![Page 1: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/1.jpg)
1
TAMPering with Research-How Research was used in developing GDOTs
Transportation Asset Management Plan (TAMP)
Georgene M Geary, P.E.State Research Engineer
Mid-Continent Transportation Research SymposiumAugust 15, 2013
![Page 2: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/2.jpg)
2
Research and Asset Management (AM)
• Resources from prior Research
• Current National Research Efforts
• GDOT TAMP Evolvement
– GDOT AM Research Projects
• What’s Next
![Page 3: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/3.jpg)
3
AM Resources
• NHI Classes– TAM Workshop– Developing a TAM Plan– Intro to TAMP (web-based)
• AASHTO Documents– TAM Guide– TAM Implementation Guide
• Websites– FHWA A.M. ETG– AASHTO S.A.M.
3
![Page 4: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/4.jpg)
4
Recent/Current NCHRP Projects
• 07-21: AM Guide for Traffic Control Devices• 08-36/ Tasks 114, 116:
– Ancillary Structures, TAMP Templates
• 08-87: GIS in AM• 08-90 TAM Gap Tool• 08-91: Cross-Asset Resource allocation• 14-25: Guide for Selection of LOS for Assets• 20-7/Task 315: TAM for ancillary structures
4
![Page 5: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/5.jpg)
5
VISION Enhancing Georgia’s
Competitiveness Through
Leadership in Transportation
MISSION Georgia DOT
provides a safe, connected, and environmentally
sensitive transportation
system that enhances Georgia’s economic
competitiveness by working
efficiently and communicating
effectively to create strong partnerships.
CORE VALUES FlexibleOpenCommittedUnifiedSuccessful
VISION Enhancing Georgia’s
Competitiveness Through
Leadership in Transportation
MISSION Georgia DOT
provides a safe, connected, and environmentally
sensitive transportation
system that enhances Georgia’s economic
competitiveness by working
efficiently and communicating
effectively to create strong partnerships.
CORE VALUES FlexibleOpenCommittedUnifiedSuccessful
CUSTOMERS
GDOT Research Technical Advisory Groups
![Page 6: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/6.jpg)
6
TAMP Evolvement at GDOT
• 2009– Peer Exchange with FHWA, Utah & Indiana DOTs
• 2009/10 – TAM introduced & TAM Director Appointed– Task Force Created– Self Assessment Completed– TAM Policy Established
6
GDOT RP 09-03 Best Practices in Selecting Performance
Measures and Standards for Effective Asset Management
![Page 7: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/7.jpg)
7
TAMP Evolvement at GDOT
• 2011– TAM Strategic Direction aligned with new Strategic
Plan– Dashboard Launched
• 2012– TAMP published after being aligned with MAP-21– TAM Steering Committee launched
7
GDOT RP 10-21 Comprehensive Transportation Asset Management: Making a Business Case and Prioritizing Assets for Inclusion in Formal Asset Management
Programs
![Page 8: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/8.jpg)
8
GDOT AM Research
• RP 09-03 Appendix includes Research Catalog in Themes
• 11 ancillary items described in RP 10-21
8
![Page 9: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/9.jpg)
9
Content of GDOT’s TAMPI. EXECUTIVE SUMMARY
II. INTRODUCTION
III. LEVELS OF SERVICE
IV. LIFE CYCLE MANAGEMENT a. PAVEMENTS
b. BRIDGES
c. HIGHWAY SIGNS
V. GROWTH AND DEMAND
VI. FINANCIAL SUMMARY
VII. TAM PRACTICES
VIII. PERFORMANCE MANAGEMENT
IX. IMPROVEMENT PLAN
9
APPENDIX
ASSET MANAGEMENT IMPLEMENTATION PLAN
PERFORMANCE MANAGEMENT IMPLEMENTION PLAN
![Page 10: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/10.jpg)
10
Life Cycle Management• Define Levels of Service (LOS) for each asset
• Explain how the LOS will be achieved
• Identify key issues & strategies for managing these issues
• Determine approximate value and remaining life of the asset
• Asset risk and the ways to manage the risk
• Define revenue plan and historical expenditures
• Identify data reliability
10
![Page 11: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/11.jpg)
11
Performance Management• Performance management evaluates data
against targets and goals set in the TAMP
• Performance Measurement - Dashboard
–High level way of sharing information
– Informs Public/Staff of Department Priorities
–Sets Public Expectations
–Celebrates our successes and identifies our challenges
11
![Page 12: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/12.jpg)
12
GDOT DASHBOARD
www.dot.ga.gov
![Page 13: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/13.jpg)
13
Highlights of TAMP Evolvement at GDOT
• Evolved simultaneously with initial TAM efforts
• Collaborative effort of different GDOT units/offices
• Plan focuses on pavements, bridges and signs
• It is a living document; it has already changed twice
• A separate unit established to focus on TAM and develop the plan
13
![Page 14: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/14.jpg)
14
Where does TAM fit at GDOT?
STRATEGIC PLANNING
PERFORMANCE MANAGEMENT
ASSET MANAGEMENT
An effective TAM program requires the coordinated
effort of three things
14
RESEARCH
![Page 15: 1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research](https://reader036.vdocuments.site/reader036/viewer/2022081520/56649e265503460f94b16054/html5/thumbnails/15.jpg)
15
What’s Next
• Named a Risk Manager in 2013– Pilot for SHRP2 R09- Risk Management in
Complex projects• Current IT project to develop data warehouse• Looking at how to incorporate risk further
into TAM, and, how to measure and manage data better …future research projects?