1 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
Please find attached herewith for our comments to the above cited subject.
00000-MST-FUL-0001 Rev. 00 “Status – B” Page 1/1
Comments for Method Statement & Risk AssessmentSubmittal No. 0000-MST-FUL-0001 Rev. 00Method Statement and Risk Assessment for Installation of Fuel System:
Status B
1. Method statement should include the manufacturer recommended details with drawings for tank installation
2. Incorporate details of Lifting and shifting of tanks.
3. The pipe coating shall be 3 mm thick and the surface shall be shot blasted as specified.
4. Install anchor tank supports and seismic restraints as specified.
5. Comply with specification section 15191.
6. Ensure that the work is carried out by trained technicians under the supervision of specialist engineers. All check lists shall be filled by the specialist.
7. The methods proposed in submission to be verified on site prior to start of work and acceptable as per local civil defense. Any changes required complying with specification, Authorities Having Jurisdiction and / or good engineering practice etc. shall be agreed at site without any claims.
8. HSE measures and precautions stipulated on the attached risk assessment, to be verified on site prior to com. Working at height and its required precaution to be indicated in details and include risk assessment. Ensure presence of competent safety officer at the time of installations including lifting and shifting of material.
9. Required precautions indicated on the Risk Assessment to be verified by LAD Sr. Safety Engineer prior to commencement.
2 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
3 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
4 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
5 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
6 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
7 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
8 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
9 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
10 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
11 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
12 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
13 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
14 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
15 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
16 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
17 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
18 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
19 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
20 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
21 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
22 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
23 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
24 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
25 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
26 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
27 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
28 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
29 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
30 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
31 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
32 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
33 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
34 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
35 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
36 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
37 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
38 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
39 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
40 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
41 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
42 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
43 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
44 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
45 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
46 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
47 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
48 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
49 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
50 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
51 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
52 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
53 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
54 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
55 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
56 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
57 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
58 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
59 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
60 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
61 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
62 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
63 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
64 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
65 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
66 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
67 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
68 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
69 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
70 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
71 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
72 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
73 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
74 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
75 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
76 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
77 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
78 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
79 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
80 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
81 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
82 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
83 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
84 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
85 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
86 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
87 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
88 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
89 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
90 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
91 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
92 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
93 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
94 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
95 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
96 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
97 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
98 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
99 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
100 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
101 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
102 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
103 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
104 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
105 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
106 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
107 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
108 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
109 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
110 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
111 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
112 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
113 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
114 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
115 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
116 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
117 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
118 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
119 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System
120 0000-MST-FUL-0001-Rev.00 Method Statement & Risk Assessment for Installation of Fuel System