wind turbines with total nominal electric capacity of 39 MW Deutschlandsberg, Styria, Austria Average altitude: 1800m Optimised for wind and site conditions in mountain areas Project sponsor Energie Steiermark AG www.e-steiermark.com/erzeugung/Windkraft/Handalm.aspx Max. NER 300 funding: €11.3 million
Climate Action
![Page 8: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/8.jpg)
Nordsee One
Offshore windpark of 332 MW capacity 40 km north of Juist, Germany 6.15MW turbines on monopile foundations Own substation Project sponsor 85 % NPEW North S.à r.l. and 15 % Nordsee Windpark Beteiligungs GmbH www.nordseeone.com Max. NER 300 funding: €70.0 million
Climate Action
![Page 9: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/9.jpg)
Communication points (1)
Mention of NER 300 award
Use of NER 300 visual element
Co-funded by the NER 300 programme of the European Union
Climate Action
![Page 10: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/10.jpg)
Communication points (2)
Inauguration ceremonies: send invitations as early as possible
Improve section 8. Factsheet (for public use) in annual reports
https://setis.ec.europa.eu/NER300-Doc
Send us photos with permission to use and copyright details
Climate Action
![Page 11: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/11.jpg)
Overall state of play
• Overview: projects (number)
Climate Action
Overview: status by volume
6
28
5
In operation
In planning
Withdrawn
€260
€1389m
€456,7
In operation
In planning
Withdrawn
![Page 12: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/12.jpg)
NER300 unused funds
NER300 unused funds
(€457m)
InnovFin Energy Demo
Projects
CEF Debt Instrument
• For bankable innovative renewable energy
• Loans & equity-type financing, project development assistance grants
• Blending with NER300 grant possible
• For bankable renewable energy transport
• Loans and guarantees • Blending with CEF grant
possible, current call open until April 2018
→ Both managed by the European Investment Bank, in case of
interest contact the EIB directly.
Climate Action
![Page 13: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/13.jpg)
Forthcoming milestones
• 1st call projects:
• Entry into operation: by 31/12/2018 + 1 year of grace
• 2nd call projects:
• FID, permits, State Aid clearance: by 30/06/2018
• Entry into operation: by 30/06/2020 + 1 year of grace
Climate Action
![Page 14: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/14.jpg)
Forthcoming deadlines
• Annual reports
• 31 December 2017: for projects before operation
• 15 July 2018 (including energy produced): for projects in operation
• Relevant knowledge
• 15 February 2018: projects in operation to COM
• 30 June 2018: COM confirms to MS
• Annual payment requests
• 15 July 2018: for projects in operation
![Page 15: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/15.jpg)
Guidance documents and templates
Annual report, payment request templates and guidance documents
https://ec.europa.eu/clima/policies/lowcarbon/ner300_en#tab-0-1
Public factsheets and knowledge sharing templates
https://setis.ec.europa.eu/NER300-Doc
Questions: [email protected]
![Page 16: 2017 NER 300 Info Day - EUROPA - SETIS · Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae •for withdrawals: France: BIOd UPM Stracel BTL, Netherlands:](https://reader034.vdocuments.site/reader034/viewer/2022050418/5f8e4e151f913c45d43330cf/html5/thumbnails/16.jpg)
4th amendment of NER 300 Award Decision
• Notifications received in 2017
• for changes in date of entry into operation: Austria: WINe Handalm, UK: OCNb Stromae, Estonia: BIOb TORR, Croatia: GEOc Geothermae
• for withdrawals: France: BIOd UPM Stracel BTL, Netherlands: BIOg Woodspirit, Sweden: BIOc Gobiogas phase 2, UK: OCNb Sound of Islay
• Vote in CCC: 30 November 2017
• Adoption: forthcoming
Climate Action