1CONFIDENTIAL
SEDIRSony Ericsson Data Integration & ReportingRWS Quality Team
Application Design/Programming Project Planning & Research Executive Sponsorship . Scott Stewart Christopher Patnoe Pierre Steene Khaled Khatib Jong-Wook Shin Mats Ekstrand Sean Campbell
Dominic Jong
Official Launch
October 18, 2010
Confidential
Rev PA1 7/26/2010 2Rev PA1 7/26/2010 2
Confidential
Rev PA1 7/26/2010 3
Table of Contents
What is SEDIR?
Product Level Analytics
Project Level Analytics
Project HW/SW Level Analytics
Func Group Level Analytics
Confidential
Rev PA1 7/26/2010 4Rev PA1 7/26/2010 4
What is SEDIR?
Sony Ericsson Data Integration & Reporting
• Automatic collection of quality related data from multiple
sources within SEMC.
• Integration of data into dynamically created Charts/Reports.
• User Interface for ease of access to data
SEDIR (cedar) is a highly unattractive to bugs
Confidential
Rev PA1 7/26/2010 5Rev PA1 7/26/2010 5
Product Level AnalyticsProject - Zeus
Analytical Reports: Project Summary Status – Metered Tracking-Overall Status of Tracking KPIs
-Includes Project Metered Status Indicators
-Dynamically Updated for all areas using DMS data
Navigation Available:
-Menu Driven
-Click results to drill down through data
- Detailed graphs/charts or
- Data supporting chart
- Data may be saved to PC
• SEDIR (cedar) is resistant to rot and decay
Confidential
Rev PA1 7/26/2010 6Rev PA1 7/26/2010 6
Project Level AnalysisSEDIR (cedar) stands for high-quality, heirloom quality products
Reports included on the main pages of SEDIR and those maintained by the Quality team will track and display the overall Project Level data.
It is possible to drill down to the more detailed charts and/or to the DMS data behind the charts by simply clicking on the data point desired.
Confidential
Rev PA1 7/26/2010 7Rev PA1 7/26/2010 7
SW/HW Project Level Analysis
SEDIR (cedar) stays cool even during hot days
Project Data will be stored both on the main SEDIR pages and also on the appropriate SW / HW project related functional areas. All data updated on SEDIR will either come from the Project responsible group or automatically sync’d with DMS.
Confidential
Rev PA1 7/26/2010 8Rev PA1 7/26/2010 8
Functional Group Analysis
SEDIR is better than DIRT
FG data, or PDC responsible groups, will be updated as appropriate on the FG assigned pages. DMS data will automatically update these charts.
Confidential
Rev PA1 7/26/2010 9Rev PA1 7/26/2010 9
Executive Level Reports
In addition to the main page Project meter metrics, some reports will be auto generated on SEDIR for Executives. Potentially for ease in report/presentation creation in the future.
Confidential
Rev PA1 7/26/2010 10Rev PA1 7/26/2010 10
Future DevelopmentSEDIR (cedar) is a highly unattractive to bugs
- Charts that change as user selects specific data- Charts created on the fly with latest data.- Historical data for all charts, easily accessed - Focus into subset of charts on demand- Additional Charts/Links to GPV detailed data- Creation of Watermarks/Logo Marking Reports
- Charts that drill down into latest underlying data- Dynamic links to DMS, LUT for each Data Point- Compare 2 projects or include full Platform data- Interactive display of values, turn on/off live- Plans to filter data down to Employee Level
Confidential
Rev PA1 7/26/2010 11
- Include Project Estimation Reports (Phased Approach, input data for quick Project est.)
- Potential use to partner with IDD team on using SEDIR as template for canned reports
- Synchronize with IDD/CIQ to match up DMS data with actual log data
- Update Project Plan vs. Actual type Report data “live” on SEDIR
- Further Automate Project Reporting Charts/Data (Web to Power Point/online present)
- Automated RRE reporting
-Dynamic Scorecard updating (with links finalized to DMS, Quality Center, MTBF, CSIP)
New Interfaces with other SEMC Functional Groups
Confidential
Rev PA1 7/26/2010 12
- Dynamic Plan vs. Actual charting and planning (Web Interface)
- Dynamic Trending and Project Recovery planning (Web Interface)
- Quality Gates and Auto-notification
- ECB Review and Update Tools
- Work Prioritization & DMS “Live” Portal - (CQ or JIRA)
- RCA & Return Fault Code Analysis (W/DMS & CSIP Synchronization)
- Aging Tools, Reports and Data inclusion throughout SEDIR
- Automatic/Manual Issue Reporting from Mobile (w/In-Device Diag)
- Ad-hoc Query and Reporting
New Data Tools & Reports
-200
0
200
400
600
800
1000
1200
# Is
sues
Time
Project Trend Report
Inflow
OutFlow
Refix/Break
Delta
Total Issues
Extrapolated Data --><--LiveData
Crash
Occurs
X2 logs Display
X2 uses DMS Tool
Opens new DMS
Sends Log & Data
1
2
Closes
DMS
Sends
Email/Text
of DMS#
Mobile Reporting Tool
DMS Full
Confidential
Rev PA1 7/26/2010 13
Future Development
SEDIR Expanded
Confidential
Rev PA1 7/26/2010 14Rev PA1 7/26/2010 14
Integration to Other SEMC
SEDIR (cedar) stays cool even during hot days
Used for calculating RRE
and related customer data.DMS related data
reports, charts, hotlists, etc.
Used to combine real time
network/android logs with DMS &
LUT issues.
Will be used to track test results
then later tie back to
requirements.
Live User Testing, will be combined
with IDD/CIQ data.
WIKI Based Corporate Networking Software
Confidential
Rev PA1 7/26/2010 15Rev PA1 7/26/2010 15
Globalization of SEDIR
SEDIR (cedar) stands for high-quality, heirloom quality products
• Roll-out to multiple projects• Cross Project Reporting• Side-by-Side Project Comparison• Apply Lessons Learned to New Projects
• Global Standardization
• DMS PDC Alignment• Refinements of DMS Processes• Cross System Data Standardization
Confidential
Rev PA1 7/26/2010 16Rev PA1 7/26/2010 16
Questions
Q & A
17CONFIDENTIAL
THANK YOU!