UMTS Radio Network Planning Process
ZTE University
![Page 2: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/2.jpg)
Content
UMTS Technical Features UMTS Network Planning Process
![Page 3: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/3.jpg)
Propagation of Electromagnetic wave - straight, reflection, scattering, diffraction
Radio signal fading includes 3 parts: Path loss: fading with distance between transmitter and receiver Large scale fading : middle amplitude of fading with log normal
distribution, slow fading, caused by shadow effect Small scale fading: small amplitude of fading with rapid change,
fast fading, caused by multi-path effect.
Radio Propagation Feature
= +
+
Pathloss
Slow fading
Fast fading
distance
Signal Rx Level
![Page 4: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/4.jpg)
Multi-Address Technology
FDMA Different channels at different
frequencies, such as AMPS and TACS.
TDMA Different channels at the same
frequency are distinguished by timeslots, such as GSM.
CDMA Different channels at the same time
and frequency are distinguished by different codes, such as UMTS.
![Page 5: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/5.jpg)
Self-Interfering System
Source Shared frequency spectrum caused
intra-frequency interference, multi-Path effect, difficult to implement perfect orthogonality with ideal self correlation and cross correlation.
Phenomenon Noise rise, soft capacity
Solution Power control, admission control, load
control and careful network planning
One of radio network planning goals is to minimize self-interfering
![Page 6: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/6.jpg)
Power Escalation
Uplink noise rise increases with the number of subscribers non-linearly
Downlink Node B power increases with the number of subscribers non-linearly
![Page 7: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/7.jpg)
Soft Capacity
Soft Capacity
InterferenceInterference
Cell Breathing
![Page 8: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/8.jpg)
Power Control
The signal for one subscriber is the noise to the others. The transmitted power should be controlled in order that it would not block other subscribers.
Near - far effect
Node B
Node B
despreading
despreading
![Page 9: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/9.jpg)
Soft Handover
Soft handover UE connects with more than
one radio links with different Node B
Softer handover UE connects with more than
one radio links with the cells in the same Node B
Hard handover Intra-frequency hard
handover Inter-frequency hard
handover Inter-RAT hard handover
RL1
RL2
![Page 10: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/10.jpg)
Coverage and Capacity Relationship
135
140
145
150
155
160
100 200 300 400 500 600 700 800 900 1000 1100 1200 1300
throughput per sector [kbps]
Max.
allow
ed
path
lo
ss [
dB
]
downlink loaddownlink load
uplink load
uplink load
Normally,Coverage is UL limitedCapacity is DL limited
![Page 11: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/11.jpg)
Demodulation threshold Eb/No
Eb indicates the signal energy per bit, Eb = S/R where S indicates signal energy and R indicates service bit rate.
No indicates the noise spectrum density, No = N/W where W indicates chip rate (3.84 M) and N indicates noise.
Eb/NoEb/No
Subscriber 1Subscriber 1NoiseNoise Subscriber 2Subscriber 2
Subscriber 3Subscriber 3
Processing Processing Gain(PG)Gain(PG)
PGN
S
R
W
N
S
N
W
R
S
N
E
o
b
![Page 12: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/12.jpg)
Multi-Service Hybrid System
Different services have
different rates, and their
coverage ranges and
capacities are different.
Different services have
different rates, and their
coverage ranges and
capacities are different.
Different proportions and
composition of hybrid service, with
different system capacities
Different proportions and
composition of hybrid service, with
different system capacities
64kbps service coverage
128kbps service coverage
384kbps service coverage
![Page 13: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/13.jpg)
Network Planning Goals
Fulfill operators’ requirement on coverage, capacity, and service quality, estimate network scale, minimize investment, and simulate to verify.
Predict network development trend, and prepare for future development.
We should do…We should do…
Maximize coverage in time and space.
Minimized intra-system interference to reach the required service quality.
Optimize radio parameters to maximize service quality.
With capacity and service quality fulfilled, minimize equipment number and cost.
GoalsGoals
![Page 14: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/14.jpg)
Network Planning Policy
The purpose of radio network planning is to shorten the investment return period than lower the CAPEX as well as OPEX.
Firstly for coverage, the solution is:
point coverage
line coverage
plane coverage
![Page 15: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/15.jpg)
Content
UMTS Technical Features UMTS Network Planning Process
![Page 16: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/16.jpg)
Planning Process - Requirement AnalysisRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 17: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/17.jpg)
Requirement Analysis
Learn the customer’s requirement of coverage, capacity, and QoS.
Learn the landform and environments of the planned area.
Learn the population distribution and average income per person in the planned area.
Learn information about the existing network in the planned area.
![Page 18: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/18.jpg)
The purpose to sort the planning area is to refine network design and layout. Different areas have different geographical environment, vegetation distribution, and building density. Different areas require different number of Node B to meet the coverage requirement.
Planning Area SortingPlanning Area Sorting
Requirement Analysis (Cont.)
Area type Area characters
Dense Urban Central business district, dense shopping center, dense residential area
Mean Urban Industrial park, shopping center, residential area
Suburban The edge of city, the center of village and town
Rural Farm, the edge of village and town
![Page 19: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/19.jpg)
Different areas have the different requirements for the service type coverage rate. Different requirements for service type and coverage rate in the same area will get different number of Node B
Coverage Requirements Coverage Requirements 64 k CS
144k PS data
384k PS data
Requirement Analysis (Cont.)
![Page 20: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/20.jpg)
No. of subscribers and their ‘profile’, traffic model,
service type , forecast, “hot spots”
Capacity Requirements Capacity Requirements
Requirement Analysis (Cont.)
![Page 21: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/21.jpg)
0
2
4
6
8
10
12
0 10% 20% 30% 40% 50% 60% 70% 80% 90%
Load
Noi
se R
ise
Stable system
Just stable system
Uns
tabl
e sy
stem
Load increases, Coverage reduces , System unstable
Cell loadCell load
Requirement Analysis (Cont.)
![Page 22: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/22.jpg)
The important building in the planning areaThe information of traffic line, just as highway The important villages and towns in the planning area
Other information Other information
Requirement Analysis (Cont.)
![Page 23: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/23.jpg)
Planning Process – Propagation ModelRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 24: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/24.jpg)
Free Space Propagation Loss
22
2
)4()(
d
GGPdP rtt
r
Pt: TX power
Pr(d): Rx power
Gt: Gain of TX antenna
Gr: Gain of RX antenna
d: Distance between TX and RX antennas
PL: Pathloss in free space
22
2
)4(log10log10)(
dP
PdBPL
r
t
![Page 25: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/25.jpg)
d
Loss4
lg20
fdFreeLoss lg20lg2044.32
Free Space Propagation Loss
d
![Page 26: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/26.jpg)
Radio Propagation Model
Factors in radio propagation model: In the space propagation, many factors enter into radio wave loss,
including ground absorption, reflection, refraction and diffraction, while these factors are inapplicable for the propagation loss formula in free space;
While planning and constructing a mobile communication network, you have to make detailed study about electric wave propagation features and field strength prediction before determining frequency band, frequency allocation and radio wave coverage, calculating communication probability and inter-system electromagnetic interference, and finally defining radio equipment parameters;
The radio propagation model presents the designer an approximate propagation effect in the practical propagation environment to estimate the space propagation loss. Therefore, the propagation model veracity determines whether the cell planning is reasonable.
![Page 27: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/27.jpg)
Radio Propagation Model
The propagation environment plays an important role in setting up a radio propagation model. The propagation environment in a special region consists of the following factors:
Terrains (mountains, hills, plain or water area) Number, height, distribution and material features of buildings Vegetation features Weather conditions Natural or man-made electromagnetic noise Working frequency of system Movement of mobile station
![Page 28: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/28.jpg)
Model Name Frequency Range
Okumura-Hata 150 MHz–1500 MHz macro cell
Cost231-Hata 150 MHz–2000 MHz macro cell
Cost231 Walfish-Ikegami 800 MHz–2000 MHz micro cell
Keenan-Motley 900 MHz and 1800 MHz indoor environment
General model 150 MHz–2000 MHz macro cell
Radio Propagation Model
Improvement to the space free loss formula:
![Page 29: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/29.jpg)
mmbb CAhdhhfPathloss lglg55.69.44log82.13lg9.333.46
f -refers to carrier, unit: MHz, applicable for 150 MHz–2000 MHz
bh -refers to BS antenna height, unit: m, effective height 30 m–200 m
d -refers to the distance from mobile station to antenna, unit: Km
mAh -refers to mobile station antenna height correction factor
mC -refers to city center correction factor, 3 dBm for large cities and 0 dBm for middle- and small-size cities
Cost231-Hata Model
![Page 30: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/30.jpg)
General Model
K1-Fading Constant K2-Distance Fading Coefficient K3 、 K4-Mobile Station Antenna Height calibration
Coefficient K5 、 K6-Base Station Antenna Height calibration
Coefficient K7-Diffraction calibration Coefficient Clutterloss-Calibration Value of Physiognomy Fading D-Distance between base station and mobile station (km) Hms -Mobile Station Antenna Effective Height (m) Heff-Base Station Antenna Effective Height (m)
sClutterlosnlossdiffractioK
dHeffKHeffK
HmsKHmsKdKKPathLoss
)(7
)log()log(6)log(5
)log(43)log(21
Propagation Model Selection Propagation Model Selection
![Page 31: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/31.jpg)
Propagation Model Test
Test sites should be selected from each environment categories.
To cover enough clutters.
The testing site shall be free of visible obstructions around.
The testing site shall be higher than the surrounding buildings.
Site SelectionSite Selection
Transmitter
Antenna
Receiver
Laptop
![Page 32: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/32.jpg)
Propagation Model Test (Cont.)
All directions from the testing site should be included.
The vehicle should take a route to or from the testing site in the shape of “8”, net, ring, or spiral, with a constant speed.
Route SelectionRoute Selection
![Page 33: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/33.jpg)
Propagation Model Calibration (Cont.)
Distance Filtration.
Intensity Filtration.
Land Feature Filtration
Data ProcessData Process
![Page 34: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/34.jpg)
Propagation Model Calibration (Cont.)
K1-Fading Constant K2-Distance Fading Coefficient K3 、 K4-Mobile Station Antenna Height calibration
Coefficient K5 、 K6-Base Station Antenna Height calibration
Coefficient K7-Diffraction calibration Coefficient Clutterloss-Calibration Value of Physiognomy Fading D-Distance between base station and mobile station
(km) Hms -Mobile Station Antenna Effective Height (m) Heff-Base Station Antenna Effective Height (m)
sClutterlosnlossdiffractioK
dHeffKHeffK
HmsKHmsKdKKPathLoss
)(7
)log()log(6)log(5
)log(43)log(21
Propagation Model Selection Propagation Model Selection
![Page 35: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/35.jpg)
Planning Process – Network DimensioningRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 36: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/36.jpg)
Network Dimensioning
Link budget Capacity analysis Give need analysis report, and estimate the Number
of NodeBs in the planned area.
![Page 37: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/37.jpg)
Network Dimensioning (Cont.)
![Page 38: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/38.jpg)
Link Budget
Coverage Target Mas Allowable Path Loss
Raius
Propagation Model
Link budget
No.Node B
PAPA
Feeder lossFeeder loss
PathPath Loss Loss
Antenna GainAntenna Gain
Penetration LossPenetration Loss
Receiver SensitivityReceiver Sensitivity
Margin Margin
Body LossBody Loss
UE PowerUE Power
BS PowerBS Power
![Page 39: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/39.jpg)
Capacity Analysis
Ampl i tudeEqui val ent voi ce channel s
provi ded by each cel l
I nter meanI nter vari anceCapaci ty factor
Vi rtual channel of eachcel l
Syetem Total _vi rtual _El r Cel l _vi rtual _El r
No. Cel l
ErlvirtualCell
ErlvirtualTotal
__
__
![Page 40: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/40.jpg)
Planning Process – Pre-Planning SimulationRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 41: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/41.jpg)
Pre-Planning Simulation
Verify estimation with simulation
Give suggestions for Node B layout, location, and
area.
Guide site survey work
Existing site’s sourcesExisting site’s sources
PropagationPropagation modelmodel
Traffic modelTraffic model
![Page 42: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/42.jpg)
Planning Process – Sites SurveyRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 43: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/43.jpg)
Sites Survey
To get the necessary data needed by network
planning and simulation
To learn geographical environment and radio
environment of the site
To learn the condition of building site
To learn the traffic distribution of planning area
To provide the candidate sites for planning area
![Page 44: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/44.jpg)
Site Survey
Convenience in traffic, reliability in city power supply, lightning protection and
grounding, small floor space;
Network construction initial stage, ensure the coverage and quality of VIP
subscribers and the area with high user density ;
Under the condition of no effects to the site layout, should choose the currently
existed sites as the candidate sites and utilize their equipment room, power
supply, tower, etc. ;
Avoid the site location which is close to radar, if necessary, for the security
factors, should apply the correspond methods to avoid the mutually interference ;
Avoid to locate the site on the mountain, in the forest ;
Avoid to select the sites which will be affected by the potential constructed
buildings .
Site Selection PrinciplesSite Selection Principles
![Page 45: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/45.jpg)
Site Survey
Site information: site name, site address, latitude, longitude, building height, tower height Radio Parameter: azimuth angle, down-tilt, antenna height antenna type, diversity type and separation Radio environment description Interfering source
Data RecordingData Recording
![Page 46: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/46.jpg)
Planning Process – Network SimulationRequirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 47: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/47.jpg)
Network Simulation
Input several optional solutions simultaneously.
Simulate all optional solutions. Select the most appropriate solution
according to the simulation result.
![Page 48: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/48.jpg)
Simulation results - graphic output
Best server Pilot strength Pilot Ec/Io Soft handover probability Pilot pollution Service coverage probability Cell load
![Page 49: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/49.jpg)
Best server
![Page 50: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/50.jpg)
Best server
Over shoot
Over shoot erased
![Page 51: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/51.jpg)
Pilot strength-CPICH RSCP
![Page 52: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/52.jpg)
Pilot strength
No continuous coverage of pilot
Continuous coverage of pilot
![Page 53: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/53.jpg)
Pilot Ec/Io
Pilot quality improved
Pilot quality not good
![Page 54: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/54.jpg)
Soft handover probability
![Page 55: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/55.jpg)
Pilot pollution-The number of pilot polluters
![Page 56: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/56.jpg)
Service coverage probability
Coverage probability improved
Coverage probability not good
![Page 57: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/57.jpg)
Cell load-Uplink Load
![Page 58: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/58.jpg)
Statistics reportSimulation Statistics AnalysisSimulation Statistics Analysis
![Page 59: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/59.jpg)
Statistics report (Cont.)
Mean Attempted 992.850Mean Served 964.050 97.10%Mean Failed 28.800 2.90%Mean In Soft or Softer Handover 271.250 28.14%Mean In Softer Handover 66.400 6.89%
Contributions to FailureNo UL Channels Primary Channel 0.00%No DL Channels Primary Channel 0.00%UL Channels Channel Limit Reached 0.00%DL Channels Channel Limit Reached 0.00%Low Pilot SIR 3.65%Downlink Eb/No (Range) 1.74%Downlink Eb/No (Capacity) 0.00%Uplink Eb/No 15.63%Noise Rise 86.63%No Carrier 0.00%Excessive Pathloss 0.00%
![Page 60: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/60.jpg)
Comparison between simulation and drive test data Comparison between simulated and tested
network performance Calculate the difference of
simulated and tested Ec and Ec/Io in each bin
Statistics on thousands of samples
Made comparison for 3 trial UMTS networks in China: Beijing, Shanghai, Guangzhou
![Page 61: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/61.jpg)
Comparison between simulation and drive test data
![Page 62: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/62.jpg)
Comparison between simulation and drive test data
Comparison shows that the planned network can predict the performance of real network quite well
![Page 63: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/63.jpg)
Planning Process – Output Planning Report
Requirement AnalysisRequirement Analysis
Sites Sites SurveySurvey
Network DimensioningNetwork Dimensioning
Pre-Planning Pre-Planning SimulationSimulation
Network Network SimulationSimulation
Propagation Model Propagation Model Test and CalibrationTest and Calibration
Output PlanningOutput Planning ReportReport
Sites LayoutSites Layout
![Page 64: 1 UMTS Radio Network Planning Process-65.ppt](https://reader035.vdocuments.site/reader035/viewer/2022081416/552fe4364a7959d6288b45dc/html5/thumbnails/64.jpg)
Planning Report Output
Report contents Networking requirements for the UMTS network Service model and demand analysis Radio network scale estimation Policy and principle analysis Networking proposal and solution to network construction by
stages
Attachment contents Propagation model test result BS address survey table BS engineering parameter table Radio parameter configuration table Network diagram and site layout diagram simulation result report