Support Graphics forTraffic and Circulation Princeton Junction Redevelopment Area
Township of West Windsor
September 8, 2008
Urbitran | DMJM Harris
2
ENG-WONG, TAUBTRAFFIC ASSESSMENT REPORT
It is important to note that the results of this “pre-conceptual” analysis are based on …. Preliminary assumptions and would likely change based on changes in background regional traffic volumes associated with revisions to the NJDOT Penns Neck model (i.e., with the Vaughn Drive Connector included as a stand-alone improvement without any of the US-1 upgradws previously identified in the Penns Neck EIS).
Principal objectives– Confirm findings of my initial “sketch” analysis (3/31/08)
– More specific traffic data to guide sizing and layout of streets and intersections
4
2030 No-Build Assessment
This analysis indicates that at each of the three signalized intersections in the Study Area, traffic volumes will exceed capacity even with no further development action within the redevelopment area and if no further mitigation is applied. In considering alternatives for the Route 571 improvement, the Township clearly articulated its objective to limit roadway widening, even if congestion were to result. The findings of this analysis are consistent with that position.
- 3/31/08 memo re. Hillier- 9/08/08 memo re. InterCap
7
INTERCAP REDEVELOPMENT PLAN REVIEW
Traffic Access (1-7)
West-Side Circulation (8-13)
East-Side Circulation (14)
Main Street (Route 571 Area) (15-17)
Parking (18-21)
Pedestrians and Bicycles (22-24)
Finance (25-29)
14
Traffic Access:(7) NJDOT evaluating implications of changing Penns Neck EIS Record of Decision plan
15
West Side Circulation:(8) Core Area: More detail needed, accomodation for drop-offs / pickups, BRT, etc.
25
Parking:(18) Parking space supply
Existing Commuters(3,500 spaces)
New Commuters(2,500 spaces)
Site Uses(5,650 spaces)
26
Parking:
(19) BRT impact on parking demand 1000-1200 space reduction in demand
(20) Accounting for shared parking in new non-commuter space calculations
(21) Garage layouts, sizes, access, general arrangement
30
Finance:
(25) Infrastructure financing not analyzed by me (26) Basis of initial cost estimate not presented
(27) Cost reductions being investigated- Eliminate grade separations- Effect on Penns Neck EIS being evaluated- Added cost items probable
(28) Vaughn Drive on Township Roadway Assessment program
(29) State funding implies need for flexibility in layout, phasing, financing