The Support Structural System for Sicbar and EC Detector of SciBooNE
FermiLab/PPD/MD
May 08, 2006
Edward Chi
2
Electron Catcher (EC)Support Device
See(http://home.fnal.gov/~edchi/Sciboone/
ec_scibar/support-ec-042806.ppt)for details
Scibar Support Device
See (http://home.fnal.gov/~edchi/
Sciboone/EC_Scibar/structure-Supt-041306.ppt) for details
SciBooNEProject
(Mechanical)MRD
(E. Villegas)
Scibar & ECSupport Struc.System
(Main Supt.Frame)
Dark house,upper & lower
removablefloors, railings,
A.C. system
VME, HV Gain Monitor & other
Accessorial Support Devices
3Iso view of the Scibar & EC detector @ inside of the SciBooNE enclosure floor
4
Move Scibar & EC main supt. frame (pre-fabricated,
~9,800 lbs) to CDFAssembly hall
5Install Hor. and Vert. EC supt. frame to the main frame before EC modules installation
6
By using the special horizontal EC modulelifting fixture to install
32 EC modules horizontally, the mech.design should allow the
alignment in x, y & zdirections respectively.
7
Scibar Module
layer
Scibar module Lifting fixture
Mr. H. Tanaka willtry his best to reshape
all shipped Scibar Module layers if needed
(The supt. frame hasadded the device)
8View w/all 64 scibar modules are installed (with x, y & z adjustment capabilities)
9
EC vertical super module(w/4 modules
& plates)
View of the 1st EC vertical module Installed to the main support frame
with the special vertical lifting fixture
10
View with all 32 vertical EC modules installed (w/x,y & z alignment ability), the clearance between the downstream surface of the 64th Scibar module to the
upstream surface of the EC vertical module is ~10 cm (z dir.), the clearance betweenthe top surface of the floor to the vt. Module connect is ~12”(30.5 cm, y dir.).
11
Install pre-assembled PMT frames to the top
and vertical of frame, alsoInstall the gain monitors. (Will design the safety
railings all around the top of the support frame)
12
Install the removable service fl @ the top service of the dark room
(floor rating: 75 lbs/ ft sq.), the restsides of the dark room still under
developing.
Remove one fl panel for
reg. serviceaccess
WARNING: Please don’t using this Please don’t using this service floor as boxing ring to excise service floor as boxing ring to excise you boxing skills!!you boxing skills!!
Install the Movable railings
13
For moving out fromCDF to SciBooNE site:
View of the Scibar & EC detector with the special
lifting fixture (total weight: ~36.5 tons) for lifting from CDF assembly hall to the
low boy trailer on the CDF loading dock.
(All railings must beremoved)
CDF loading dock and the 50 tons crane: 18’ clearance for the crane bridge, 19’ for the hook.
14
View of the CDF west sd. Door: 16’ height with 3
degree ramp
The layout of the truck w/low boy trailer(25” height) loading with the Scibar & EC detector
passing through the CDF west side door (limited to158.50” overall height).
Remove the lifting fixturebefore moving out
the CDF door.
15
Install Scibar & EC detector to the SciBooNEEnclosure with A.C. system (see on the next slide), HV & VME outside of the dark room.
HVVME rack
& supt.brackets
16
FAN(Grainger 7C409)
HeatExchanger
(TBD)
Inside dark room of the Scibar & EC
Detector(2C temp. diff. between
Inlet and outlet, heatload for PMT is
~ 2 KW)
Chiller(Neslab HX200)
re-use
AC System for the Scibar & EC Detector R. Schmitt
4 GPM water
2000 CFM air 18 C
17
Top view of the Scibar& EC detector @ theSciBooNE enclosure
Scibar & EC
Detector
Removable Platform and the Detectors(assuming the MRD
is under theplatform)
18
19
20