![Page 1: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/1.jpg)
1
Hydro One Networks
Guelph Area Transmission Refurbishment (GATR) Project
Presentation to Ward 4 residents
West End Community Centre, Guelph
June 27, 2012
![Page 2: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/2.jpg)
2
Location of existing facilities
![Page 3: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/3.jpg)
3
Aerial view of corridor
![Page 4: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/4.jpg)
Planning & approvals• Class Environmental Assessment for Minor
Transmission Facilities, approved under provincial Environmental Assessment Act
• Ontario Energy Board
– “Leave to Construct” (Section 92) approval
– Recovery of project costs through transmission rates
• Provincial Policy Statement, 2005
• Design & construction according to industry standards and best practices
• Other municipal, provincial or conservation authority permits, as required
![Page 5: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/5.jpg)
Existing transmission corridor• 115 kilovolt (kV)
transmission line built in the 1950s
• Easement rights, not ownership on this section of the right-of-way
• Right-of-way is 34 m (110’) wide along Deerpath Drive, with structures located 9 m (30’) east of centre
• Twin pole structures approx. 18-24 m (60’-80’) tall and spaced about 100 m (330’) apart
• Six twin pole structures between the railway and Hanlon Pkwy crossing; the latter is an angle structure
View along Deerpath Drive
![Page 6: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/6.jpg)
Proposed transmission corridor• Upgrade transmission line to
230 kilovolt (kV) on existing corridor under existing easement
• Replace existing structures with steel poles, conventional or narrow base steel lattice towers, approx. 37-40 m (120’-130’) tall
• Spans between poles can be longer; e.g. three poles could replace five existing structures
• New structures adjacent to Deerpath Drive will be closer to the curb
View of steel poles in residential neighbourhood in Woodstock
![Page 7: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/7.jpg)
230 kV steel lattice tower types
7
Narrow based ( (shown west of Barrie)
Conventional (shown in Essex County)
![Page 8: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/8.jpg)
Woodstock transmission line upgrade 115 kV to 230 kV
8
2007 2012View from Augusta Place, Woodstock
![Page 9: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/9.jpg)
Community issues and concerns
• Opportunity to provide input into the process• Electric and magnetic fields• Property values• Tidiness of the vacant lot on Deerpath Drive• Desire to bury the line underground• Visual appearance of the new transmission
line• Desire to move the transmission line closer
to Hanlon Pkwy
![Page 10: 1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,](https://reader030.vdocuments.site/reader030/viewer/2022032722/56649ceb5503460f949b6516/html5/thumbnails/10.jpg)
10
Questions and Discussion