Dow Confidential
Chlor-Alkali Assets
Reliability
Page 1
Freeport Chlor-Alkali AssetsSlip Blind PolicyTraining Code 282539_1095
In order for the links to work, press F5 to view in slide-show view
Dow Confidential
Chlor-Alkali Assets
Reliability Background
The need for a policy was identified during the RCI process following the April 2013 HCL spill during the CARB plant outage (see Event 352891). 48” pancake buckled when ~20 psig of head pressure was
applied during chemical cleaning operation The leak resulted in approximately 20,000 gallons of weak
HCl solution being spilled to the slab and ditch.
Page 2
Dow Confidential
Chlor-Alkali Assets
Reliability Scope
The policy is intended to direct personnel working in Chlor-Alkali units in the proper method for selecting the correct slip blind and documenting slip blind usage.
EXEMPTIONS - • Blind flanges that meet the line or vessel piping specification and
spectacle blinds designed into the plant (i.e. electrolyzer spectacle blinds) are exempt from this policy.
• Blinds that are specified as part of a properly reviewed and approved plant operating or maintenance procedure that meets the evaluation and documentation requirements of this policy are exempt from the tracking log requirements.
• It is considered a good practice to include any temporary line blinds in the Slip Blind Tracking Log for a given job to ensure proper reconciliation at the end of the project or repair work.
Page 3
Dow Confidential
Chlor-Alkali Assets
Reliability Root Causes
The RCI found the following were root causes of the incident and are intended to be resolved by standardizing blind practices across CAA: Hazard of bowed slip blind and column head pressure not
understood Slip blind not adequate for head pressure in column Inadequate awareness, training, and assessment of
existing policies No slip blind policy implemented in L&D
Page 4
Dow Confidential
Chlor-Alkali Assets
Reliability Important Information
All blind installation and removal activities in the CAA Reliability Zone are considered CRITICAL activities and are covered by one of the following procedures:
Com_CRIT_Slip Blind Installation and Removal Procedure.doc
Slip Blind Tracking Log for CAA
Production plants may have additional safe work procedures that cover specific pancakes installation activities.
Page 5
Dow Confidential
Chlor-Alkali Assets
Reliability Roles & Responsibilities
The Freeport CAA Slip Blind Policy covers the responsibilities of the following roles:
• CAA Reliability Zone Leader• Production Plant Leaders• Approved Slip Blind Reviewer• Training Coordinator• Planners - Turn Around, WAC, Project, Field• Maintenance Do-Workers• Permit Issuer
Review the policy - know your responsibilities.
Page 6
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #1- Blind Labeling
All slip blinds will be labeled:
Material of construction Blind thickness (i.e. 1/8”, 1/4”, 0.125”) Nominal line size designed for (i.e. 3”) Flange class the diameter is designed for (i.e. 150#, 300#)
NOTE: this designation is strictly based on the flange class the blind dimensions are designed to fit and is NOT meant to indicate pressure rating
Page 7
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #2 – Blind sizing
Slip blinds will have a pressure rating which conforms to the piping specification of the system unless there is a documented basis for a lower pressure rating with supporting slip blind design documentation (one time calculation sheet or reference to blind matrices).
Page 8
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #3 –Determination of Process Conditions
For all slip blind installation, the worst case scenario for temperature, pressure, and chemical content must be considered when determining the material of construction and thickness of the blind.
Page 9
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #4 –Slip Blind Reviewer Requirements
All slip blind installations (daily maintenance, TA, or project) that do not meet the requirements of the pipe specification for the line in question will be reviewed and approved.
Page 10
Dow Confidential
Chlor-Alkali Assets
Reliability Slip Blind Tracking Log
Page 11
1 123456789 4" pancake on brine line to T-201BOn 4" brine line right before it ties into top of T-201B. Vessel Entry 4" 150
Stainless Steel or Monel 1/8"
2 123456789 24" blind flange for T-201B Chlorine InletT-201B inlet nozzle after inlet spool is removed. Vessel Entry 24" 150
Carbon Steel or FRP Blind flange
3 1234567892" pancake on softwater line to D-203B Chlorine inlet.
Downstream of 2" manual valve on softwater line to D-203B chlorine inlet. Vessel Entry 2" 300
Stainless Steel or Monel 1/8"
4 1234567893" pancake on D-203B Chlorine inlet sniff line.
On D-203B side of 3" manual valve on sniff line on D-203B chlorine inlet. Vessel Entry 3" 300
Stainless Steel or Monel 1/8"
Reason for slip blind or blind flange
Slip Blind Specifications
Size, inches
Flange Class
Material on Construction
Slip blind thickness,
inches
Blind Tag
Number
Work Order or TA Job Number
Description Location
Continued
Example
Dow Confidential
Chlor-Alkali Assets
Reliability Slip Blind Tracking Log (cont.)
Page 12
None - Manual valve and bypass valve upstream of AO-204F will be closed and bleed valve open, so no pressure will be on the line. 0 amb CA30 N/A B1-268-5051 Heath Tanner
None 0 amb CA30 N/A B1-268-5051 Heath Tanner
Softwater manual valve leaking by. 80 200 CA30 Softwater B1-270-5051 Heath Tanner
Sniff valve leaking by. 0.25 amb CA30 N/A B1-270-5051 Heath Tanner
P & ID No.
Approved DOA Blind Sizer Signature *only if
not per pipe spec, otherwise N/A
Blind installed and stamp verifed (permit
closer signature)
Blind removed after use (permit closer
signature)
Pressure Source and Notes on Max pressure requirements (i.e air gap, split gasket, double block and bleed needed)
Max Press,
psi
Max Temp,
F
Pipe Spec
Process Medium
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #5 - Blind Installation/ Removal Tracking
All slip blinds will be tracked via the Slip Blind Tracking Log to document.
Page 13
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #6 – Blind Identification
Blinds will be positively identified with a unique numbering system that matches the P&ID markup or annotated picture to avoid potential issues with installing blinds in the wrong location and to facilitate reconciliation of removed blinds. Green tags are one way to meet this requirement but other methods are acceptable such as project tie-point tags.
Prior to installation, workers will confirm that the size, material of construction, and flange class of the blind match the Slip Blind Tracking Log documentation for that specific location
Page 14
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #7 – Work Authorization
No slip blinds or pancakes other than normal line blinds that meet the full requirements of the line pipe specification can be installed without the Slip Blind Tracking Log and marked up P&ID or annotated picture being attached to the job plan.
Operations personnel will not issue a permit for work without verifying this documentation is included.
Maintenance, project, and/or TA personnel will not install non-spec blinds without such documentation being provided. Blinds will only be installed if the label matches the tracking log and the job plan.
Blinds will only be installed at locations that have been positively identified per the block LEO policy (i.e. yellow tag attached).
Note: Many blind installation and removal activities will be considered Line & Equipment Opening work and will need to meet the requirements of that Life Critical Standard.
Page 15
Dow Confidential
Chlor-Alkali Assets
Reliability Requirement #8 – Blind Inspection
Prior to installation, all blinds will be inspected to confirm good condition
Upon removal, all blinds will be inspected to confirm suitability for future use.
Any blind that has suffered corrosion damage or has been deformed by pressure exposure will be immediately reported to the person who approved the blind for use so proper near miss follow-up will occur.
Page 16