double drop boulder cross vane - city of charlotte...the vane arm intercept location may be...

3
A' A 1/3 X6 1/3 X6 1/3 X6 X7 X9 HEADER BOULDER, TYPICAL (SEE NOTE 6) COARSE BACKFILL (SEE NOTE 8) FLOODPLAIN SILL, TYPICAL POOL FLOW STREAM BED X1 - CROSS VANE INVERT CONTROL POINT ELEVATION FOOTER BOULDER, TYPICAL (SEE NOTE 6) FILTER FABRIC, TYPICAL (SEE NOTE 7) STREAM BANK, TYPICAL X10 X11 TOE OF BANK, TYPICAL TOP OF BANK, TYPICAL (BANKFULL SEE NOTE 3) X2 - LEFT VANE ARM INTERCEPT CONTROL POINT ELEVATION (SEE NOTE 3) X3 - RIGHT VANE ARM INTERCEPT CONTROL POINT ELEVATION (SEE NOTE 3) X6 BANKFULL WIDTH POOL X4 - STEP INVERT CONTROL POINT ELEVATION X8 X5 - POOL CONTROL POINT ELEVATION X11 X14 X15 BANKFULL COARSE BACKFILL (SEE NOTE 8) HEADER BOULDER FOOTER BOULDER 0' TO 1/3 X6 TOE OF BANK 2x X16 FILTER FABRIC (SEE NOTE 7) STREAM BED - POOL VARIES STREAM BANK X15 X16 X19 COARSE BACKFILL FILTER FABRIC POOL FLOW X9 X1-CROSS VANE INVERT CONTROL POINT ELEVATION (SEE NOTE 2) TOP OF BANK, (BANKFULL SEE NOTE 3) X12 POOL X5-POOL CONTROL POINT ELEVATION (SEE NOTE 2) X2, X3-LEFT OR RIGHT VANE ARM INTERCEPT CONTROL POINT ELEVATION X4-STEP INVERT CONTROL POINT ELEVATION VARIES 0'-X13 X18 (SEE NOTE 10E) X14 X16 FLOW DOUBLE DROP BOULDER CROSS VANE NOT TO SCALE REV. # REV. DATE DRAFT - NOT TO BE USED FOR CONSTRUCTION 1 OF 3 SHEET NUMBER PLAN VIEW SECTION A - A' PROFILE VIEW THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE. THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH.

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOUBLE DROP BOULDER CROSS VANE - City of Charlotte...the vane arm intercept location may be otherwise described by its relationship to bankfull stage or by the length and slope of

A'

A

1/3 X6 1/3 X6 1/3 X6

X7

X9

HEADER BOULDER,TYPICAL (SEE NOTE 6)

COARSEBACKFILL

(SEE NOTE 8)

FLOODPLAINSILL, TYPICAL

POOL

FLOW

STREAM BED

X1 - CROSS VANE INVERT CONTROL POINT ELEVATION

FOOTER BOULDER,TYPICAL (SEE NOTE 6)

FILTER FABRIC,TYPICAL (SEE NOTE 7)

STREAM BANK,TYPICAL

X10

X11

TOE OF BANK,TYPICAL

TOP OF BANK, TYPICAL(BANKFULL SEE NOTE 3)

X2 - LEFT VANE ARM INTERCEPT CONTROL POINT ELEVATION (SEE NOTE 3)

X3 - RIGHT VANE ARM INTERCEPT CONTROL POINT

ELEVATION (SEE NOTE 3)

X6

BANKFULL WIDTH

POOL

X4 - STEP INVERT CONTROL POINT ELEVATION

X8

X5 - POOL CONTROLPOINT ELEVATION

X11

X14 X15

BANKFULL COARSE BACKFILL (SEE NOTE 8)

HEADER BOULDER

FOOTER BOULDER0' TO 1/3 X6TOE OF BANK

2x X16

FILTER FABRIC (SEE NOTE 7)

STREAM BED - POOL

VARIES

STREAM BANK

X15

X16

X19

COARSEBACKFILL

FILTERFABRIC

POOL

FLOW

X9

X1-CROSS VANE INVERTCONTROL POINT ELEVATION

(SEE NOTE 2)TOP OF BANK, (BANKFULL SEE NOTE 3)

X12

POOL

X5-POOL CONTROLPOINT ELEVATION(SEE NOTE 2)

X2, X3-LEFT OR RIGHTVANE ARM INTERCEPTCONTROL POINTELEVATION

X4-STEP INVERT CONTROLPOINT ELEVATION

VAR

IES

0'-X

13X1

8

(SEE NOTE 10E)

X14

X16FLOW

DOUBLE DROP BOULDER CROSS VANE

NOT TO SCALE

REV. #REV. DATE

DRAFT - NOT TO BE USED FOR CONSTRUCTION

1 OF 3SHEET NUMBER

PLAN VIEW SECTION A - A'

PROFILE VIEW

THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE.THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH.

Page 2: DOUBLE DROP BOULDER CROSS VANE - City of Charlotte...the vane arm intercept location may be otherwise described by its relationship to bankfull stage or by the length and slope of

NOT TO SCALE

REV. #REV. DATE

2 OF 3SHEET NUMBER

DOUBLE DROP BOULDER CROSS VANEDRAFT - NOT TO BE USED FOR CONSTRUCTION

PHOTO: DOUBLE DROP BOULDER CROSS VANE

THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE.THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH.

DIMENSIONS (VALUES TO BE PROVIDED BY DESIGNER)

VARIABLE VALUES TYPICAL UNIT DESCRIPTION

X1 FT. (NAVD) CROSS VANE INVERT CONTROL POINT ELEVATION

X2 FT. (NAVD) LEFT VANE ARM INTERCEPT CONTROL POINT ELEVATION

X3 FT. (NAVD) RIGHT VANE ARM INTERCEPT CONTROL POINT ELEVATION

X4 FT. (NAVD) STEP INVERT CONTROL POINT ELEVATION

X5 FT. (NAVD) POOL CONTROL POINT ELEVATION

X6 FT. BANKFULL WIDTH

X7 FT. LENGTH OF FLOODPLAIN SILL

X8 FT. LENGTH BETWEEN CROSS VANE INVERT AND STEP

X9 FT. LENGTH OF COARSE BACKFILL

X10 FT. VANE ARM LENGTH

X11 DEGREES VANE ARM ANGLE WITH STREAM BANK

X12 PERCENT VANE ARM SLOPE

X13 FT. OR IN.DIFFERENCE BETWEEN TOP OF BANK (BANKFULL) AND VANE ARMINTERCEPT POINT

X14 FT. OR IN. BOULDER LENGTH

X15 FT. OR IN. BOULDER WIDTH

X16 FT. OR IN. BOULDER THICKNESS

X17 IN. D50 OF COARSE BACKFILL

X18 FT.MAXIMUM POOL DEPTH FROM VAN ARM INTERCEPT CONTROLPOINT ELEVATION

X19 IN. HEADER BOULDER SETBACK

Page 3: DOUBLE DROP BOULDER CROSS VANE - City of Charlotte...the vane arm intercept location may be otherwise described by its relationship to bankfull stage or by the length and slope of

NOT TO SCALE

REV. #REV. DATE

3 OF 3SHEET NUMBER

DOUBLE DROP BOULDER CROSS VANEDRAFT - NOT TO BE USED FOR CONSTRUCTION

NOTES:

1. A DOUBLE DROP BOULDER CROSS VANE IS A GRADE CONTROL, IN-STREAM STRUCTURE THAT DIRECTS STREAM FLOW AWAY FROM THE STREAM BANKS AND IN TOWARD THE CENTER OF THECHANNEL. IT IS SIMILAR TO A BOULDER CROSS VANE WITH AN ADDITIONAL DROP (OR “STEP”). THE “STEP” EFFECTS A GRADE CHANGE OVER MULTIPLE DROPS TO MINIMIZE THE HEIGHT OF ANYSINGLE DROP TO PREVENT BARRIERS TO FISH PASSAGE.

2. ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE UPSTREAM INVERT (CENTER) OF THE CROSS VANE AND AT THE STEP TO ESTABLISH PART OF THE PROFILE. POOL ELEVATIONCONTROL POINTS OR EXCAVATION TO A SPECIFIED MAXIMUM POOL DEPTH SHALL BE DESIGNATED TO ESTABLISH THE REMAINING PROFILE. SURVEY OF CONTROL POINTS SHALL BE REQUIRED TOESTABLISH ACCURATE INSTALLATION WITHIN THE TOLERANCE SPECIFIED BY THE DESIGNER.

3. THE VANE ARM SHALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN ½ BANKFULL STAGE AND BANKFULL STAGE. ELEVATION CONTROL POINTS MAY BE ESTABLISHED AT THELEFT AND RIGHT STREAM BANK/VANE ARM INTERCEPT POINTS. THE VANE ARM INTERCEPT LOCATION MAY BE OTHERWISE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THELENGTH AND SLOPE OF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE.

4. IF PLANS DESIGNATE THE USE OF MULTIPLE DOUBLE DROP BOULDER CROSS VANES, A TABLE OF ALL STATION LOCATIONS AND CONTROL POINT ELEVATIONS SHALL BE PROVIDED IN THIS DETAILOR PROVIDED ELSEWHERE IN THE PLANS AND REFERENCED HEREIN.

5. TYPICAL RIFFLE AND POOL CROSS SECTIONS SHALL BE PROVIDED ELSEWHERE IN THE PLANS TO ESTABLISH THE DIMENSIONS OF THE CHANNEL GRADING INTO WHICH THE DOUBLE DROPBOULDER CROSS VANES ARE TO BE INSTALLED.

6. THE DOUBLE DROP BOULDER CROSS VANE SHALL BE CONSTRUCTED WITH FLAT-SIDED BOULDERS OF A SIZE (LENGTH, WIDTH, AND DEPTH) AS SPECIFIED BY THE DESIGNER.

7. FILTER FABRIC OF A TYPE AND SIZE SPECIFIED BY THE DESIGNER SHALL BE USED TO SEAL THE GAPS BETWEEN THE BOULDERS AND UNDER THE COARSE BACKFILL MATERIAL.THERE SHALL BENO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED.

8. COARSE BACKFILL OF THE DOUBLE DROP BOULDER CROSS VANE SHALL BE OF A TYPE, SIZE, AND GRADATION AS SPECIFIED BY THE DESIGNER. COARSE BACKFILL SHALL BE PLACED TO ATHICKNESS EQUAL TO THE DEPTH OF THE HEADER AND FOOTER BOULDERS AND SHALL EXTEND OUT FROM THE VANE ARMS TO THE STREAM BANK AND UPSTREAM A DISTANCE SPECIFIED BY THEDESIGNER.

9. THE INVERT (CENTER) OF THE DOUBLE DROP BOULDER CROSS VANE SHALL BE CONSTRUCTED FIRST, FOLLOWED BY ONE VANE ARM, THE OTHER VANE ARM, AND THEN THE STEP. THEFLOODPLAIN SILLS SHALL BE CONSTRUCTED LAST

10. DOUBLE DROP BOULDER CROSS VANES SHALL BE BUILT TYPICALLY AS FOLLOWS:

A. OVER-EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER AND FOOTER BOULDERS

B. PLACE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS.

C. INSTALL FILTER FABRIC.

D. PLACE COURSE BACKFILL BEHIND THE FOOTER BOULDERS.

E. INSTALL HEADER BOULDERS ON TOP OF AND SET SLIGHTLY BACK FROM THE FOOTER BOULDERS (SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE COARSE BACKFILL).HEADER BOULDERS SHALL SPAN THE SEAMS OF THE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THEVANE ARM WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE.

F. PLACE COARSE BACKFILL BEHIND HEADER BOULDERS ENSURING THAT ANY VOIDS BETWEEN THE BOULDERS ARE FILLED.

11. IF ANY EROSION CONTROL MATTING IS SPECIFIED FOR USE IN THE VICINITY OF THE VANE ARM INTERCEPT POINTS AND FLOODPLAIN SILLS ALL MATTING EDGES SHALL BE NEATLY SECUREDAROUND THE BOULDERS.

THIS FIGURE IS ONLY MEANT TO DEFINE THE MINIMUM INFORMATION REQUIRED BY THE CITY OF CHARLOTTE TO BE INCLUDED IN A DETAIL FOR THIS TYPE OF TECHNIQUE.THIS FIGURE IS NOT MEANT TO REPRESENT A STANDARD DESIGN METHOD FOR THIS TYPE OF TECHNIQUE AND SHALL NOT BE USED AS SUCH.