dover d final draftmoderngov.dover.gov.uk/documents/s19015/annex 1l - redacted feasibility...
TRANSCRIPT
Do
F
over
S
FIN
r Lei
SequA
D
NAL
sure
uentAsse
Dover D
L D
e Cen
tial Tessm
istrict C
RA
June
MB/
ntre
Testment
Council
AFT
e 2016
/11443
e
t t
l
T
Dover DisDover Lei
June 201Ref: MB/1
Cont
1
1.1
2
2.1 2.2
3
3.1 T3.2 T
4
4.1 4.2
4.3 4.4
5
5.1 5.2 5.1 5.2
6
6.1 6.2 6.3
7
7.1 7.2 7.3 7.4
strict Council isure Centre
6 11443
tents
INTRODUCT
Purpose of th
IDENTIFYIN
District-WideOptions..........
PLANNING
The NPPF andThe Developm
CoreLandLoca
SEQUENTIA
Identified SeaParameters ...
ScaleScopOthe
Site IdentificaSite Assessme
SuitaAvaiViab
SITE ASSES
St James ........Dover WaterfDover WaterfMaison Dieu .
SITE ASSES
Dover LeisureAlbany Car PaFormer Charl
SITE ASSES
Buckland MilWestmount ..Land East EndFormer Buckl
TION ..........
his Report .......
NG THE NEE
e Context ....................................
POLICY BAC
d the Need foment Plan ......
e Strategy (20d Allocations Lal Plan Saved
AL ASSESSM
arch Area ...................................e and Format pe for Disaggrer Consideratiation ................ent ...................ability ...............lability .............ility...................
SMENT – TO
...........................front (South ofront (North o...........................
SMENT – ED
e Centre ..........ark ....................ton Sorting O
SMENT - OT
l ....................................................d of Coombe land Hospital
....................
..........................
D ................
..........................
..........................
CKGROUND
or a Sequentia..........................10) ...................Local Plan (20Policies (2002
MENT METH
..........................
...................................................
regation .........ions ...................................................................................................................................................
OWN CENTR
..........................of A20) ............of A20 – Land ..........................
DGE OF CEN
..........................
..........................Office ...............
THER URBA
..........................
..........................Valley Road ..Site .................
...................
..........................
...................
..........................
..........................
D .................
al Assessment....................................................
015) ..................2) .......................
ODOLOGY
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
RE ...............
..........................
..........................at Bench Stre..........................
NTRE ...........
..........................
..........................
..........................
AN SITES .....
..........................
..........................
..........................
..........................
...................
..........................
...................
..........................
..........................
...................
t ................................................................................................................................
...................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
...................
..........................
..........................eet) ............................................
...................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
....................
..........................
....................
..........................
..........................
....................
..........................
..........................
..........................
..........................
..........................
....................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
....................
..........................
..........................
..........................
..........................
....................
..........................
..........................
..........................
....................
..........................
..........................
..........................
..........................
...................
..........................
...................
..........................
..........................
...................
..........................
..........................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
...................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
Page 2
........... 4
................ 4
........... 5
................ 5
................ 6
........... 9
................ 9
................ 9
................ 9
.............. 10
.............. 10
......... 11
.............. 11
.............. 11
.............. 11
.............. 13
.............. 13
.............. 14
.............. 15
.............. 16
.............. 16
.............. 16
......... 18
.............. 18
.............. 19
.............. 20
.............. 21
......... 24
.............. 24
.............. 25
.............. 27
......... 28
.............. 28
.............. 28
.............. 29
.............. 30
Dover DisDover Lei
June 201Ref: MB/1
7.5 7.6 T7.7 7.8 7.9
8
8.1 8.2
strict Council isure Centre
6 11443
Land at WestTA Centre, LoFormer MelbWhite Cliffs BLand Adjacen
SUMMARY
Summary ......Conclusions .
SequWide
ern End of Coondon Road ...ourne Comm
Business Park, nt to Dover Ch
& CONCLUS
...........................
...........................uential Test ....er Assessmen
oombe Valley ..........................
munity PrimaryWhitfield – ‘T
hristchurch A
SIONS .........
..........................
..........................
..........................t .......................
y Road ........................................y School ..........Triangle Site’ .
Academy ..........
...................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
....................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
..........................
...................
..........................
..........................
..........................
..........................
Page 3
.............. 31
.............. 32
.............. 33
.............. 34
.............. 35
......... 37
.............. 37
.............. 37
.............. 37
.............. 37
Dover DisDover Lei
June 201Ref: MB/1
1
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
strict Council isure Centre
6 11443
Introd
Purpose o
DHA PlannCouncil todevelopmcentre fromBusiness Ppool, 4 costudio, 2 sof house, coutdoor ch
In accorda(NPPF), thalternative
The SportConsultingfeasibility Dover Leiswas publis
This originbase for tindependethe correchave also bthe conten
As such, Ddevelopmthis applie
duction
of this Repo
ning has beo prepare ent of a newm its existin
Park, Whitfieurt sports hquash courtcafe and sufhanging roo
ance with this Sequentia
e sites in exis
ts Consultang, were appand options
sure Centre. shed in 2015
nal feasibilitythis report, ent review oct baseline sbeen soughtnt of the wor
DHA have prent with sp
es.
rt
een instructean indepe
w Dover Leisug edge of to
eld. The devall, 120 stat
ts, changingfficient park
oms and two
he requiremal Test conssting centres
ncy, in partpointed by Ds appraisal st
The Feasibi5.
y work has palthough D
of the identifshould be int and assessrk already ca
oduced thisecific regard
ed by The Sndent Sequure Centre, town centre velopment iion health a
g rooms, toileking spaces o 5-a-side 3G
ments set ousiders the avs and edge o
tnership witDover Distritudy for theility and Opt
provided anDHA Plannified need forn terms of tsed independarried out.
s standaloned to the Seq
Sports Consuuential Testthat is proposite to an os to include
and fitness sets, equipmand service
G football pit
ut in the Navailability, sof centre loc
th GT Archict Council i improvemetions Apprai
n extremely ng have su
r sports facilihe Sequentdently, havin
e document,quential Tes
ultancy on bt assessmenosed to invout of centre
e an 8 lane sstudio, 3 muent storage,areas. Theches.
ational Planuitability anations.
tects, Faithfn July 2015
ent and replaisal Study fo
useful startiubsequentlyities within Dial Test. Pong regard to
which const and strict
behalf of Dont in relatlve the reloc
e location at swimming pulti-activity s, reception,
e proposals a
ning Policy nd viability
ful+Gould a5 to compleacement of
or Dover Leis
ing point any undertakeDover, to estotential altero and critical
siders the leplanning m
Page 4
over Distriction to the
cation of theWhite Cliffs
pool, learnerstudios, spinoffices/backalso include
Frameworkof potential
and Hadronte an initialthe existingsure Centre’
nd evidencen a furthertablish whatrnative siteslly assessing
eisure centremethodology
t e e s r
n k e
k l
n l
g ’
e r t s g
e y
Dover DisDover Lei
June 201Ref: MB/1
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
strict Council isure Centre
6 11443
Identi
District-W
As the Go2015) setsleadershipsport (NGBto participwill continactivity op
Dover Distof leisure fcase Doveprovision ofacilitates tIndoor Spoand usage
As part of the currenof Dover Rthe LatentconsultatioIndoor Spo
In summarhas a low Dover. In trelatively lthat indoorequiremedemand fooutcomes Leisure Ce
• Mapro
• Lea
• Spthe
• He
• Mu
fying th
Wide Contex
overnment’s s out, sport p role to playBs), health a
pation and imnue to havepportunities.
trict Councilfacilities incer District Cof indoor spthan are curorts Facility
e to provide r
the originant and futureResidents. Tht Demand Rons were usorts Facility S
ry in the fealevel of swi
terms of the low level of or bowls pr
ent for squasor gymnastiof the detantre were pr
ain Pool - 6 oovision);
arner Pool –
orts Hall – 4e draft strate
ealth and fitn
ulti activity s
he Nee
xt
‘Sporting Fis a key pa
y, bringing scnd the priva
mprove the e, an absolu
already recluding oppoCouncil aimports facilitierrently availaStrategy (Fe
recommend
l feasibility we (up to 2026he Facility PReport for Hed to assessStrategy wo
sibility and dmming pooother formssports hall
rovision is ssh courts or cs, health an
ailed needs arovided in th
or 8 lane 25m
learner poo
4-8 courts toegy assume 4
ness – 120 st
studio – 2-3 s
d
Future: A Neart of local cchools, voluate sector tolocal sport
utely crucial
ognises thatortunities fo
m to take tes in Dover. able and theebruary 201
dations for fu
work, a deta6) provision Planning MoHealth and s the needs irk and need
draft strategol provision os of provisioprovision (3
sufficient toindoor tennnd fitness suanalysis, thehe feasibility
m pool (6 to
ol with move
o be conside4 court prov
tations could
studios;
ew Strategycommunitientary sport c
ogether to fdelivery sysrole to pla
t there is a nor sport, playhis opportuThe aspirat
e Council ha6), which co
uture deliver
ailed needs required to m
odel (FPM) reFitness Memn the area as identified
gy it was ideof 8.88m2 wn, it was ide
3+ court) bu meet need
nis courts. It uites and dae following ry:
replace the
eable floor;
ered – althovision and sh
d be support
y for an Acts and Counclubs, Nationorge partnetem. So locay in deliver
need within y and relaxaunity to sigion is to prove recently c
onsiders exisry.
analysis wasmeet the indeports from mbership annd the feasitherein.
ntified that water space p
ntified that out with imprd, and that has been no
ance and aerecommend
existing pro
ough the 202how improve
ted;
tive Nation’ ncils have annal Governin
erships, unblal authoritiering sport a
Dover for thation to impgnificantly imovide a broaconsulted osting and fu
s conducteddoor sport fa Sports Engnd various ibility doveta
the district per 1,000 pooverall the droved projec
there is nooted that th
erobic studiodations for a
ovision and 8
26 projectioed supply;
Page 5
(Decembern importantng Bodies oflock barrierses have, andand physical
he provisionrove. In thismprove theader base ofn their draft
uture supply
d to identifyacility needsland (2015),stakeholderails with the
in particularopulation indistrict has acted supply,o additionalere is latent
os. From the new Dover
8 to increase
ons noted in
r t f s d l
n s e f t y
y s , r e
r n a , l t e r
e
n
Dover DisDover Lei
June 201Ref: MB/1
2.2
2.2.1
2.2.2
2.2.3
strict Council isure Centre
6 11443
• Sp
• Sq
• Pasta
Options
The first opresent levthe 1970s within thereport.
The seconThe refurbundertakinfacilities rrefurbishmyears and new build months toallow for arequiremeurban settStrategy awould theconfirmed
In additioconsideredneeds of ththe oppormeeting thservice of new leisurpresented
in studio – s
quash courts
rking spaceandards.
option is thevel. This is nand have n
e adopted Co
d option invbishment wng significanrequired. Th
ment and rein terms of options. Fu
o allow for tha continuity
ent. The existlement in t
and draft Inderefore have would not b
on to the red in the 20he catchmenrtunity to phe needs of the existinge facilities. A in the feasib
spin studio p
s – maximum
es –requirem
e ‘do nothinot a feasible
now come tore Strategy
volves the rewould involvnt works to rhis is also constructioncost is deemrthermore, t
he refurbishmin service.
sting leisurethe District, door Sports e significanbe somethin
efurbishmen15 feasibilitynt populatio
provide a hithe District.
g Dover LeisA summary obility is prov
provided in l
m of 3 courts
ments based
ng’ option ae option. Thto the end oy (paragraph
efurbishmenve retainingreconfigure t
not a fean will only emed to be othe centre wment works Continuity
e centre is ththe importFacility Stra
t impacts wng that could
nt of the ey study, in
on. The new igh quality . A new builsure Centre of the refurb
vided overlea
arger facility
s; and
d on scale o
and instead e facilities atof their opeh 2.55) and t
nt of the exisg some or the buildingsible optionextend the nly margina
would be clo to be carrieof service p
he primary intance of whategy. Its lowhich the Cd be enterta
existing cenresponse tobuild optionefficient leid option woif an alterna
bishment opaf.
y options;
of facility op
maintain tht Dover Leis
erational lifethe more re
sting Dover all of the to provide an. The felife of the b
ally less expeosed for a peed out and sprovision is ndoor sportshich is recogoss for any Council, as ined.
tre, five neo the identifns provide a sure centre
ould also alloative suitabl
ption and the
ption and K
he existing fure Centre w
e span, as isecent detaile
Leisure Cenexisting buan appropri
easibility cobuilding for ensive comperiod of bet
subsequentlykey and a fus facility in tgnised withlengthy perservice pro
ew build opfied current long-term s
e, which conow for the cle site is choe five new b
Page 6
KCC parking
facility at itswere built in
recogniseded feasibility
tre facilities.uildings and
ate range ofnfirms thatanother 20
pared to thetween 12-18y would notundamentalhe principalin the Coreriod of time
ovider, have
ptions weret and futuresolution andntributes to
continuity ofosen for theuild options
g
s n d y
. d f t 0 e 8 t l l
e e e
e e d o f e s
Dover DisDover Lei
June 201Ref: MB/1
Refurbis
6 lane x 2pool Learner p 8 court shall 65 healthfitness st 1 multi astudio No spin s 3 squash 90 parkinspaces
2.2.4
2.2.5
2.2.6
strict Council isure Centre
6 11443
shment N
25m
pool
ports
h & tations
ctivity
studio
h courts
ng
6 lapoo 15mlear(mofloo No 120fitn 2 mstud No 0 sq 160spa
As the 201Leisure Cemore viabcould be bthe duratio
In line withas the basbe the moparticular, within thedespite thhas already
In developand undecomparabinformed dapplication
• Pro
• Inc
New Build Option 1
ane x 25m ol
m x 8.5m rner pool oveable or)
sports hall
0 health & ness studios
multi activity dios
spin studio
quash courts
0 parking aces
5 feasibility entre. Whilsle and will r
built on an aon of the bu
h the detaileeline positio
ost suitable oit accommo
e district. The existing cy accounted
ping a proportaken a mole facilities tdevelopmenn stage and
ovision of 2 s
creased park
New BuiOption
6 lane x 25pool 15m x 8.5mlearner poo(moveable floor) 4 court spohall 120 health fitness stud 2 multi actistudios No spin stu 0 squash co 200 parkingspaces
study conclst it will havresult in thealternative sild period an
ed needs anon from whioption in terodates the lahe provisionentre comp
d for this.
osed facility ore compreto note succnt of the faciincludes the
squash cour
king provisio
ild 2
NeOp
m
m ol
orts
& dios
ivity
udio
ourts
g
6 lanepool 15m xlearne(movfloor) 8 couhall 120 hfitnes 3 mustudio 1 spin 3 squ 250 pspace
ludes, the neve higher coe provision osite, allowingnd allowing
nalysis, new ch to develoms of meetiarger 8 lane n of a 4 co
prising 8 cou
mix, the Cohensive cosessful and nility mix ande following c
rts instead of
on to c. 340 s
ew Build ption 3 e x 25m
x 8.5m er pool eable )
urt sports
health & ss studios
lti activity os
n studio
uash courts
parking es
ew build optost implicatiof higher qug the existinfor the cont
build optionop a proposng the identpool which urt sports h
urts, as the d
uncil have tsting and vinot so succes
design thatchanges from
f 3;
spaces;
New BuildOption 4
8 lane x 25m pool 15m x 8.5m learner pool (moveable floor) 4 court sporthall 120 health & fitness studio 3 multi activistudios 1 spin studio 3 squash cou 250 parking spaces
Table
tion is the prons, a new ality leisure
ng centre toinuity in the
n 4 has beened facility mtified needs is identified
hall was alsodraft Indoor
aken Optionability exercssful designst is being takm the feasibi
d New Opt
ts
os
ity
o
urts
8 lane xpool 15m x 8learner (moveafloor) 8 court hall 120 heafitness s 3 multi studios 1 spin s 3 squas 250 parspaces
e 2.1 Feasibility O
referred roubuild is dee
facilities. A o remain opee service pro
n chosen by mix and is co
for the wided as the maio considereSports Faci
n 4 as the stcise whilst as and facilitiken forward ility Option 4
Page 7
Build ion 5
x 25m
8.5m pool
able
sports
alth & studios
activity
studio
sh courts
rking
Options Summary
te for Doveremed to benew centre
erational forvision.
the Councilonsidered toer district. Inn deficiency
ed sufficientlity Strategy
arting pointalso visitinges. This hasto planning4 mix:
y
r e e r
l o n y t y
t g s g
Dover DisDover Lei
June 201Ref: MB/1
2.2.7
2.2.8
2.2.9
strict Council isure Centre
6 11443
• Ou
• Proan
Whilst theIndoor Spovisiting oth3G pitch pmulti-use fundamensports hall
In view of team, andconsideredTest Asses
Whilst theFacility Strconsultatioshould trig
utdoor chang
ovision of chd enhance v
e 4 court spoorts Facility her facilities
provision, int3G pitch as
ntal compon for other us
the extensivd having revd to represesment.
e above mixrategy remaion exercise gger a review
ging with 2 e
hildren’s softviability
orts hall proStrategy andwith a simil
trinsically linwas origina
ent of the fases.
ve feasibilityviewed this went a robust
x is being tains in draft foare being r
w of the prop
external 3G
t play and/o
ovision has bd projected ar offer has
nked to the wally mootedacility mix, re
y undertakenwork, this aand reason
aken forwarorm and conreviewed. Aposed mix a
5-a-side foo
r ‘clip and cl
been considsupply, furtidentified thwider facility in the feaselieving pres
n by the Couand the subnable basis u
rd, it shouldnsultation reAny change nd in turn th
tball pitches
imb’ facility
dered sufficieher review o
he importancy. This is difibility studyssure and de
uncil and thsequent ref
upon which
d be noted esponses rec
to the strahis report.
s;
to broaden
ent in light of evidence oce of additiofferent to an
y and has ememand place
eir specialistfinement of
to base this
that the Indceived durinategy as a re
Page 8
facility offer
of the draftof need and
onal 5-a-siden associatedmerged as aed upon the
t consultantOption 4 is
s Sequential
door Sportsg the recentesult of this
r
t d e d a e
t s l
s t s
Dover DisDover Lei
June 201Ref: MB/1
3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.2
3.2.1
3.2.2
strict Council isure Centre
6 11443
Plann
The NPPF
Paragraphnot in an ebe supporprescribedlocations. by the NPPPlanning P
The assessuitability such an assequentialdeliver the
In this instCliffs Businis classed Appendix more interestaurantscentres, antest is requ
The requirwhich setstown cenpredominaprimary shthe town c
The Deve
The adoptallocations
Core Strat
The adoptas the majthat the Sprovided a
ing Pol
and the Ne
24 of the Nexisting centrted by a seqd hierarchy
PPS4, whichPF and the cPractice Guid
sment shouand viability
ssessment islly preferabe proposed d
tance, the pness Park falas a ‘main t2 defines ‘mnsive sport s, bars and
nd bingo haluired in acco
rements for as out what itre”. A towantly leisure
hopping areacentre bound
elopment Pl
ted Proposas or designat
tegy (2010)
ted Dover Cojor focus forStrategy’s inat the right t
icy Bac
eed for a Seq
NPPF requiretre and are nquential assof location
h previously orrespondin
dance which
uld not only as an alterns to establisle locationsdevelopmen
roposed redls outside of
town centremain town ce
and recreapubs, night
ls)”. A leisurordance with
a sequentials deemed t
wn centre ise, business aa. Edge of cedary for non
an
ls Map, whitions contain
ore Strategydevelopme
nfrastructureime.
ckgroun
quential As
es planning anot in accorsessment wh i.e. defined
y dealt with ng Practice Gh details the
ly identify native optioh whether t
s that couldnt.
developmenf any defined
e use’ under entre uses’ a
ation uses (t-clubs, casinre centre fith Paragraph
assessmento be a “tows defined a
and other mentre location-retail town
ich reflects tned therein,
y sets out a sent in the dise needs are
nd
sessment
applicationsdance with hich assessed town centown centre
Guidance nomethodolog
alternative on to the appthere are and reasonably
t of the exisd town centthe terms o
and includes(including cnos, health s within this24.
t are set out wn centre” aas the primain town ce
ons are definn centre uses
the policies , defines the
spatial stratestrict. One o
identified a
for main toan up to dats alternative
ntres, followe issues, has
ote has also bgy that shou
sites but aplication proy other altey and suita
sting Dover tre, and the pof the NPPF.s “leisure, en
cinemas, resand fitness s description
within the Pnd what is d
mary shoppientre uses wned as the ars such as leis
of the deve extent of Do
egy for growf the districtand that req
own centre ute developme sites accor
wed by edgs now been been supers
uld apply.
assess their oposal. The oernative sites
bly accomm
Leisure Cenproposed le. The NPPFtertainment
staurants, dcentres indo
n and thus a
Planning Pradeemed to ing area an
within or adjarea within 30sure.
elopment pover Town C
wth and ident objectives quired infra
Page 9
uses that arement plan tording to thee of centresupersedededed by the
availability,objective fors that are in
modate and
tre at Whiteeisure centre
Glossary atfacilities the
rive-throughoor bowlinga sequential
actice Guide,be “edge of
nd areas ofacent to the00 metres of
lan and anyCentre.
ntifies Doveris to ensure
astructure is
e o e e d e
, r
n d
e e t e h g l
, f f e f
y
r e s
Dover DisDover Lei
June 201Ref: MB/1
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
strict Council isure Centre
6 11443
Core Poliinfrastructefficiently,before pro
The Core S
Land Alloc
The Land Asites that and in doin
The plan idthe area isof its usefulocated at a
The broadmeet the non the exdevelopedprominent
Local Plan
Policy OSrecreationDover or Dedge-of-ceavailable, iby a range
icy 6 stateure provide, or whethe
oposing incre
Strategy note
cations Loca
Allocations Pare suitableng so make
dentifies Dos to ‘create aul life, an oppa different sit
d objectives need for mo
xisting site, od; and to enst location.
n Saved Polic
S6 (Indoor spal facilities
Deal, at a sitentre with gis located els
e of transpor
s that in ders should fer demand ceased capac
es that the D
al Plan (2015
Plan was ad for developa major con
over Leisure and restore’. portunity exte, so long as
set out by odern, inclusor whether sure that an
cies (2002)
ports and rewill be perme within thegood pedessewhere in tt modes, inc
determiningfirst considecan be reducity through
Dover Leisur
5)
opted in Janpment in ortribution to
Centre as anIt notes tha
xists to creates it equally ac
the plan aresive sport an
the Leisureny new deve
ecreational mitted prove town centrstrian and cthe urban arcluding publ
g infrastructer if existinguced througextending o
e Centre is b
nuary 2015 arder to meedelivering t
n ‘Area of Chat “given thate a landmarccessible to re
e to investignd recreatione Centre shoelopment on
facilities) stavided that are, or if no scycle links torea on a site lic transport
ure requireg infrastructgh promotinor providing
becoming ou
and identifiet the Core She Strategy.
hange’ and st the existingk building. Lesidents” (Pa
gate whethen facilities byould be relon the site ful
ates that prny major neuch site is avo the centrwhich is or .
ements appture can be ng behaviou
new infrast
utdated (Par
es and allocaStrategy’s re.
states that tg building is nLeisure facilitara 3.144).
er it will be y building nocated and lfils the pote
roposals for ew facility isvailable, loc
re, or if no can be mad
Page 10
plicants andused more
ural change,ructure.
ra 2.55).
ates specificequirements
he focus fornear the endties could be
possible tonew facilities
the site re-ential of this
indoor ands located in
cated on thesuch site ise accessible
d e ,
c s
r d e
o s -s
d n e s e
Dover DisDover Lei
June 201Ref: MB/1
4
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.2
4.2.1
strict Council isure Centre
6 11443
Seque
Identified
The existinoutside of assessmenarea of DoLeisure Ceare no oth
The NPPF first look atherefore aany sites thto the Nati
To ensure adapted tassessmenconsiderinrequired topotential slocation tobalance. TTest Asses
Following wider Dov(2015), whor edge ofmethodolobalance, al
Paramete
Scale and
For the puconsider wprovision. Option 4 provision detailed anthe findingmeet evidCouncil wo
ential A
d Search Are
ng Dover Lef the Town Cnt, the neareover Districtntre, it is noer types of c
and the Naat all potentassessed sitehat may fall ional Plannin
the sequento reflect tnt forms twng potential o include. Ssites in the uo inform thThis later pasment.
pre applicatver urban arhich notes thf centre site, ogy will thlbeit not nec
ers
Format
urpose of thwhat can re
The Councias best meto be replacnalysis. Havgs are cons
denced needould commi
Assessm
ea
eisure CentreCentre area aest centre ist Council. t necessary t
centre within
tional Planntial sites in ces within theto be consid
ng Practice G
ntial test is ahe particula
wo distinct ptown centre
Separate to turban area the wider ass
art of the ass
tion discussiea should b
hat the new so long as iterefore assicessarily incl
he Sequenteasonably beil have unde
eeting evideced and thising reviewedidered robuds, there cat the signific
ment Me
e is situatedas defined ins therefore Given the pto consider n the urban
ning Practicecentres, befoe defined bodered as beiGuidance, i.e
as robust as ar circumstaparts; firstly
e and edge othis, the asshat do not fsessment ofsessment do
ions with Dobe considere
leisure facilt equally accist in informluding sites
ial Test, thee considereertaken an
enced need s has since d this feasib
ust and unleannot be ccant financia
ethodo
d within then the develoDover Townproposals reany other toarea defined
e Guidance ore assessingoundaries ofng located o
e. within 300
possible, thances of th
y, the requiof centre siteessment has
fall within thf alternativeoes not com
over District ed in line wiities could b
cessible to reming the wthat are seq
e proposed d as the min-depth feahaving reg
been refinebility and theess a site is cconsidered aal resources
logy
urban builtopment plann Centre witelate to the own centres d in the deve
require a seg edge of cef Dover Towof the edge o0m of the de
e standard his developrements of
es. This is alls been expa
he town cents when und
mprise part o
Council it haith the Land
be located atesidents. Thiwider plannuentially pre
facility mix inimum reqasibility stud
gard to the d further wi
e current dracapable of dany reasonainvolved in d
t confines on. In terms othin the loc
replacemenin the Distri
elopment pl
equential assentre option
wn Centre anof this centr
efined town
methodologpment. Asf the NPPF l that a sequanded to contre or an edgdertaking th
of the forma
as been agred Allocationt a differentis expanded
ning consideeferable in N
has been rquired level dy which ha
existing leiith the bene
aft proposeddelivering faable prospedelivering a
Page 11
of Dover butof sequentialcal authoritynt of Doverct and therean.
sessment tons. We haved thereafter
re accordingcentre.
gy has beens such, theare met inential test isnsider otherge of centrehe planningl Sequential
eed that thes Local Plant non-centre
assessmenteration and
NPPF terms.
reviewed toand mix of
as identifiedisure centreefit of more
d facility mix,acilities that
ect that the new leisure
t l
y r e
o e r
g
n e n s r e g l
e n e t
d
o f
d e e , t e e
Dover DisDover Lei
June 201Ref: MB/1
4.2.2
4.2.3
4.2.4
4.2.5
strict Council isure Centre
6 11443
centre, noresidents.
Whilst theparking spsequentialstandards indicate th250+ parkcontext ofthe existin
The 2015 footprints surface pa12,560m2 developingregion of 2this exerciconsideredthe purpocentre siteadjoins thethe feasibibeing tighreasonableprovides a
This site arside pitchebelow at 4consideredclearly presense. Thibe the case
It should baccording provide subasis givenparking is be considesite area isdemonstrasuitability ascertain if
twithstandin
e 2015 feasibpaces and sul test, parkfor this type
hat further aking space f this assess
ng leisure cen
feasibility stand site a
arking or deif surface pag designs fo2 hectares (aise and has d a realistic rses of ident
e provides ae town centility study shht). The exe degree of
a reasonable
rea does notes now prop4.2.8 but in od robust. Necluded, thisis approach e, again ens
be noted thato the circu
ufficient span the variatioavailable clo
ered viable ws consideredates, albeit aand viabilitf the minimu
ng its civic r
bility studyubsequent w
ing will bees of develo
assessment irequiremenment, particntre site.
tudy includereas to accecked parkiarking for 25or the earmagain assumalready bee
requirementifying a min useful benctre and the hows that thxisting site f flexibility, i
threshold fo
t include an posed as an iorder to demNotwithstands is taken intensures mouring robust
at the actuaumstances oce. It is alsoons in adoptose by, a smwhere a site robust to inany site closy is likely toum level of d
responsibilit
option statework has idene consideredopment on a
s warrantedt on a towcularly when
ed a design ommodate ing. The O50 cars is as
marked site, ming surface
en identifiedt in the cont
nimum site achmark. Altmany public
he Option 4 measures 0
it is consideor site assess
allowance fimportant p
monstrate a rding that, wto considera
ore sites are tness.
al requiremeof each site,o necessary tted parking
maller site w is readily ac
nclude this flse to this aro require modevelopmen
ties more ge
es that therntified a need in accord
a site specificd. It is, for ex
wn centre sin considerin
feasibility teach of th
Option 4 facssumed. Thhave identifparking, bu
d, the provistext of a towarea to aid sthough stricc car parks tfootprint ca
0.84 hectareered that a sment purpo
for, or abilityart of the mreasonable l
where a site ation when given due c
ent for parkin, and so in to consider standards b
with a reduceccessible by lexibility, as rea and meeore detailed
nt could be a
enerally in m
re is a need ed for more, dance with c basis, whe
xample, recote would b
ng the curre
hat establise options c
cilities mix he current dfied a site at for 340 spasion of 250+
wn centre or site assessmectly edge of that are founn be accom
es and therminimum sioses.
y to accommix. This is coevel of flexibis of a size consideringonsideration
ng and landsome cases parking pro
by location. Ifed number opublic transthe existing
eting the thd suitability aappropriately
meeting the
for approxfor the purpthe adopt
ere other conognised thatbe unreasonent level of
hed minimuconsidered, requires a
draft proposaarea requiremaces). Notw+ parking spedge of cenent, the exiscentre, the nd there. F
mmodated onrefore to incite area of 0
modate, the oonsidered inbility in the awhere this
g suitability in than woul
dscaping spaa smaller s
ovision on af adequate sof parking ssport. A 0.8h leisure cent
hree tests of assessment y accommod
Page 12
needs of its
imately 250poses of thisted parkingnsiderations imposing a
nable in theprovision at
um buildingwith either
site area ofals, throughment in the
withstandingpaces is not
ntre site. Forsting leisuresite directlyurthermore,n site (albeitcorporate a0.8 hectares
outdoor 5-a-more detail
approach, isprovision is
in the widerd otherwise
ace will varyite may not site by site
surface levelpaces could
ha minimumtre site aptlyf availability,
to properlydated..
s
0 s g s a e t
g r f
h e g t r e y , t a s
-l s s r e
y t e l
d m y ,
y
Dover DisDover Lei
June 201Ref: MB/1
4.2.6
4.2.7
4.2.8
4.2.9
4.2.10
strict Council isure Centre
6 11443
Scope for D
The Practileisure devseek arbitrwhich couand practic
Disaggregviable andwhich folloleisure facprovide fu
Where disfacilities, nprovided however, tonly 2 pitsubdivisiobe viable aforms an inneed, Thematerial. undertakinexclude thother reqconsiderat
Furthermoexternal 3Gland-hungassessmensimilarly, w
Other Con
In addition
• Easy accaccessibto acceswhere re
• Prominesports fdegree with wa
Disaggrega
ce Guidancevelopment orary sub-divild be physiccal scope fo
ation of thed sit counterows the tradilities is as arther facilitie
aggregationnamely the sy
as standalothe provisiotches (compn to form 4 and thereforntegral come ability for Notwithstan
ng an initial his from thequirements tion.
ore, in the coG pitch in to
gry 9albeit lent, a 3G pitcwas not inclu
nsiderations
n, the leisure
cess to the ble to users ssibility in tequired in re
ence – givenfacility in Doof promine
ayfinding and
ation
e requires donto separatsion of prop
cally and ther this require
e core facilitir to the leisuditional leisu
a baseline toes to meet th
n can reasonynthetic 3G ne developn currently
pared to a smaller 5-a-re deliverablponent of tha site to delnding this asite sieving e minimum swith the
ontext of a toown centre ess so for thch has not buded in the 2
s
e centre is co
road netwoby a range ohe developespect of acc
n the civic nover, it is conce or favoud legibility fo
evelopers tote sites, alth
posals. In theeoretically bees further co
ies is deemeure centre mure centre fo
o provide likhe identified
nably be conpitches. It is
pment, or linproposed isstandard/fuside pitchesle as a standhe current dliver this fac
and for the exercise bassite area as exception
own centre locations is e model env
been include2015 design
onsidered to
ork and pubof means. Tment plan.cessibility, p
nature of thonsidered neurable locator users.
o consider dhough it recoe case of thee split into c
onsideration
ed unreasonmodel and normat. The ke for like fac
d needs of th
nsidered is is not uncomnked to schs more bespull sized 3G s. As such, thdalone facilitdraft mix in tcility alongsireasons out
sed on size, iany sequenof that w
sequential tconsidered visaged). Aced in determfeasibility th
o require the
blic transporThis is particu
Advice has parking and o
he use and tecessary for tion strategi
disaggregatiognises that leisure facilonstituent p.
able as it woneed to replkey intentiocilities to thohe district.
n respect ofmmon that mhools or spopoke and lim
pitch whichis form of pty. For this rthe context ode the leisu
tlined in 4.2t is consider
ntially preferwould reaso
test assessmout of chara
ccordingly, fmining the mhat consider
following:
rt links – a ularly relevabeen sough
other related
the status othe buildingcally, which
ing specific t authoritiesities, it is a m
parts and so
ould not belace the exis
on of the proose existing,
f the proposmulti-use 3G orts club.
mited to 5-a-ch would usprovision is reason and gof identified
ure centre is2.4, for the red more aprable site thonably requ
ment, the proacter and unfor the purpminimum sired minimum
leisure centant given theht from DHd highway m
of the facilityg to have a
h in itself can
Page 13
parts of thes should notmultiple use,
the realistic
practical orsting facilityoposed new, but to also
sed externalfacilities areIn this case-side use forsually allowless likely togiven that it
d supply ands consideredpurposes ofpropriate toat meets all
uire careful
ovision of annreasonably
poses of thisite area andm site areas.
tre must bee referencesA Transport
matters.
y as the key reasonablen also assist
e t ,
c
r y
w o
l e e r
w o t
d d f
o l l
n y s d
e s t
y e t
Dover DisDover Lei
June 201Ref: MB/1
4.2.11
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
strict Council isure Centre
6 11443
These factassessmenand edge this report
Site Ident
Having estprovision acentre for
In this regain order toand ensurApril and M
Firstly, a reDover LeipartnershiDover Distthe improinvolved athe requirWhilst thefurther com
Secondly, undertakeand/or witWhere thisany relevasearch facAvailabilityresidentialavailability
Thirdly, thdesignatioidentified
Fourthly, currently bdevelopmdetailed in
Fifthly, theeither beinlistings seredevelopdevelopm
ors have bent of the siteof centre sit
t’s wider rem
ification
tablished thand scale, it detailed ass
ard, site ideno compreheing that no
May 2016.
eview of theisure Centrep with GT Atrict Council
ovement ana detailed evements of a
e original feamprehensive
a desk-basen to identif
th plannings was lackin
ant past pecility on they Assessmenl developmy of sites.
he Proposalsons that maas a potentia
local listingbeing markent potentia
nformation o
e Dover urbang actively
earch, or whment eitherent of the na
en taken inte is set out oes, followed
mit.
e parameteris necessaryessment.
ntification haensively sear
potential si
e sites identie’, DecembArchitects, F in July 201d replacemvaluation ofa sequentialasibility wore independe
ed search ufy all sites a
g permissionng, the planrmissions, w
e Council’s nt (SHLAA) w
ment opport
s Map was ay offer poal use in the
s form landeted, eitheral. Agents won sites.
an area was vmarketed ohich in the by virtue of
ature propo
to consideraon the followd by further a
rs for the sity to identify
as been undrch the relevtes go unas
fied within tber 2015 wFaithful+Gou5 to comple
ment of the f some potel test (albeitk was extenent site searc
using the loallocated forn for a leisuning depart
which was nonline data
was also exatunities, it
examined otential for e policy.
d and other specifically
would be con
visited and eon the groun
opinion off being presesed.
tion in asseswing pages aassessment
te requiremeindividual s
dertaken in avant areas f
ssessed. This
the ‘Feasibilwas undertauld and Hadete a feasibi
existing Dential alternat not all we
nsive, the stuch to be con
ocal authorr developm
ure use/ leisutment was cnecessary gabase. The mined. Whioffers a u
to identify leisure dev
r agents wey for leisurentacted direc
explored on nd which mf DHA Planently vacant
ssing potentand broken of non-cent
ents, and theites in the to
methodicalfor sites thats work was p
ity and Optiken. The S
dron Consultlity and optover Leisur
ative sites inre town cenudy providednducted.
ity online pent within ture centre ocontacted byiven the abCouncil’s S
ilst this consseful indica
any sites wvelopments,
ere revieweuse or gen
ctly where r
foot and bymay have be
ning, may t or being ph
tial sites. Thedown into t
tre urban site
e degree of own centre a
l, multi-metht should beprimarily un
ions AppraisSports Consting, was apions apprais
re Centre. Tn broad aligntre or edged the found
planning dathe Develop
or similar dey telephone
bsence of a Strategic Hosiders sites ination of th
with site-speeven if no
ed to identinerally and required to o
y car to identeen missed d
have the physically wel
Page 14
e sequentialtown centrees as part of
flexibility inand edge of
hod manner considered
ndertaken in
sal Study forsultancy, inppointed bysal study forThe processnment with
e of centre).dations for a
atabase waspment Plan,evelopment.e to identify
map-basedousing Landn relation toe potential
ecific policyot explicitly
fy the sitesunspecified
obtain more
tify any sitesduring local
potential forll suited to a
l e f
n f
r d n
r n y r s h .
a
s , .
y d d o l
y y
s d e
s l r a
Dover DisDover Lei
June 201Ref: MB/1
4.3.8
4.4
4.4.1
4.4.2
strict Council isure Centre
6 11443
The area boundary photograpHere, the dGoogle Ea300 metreof centre’.
Site Asses
Each site iassessed in
In this rega
of search wfor the cen
ph in order tdistance frorth measuri
es in accorda
ssment
identified inndividually i
ard, each site
was definedntre. This bto accuratelym the centrng tool to eance with th
n accordancen accordanc
e was assess
using the boundary wy define there could be
establish thehe National
Figure 4.1:
e with the mce with the N
sed on the b
Proposals Mwas also plo
‘edge of cemeasured a
e geographicPlanning Pra
Dover Town Cen
methodologNational Plan
basis of its su
Map, which tted on Gontre’ zone fond calculate
cal extent ofactice Guida
ntre (edged red)
gy set out atnning Practic
itability, ava
plots the toogle Earth or the idented using thef ‘edge of ceance definiti
– Image courtes
t 4.3 was suce Guidance
ailability and
Page 15
town centrebase aerial
tified centre.e integratedentre’, beingion of ‘edge
y of Google Earth
ubsequentlye.
d viability.
e l .
d g e
h
y
Dover DisDover Lei
June 201Ref: MB/1
4.4.3
4.4.4
4.4.5
4.4.6
4.4.7
4.4.8
4.4.9
strict Council isure Centre
6 11443
Suitability
Each site ipotential trequirememay makebeen madis suitable
In determnecessary history reswhy, and ato any plaspecialist a
In making Guidance, linkages, athere are sinterest of
Availabilit
Where a sienquiries upon the fcertain uslikelihood no such inthat site aidentified availability
It is also imon a freehprospect o
Viability
Viability ofactors (inc(including consideratdetailed fiwhere a sibecomes n
The followabove, gro
y
identified vito accommo
ents in termse a site thate on whethefor a leisure
ining suitabconsents fo
search of eaca review of a
anning appliadvice on hig
a qualitativit is also ne
and the waysubjective juf robustness,
ty
ite is being amade do nofacts. For ex
se but no othat the site
ndication avssembly andas both su
y are made, g
mportant to hold or leasof the site be
f a site, as tcluding pote
any excetions, site ownancial andte is deeme
necessary.
wing sectionsouped into
a the meanodate the prs of scale, ac was otherwer the site is centre of th
bility, it is aor the propoch site to deany relevantication. Thisghway relate
e judgemenecessary to in which th
udgments in, to log all su
actively marot yield a d
xample, if a soperator hase owners woailable and d therefore uitable andgiven that th
consider thsehold basisecoming ava
the Nationaential altern
eptional sitewnership iss
market assed both suita
s considers ttown centre
s outlined aroposed devccessibility awise suitables suitable forhe type and s
also necessaosed develoetermine wht planning p
s is thereforeed matters w
nt on suitabiconsider th
he scheme wnvolved in souch commen
keted, its avdefinitive ansite has bees been nam
ould be opena site is cleaavailability a viable, fur
his then bec
he nature of s, and also
ailable in the
al Planning ative uses, ae or plann
sues, s106 reessment on able and ava
those sites ide sites (the
above has bvelopment, hand locatione unsuitabler the proposscale propos
ary to considopment. Thishat has prevpolicy or dese a professiowhere appro
lity, and as she nature ofwill operate aome aspectsnts in the ass
vailability is cswer, an ed
en subject tomed or devn to redevelarly in multiare likely to rther more omes the de
any availabif deemed
e near future
Practice Guiadjacent usening costs)equirements
a site basisailable, and w
dentified folmost seque
een visited having reganal context (e). Based onsed leisure used.
der the pros process is iously been
signations wonal plannin
opriate.
set out withf the schemas an integras of suitabilisessment ma
clear. Whereducated judgo recent planelopment copment. Cople ownershprove probconcrete e
ecisive factor
bility and whunavailable.
idance confes, level of d, and deli
s etc). These and are the
where this le
lowing the mentially prefe
in order to ard to the id(e.g. neighb
n this, a judguse, and if so
ospects of s informed vgranted or
which would ng judgeme
hin the Natioe, the attracal part of thty, it is neceatrix.
e this is not tgement is mnning appliccommencednversely, whhips, it can
blematic. Whenquiries tor in the asse
hether a sitee, whether t
firms, rests wemand etc) ivery factor by their naerefore onlyevel of asses
methodologferable), edg
Page 16
consider itsentified site
bouring usesgement has
o, whether it
ecuring thevia planningrefused andbe material
ent. Further
onal Practicectiveness ofe centre. As
essary in the
the case andmade basedcations for a, there is a
here there isbe deduced
here a site iso determine
ssment.
e is availablethere is any
with marketcost factors
rs (phasingture require
y consideredssment thus
gy describedge of centre
s e s s t
e g d l r
e f s e
d d a a s d s e
e y
t s g e d s
d e
Dover DisDover Lei
June 201Ref: MB/1
strict Council isure Centre
6 11443
sites (nextthe other but instead
t most prefeurban sites cd a wider ass
rable sequeconsidered dsessment th
entially) and do not strict
hat reflects th
other urbantly form parthe policy con
n sites. It is t of the sequntext which
important tuential test applies in th
Page 17
to note thatassessment,his case.
t ,
Dover DisDover Lei
June 201Ref: MB/1
5
5.1
5.1.1
5.1.2
5.1.3
strict Council isure Centre
6 11443
Site A
St James
This is an policy alloleisure andLand AllocFigure 5.1,
The large planning pconstructioprovision offer (sour
Therefore and requiconsidered
ssessm
identified decates the sitd tourism ucations Loca, includes th
majority ofpermission fon. As partof a leisure
rce: www.stja
although thres no furthd separately
ment – T
evelopmentte for a mixeuses. This aal Plan (2015e existing le
f the site (i.efor a mixed t of this app
centre, withamesdover.c
he wider alloher assessmbelow as an
Town Ce
t site in the ed use schemallocation is 5 – page 46)eisure centre
e. excludingretail and le
proved and h the majorco.uk).
ocated site isment or conn edge of ce
F
entre
Local Plan ume including
reinforced a). The exten site.
g the existineisure-led deimplementeity of altern
s suitable in nsideration.ntre site.
Figure 5.1: Propo
under Savedg B1 employand reiteratnt of the allo
ng leisure ceevelopment
ed scheme, tative space
size and locThe existing
osals Map Extract
d Policy AS9yment, retailted within tocated site a
entre site) ht and is currthere is no on site take
cation, it is ng leisure ce
t – Policy AS9, St
Page 18
. The saved, residential,he adoptedas shown at
has securedrently underinclusion oren or under
not availableentre site is
James Allocation
d ,
d t
d r r r
e s
n
Dover DisDover Lei
June 201Ref: MB/1
5.2
5.2.1
strict Council isure Centre
6 11443
Dover Wa
This site is a mixed uscafés and leisure (D2 and hotel principle a
aterfront (So
an identifiese scheme inc
drinking estauses up to 15(C1) uses”.
accommoda
Figure
Figu
outh of A20
d developmcluding retailablishments 5,000 squareGiven this ate leisure us
e 5.2: St James d
ure 5.3: St James
0)
ment site in tl (A1 uses up(A3 and A4
e metres), resiallocation, ases in the fo
development Loc
s development L
he adopted p to 20,000 sq4 uses up to
idential (C3 ua mixed userm of a leisu
cation Plan – cou
ayout Plan – cou
Core Strategquare metres
7,000 squareuse of at lease developmeure centre. F
urtesy of www.stj
urtesy of www.stj
gy under Pos floorspace),e metres), as
st 300 homes)ent at the sFor the purp
Page 19
jamesdover.co.u
jamesdover.co.u
olicy CP8 “for restaurants,ssembly and), offices (B1)
site could inposes of this
k
k
r ,
d )
n s
Dover DisDover Lei
June 201Ref: MB/1
5.2.2
5.2.3
5.2.4
5.1
5.1.1
strict Council isure Centre
6 11443
site assessfrom the la
The site is any clearlythe car paawkward idependenmaking depolicy referepresent
Other avaiadvertisedlargely refmasterplan
The Port odevelopmsuitable op
Dover Wa
This land, Strategy Pwould in pwith Policy
sment, the Wand north of
by its naturey developabark to the noin its linear ct upon reloelivery with
ers to some pan additiona
ilable parts d on site off furbishmentn approach
of Dover havent plans bpportunity e
aterfront (No
as referred Policy CP8 (principle be y.
Waterfront af the A20 at B
e constrainele and contigorth west ofconfiguratio
ocation of thin a reasonpotential infal, and likely
of the site cCambridge opportunitand compre
ve been contut a respon
exists on site
orth of A20
to at 5.2 abo(part of Watable to suit
allocation soBench Stree
ed physicallyguous parcef the marina
on. Any devhe Marina, pable timescfilling of the
y not insignif
comprise smCrescent) fo
ties. It is alsehensive site
tacted (twicse still awai
e., notwithsta
Figure 5.4
0 – Land at B
ove, forms pterfront allo
tably accom
outh of the t (see below
y by the centels of land. La is still of invelopment oplanned as pcale almost doc to help
ficant, extrao
mall parcels aor the develoso noted th
e-wide propo
e) to enquirited. In anyanding the a
4: Proposals Map
Bench Stree
part of the iocation). Amodate leis
A20 has bew).
tral marina, wLarge spacesnsufficient s
of this part, ipart of the Wcertainly no
p facilitate deordinary cost
and are not opment soughat Policy CPosals.
re about avay event, it haallocation.
p Extract – Policy
t)
dentified des such, a mure uses and
een assessed
which does s which do esize (c.0.5 heit is assumedWestern Do
ot possible. evelopmentt of develop
suitable (sught, insteadP8 seeks a c
ailability andas been sho
CP8, Dover Wate
evelopment mixed-use de
d remain in
Page 20
d separately
not provideexist, such asectares) andd, would be
ocks Revival, Whilst the
t, this wouldpment.
uch as those comprisingcoordinated
d their widerown that no
erfront Allocation
site in Coreevelopmentaccordance
y
e s d e ,
e d
e g d
r o
n
e t e
Dover DisDover Lei
June 201Ref: MB/1
5.1.2
5.1.3
5.1.4
5.2
5.2.1
strict Council isure Centre
6 11443
The site liprominentoccupied ain size. It doesn’t wa
The site is south, whcomprehewhat mighThe policythe northebuilding toscale and objective.
Given the appears tounlikely thcriteria ofanticipatedbut basedsuitable.
Maison Di
This site foThis policyC3 uses (reA4 Drinkininstitutionparking toit is considcontext ofobjection, allocations
ies immediat frontage aand in active
is assumedarrant furthe
currently cohich it is asensive redevht otherwisey also states ern side of to the south,
mass requ
above, whio be sufficiehat a develof the allocad timescales on the info
ieu
orms part oy allocates thesidential ofng establishs), the rede
o serve the ddered reasof the existin
albeit the s where this
ately north and approace A1/A3/A4/d that the laer investigati
onstrained bssumed wouelopment, a
e be a physicthat “It may
the A20”, wwhich the p
uired to acc
ilst the overent in size, topment of tation policys for masterp
ormation ava
f the Dover he site for mf at least 100hments usevelopment evelopmentnable to ass
ng characterexclusion ouse is specif
of the A20ch into the t/A5 uses. Asand is in muion.
by the existiuld be repl
as sought bycal constrainy also be ap
with referencpolicy seeks.commodate
rall land allothe immediathe nature sy. Further plan developailable the s
Figure 5.5
Mid Town mixed use de0 homes), A
es (of up toof South Ket and the towsume that ar of public aof this use fied.
0 and includtown. The rsuch, the cu
ultiple owne
ng underpaaced by an
y the allocatnt to developpropriate toce to the im. It is consid
the leisure
ocated as paately availabsought and
informationpment woulite would n
5: Proposals Map
allocation seevelopment 1 shop uses,o 15,000 sqent College wn centre. Was a definedand civic usis notable
des vacant/dremainder ourrently avaierships, but
ss leading ton overgrounion policy. Tpment, but o include a fportant view
dered unlikee centre wo
art of Policyble land is n
required wn regardingd assist in fuot appear im
p Extract – Policy
et out in Coof C2 uses (, A3 restaura
quare metre(around 5,0
Whilst D2 leimain town
es, there woby contrast
derelict buiof site is preilable land islack of suit
o the Waternd link as pThis could hthe policy dforeground ws towards ly that a buiould satisfy
y CP8 northnot and it is
would satisfyg land ownurther assessmmediately
CP8, Dover Wate
ore Strategy(residential iants and caf
es), D1 (non000 square misure uses ar
n centre useould be no
t to other t
Page 21
ldings on aedominantlys insufficientability (size)
rfront to thepart of any
help removedoes refer to
building ona landmark
ilding of thethis policy
of the A20 considered
y the designnership andsing the site,available or
erfront Allocation
y Policy CP9.nstitutions),
fés uses andn-residentialmetres), andre not listed,, and in thein-principleown centre
a y t )
e y e o n k e y
0 d n d , r
n
. ,
d l
d ,
e e e
Dover DisDover Lei
June 201Ref: MB/1
5.2.2
5.2.3
5.2.4
5.2.5
strict Council isure Centre
6 11443
The policycomprehewithin it aonly parcethe surfacconsidered
As the aerHealth CeoccupancyPlan) in prpoorly servassumes re
The car pafeasibility, also not al
The NHS hsite is likelparking aNotwithstafuture, it wnot big enfurther ass
y preambleensive view oare proposedels deemed tce car park d prudent to
rial photograentre use. y and low qrinciple is coved relativeeprovision a
ark falls sligwhich showlow for 3G 5
have been coly to be ava
area). The Nanding this would need nough to desessment is n
e confirms of its future d for redeveto have a rea
outlined ino also consid
aph shows, tThe Counc
uality scorinonsidered lik
to retail flos part of any
ghtly under ws the site to5-a-side prov
ontacted regilable in the
NHS in resif any redevto include
eliver this, rnecessary.
that the sito be taken
elopment. Inasonable pon blue at Fder the adjoi
the site is pcil’s Parkingng and so sckely to exist.oorspace comy redevelopm
0.8Ha in sio be very covision as per
garding avaie near futureponse havevelopment ereprovision reprovide p
Figure 5.
te is define and that th
n reviewing ssibility of bigure 5.7 bning health
rimarily exisg Strategy (cope for red. It is thougmpared to cment..
ze. It was onstrained to
the current
lability in ane or not ande confirmedever were toof the clinicarking and
.6: Proposals Ma
ed in a brhis does not
the land wieing availabelow. In ccentre for co
sting car par(Draft 2007)
developmenth noted thaompeting c
considered o accommodproposals.
ny event (to d to understd that the o come forwcal facility. Tthe leisure
p Extract – Policy
road way toimply that a
ithin the alloble and suitaconsidering ompletenes
rk, partly des) shows ret (consisten
at Dover is scentres and t
as part of date Option
see if the Hetand availab
site is noward in the The site is se
centre and
y CP9, Dover Mid
Page 22
o enable aall buildingsocation, theble in size isthis, it wass.
signated forlatively lowt with Local
shown to bethe strategy
the original 4. It would
ealth Centrebility of theirot available.
foreseeableelf-evidently
as such no
d Town Allocation
a s e s s
r w
l e y
l d
e r .
e y o
n
Dover DisDover Lei
June 201Ref: MB/1
strict Council isure Centre
6 11443
Figure 5.7: Maaison Dieu Car Paark & Health Cent
tre (edged blue) – Image courtes
Page 23
y of Google Earthh
Dover DisDover Lei
June 201Ref: MB/1
6
6.1
6.1.1
6.1.2
6.1.3
strict Council isure Centre
6 11443
Site A
Dover Lei
The 2015 fwill it yieldongoing pthat period
Redevelopprovision such a scegiven the principal sterms throreasonable
Although shows), thnot allow p
ssessm
sure Centre
feasibility cod the qualityprovision, evd, which is d
pment is noof approxim
enario will nosite’s role
ettlement, tough the nee and highly
the Option e site is not provision of
ment – E
e
onsiders refuy of provisionen if it wereeemed dou
ot a suitablemately 18 moot be entertas the prinhat is consided to delive
y relevant co
4 footprint suitable du3G 5-a-side
Edge of
urbishment n sought. In
e possible tobtful.
e option asonths. Disc
tained in thencipal indoodered a reasoer sustainablonsideration
can just be ue to the nee
pitches as p
Figure 6
Centre
and concludn any event, o maintain so
s it would rcussions wite interests ofor leisure faonable posite developmin respect o
accommodaed for ongoi
per the curre
6.1: Proposals Ma
e
des this is neit is likely to
ome degree
require a leh the Councf local leisur
acility at thetion and one
ment. This is f suitability.
ated on siteing service pnt proposals
ap Extract – Polic
either cost-eo be highly d
of public ac
ngthy breacil have conre facility proe District’s e supporteds therefore c
e (as the 201provision. Its.
cy AS9, part of St
Page 24
effective nordisruptive toccess during
k in servicenfirmed thatovision, andlargest and in planning
considered a
5 feasibilityt would also
James Allocation
r o g
e t
d d g a
y o
n
Dover DisDover Lei
June 201Ref: MB/1
6.2
6.2.1
6.2.2
6.2.3
strict Council isure Centre
6 11443
Albany Ca
This is an LA4) and s15 dwellin
At 0.4ha, t
The site isdevelopm
ar Park
identified dso can reasogs).
he site is too
s also constrent.
evelopmentonably be co
o small and t
rained by he
Figure 6.2: Do
t site in the onsidered av
therefore no
eritage desi
over Leisure Cent
Local Plan vailable for d
ot suitable.
ignations an
tre (edged blue)
(Land Allocadevelopmen
nd topograp
– image courtes
ations Localt (albeit ide
phy relative
Page 25
y of Google Earth
Plan Policyntified for c.
to adjacent
h
y .
t
Dover DisDover Lei
June 201Ref: MB/1
strict Council isure Centre
6 11443
FFigure 6.3: Alban
F
ny Car Park Alloc
Figure 6.4: Propo
cation – extract fr
osals Map Extract
rom Land Allocat
t – Policy LA4, Al
tions Local Plan (
bany Car Park Ho
Page 26
(2015), Policy LA4
ousing Allocation
4
n
Dover DisDover Lei
June 201Ref: MB/1
6.3
6.3.1
6.3.2
6.3.3
strict Council isure Centre
6 11443
Former Ch
This is an LA3) and s15 dwellin
A previousnow being
At 0.68ha its linear cthe site is n
harlton Sort
identified dso can reasogs).
s planning ag actively ma
the site is toonfigurationnot suitable
ting Office
evelopmentonably be co
application farketed and
oo small to an given that and further
Figure 6.5 Prop
t site in the onsidered av
for residentiso is confirm
accommodathe leisure direct enqu
posals Map Extra
Local Plan vailable for d
al developmmed as availa
te the develcentre requires regardin
ct – Policy LA3, F
(Land Allocadevelopmen
ment was wiable.
opment, a pires a more sng availabilit
Former Charlton S
ations Localt (albeit ide
ithdrawn an
position exasquare formty are not ne
Sorting Office Ho
Page 27
Plan Policyntified for c.
d the site is
cerbated bym. Given this,
ecessary.
ousing Allocation
y .
s
y ,
n
Dover DisDover Lei
June 201Ref: MB/1
7
7.1
7.1.1
7.1.2
7.1.3
7.2
7.2.1
strict Council isure Centre
6 11443
Site A
The followpart of thmore sequincluded fPark site is
Buckland
The site isPlan Policy
Although it is a clear
The site owould notnot to be s
Westmou
The site is
ssessm
wing sites arhe sequentiauentially prefor completes also includ
Mill
s identified iy LA9 – 265 d
leisure dever larger scale
owners (HCAt be availablesuitable in lig
nt
of sufficient
ment - O
re neither toal test asseseferable thaeness. For
ded and asse
in the Localdwellings).
elopment doe developme
A) have beene for leisure ght of its pre
size and we
Other U
own centre ssment as ran the identease of com
essed.
Plan for re
oes not forment opportun
n contactedcentre deve
escriptive res
Figure 7.1: Pro
ell located in
rban Si
nor edge ofrequired by tified White
mparison, th
sidential de
part of this nity.
d and have velopment. Itsidential allo
oposals Map Extr
n relation to t
ites
f centre andpolicy (i.e.
e Cliffs Businhe proposed
velopment
developme
very firmly cis not there
ocation.
act – Policy LA9,
the train stat
d do not thein policy te
ness Park sid White Clif
(Land Alloca
nt sought by
confirmed tefore availab
Buckland Mill Ho
tion.
Page 28
refore formerms are noite), but areffs Business
ations Local
y the policy,
that the siteble and likely
ousing Allocation
m o e s
l
,
e y
n
Dover DisDover Lei
June 201Ref: MB/1
7.2.2
7.2.3
7.2.4
7.3
7.3.1
7.3.2
7.3.3
7.3.4
strict Council isure Centre
6 11443
The site hLand Allocapproxima
Residentia
The Churcnot therefo
Land East
Land here part of theAllocation
Of the landthe gas hoovercome
The plot ttherefore developm
Coombe Vnodes andany event,be considfurther.
as recently cations Locaately 100 dw
al planning p
chgate (deveore available
t End of Coo
is in varyinge wider Cooms Local Plan
d shown in older and th
and/or addi
to the immeslightly too ent.
Valley Road d the main ro, it was consered in mo
been cleareal Plan Polic
wellings.
permission w
eloper) webe and does n
ombe Valley
g industrial umbe Valley d
Policy LA8 f
Figure 7.3 bere are theritional costs
ediate east small to ac
represents aoad networksidered relevre detail in
ed and buildcy LA10 ide
was secured f
site confirmnot warrant a
Figure 7.2: Pro
y Road
use and so ndevelopmenfor an estima
below, the mrefore likely
to developm
of the gashccommodate
a secondaryk, limiting pvant for the
respect of
dings demoentifies the
for the site i
ms that the sany further a
oposals Map Extr
not readily ‘at area in the
ated 450 res
most obviousto be Health
ment as a res
holder mease the minim
y urban locarominence aCoombe Vahighway co
lished with site as a re
n Septembe
site is now bassessment.
ract – Policy LA10
available’. Ite Local Plan uidential dwe
sly developah & Safety Exsult.
sures appromum require
tion, separaand legibility
alley potentiaonsideration
groundworesidential al
er 2009.
being develo
0, Westmount Ho
t is though iunder the teellings.
able site lies xecutive (HS
oximately 0ed form and
ate from may for potental developm
ns to explor
Page 29
ks ongoing.location for
oped and is
ousing Allocation
identified aserms of Land
adjacent toSE) issues to
0.7ha and isd amount of
in transporttial users. In
ment sites tore this issue
. r
s
n
s d
o o
s f
t n o e
Dover DisDover Lei
June 201Ref: MB/1
7.3.5
7.3.6
7.3.7
7.3.8
7.3.9
7.3.10
7.4
7.4.1
strict Council isure Centre
6 11443
From the Ajunction tobridge. Bohave capac
Coombe Vhowever, t
Two bus stboth operaprovided o350m awa
It is anticipout of cenflexibility.
The sites gbe suitablewould not
This assessa ‘secondaas set out i
Former Bu
This site, ato be takethat the splace bet
A256 Londoo access theth of these rcity for any i
Valley Roadthose on foo
tops are proating betweon the A256y.
pated that thntre location
generally bee for the prot be suitable.
sment is conary’ locationin this repor
uckland Hos
also located oen to auctionite was withween them
n Road, vehe site. From restrictions oincrease in fl
d is provideot would nee
vided on Coeen Ayecliffe6 (60, 60A, 6
he site wouldn. However,
nefit from eoposed use .
nsidered to b which wou
rt.
Figure 7.3: Prop
spital Site
on Coombe n. It is undehdrawn from
m and the
hicles would here vehicl
on the netwlows as a res
ed with fooed to cross th
oombe Valleye and Whitfie61, 61A, 62, 8
d require a rgood bus a
existing accewith slight
be consistenuld not readi
posals Map Extrac
Valley Roaderstood howm the recenNHS to fu
turn onto Ces would goork may neesult of a leisu
otways so she road afte
y Road but teld (60 and 87, 88, 88A,
reasonable laccess from
ess onto Coomodification
nt with the vily meet the
ct – Policy LA8, C
d further to twever from snt auction tolly explore
oombe Valleo under a ned to be modure centre de
afe pedestrr walking un
these are on60A). A wid89, 89A, 91,
evel of parkLondon Roa
ombe Valley ns. Rear acce
view that Coe requiremen
oombe Valley Ro
the west, is vspeaking wito allow furt
any poten
ey Road via narrow signadelled to ideevelopment
rian access nder the railw
ly served byder range of , 93, 96, 541
king to reflecad may allo
y Road, whicess from Pro
oombe Vallents of the de
oad Housing Allo
vacant and wth the site oher discussitial healthc
Page 30
a signalisedalled railwayentify if theyt.
is possible,way bridge.
y two routes,services are, 991) some
ct its slightlyow for some
h is likely toospect Place
y comprisesevelopment
ocation (east end
was recentlyowners KCC,ions to takecare related
d y y
,
, e e
y e
o e
s t
d)
y ,
e d
Dover DisDover Lei
June 201Ref: MB/1
7.4.2
7.4.3
7.4.4
7.4.5
7.4.6
7.5
7.5.1
7.5.2
strict Council isure Centre
6 11443
developmpositively, availability
The vacanof develop
None of tdesignated
The existinacross Coo
The site is out at 7.3additional
Some potein terms ofof the currnot therefo
F
Land at W
This land afurther froconsideredprominenchighly mat
The land isfor constru
ents. It is it would b
y at the pres
t part of thepment requi
the existing d heritage va
ng Land Alloombe Valley
remote from3 above, but
bus services
ential ‘civic/cf character arent allocatiore consider
igure 7.4: Propo
Western End
also forms paom the towd above. Tce and addeterial planni
s a former inuction/decon
understoodbe put back
ent time.
e site is largered.
buildings aalue to cons
ocation Locarea) with n
m strategic rt without ths found ther
community’ and use, buton and at sered suitable,
osals Map Extract
of Coombe
art of the wiwn centre aThis is consed potential ng considera
dustrial devntamination
d that in thefor auction
e enough to
are understsider in the t
cal Plan refeno provision
routes, with he added bre.
synergy cou this would econdary lo, whilst avail
t – Policy LA8, Co
e Valley Roa
der Coombeand main usidered to bimplicationsation to any
velopment an costs.
e event thon. Given th
accommoda
ood to be erms set out
ers to residefor leisure re
the same hibenefit of p
uld be delivebe to the de
ocation awayability rema
oombe Valley Roa
ad
e Valley allocurban area be very mus in respect o
y developme
nd use mean
ose discussiois, there is
ate the mini
listed, but dt within the
ntial develoeferenced.
ghways asseroximity to
ered with theetriment of hy from mainins uncertai
ad Housing Alloc
cation (Policthan the
uch a seconof landscape
ent where th
ning there a
ons are notsome unce
imum amou
do provide NPPF.
opment here
essment appLondon Ro
e adjacent nhousing delin roads and
n.
cation (Former Bu
cy LA8) and iBuckland H
ndary locatioe impact on at applies.
are possible i
Page 31
t concludedrtainty over
nt and form
some non-
e (450 units
plying as setoad and the
new hospitalvery in viewroutes. It is
uckland Hospital
is sited evenHospital site
on with nothe AONB, a
implications
d r
m
-
s
t e
l w s
l)
n e o a
s
Dover DisDover Lei
June 201Ref: MB/1
7.5.3
7.6
7.6.1
7.6.2
strict Council isure Centre
6 11443
In highway7.4. For thconsiderednecessary.
TA Centre
This site is for approx
At 0.33 herequired.
y terms, thehe same bud suitable a
F
e, London Ro
an identifieximately 10 d
ectares the s
e site is evenut even moand accordi
Figure 7.5: Propo
oad
d developmdwellings.
ite is too sm
n more remre applicabngly enquir
osals Map Extrac
ment site in th
mall and not
ote from strle reasons ries regardin
t – Policy LA8, Co
he Land Allo
therefore su
rategic routeas outlined ng availabil
oombe Valley Ro
ocations Loca
uitable, with
es than noteat 7.4, the
ity are not
oad Housing Allo
al Plan unde
h no further
Page 32
ed above ate site is not
considered
cation (west end
er Policy LA7
assessment
t t
d
d)
7
t
Dover DisDover Lei
June 201Ref: MB/1
7.7
7.7.1
7.7.2
strict Council isure Centre
6 11443
Former M
This site isCouncil’s SHill). It is tthe SHLAAnot big en
The site octhis and th
Melbourne C
s known to hSHLAA) but therefore noA. The site iough (and in
ccupies a sehe above is n
Figure 7.6
ommunity
have previounot taken fot available as part allocan any event
condary locaneither suita
6: Proposals Map
Primary Sch
usly been avorward for aand has prevated for residfor resident
ation and acble nor avai
p Extract – Policy
hool
vailable (it wllocation an
viously beendential deveial developm
ccess onto tlable.
y LA7, TA Centre,
was promoted is now occdeemed un
elopment, bment and no
he highway
London Road Ho
ed by DHA tcupied by K
nsuitable forut that alloc
ot leisure use
network an
Page 33
ousing Allocation
through theKCC (Thistley
inclusion incation site ise).
nd in view of
n
e y n s
f
Dover DisDover Lei
June 201Ref: MB/1
7.8
strict Council isure Centre
6 11443
White Clif
Figure 7
ffs Business
Figu
7.7: Former Melb
Park, Whitf
ure 7.8: Land at W
bourne Commun
field – ‘Tria
White Cliffs Busin
nity Primary Scho
ngle Site’
ness Park, Whitfie
ool (edged blue)
eld (edged blue)
– Image courtes
– Image courtes
Page 34
y of Google Earth
y of Google Earth
h
h
Dover DisDover Lei
June 201Ref: MB/1
7.8.1
7.8.2
7.8.3
7.8.4
7.8.5
7.8.6
7.8.7
7.8.8
7.9
strict Council isure Centre
6 11443
This site faCliffs Busindevelopmalternative
Design feproposed work wouimplicationCouncil to
In highwaynot necess
The site is Canterburyunderstooimprove ac
Pedestriansite, howev
It is anticiplocation.
The site wdesigned t
The Councregarded a
Land Adja
alls within thness Park eent at this
e use would
asibility wodevelopmen
uld be requns of these) date have in
y terms, the sarily located
served by a y, Deal and
od that a Buccessibility.
n access wouver, new goo
pated that t
would requirto the curren
cil have heldas available.
acent to Dov
he urban aremployment site is broaneed addres
ork has shownt and it exc
uired on thesuch as draindicated tha
site is affordd in a highly
number of d Whitfield gus Rapid Tr
uld be limiteod quality lit
he site wou
e a new accnt standards
d constructiv
ver Christch
a as definedallocation
adly acceptssing in any
wn the siteceeds the me feasibilityinage and seat the site is
ded good vey sustainable
bus servicesgenerally at
ransport sys
ed to those t footways a
ld require h
cess on to Hs and be sub
ve discussio
hurch Acade
d on the Propat Whitfielded by policplanning ap
e to be larminimum 0.8y of developervices, althodevelopable
ehicle accesse location.
s (12, 60, 60At a minimustem is prop
living in theare provided
igh levels of
Honeywood bject to a Roa
ons with the
emy
posals Map, . In that re
cy, althoughpplication.
ge enough 8 hectare siepment specough assessme.
s to the A2 a
A, 61, 61A anm of one bposed withi
e small resid.
f parking to
Parkway, wad Safety Au
site owner
being part oespect, the h the alloca
to accommeving threshcifics (and tments instru
and A256, h
nd 89) providbus per houin the area,
dential area
reflect its o
which would udit.
and it can t
Page 35
of the Whiteprinciple of
ation for an
modate theold. Further
the viabilityucted by the
owever, it is
ding links tour. It is also, which will
close to the
out of centre
need to be
therefore be
e f
n
e r y e
s
o o l
e
e
e
e
Dover DisDover Lei
June 201Ref: MB/1
7.9.1
7.9.2
7.9.3
7.9.4
strict Council isure Centre
6 11443
This site unallocateexceptiona
In pure palthough c(and the vi
In accessibabove for accessibilitmore remo
The site is by the Couwere not c
Figure
sits entireled land. Thal justificatio
hysical termconsiderableiability impli
bility and higthe adjacen
ty from the ote and deta
not known uncil with thconclusive.
7.9: Land adjace
y outside here is no don would be
ms, the site e work wouications of th
ghway termnt White Clif
urban area ached from t
to be unavahe landowne
ent to Dover Chri
the settlemdirect policye required as
is of sufficld be requirhese) such a
s, broadly spffs Business to the soutthe existing
ailable and iter that would
stchurch Academ
ment boundy support fos part of the w
cient size tored on the f
as drainage a
peaking thePark site, a
th may be aroad netwo
t is understod support th
my (edged blue)
dary and isor such devwider plann
o accommodfeasibility ofand services.
same applielthough it isachievable, wrk and publi
ood that somhis position, a
– Image courtes
s therefore velopment a
ing case pre
date the def developme.
es to this sits noted thatwhilst the sic transport
me enquiriesalbeit those
Page 36
y of Google Earth
greenfield,and as suchesented.
evelopment,ent specifics
te as set outt pedestrianite is lightlynetwork.
s were made discussions
h
, h
, s
t n y
e s
Dover DisDover Lei
June 201Ref: MB/1
8
8.1
8.1.1
8.1.2
8.1.3
8.2
8.2.1
8.2.2
8.2.3
8.2.4
strict Council isure Centre
6 11443
Summ
Summary
Dover Distcomprisesdirected bcentre siteand applicCliffs Busin
This reportsuitability which hav2015.
The assesspotential sprocess inand when Call for Sitto the poinpresented planning a
Conclusio
Sequentia
No site locconsideredwhen allowfootball pi
No site lodefined toavailable, allowing fopitches.
Accordingout within
Wider Asse
Separate fconsidered
mary & C
y
trict Council a ‘Main To
by policy, a e is proposecable guidanness Park, W
t offers an inand availab
ve been info
sment has dsites. It is in the deliveryany new ev
tes) or new snt of plannin as part of a
authority’s d
ons
al Test
cated withind available, swing for somtches.
cated in anown centre)suitable an
or some disa
ly, it is cons and require
essment
from the seqd in the int
Conclus
l are pursuinown Centre Sequential
ed. This assence, given thhitfield as th
ndependentbility for theormed by th
drawn upon ntended to iy of a new l
vidence becosites identifieng applicatiany applicateterminatio
n the town csuitable andme disaggre
n edge of ce), has beend viable foaggregation
idered that ed by the NP
quential testerests of in
sions
ng plans forUse’ as de
Test Assessessment fulf
hat the Counhe preferred
t assessmene proposed horough and
a range of inform the Cleisure centromes availabed or suggeon submissiion that bot
on of the app
centre has bd viable for tegation of fa
entre location identified r the propo
n of facility in
the proposaPPF.
t, other poteforming the
a replacemefined withisment is reqfils that reqcil have idensite.
t of potentiadevelopme
d well-reaso
evidence aCouncil’s onre and shouble (such as ested. This oion, if pursuth informs t
plication.
been identifthe proposedacility in the
on, as definto date th
osed leisuren the form o
als at Whitfie
ential sites ie overall pla
ent to Doven the NPPF
quired in theuirement anntified an ou
al alternativeent, the minoned feasibi
nd methodsgoing reviewld be subjecthe results o
ongoing revied, to ensurhe proposal
ied to date d leisure cen
e form of the
ned by policat can reas centre dev
of the propos
eld satisfy th
in the wideranning bala
er Leisure ceF. Accordine event tha
nd follows tut of centre s
e sites havinnimum requlity work ca
s to identifyw and decisct to ongoinof the recentiew should cre a robust dls and inform
that can reantre develope proposed
cy (within 3sonably be velopment, sed 3G 5-a-s
he sequentia
r urban areance and co
Page 37
entre, whichngly, and asat an out ofhe availablesite at White
ng regard toirements of
arried out in
y and assesssion-makingng review ast Brownfieldcontinue updocument isms the local
asonably bepment, even
3G 5-a-side
300m of theconsideredeven when
side football
al test as set
a have beenonsideration,
h s f
e e
o f
n
s g s d p s l
e n e
e d n l
t
n ,
Dover DisDover Lei
June 201Ref: MB/1
8.2.5
8.2.6
8.2.7
strict Council isure Centre
6 11443
particularlybuilding isLeisure fac(Para 3.144
Other siteshowever tCouncil aconsistentsite owner
In locationWhitfield) does makemore strat
Therefore,Coombe VBusiness Parea. It wiplanning cto alternat
y in light of near the en
cilities could b4).
s suitable inthese are all s facility p
t with a leisurs as unavaila
nal terms, thare not cur
e direct fututegically adv
in the widValle Road) aPark is consiill be for anycase for the dtives and the
f the Land And of its usefbe located a
n size have ballocated fo
rovider is aure use, doesable.
he potentiarrently highlure provisionvantageous a
er planningand the greadered broady subsequendevelopmene existing sit
Allocations ful life, an op
at a different
been identifor housing. allocated fos still offer e
lly availablely accessiblen for improvand promine
g sense, owiater scope fdly preferabnt planning nt, includinge.
Local Plan spportunity esite, so long
fied at Buckl In contrast,
or employmemployment
e and suitabe by public ved bus servent location.
ing to the nfor public tra
ble to other application
g a thorough
stating that exists to creag as it equally
and Mill and, the current
ment, which. Buckland
ble sites (Cotransport, avices at Whi.
nature of itsansport acceidentified alto provide t
h assessment
“given that ate a landmay accessible
d Coombe Vtly favoured
h although Mill is confir
oombe Vallealthough theitfield and it
s allocation ess, land at lternatives ithe sufficient of accessib
Page 38
the existingark building.to residents”
Valley Road,d site by the
not strictlyrmed by the
y Road ande Local Plant provides a
(relative toWhite Cliffs
n the urbanntly detailedbility relative
g . ”
, e y e
d n a
o s n d e