1
Push logistics
Traditionally, the supply chain was pushed: manufacturers produced goods and "pushed" them through the supply chain, and the customer had no control.
2
Pull logistics
In a pull environment, a customer's purchase sends replenishment information back through the supply chain from retailer to distributor to manufacturer, so goods are "pulled" through the supply chain.
3
Push
4
Pull
5
The de-coupling pointAlso called “push-pull boundary”, where partial products are built up to and where they wait until actual order signals are received to complete the products.
The physical flow in a manufacturing process is between "manufacture-to-supply" or inventory-based logistics ("push" logistics) to "manufacture-to-order" or replenishment-based logistics ("pull" logistics).
The reliance is shifting from maintaining inventories aimed at approximately satisfy the forecasted demand to an information system insuring, mainly through on-demand that supply matches with demand.
6
More integrationWhile a push logistics system involves a limited level of integration between suppliers, manufacturers and distributors, a pull logistics system tries to achieve a higher level of efficiency through integration.
Freight flows between components of the supply chain tend to be more frequent and in smaller batches.
In addition, the sharing of demand dependant data (such as sales) helps better synchronize supply with demand.
Reverse logistics also tends to be better integrated in the system to achieve a higher level of customer service as well as to promote environmental strategies such as recycling.
7
Il ciclo di produzione
Il ciclo comprende l’approvvigionamento delle materie prime e prodotti intermedi, fino alla distribuzione.
Il ciclo è composto di fasi di produzione, che possono essere in parallelo, ma esiste sempre un percorso critico da cui dipende la durata del ciclo.
8
La regolazione della produzione con degli stock intermedi
fase P 1
fase P 2
richiesta fornitore
consegna cliente
Stockstrat.
distribuz.
fase P 1
fase P 2
distribuzionerichiesta fornitore
consegna cliente
flusso tirato dagli ordiniflusso spinto dalle previsioni
Il flusso della produzione è composto da una parte tirata (pull) dalla domanda e una parte spinta da rigidità tecnica e da considerazioni economiche
Flusso produttivo e stock
9
Posizione dello stock strategico
La produzione in generale necessita di uno o più stock
Occorre posizionarli nel ciclo di produzione (supply chain)
Sono possibili tre casi in funzione del tempo del ciclo di produzione (P) e del periodo di tempo lead time della consegna dei prodotti al cliente (L)
10
Gestione del ciclo di produzione all’ordine
P<L
lead timedata dell’ordine data di ricevimento
fase P 1
fase P 2
distribuzionerichiesta fornitore
consegna cliente
• nessuna necessità di stock• produzione all’ordine• es.. aeronautica, cantieri navali
inizio produzione tempo di produzione fine produzione
11
Gestione parziale del ciclo all’ordineP>L
• stock teoricamente unico• dimensionato sull’errore delle previsioni• es. industria auto, tessile, elettronica
lead time
data dell’ordine data di ricevimento
fase P 1
fase P 2
richiesta fornitore
consegna cliente
Stockstrat.
flusso tirato dagli ordiniflusso spinto dalle previsioni
distribuz.
12
Gestione del ciclo di produzione su previsioni e distribuzione all’ordine
P>L
• stock in un deposito centrale o regionale• dimensionato sulle previsioni di vendita• distribuzione e consegna all’ordine• es. industria auto, tessile, elettronica
Lead time L
data dell’ordine data di ricevimento
fase P 1
fase P 2
richiesta fornitore
consegna cliente
flusso tirato dagli ordiniflusso spinto dalle previsioni
distribuzione con stock strategico
13
Posizione e valore dello stockLo stock a valle delle lavorazioni ha un valore superiore di quello a monte.I prodotti in magazzino valgono di più della somma delle componenti e materie prime di cui sono composti, perché presentano il valore aggiunto della lavorazione.La loro giacenza in magazzino equivale ad un maggiore immobilizzo di capitale.
14
Riduzione dei costi delle scorte
Rimontare gli stock nella catena logistica
• ridurre la durata delle fasi a valle lasciando lo stesso lead time
• spostare alcune operazioni del ciclo a valle dello stock (post manufacturing)
• sincronizzare i flussi a monte e a valle con i fornitori che riforniscono più volte al giorno le linee (lo stock rimonta sui magazzini dei fornitori)
15
Riduzione dei costi delle scorte
Ridurre le quantità in stock
• migliorando le previsioni e le incertezze (la componente dello stock detta di sicurezza);
• aumentando la frequenza e la regolarità dei rifornimenti
16
Ridurre il numero dei modelli
La riduzione del numero dei modelli
comporta una diminuzione delle scorte in
magazzino a parità di sicurezza, cioè
maggiore probabilità di poter soddisfare i
clienti per la presenza di scorte sufficienti.
17
Postponement
Build partial products up to a “de-coupling point”, or “push-pull boundary”, and wait until actual order signals are received to complete the products
Postponement is a business strategy that maximizes possible benefit and minimizes risk by delaying further investment into a product or service until the last moment.
It requires fast and accurate information.
18
Postponement Benefits
Inventory Flexibility (Demand signals)
Freight efficiency (Bulk shipping)
Cost reductions (Local procurement)
Speed (Time-to-market)
Legal (Tax & duties, Export regulations)
19
Postponement and Forecasting
Rules of Forecasting:
1. The closer the event, the better the forecast
2. The less detailed the subject, the greater the accuracy
Delay the details so forecasts are accurate
20
Bulk Packaging
Delayed customer specific packaging
Don’t have to forecast sales by customer
Shortens order-to-delivery window (lead time)
Allows efficiency in in-bound transport
21
Inventory Pooling
Delays differentiation to customer specific inventory
Reduces stock and the value of the inventory
22
Build – to – Order (BTO)It is the capability to quickly build standard or mass-customized products upon receipt of spontaneous orders without forecasts, inventory, or purchasing delays.
These products may be shipped directly to individual customers, to specific stores, or as a response to assemblers’ “pull signals”.
Similarly, your suppliers may need to use spontaneous BTO to respond to your pull signals, which is a key element of flow manufacturing.
23
The BTO advantage
Low finished goods (FG) inventory
Customizable product
Quick delivery
Short cash-to-cash cycle
Purchase components at last minute
24
The BTO disadvantage
High manufacturing costs
• Can’t move desktops to China
High delivery costs
• Hard to consolidate last mile
25
Functional Products
Innovative Products
Stable Process
Efficiency is king, high integration
Postponement, flexible system
Evolving Process
Decoupling point, dual sourcing
Build-to-order, flexible system
Demand Uncertainty
Sup
ply
Unc
erta
inty
Low
High
Low High
Strategies with uncertainties
26
The new BMW system KOPV
Customer-oriented sales and a build-to-order production process KOVP (Kundenorientierter Vertriebs-und Produktionsprozess).
The main prerequisites for the realization of KOVP are a flexible production system and an advanced IT-environment.
27
The main points
• Simple online ordering processes at the dealers,
• the prompt receipt of a binding confirmation of order,
• flexibility when altering individual customer orders,
• information on the order status, • quick and punctual delivery.
28
The BMW Sales Assistant
The salesperson illustrates the
current BMW offer in a single medium
using films, pictures and explanations
29
During the Sales Process, a delivery date based on production capacity is available at any time
Following the Car Configuration an online check is preferred on whether the order can be build
Production sequence set throughout manufacturing
Body Shop AssemblyPaint shop
Startcustomer order
Re-sort Re-sort
BMW-Production System
Assembly
Startcustomer order
‘Late order assignment’
The BMW Production System
Body Shop Paint shop
Re-sort
Component Control
‘frozen horizon’
Reduction of lead timeOrdering Production/Distribution
minimum lead time:
28-32 working days
1513-17
up to now:
91
to be:flexibility until 10 days before the delivery date
10 working days
1 day Ordering4 days Frozen Horizon2 days Production2 days Distribution1 day Hand over