Download - 看, カン 板, バン Kan Ban
![Page 1: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/1.jpg)
© AgiliX Agile Development Consulting
看 , カン 板 , バン Kan Ban
30 min intro
Cesario Ramos
![Page 2: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/2.jpg)
© AgiliX Agile Development Consulting
![Page 3: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/3.jpg)
© AgiliX Agile Development Consulting
Focus on FLOW
Cycle Time = Work In ProgressAvg Completion Rate
(Little’s Law)
![Page 4: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/4.jpg)
© AgiliX Agile Development Consulting
Overproduction
Delay
Hand-offsTask Switching
Defects
InventoryRelearning
Seeing WASTE
![Page 5: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/5.jpg)
© AgiliX Agile Development Consulting
Why KanBan
• By reducing the WIP all kinds of WASTE will emerge.
• Bottlenecks in the process become clear.
• You’ll get an average cycle time.• You’ll get an average wait time.
![Page 6: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/6.jpg)
© AgiliX Agile Development Consulting
Scrum v.s. KanBan
• Velocity• Sprint• WIP per sprint• Roles• Cannot
change sprint.• Item must fit
in sprint
• Cycle Time• No timebox• WIP per state • No Roles• Can change at
any time.• No timebox…
![Page 7: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/7.jpg)
© AgiliX Agile Development Consulting | |
WIP and Cycle Time
Source: M Griffiths
![Page 8: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/8.jpg)
© AgiliX Agile Development Consulting | |
Bottlenecks
Source: M Griffiths
![Page 9: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/9.jpg)
© AgiliX Agile Development Consulting
![Page 10: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/10.jpg)
© AgiliX Agile Development Consulting
One metric to rule them all
Lead Time =
CycleTime *
Work In Progress +
Delay Between Sub-Processes
![Page 11: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/11.jpg)
© AgiliX Agile Development Consulting
Improve Kan Ban bottlenecks using A3
• Lead Time gives us a clear indication for potential wastes.
• Analyze waste to determine current situation
• Specify future state• Find root cause by walking the gemba• Propose counter measures for attacking
root cause.• Make a plan.• Sell it to management.
![Page 12: 看, カン 板, バン Kan Ban](https://reader031.vdocuments.site/reader031/viewer/2022013103/56814208550346895dadf05a/html5/thumbnails/12.jpg)
© AgiliX Agile Development Consulting
看 , カン 板 , バン Kan Ban
30 min intro