P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected] Web: www.hollandandassociates.net DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE OPTION 3 (CUPRUM) FOR THE KRONOS PHOTOVOLTAlC DEVELOPMENT NEAR COPPERTON WITHIN THE SIYATHEMBA LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE DEA Reference: 14/12/16/3/3/1/1344 14/12/16/3/3/1/1344 (Amendment 1) Independent Audit as required in terms of Regulation54A(3) of the National Environmental Management Act (NEMA) Environmental Impact Assessment (EIA) Regulations (2014), as amended DECEMBER 2019 Compiled for: Mr Corné van der Westhuizen Juwi Renewable Energies (Pty) Ltd 20 th Floor, The Halyard 4 Christiaan Barnard Street, Foreshore Cape Town 8001 [email protected] Compiled by: Holland & Associates Environmental Consultants P O Box 31108 Tokai, 7966 M 072 601 0803 E [email protected] Impact Assessments - Environmental Management Programs - Compliance Monitoring - Process Review

Upload: others

Post on 18-Feb-2022

5 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE

OPTION 3 (CUPRUM) FOR THE KRONOS PHOTOVOLTAlC

DEVELOPMENT NEAR COPPERTON WITHIN THE

SIYATHEMBA LOCAL MUNICIPALITY, NORTHERN CAPE

PROVINCE

DEA Reference: 14/12/16/3/3/1/1344

14/12/16/3/3/1/1344 (Amendment 1)

Independent Audit as required in terms of Regulation54A(3) of the

National Environmental Management Act (NEMA) Environmental

Impact Assessment (EIA) Regulations (2014), as amended

DECEMBER 2019

Compiled for:

Mr Corné van der Westhuizen

Juwi Renewable Energies (Pty) Ltd

20th Floor, The Halyard

4 Christiaan Barnard Street, Foreshore

Cape Town

8001

[email protected]

Compiled by:

Holland & Associates Environmental Consultants

P O Box 31108

Tokai, 7966

M 072 601 0803

E [email protected]

Impact Assessments - Environmental Management Programs - Compliance Monitoring - Process Review

Page 2: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Contents 1. Introduction ....................................................................................................................... 1

2. Audit Requirement ............................................................................................................ 1

3. Audit Methodology ........................................................................................................... 4

4. Assumptions and Limitations .......................................................................................... 4

5. Details and Expertise of the Authors ............................................................................... 4

6. Audit Inspection Checklist ............................................................................................... 6

7. Conclusions and Recommendations .............................................................................16

ANNEXURES ...........................................................................................................................16

Page 3: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

1. Introduction

In 2016, Juwi Renewable Energies (Pty) Ltd applied for environmental authorisation in terms of

the National Environmental Management Act (No. 107 of 1998) Environmental Impact

Assessment (EIA) Regulations (2010) for construction and operation of the 132kV Overhead

Transmission Line Option 3 (Cuprum) for the Kronos Photovoltaic Development on Nelspoortje

Farm 103 Portion 6, Humansrus Farm 147 Portion 0 and Vogelstruisbult Farm 104 Portion 1 near

Copperton within the Siyathemba Local Municipality in the Northern Cape Province. The project

involves the construction of approximately 12.8km double circuit 132 kV overhead transmission

lines inside a 200m wide assessed corridor between the proposed Kronos Solar Park central

substation and Eskom's Cuprum Substation, and includes the following components:

• self-supporting or suspension pylons (≤60 pylons at 250m intervals) to support each

132 kV line; and

• access and maintenance tracks (gravel) along the transmission line route.

The Department of Environmental Affairs (DEA) issued an Environmental Authorisation (EA) in

terms of the 2010 EIA Regulations for the project on 9 May 2016 to juwi Renewable Energies

(Pty) Ltd.

The Environmental Management Programme (EMPr) submitted with the application for

environmental authorisation for the project was not approved by DEA in the EA dated 9 May 2016,

and the amended EMPr has not yet been submitted to DEA for approval (in terms of Condition 14

of the EA). Furthermore, the authorised activities have not commenced to date.

An amendment to this EA was issued on 4 July 2016 for the correction of a typographical error

within the project description.

Holland and Associates Environmental Consultants have been appointed by Juwi Renewable

Energies (Pty) Ltd to conduct an independent environmental audit of the above in terms of

Regulation 54A(3) of the NEMA EIA Regulations, 2014 (as amended).

2. Audit Requirement

The primary audit requirement arises as a result of an obligation imposed in terms of the NEMA

EIA Regulations, 2014, as amended. In particular, Regulation 54A(3) of the aforementioned

Regulations states:

“Where an environmental authorisation issued in terms of the ECA regulations or the previous

NEMA regulations is still in effect by 8 December 2014, the EMPr associated with such

environmental authorisation is subject to the requirements contained in Part 3 of Chapter 5 of

these Regulations and the first environmental audit report must be submitted to the competent

authority no later than 7 December 2019 and at least every 5 years thereafter for the period during

which such environmental authorisation is still in effect.”

Part 3 of Chapter 5, Section 34 states:

Page 4: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

“(1) The holder of an environmental authorisation must, for the period during which the

environmental authorisation and EMPr [Environmental Management Programme], and where

applicable the closure plan, remain valid—

(a) ensure that the compliance with the conditions of the environmental authorisation and the

EMPr, and where applicable the closure plan, is audited; and

(b) submit an environmental audit report to the relevant competent authority.”

In addition, the EIA Regulations (2014), as amended, require that the environmental audit report

must be prepared by an independent person with the relevant environmental auditing expertise;

and comply with Appendix 7 of the EIA Regulations (GN No. R.982, as amended), which sets out

the content requirements for environmental audit reports.

In other words, all holders of Records of Decision or Environmental Authorisations (for Records

of Decision and/or Environmental Authorisations issued in terms of the previous NEMA EIA

Regulations) are required to conduct regular independent environmental audits on the conditions

of authorisation of the Environmental Authorisation and EMPr, and the content of the audit reports

must meet the requirements of Appendix 7 of Regulations (GN No. R.982, as amended), The first

audit report must be submitted to the competent authority before the 7th December 2019.

Table 1: Compliance of this Environmental Audit report with Appendix 7 of the EIA Regulations,

2014, as amended.

Section Contents Section Audit

Report

1 The environmental audit report must provide for recommendations regarding the need to amend the EMPr, and where applicable, the closure plan.

Section 7 (N/A as yet since the project does not have an approved EMPr as yet).

2 (a)(i) The objective of the environmental audit report is to-

report on-

the level of compliance with the conditions of the environmental authorisation and the EMPr, and where applicable, the closure plan; and

Section 6

2 (a)(ii) The extent to which the avoidance, management and mitigation measures provided for in the EMPr, and where applicable, the closure plan achieve the objectives and outcomes of the EMPr, and closure plan;

Section 6

2 (b) Identify and assess any new impacts and risks as a result of undertaking the activity;

N/A, since no commencement has occurred as yet.

2 (c) Evaluate the effectiveness of the EMPr, and where applicable, the closure plan;

Section 7

Page 5: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

2 (d) Identify shortcomings in the EMPr, and where applicable, the closure plan; and

Section 7

2 (e) Identify the need for any changes to the avoidance, management and mitigation measures provided for in the EMPr, and where applicable the closure plan.

Section 7

3 (1)(a) An environmental audit report prepared in terms of these Regulations must contain-

details of the -

(i) independent person who prepared the environmental audit report; and

(ii) expertise of the independent person that compiled the environmental audit report;

Cover page, Section 5 and Annexure 5

3 (1)(b) A declaration that the independent auditor is independent in a form as may be specified by the competent authority;

Annexure 6

3 (1(c) An indication of the scope of, and purpose for which the environmental audit report was prepared;

Section 2

3 (1)(d) A description of the methodology adopted in preparing the environmental audit report;

Section 3

3 (1)(e)(i) An indication of the ability of the EMPr, and where applicable, the closure plan to -

sufficiently provide for the avoidance, management and mitigation of environmental impacts associated with the undertaking of the activity on an on-going basis;

Section 7

3 (1)(e)(ii) Sufficiently provide for the avoidance, management and mitigation of environmental impacts associated with the closure of the facility; and

N/A

3 (1)(e)(iii) Ensure compliance with the provisions of environmental authorisation, EMPr and where applicable the closure plan;

Section 6

3 (1)(f) A description of any assumptions made, and any uncertainties or gaps of knowledge;

Section 4

3 (1)(g) A description of any consultation process that was undertaken during the course of carrying out the environmental audit report;

Section 3

3 (1)(h) A summary and copies of any comments that were received during any consultation process; and

N/A

3 (1)(i) Any other information requested by the competent authority. N/A

Page 6: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

3. Audit Methodology

The key tasks conducted for this independent audit included the following:

• Review of the statutory requirements for the Audit Process as set out in Section 34 and

Appendix 7 of the 2014 NEMA EIA Regulations (as amended);

• Review of all applicable reports, permits and authorisations, including the EA and EA

amendments;

• Compilation of an environmental audit checklist against which to measure compliance;

• Review all applicable documentary records of compliance as provided by the holder of the

EA;

• Compilation of an audit report which meets the objectives and content requirements

outlined in Appendix 7 of the 2014 NEMA EIA Regulations (as amended), including

reporting on compliance with the conditions of the EA and EMPr (if approved) and

identifies gaps in terms of alignment with conditions and provides recommendations to

address gaps or non- compliance.

4. Assumptions and Limitations

The assumption is made that the information received from the holder of the EA on which this audit

report is based (specialist and project information, as well as information about the holder of the

EA) is accurate and correct.

5. Details and Expertise of the Authors

Ross Holland

Qualifications: BSc Environmental and Geographical Science and Economics; BSc (Hons) Environmental and Geographical Science; MSc Environmental and Geographical Science; The Framework Program for Education & Training in Water. Certificates of competence held with distinction, in “Water Quality” and “Aquatic Ecology”

Experience in years: 16 years

Experience: Ross Holland is the founder of Holland & Associates Environmental Consultants. Ross is a founder member of the Environmental Assessment Practitioners of South Africa (EAPASA), a Green Star SA Accredited Professional, and is a member of the South African affiliate of the International Association for Impact Assessment (IAIAsa).

Ross has extensive environmental auditing and environmental assessment experience, and has been involved in over 120 environmental processes, including water supply dams, housing, resort, and commercial developments, renewable energy facilities, new roads and road upgrades, pipelines, a municipal waste site, and a shooting range. Ross has also undertaken the independent review of a number of Scoping and Environmental Impact Reports and NEMA S24G applications.

For the past 11 years Ross has been involved as a contributing lecturer to a number of academic courses in Environmental Management. In particular, Ross is a contributor to the UWC Geography Departments postgraduate (honors) module on Environmental Management and also contributes annually to the Environmental Management Module which is presented to postgraduate students enrolled in the Masters of City and Regional Planning Degree, at UCT.

Page 7: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Ross has also been involved in a wide spectrum of other environmental work including the undertaking of capacity building within the National Department of Environmental Affairs’ Marine and Coastal Management Directorate (now known as DEA Oceans and Coasts), the undertaking of environmental opportunity and constraints analysis, environmental due diligence investigations and risk analysis, as well as, drafting of numerous Environmental Management Plans/ Programs (EMPr) and Environmental Control Officer (ECO) work.

Kelli Ross

Qualifications: BSc Environmental Management (Zoology & Geography) and BSc (Hons) Marine Biology

Experience in years: 2 years

Experience: Kelli Ross is a member of the South African affiliate of the International Association for Impact Assessment (IAIAsa).

Kelli’s academic background has equipped her with valuable knowledge on environmental sustainability and management as well as the ability to understand ecological processes and apply these to environmental issues.

Kelli has assisted in the compilation of Basic Assessment Reports and Environmental Impact Assessments within the agricultural sector, Conservation of Agricultural Resources Act (CARA) application processes and the development of Environmental Management Plans/ Programmes (EMP). Kelli has also been involved with various amendment applications, for the amendment of environmental authorisations for renewable energy projects. For the past 2 years Kelli has also assisted in environmental due diligence investigations as well as Environmental Control Officer (ECO) work on agricultural and urban projects.

The Authors CV`s are included as Annexure 5.

Page 8: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

6. Audit Inspection Checklist

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

Conditions of Environmental Authorisation (EA) dated 9 May 2016 (DEA Ref.: 14/12/16/3/3/1/1344)

Scope of authorisation

1. The construction of a double circuit 132kV Transmission Line Option 3 (Cuprum) for the Kronos Photovoltaic Development near Copperton within the Siyathemba Local Municipality in the Northern Cape is approved as per the above geographic coordinates.

N/A as yet Duly noted by the holder of the EA. Construction of the facility has not commenced as yet.

2. Construction of this project may only commence, once the Kronos Photovoltaic Developments (14/12/16/3/3/2/1768; 14/12/16/3/3/2/1769 and 14/12/16/3/3/2/1770), has commenced with the construction phase.

YES Duly noted by the holder of the EA. Construction of the facility has not commenced as yet.

3. Authorisation of the activity is subject to the conditions contained in this authorisation, which form part of the environmental authorisation and are binding on the holder of the authorisation.

YES Duly noted by the holder of the EA. Construction of the facility has not commenced as yet.

4. The holder of the authorisation is responsible for ensuring compliance with the conditions contained in this environmental authorisation. This includes any person acting on the holder's behalf, including but not limited to, an agent, servant, contractor, sub-contractor, employee, consultant or person rendering a service to the holder of the authorisation.

YES The Holder of the EA has indicated that they are aware of their responsibilities in this regard.

Construction of the facility has not commenced as yet.

5. The activities authorised may only be carried out at the property as described above.

N/A as yet No commencement of the authorized activities has occurred as yet.

Page 9: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

6. Any changes to, or deviations from. the project description set out in this authorisation must be approved, in writing, by the Department before such changes or deviations may be effected. In assessing whether to grant such approval or not, the Department may request such information as it deems necessary to evaluate the significance and impacts of such changes or deviations and it may be necessary for the holder of the authorisation to apply for further authorisation in terms of the regulations.

YES Observation An amendment to the EA was issued on 4 July 2016 (14/12/16/3/3/1/1344) to correct a typographical error in the project description.

7. This activity must commence within a period of five (5) years from the date of issue of this authorisation. If commencement of the activity does not occur within that period, the authorization lapses and a new application for environmental authorisation must be made in order for the activity to be undertaken.

N/A as yet Construction of the facility has not commenced as yet. The EA for the project expires on 9 May 2021. No commencement has occurred.

8. Commencement with one activity listed in terms of this authorisation constitutes commencement of all authorised activities.

N/A as yet Construction of the facility has not commenced as yet.

9. The holder of an environmental authorisation must notify the competent authority of any alienation, transfer and change of ownership rights in the property on which the activity is to take place.

YES Refer to Annexure 1

The Holder of the EA has confirmed that no alienation, transfer or change of ownership rights has occurred in the properties on which the activity is to take place.

10. In terms of section 43(7), an appeal under Section 43 of the National Environmental Management Act, 1998 will suspend the environmental authorisation or any provision or condition attached thereto. In the instance where an appeal is lodged you may not commence with the activity until such time that the appeal has been finalised.

YES Refer to Annexure 7

According to the Holder of the EA, no Appeals were lodged against the decision.

Notification of authorisation and right to appeal

Page 10: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

11. The holder of the authorisation must notify every registered interested and affected party, in writing and within 12 (twelve) calendar days of the date of this environmental authorisation, of the decision to authorise the activity.

YES Refer to Annexure 2

A notification letter was emailed to registered I&APs on 12 May 2016 and posted on 13 May 2016, i.e. 3 and 4 days after the date of the decision, respectively.

12. The notification referred to must-

12.1 specify the date on which the authorisation was issued; NO Refer to Annexure 2

The notification letter incorrectly notes that the EA was issued on 5 May 2016, when in fact the EA is dated 9 May 2016.

12.2 inform the interested and affected party of the appeal procedure provided for in Chapter 7 of the Environmental Impact Assessment Regulations, 2010;

PARTIAL Refer to Annexure 2

It is noted that the effect of the incorrectly noted EA date, was to foreshorten the advertised deadline for the submission of the notice of intent to appeal, which was calculated from the incorrect date.

12.3 advise the interested and affected party that a copy of the authorisation will be furnished on request; and,

YES Refer to Annexure 2

Documentary evidence provided.

12.4 give the reasons of the competent authority for the decision.

YES Refer to Annexure 2

A copy of the reasons for the decision provided by the DEA were appended to the notification letter.

13 The holder of the authorisation must publish a notice - YES Refer to Annexure 3

An advert was published in Die Gemsbok newspaper on 20 May 2016.

13.1 informing interested and affected parties of the decision; YES Refer to Annexure 3

Included in content of published notice. It is noted however that the notice incorrectly notes that the EA was issued on 5 May 2016, when in fact the EA is dated 9 May 2016.

Page 11: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

13.2 informing interested and affected parties where the decision can be accessed; and,

YES Refer to Annexure 3

Included in content of published notice.

13.3 drawing the attention of interested and affected parties to the fact that an appeal may be lodged against this decision in the newspaper(s) contemplated and used in terms of regulation 54(2)(c) and (d) and which newspaper was used for the placing of advertisements as part of the public participation process.

Refer to Annexure 3

Included in content of published notice.

Management of the activity

14. The Environmental Management Programme (EMPr) submitted as part of the Basic Assessment Report (BAR) is not approved and must be amended to include measures as dictated by the final site lay-out map and micro-siting, and the provisions of this environmental authorisation. The EMPr must be made available for comments to registered Interested and Affected Parties and the holder of this environmental authorisation must consider such comments. Once amended, the final EMPr must be submitted to the Department for written approval prior to commencement of the activity. Once approved the EMPr must be implemented and adhered to.

N/A as yet According to the holder of the EA, the EMPr has not been amended and/or submitted to DEA for approval as yet. The amended EMPr must be submitted to DEA for approval, in due course, before commencement of the authorized activities.

15. The EMPr is amendable and must be implemented and strictly enforced during all phases of the project. It shall be seen as a dynamic document and shall be included in all contract documentation for all phases of the development when approved.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

16. Changes to the EMPr, which are environmentally defendable, shall be submitted to this Department for acceptance before such changes could be effected.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the

Page 12: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

commencement of the authorized activities.

17. The Department reserves the right to amend the EMPr should any impacts that were not anticipated or covered in the amended EIAr be discovered.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

18. The provisions of the approved EMPr including recommendations and mitigation measures in the BAR and specialist studies shall be an extension of the conditions of this EA and therefore noncompliance with them would constitute non-compliance with the EA.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

19. The following must be included in the amended final EMPr:

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

19.1 Final layout of the proposed powerline, including final tower positions and their global positioning system (GPS) coordinates.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

19.2 The findings and recommendations made in all the specialist studies.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the

Page 13: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

commencement of the authorized activities.

19.3 The conditions of this environmental authorisation. N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

19.4 The EMPr must include all other licenses and permits required for the construction of the proposed development.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

20. Once approved, the EMPr must be implemented and adhered to.

N/A as yet Duly noted by the holder of the EA. The holder of the EA indicated that the EMPr will be amended and submitted to DEA in due course, prior to the commencement of the authorized activities.

Monitoring

21. The holder of the authorisation must appoint an experienced independent Environmental Control Officer (ECO) for the construction phase of the development that will have the responsibility to ensure that the mitigation/rehabilitation measures and recommendations referred to in this environmental authorisation are implemented and to ensure compliance with the provisions of the approved EMPr.

N/A as yet As the construction phase is not planned to start in the foreseeable future, this condition does not yet apply. The Holder of the EA has however indicated that they are aware of this obligation, and will make the requisite appointment at the appropriate time

Page 14: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

21.1 The ECO must be appointed before commencement of any authorised activities.

N/A as yet Duly noted by the holder of the EA. No commencement of any authorized activities has occurred as yet.

21.2 Once appointed, the name and contact details of the ECO must be submitted to the Director: Compliance Monitoring of the Department.

N/A as yet Duly noted by the holder of the EA. No commencement of any authorized activities has occurred as yet.

21.3 The ECO must keep record of all activities on site, problems identified, transgressions noted and a task schedule of tasks undertaken by the ECO.

N/A as yet Duly noted by the holder of the EA. No commencement of any authorized activities has occurred as yet.

21.4 The ECO must remain employed until all rehabilitation measures, as required for implementation due to construction damage, are completed and the site is ready for operation.

N/A as yet Duly noted by the holder of the EA. No commencement of any authorized activities has occurred as yet.

Recording and reporting to the Department

22. The holder of this authorisation must keep all records relating to monitoring and auditing on site and make it available for inspection to any relevant and competent authority in respect of this development.

N/A as yet Duly noted by the holder of the EA. No commencement of the authorized activities has occurred as yet.

23. All documentation e.g. audit/monitoring/compliance reports and notifications, required to be submitted to the Department in terms of this authorisation, must be submitted to the Director: Compliance Monitoring at this Department.

YES This independent audit report, compiled in terms of Regulation 54A(3) of the EIA Regulations (2014), as amended, will be submitted to the Director: Compliance Monitoring at DEA

Commencement of the activity

24. The authorised activity shall not commence within twenty (20) days of the date of signature of the authorisation.

YES No commencement has occurred as yet.

Page 15: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

Notification to authorities

25. Fourteen (14) days written notice must be given to the Department that the activity will commence. Commencement for the purposes of this condition includes site preparation. The notice must include a date on which it is anticipated that the activity will commence. This notification period may coincide with the Notice of Intent to Appeal period, within which construction may not commence.

N/A as yet No commencement has occurred as yet, and the date of commencement is not yet known.

Operation of the activity

26. A written notification of operation must be given to the Department no later than fourteen (14) days prior to the commencement of the activity operational phase.

N/A as yet No commencement has occurred as yet.

Site closure and decommissioning

27. Should the activity ever cease or become redundant, the applicant shall undertake the required actions as prescribed by legislation at the time and comply with all relevant legal requirements administered by any relevant and competent authority at that time.

N/A as yet No commencement has occurred as yet.

Specific conditions

28. Anti-collision devices such as bird flappers must be installed where powerlines cross avifaunal corridors (e.g. grasslands, rivers, wetlands, and dams). The input of an avifaunal specialist must be obtained for the fitting of the anti-collision devices onto specific sections of the line once the exact positions of the towers have been surveyed and pegged. Additional areas of high sensitivity along the preferred alignment must also be identified by the avifaunal specialist for the fitment of anti-collision

N/A as yet No commencement has occurred as yet.

Page 16: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

devices. These devices must be according to Eskom's Transmission and Endangered Wildlife Trust's (EWT) Guidelines.

29. All declared aliens must be identified and managed in accordance with the Conservation of Agricultural Resources Act, 1983 (Act No. 43 of 1983). There should be an alien species monitoring and eradication program to prevent encroachment of these problem plants for the duration of the operation.

N/A as yet No commencement has occurred as yet.

30. Copies of all permits required for the construction of the proposed infrastructure must be kept on site by the ECO for record keeping purposes and make it available to the Department upon request.

N/A as yet No commencement has occurred as yet.

31. No exotic plants must be used for rehabilitation purposes. Only indigenous plants of the area must be utilised.

N/A as yet No commencement has occurred as yet.

32. Vegetation clearing must be kept to an absolute minimum. Mitigation measures must be implemented to reduce the risk of erosion and the invasion of alien species.

N/A as yet No commencement has occurred as yet.

33. An integrated waste management approach must be implemented that is based on waste minimisation and must incorporate reduction, recycling, re-use and disposal where appropriate. Any solid waste shall be disposed of at a landfill licensed in terms of section 20 (b) of the National Environment Management Waste Act, 2008 (Act 59 of 2008).

N/A as yet No commencement has occurred as yet.

General

34. All relevant parties, including the holder of the authorisation, all project managers, contractors and sub-contractors, must be made aware of their responsibility for

YES The Holder has indicated that they are aware of their responsibilities in this regard.

Page 17: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

Document

Reference

Number

Issue to Review

Compliant

Yes / No /

N/A

Proof/

Observation Notes and Recommendations

compliance with the provisions for Duty of Care and remediation of environmental damage as contained in Section 28 of NEMA.

35. A copy of this authorisation and the approved EMPr must be kept at the property where the activity will be undertaken. The authorisation and approved EMPr must be produced to any authorised official of the Department who requests to see it and must be made available for inspection by any employee or agent of the holder of the authorisation who works or undertakes work at the property.

N/A as yet No commencement has occurred as yet.

36. National government, provincial government, local authorities or committees appointed in terms of the conditions of this authorisation or any other public authority shall not be held responsible for any damages or losses suffered by the applicant or his successor in title in any instance where construction or operation subsequent to construction be temporarily or permanently stopped for reasons of non-compliance by the applicant with the conditions of authorisation as set out in this document or any other subsequent document emanating from these conditions of authorisation.

N/A as yet No commencement has occurred as yet.

Conditions of Amendment to Environmental Authorisation (EA dated 9 May 2016) dated 4 July 2016 (DEA Ref.: 14/12/16/3/3/1/1344)

1.1 This amendment letter must be read in conjunction with the EA decision issued on 09 May 2016.

N/A The EA of 09 May 2016, is audited within the table above.

Page 18: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

7. Conclusions and Recommendations

An independent audit has been conducted for this project which meets the requirements of

and Section 54A(3) of Regulation 982 of the 2014 EIA Regulations, as amended. The only

non-compliance identified relates to an administrative error in the notification of the decision

and the right to appeal. The letter of notification to I&AP’s as well as the published notice,

notifying I&AP’s of the decision incorrectly notes that the EA was issued on 5 May 2016, when

in fact the EA is dated 9 May 2016. It is noted that the effect of the incorrectly noted EA date,

was to foreshorten the specified deadline for the submission of the Notice of Intent to Appeal,

which was calculated from the incorrect, earlier, date. In the Auditors opinion, this

administrative error was not materially prejudicial to I&AP’s, since any I&AP who was intent

on lodging a Notice of Intent to Appeal, would have been able to access the actual EA decision

and would have been entitled to lodge a notice of a Notice of Intent to Appeal, within 20 days

of the de facto decision date. Furthermore, in the Auditors understanding, any I&AP, who on

becoming aware of the error, had reason to believe that they had been prejudiced, would have

been entitled to apply to the Minister for condonation of a late appeal, which request is likely

to have been granted in the circumstances. It is noted that according to the Holder of the EA,

no appeals were lodged. No corrective action for the above has therefore recommended.

Since no approved Environmental Management Programme (EMPr) exists for the authorised

project, it is not possible to evaluate the effectiveness thereof, or provide any

recommendations. Once an amended EMPr is approved by the Department, the following

Audit will address these aspects.

ANNEXURES

ANNEXURE 1 Confirmation of Land Ownership

ANNEXURE 2 Proofs of Notification of EA Letter

ANNEXURE 3 Proof of EA Advert

ANNEXURE 4 Registered I&APs Database

ANNEXURE 5 Authors CV’s

ANNEXURE 6 Independent Auditor Declaration

ANNEXURE 7 DEA No Appeal Confirmation

Page 19: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 1

Confirmation of Land Ownership

Page 20: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …
Page 21: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Printed: 2019/12/02 07:57

NELSPOORTJE, 103, 6 (KIMBERLEY)

GENERAL INFORMATION

KIMBERLEYDate Requested

DEEDS OFFICEReference

FARMNELSPOORTJE1036EMTHANJENI MUNISIPALITEITPRIESKA RDNORTHERN CAPET10751/19601401.1218HPTN OF 5C06000000000010300006

FOURIE WILHETTE

Person TypeNameID NumberTitle DeedRegistration DatePurchase Price (R)Purchase DateShareMicrofilm ReferenceMultiple PropertiesMultiple Owners

# Institution MicrofilmB18725/2006CTN 1,700,000

2 A B S A BANK LTD

K21/1976SCTN UNKNOWN4 -

FARM PR 103/6 UNKNOWN

# Owner MicrofilmB27777/2000CTN UNKNOWN

2 -

T17401/1981CTN UNKNOWN4 VAN WYK BROERS TRUST

DISCLAIMERThis report contains information gathered from our suppliers and we do not make any representations about the accuracy of the data displayed nor do we accept responsibility for inaccurate data. WinDeed will not be liable for any damage caused by reliance on this report. This report is subject to the terms and conditions of the WinDeed End User Licence Agreement (EULA).

231,184T42938/2000CTN

JACOBS GIDEON BERTUS3UNKNOWNB96659/2004CTN

-1Amount (R)Document

HISTORIC DOCUMENTS (4)

-5UNKNOWNCONVERTED FROM CTN

-3500,000B33012/2011CTN

A B S A BANK LTD1Amount (R)Document

ENDORSEMENTS (5)

NOYES

2001/09/271,138,5002002/04/22T28828/2002CTN6903030260086FOURIE WILHETTEPRIVATE PERSON

Owner 1 of 1

OWNER INFORMATION

LPI CodePrevious DescriptionExtentDiagram DeedProvinceRegistration DivisionLocal AuthorityPortion NumberFarm NumberFarm NameProperty Type

PROPERTY INFORMATION

-Information Source

2019/12/02 07:57Deeds Office

Deeds Office Property

Page 22: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Printed: 2019/12/02 08:05

HUMANSRUS, 147, 0 (KIMBERLEY)

GENERAL INFORMATION

KIMBERLEYDate Requested

DEEDS OFFICEReference

FARMHUMANSRUS1470EMTHANJENI MUNISIPALITEITPRIESKA RDNORTHERN CAPET28367/19784769,4155HA-C06000000000014700000

HUMAN CHRISTINA SUSANNA

Person TypeNameID NumberTitle DeedRegistration DatePurchase Price (R)Purchase DateShareMicrofilm ReferenceMultiple PropertiesMultiple Owners

Owner 2 of 2PRIVATE PERSONHUMAN CHRISTINA SUSANNA3710090031080T15173/2009CTN-TRANSFER BY ENDO-

NONO

ENDORSEMENTS (4)Document Amount (R)

1 HUMAN JAN WYNAND VLOK

CONVERTED FROM CTN UNKNOWN3 -

FROM PR RD 102/1,104 UNKNOWN/94UNKNOWNFARM PR 147

-2UNKNOWNK620/1979RMCTN

MicrofilmInstitution#

Multiple OwnersMultiple PropertiesMicrofilm ReferenceSharePurchase DatePurchase Price (R)Registration DateTitle DeedID NumberNamePerson Type

HUMAN CHRISTINA SUSANNA

NONO

-SECT 45(1)1978/11/08T28367/1978CTN3710090031080HUMAN CHRISTINA SUSANNAPRIVATE PERSON

Owner 1 of 2

OWNER INFORMATION

LPI CodePrevious DescriptionExtentDiagram DeedProvinceRegistration DivisionLocal AuthorityPortion NumberFarm NumberFarm NameProperty Type

PROPERTY INFORMATION

-Information Source

2019/12/02 08:05Deeds Office

Deeds Office Property

Page 23: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Printed: 2019/12/02 08:05

# Owner MicrofilmT28367/1978CTN UNKNOWN

This report contains information gathered from our suppliers and we do not make any representations about the accuracy of the data displayed nor do we accept responsibility for inaccurate data. WinDeed will not be liable for any damage caused by reliance on this report. This report is subject to the terms and conditions of the WinDeed End User Licence Agreement (EULA).

DISCLAIMER

HUMAN JAN WYNAND VLOK1Amount (R)Document

HISTORIC DOCUMENTS (1)

Page 24: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Printed: 2019/12/02 07:59

VOGELSTRUIS BULT, 104, 1 (REMAINING EXTENT) (KIMBERLEY)

GENERAL INFORMATION

KIMBERLEYDate Requested

DEEDS OFFICEReference

FARMVOGELSTRUIS BULT1041 (REMAINING EXTENT)EMTHANJENI MUNISIPALITEITPRIESKA RDNORTHERN CAPET357/19116085.5029HVOGELSTRUIS BULTC06000000000010400001

REQUEST TRUST

Company TypeNameRegistration NumberTitle DeedRegistration DatePurchase Price (R)Purchase DateShareMicrofilm ReferenceMultiple PropertiesMultiple Owners NO

YES

2002/10/091,650,0002003/03/13T18939/2003CTN366/2002REQUEST TRUSTTRUST

Owner 1 of 1

OWNER INFORMATION

LPI CodePrevious DescriptionExtentDiagram DeedProvinceRegistration DivisionLocal AuthorityPortion NumberFarm NumberFarm NameProperty Type

PROPERTY INFORMATION

-Information Source

2019/12/02 07:59Deeds Office

Deeds Office Property

Page 25: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Printed: 2019/12/02 07:59

# Institution MicrofilmB30015/2012CTN 440,000,000

2 -

K1024/2012LCTN UNKNOWN

4 -

K1262/1993SCTN UNKNOWN6 -

K1266/1993SCTN UNKNOWN8 -

K129/1976SCTN UNKNOWN10 -

K557/2006SCTN UNKNOWN12 ARMSCOR DEFENCE INSTITUTES

K560/2006SCTN UNKNOWN14 -

K579/2006SCTN UNKNOWN16 -

K609/1972SCTN UNKNOWN18 -

VA4304/2001CTN UNKNOWN20 -

FARM PR 104/1 UNKNOWN

# Owner MicrofilmB76158/1996CTN UNKNOWN

2 -

K1280/1993SCTN UNKNOWN4 -

B12850/2003CTN UNKNOWN6 -

T4923/1936CTN UNKNOWN8 MOOLMAN CHARLENE

T4924/1936CTN UNKNOWN10 MARAIS CHARL JOHANNES 1/3

DISCLAIMERThis report contains information gathered from our suppliers and we do not make any representations about the accuracy of the data displayed nor do we accept responsibility for inaccurate data. WinDeed will not be liable for any damage caused by reliance on this report. This report is subject to the terms and conditions of the WinDeed End User Licence Agreement (EULA).

UNKNOWNT4925/1936CTN

MARAIS CHARL JOHANNES 1/39ESTATET87120/1996CTN

MARAIS CHARL JOHANNES 1/37UNKNOWNK1273/1993SCTN

-5UNKNOWNK1277/1993SCTN

-3UNKNOWNK1271/1993SCTN

LAND & LANDBOUBANK1Amount (R)Document

HISTORIC DOCUMENTS (10)

-21UNKNOWNCONVERTED FROM CTN

-19UNKNOWNK942/1977RMCTN

-17UNKNOWNK595/1977RMCTN

-15UNKNOWNK578/2006SCTN

-13UNKNOWNK566/2006SCTN

-11UNKNOWNK1263/1993SCTN

-9UNKNOWNK1279/1993SCTN

-7UNKNOWNK1264/1993SCTN

-5UNKNOWNK1261/1993SCTN

MULILO RENEWABLE ENERGY SOLAR P V PRIESKA PTY LTD

3UNKNOWNK1023/2012SCTN

MICAWBER 882 PTY LTD R F1Amount (R)Document

ENDORSEMENTS (21)

Page 26: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 2

Proofs of Notification of EA Letter

Page 27: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Dear Interested and Affected Parties (I&APs); 12 May 2016 AUTHORISATION OF THE PROPOSED DOUBLE CIRCUIT 132KV OVERHEAD TRANSMISSION

LINES [LINE OPTION 2 (KRONOS) AND LINE OPTION 3 (CUPRUM) NEAR COPPERTON IN THE

NORTHERN CAPE

(DEA REF. NO. 14/12/16/3/3/1/1343)

(DEA REF. NO. 14/12/16/3/3/1/1344)

This serves to notify you that the Department of Environmental Affairs (DEA) issued a positive

Environmental Authorisations (EA’s) on the 5th of May 2016 for the proposed transmission lines

(approximately 50km southwest of Prieska). The EA’s are issued in terms of Regulation 45 of the 2010

Environmental Impact Assessment (EIA) Regulations (Government Notice (GN) No. R544, R.545 and

R.546 of 18 June 2010) of the National Environmental Management Act (Act No. 107 of 1998) (NEMA).

The EA outlines the conditions of authorisation, reasons for the authorisation, recommendations, and

the appeal process. A copy of the EA can be obtained from Patrick Killick on request at Tel: 044 805

5432 or Email: [email protected]. A copy of the reasons for the decision provided

by the DEA have been appended hereto.

Please be advised of your right to appeal the decision in terms of Chapter 7 of the NEMA EIA

Regulations, 2010. Any person affected by a decision who wishes to appeal must lodge a Notice of

Intention to Appeal with the Minister by the 25th of May 2016. The relevant appeal process forms can

be obtained from www.environment.gov.za/documents/forms. Lodging may occur by any of the

following methods:

By post:

Private Bag X447; Pretoria; 0001

By Hand:

Environment House; 473 Steve Biko Road; Pretoria; 0083

Please note that all appeals must be submitted in writing to Mr. Z. Hassam, Director: Appeals and Legal

Review of the Department of Environmental Affairs at the above mentioned addresses. Mr. Hassam

can also be contacted at Tel: 012 399 9356 or contact via Email:

[email protected] .

On submission of an appeal, an Appellant must serve on the applicant (Namies Wind Farm (Pty) Ltd) a

copy of the Notice of Intention to Appeal, and indicate where and for what period the appeal submission

will be made available for inspection by the applicant.

Juwi Renewable Energies (Pty) Ltd: Corné van der Westhuizen

Tel. 021 831 6129, Fax. 021 831 6199, Email [email protected]

Address: 24th Floor, Metropolitan Centre, 7 Walter Sisulu Avenue, Foreshore, Cape Town

Should you have any queries please do not hesitate to contact the undersigned.

Yours sincerely

AURECON

Page 28: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Geagte Belanghebbende en/of geaffekteerde partye; 12 May 2016

GOEDKEURING VAN DIE TWEE VOORGESTELDE OORHOOFSE 132KV KRAGLYNE [LYN OPSIE

2 (KRONOS) EN LYN OPSIE 3 (CUPRUM) NABY COPPERTON IN DIE NOORD-KAAP

DOS VERW. NO. 14/12/16/3/3/1/1343)

(DOS VERW. NO. 14/12/16/3/3/1/1344)

U word hiermee in kennis gestel dat die Departement van Omgewingsake (DOS)positiewe

Omgewingsmagtigings (OM’s) op 5 Mei 2016 vir die voorgestelde oorhoofse kraglyne (ongeveer 50km

suid-wes van Prieska) uitgereik het. Die OM’s is uitgereik in kragtens Regulasie 45 van die 2010

Omgewingsinvloedbepaling (OIB) Regulasies (Goewermentskennisgewing (GK) No. R544, R.545 en

R.546 van 18 Junie 2010) volgens die Wet op Nasionale Omgewingsbestuur (Wet No. 107 van 1998)

(NEMA).

Die OM’s sit die voorwaardes van die magtiging, redes vir die magtiging, aanbevelings en die

appèlproses uiteen. 'n Afskrif van die OM kan verkry word op aanvraag vanaf Patrick Killick by Tel: 044

805 5432 of E-pos: [email protected].

Neem asseblief kennis van u reg om hierdie besluit te appelleer ingevolge Hoofstuk 7 van die WNOB

se OIB-regulasies, 2010. Enige persoon wat geraak word deur die besluit wat wil appelleer moet 'n

Kennisgewing van Voorneme om te Appelleer by die Minister teen 25 Mei 2016 indien. Die betrokke

appèl proses vorms kan verkry word vanaf www.environment.gov.za/documents/forms. Indiening kan

gedoen word deur enige van die volgende metodes te volg:

Per pos:

Privaatsak X447; Pretoria; 0001

Per Hand:

Environment House; 473 Steve Biko Straat; Pretoria;

0083

Neem asseblief kennis dat alle appèlle skriftelik aan mnr. Z. Hassam, Direkteur: Appèl en Wetlike

Hersiening van die Departement van Omgewingsake by die bogenoemde adresse gelewer moet word.

Mnr. Hassam kan ook gekontak word by Tel: 012 399 9356 of kontak via E-pos:

[email protected].

By die indiening van die appèl, moet die Appellant aan die aansoeker (Namie Wind Farm (Edms) Bpk)

'n afskrif van die Kennisgewing van Voorneme om te Appelleer lewer en daarop aandui waar en vir

watter tydperk die appel voorlegging beskikbaar is vir inspeksie deur die aansoeker.

Juwi Renewable Energies (Edms) Bpk: Corné van der Westhuizen

Tel. 021 831 6129, Faks 021 831 6199, Epos [email protected]

Adres: 24ste Vloer, Metropolitan Sentrum, 7 Walter Sisulu Laan, Foreshore, Kaapstad, 8001

Kontak gerus die ondergetekende indien u enige vrae het.

Die uwe

AURECON

Page 29: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 30: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 31: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 32: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 33: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 34: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Aurecon South Africa (Pty) Ltd 1977/003711/07

Suite 201 2nd Floor Bloemhof Building 65 York Street George 6529

T

F

E

W

+27 44 805 54 58 +27 44 805 5454 [email protected] aurecongroup.com

PO Box 509 George 6530 South Africa

Page 35: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …
Page 36: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …
Page 37: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …
Page 38: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 3

Proof of EA Advert

Page 39: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

BLADSY 18 DIE GEMSBOK 20 MEI 2016

Die uwe / Yours faithfully

DE NGXANGAMUNISIPALE BESTUURDER / MUNICIPAL MANAGER

MUNISIPALITEIT //KHARA HAIS MUNICIPALITYKENNISGEWING K33/2016 NOTICE N33/2016

VOORGESTELDE HERSONERING, SEKONDêRE GEBRUIK ENOPHEFFING VAN BEPERKENDE TITELVOORWAARDES VANERF 2433, CARLTONSTRAAT 8, UPINGTON

Munisipaliteit //Khara Hais het die onderstaande beplannings - en/ofgrondgebruikaansoek ontvang vir oorweging:

Perseel: Erf 2433, UpingtonLigging: Carltonstraat 8, Upington

Eienaar: Boedel Wyle SC TreAansoeker: MacroplanHuidige Sonering: Enkel woonhuis (D.h.1)

Aard van aansoek:Om die eiendom te hersoneer na Sakeperseel (D.i.1), asook aansoekom Sekondêre Gebruik (Enkelwoonhuis en woonstelle), ten einde diebestaande woonhuis en woonstelle op gemelde eiendom te wettig endie Opheffing van beperkende titelvoorwaardes, soos vervat in TitelakteT3534/2008, Afdeling B. 2 (a), (b), (c), (d) en 3, ten einde diehersonering op Erf 2433, Upington, moontlik te maak.

Nadere besonderhede is verkrygbaar vanaf die Raad seStadsbeplanner, Telefoon 054 338 7074, gedurende normale kantoorure(Maandag tot Vrydag, 07:30 tot 12:30 en 13:30 tot 16:30) en beswareteen die aansoek, indien enige, moet skriftelik voor of op Vrydag,10 Junie 2016, by die Raad se Stadsbeplanningsafdeling ingedienword. Indien enige persoon wat kommentaar wil lewer/vertoë wil rig,nie kan skryf nie, kan sodanige persoon gedurende normale kantoorureby Mnr J du Plessis by kantoor 071 aanmeld, waar sodanige persoonse kommentaar/vertoë op skrif gestel sal word.

KENNISGEWING DATUM : 13 Mei 2016 20 Mei 2016

PROPOSED REZONING, SECONDARY USE AND REMOVAL OFRESTRICTIVE TITLE CONDITIONS OF ERF 2433, 8 CARLTONSTREET, UPINGTON

//Khara Hais Municipality has received the following planning- and/orland use application for consideration:

Property: Erf 2433, UpingtonLocation: 8 Carlton Street, Upington

Owner: Estate Late SC TreApplicant: MacroplanCurrent Zoning: Single Residential House (D.h.1)

Nature of of application:To Rezone the property to Business Premises (D.i.1), as well as anapplication for secondary use (Single Residential House and Flats) inorder to legalise the accommodation of the existing flats and singleresidential house, and the Removal of restrictive title conditions asenumerated in Title Deed T3534/2008, Section B.2. (a), (b), (c), (d) and3 to facilitate the rezoning of Erf 2433, Upington.

Full particulars can be obtained from the Town Planner of the Council,Telephone 054 338 7074, during normal office hours (Mondays to Fridays,07:30 to 12:30 and 13:30 to 16:30) and objections against the application,if any, must be lodged in writing to the Town Planning Section of Councilon or before Friday, 10 June 2016. Any person with objections againstthe application, who is unable to write, can report to Mr J du Plessis inoffice 071, during normal office hours, who will put such a person’sobjections in writing.

DATE OF NOTICE : 13 May 2016 20 May 2016

KENNISGEWING VAN VOORGENOME MYNBOU-AKTIWITEITE DME VERWYSING :NCS30/5/1/3/2/10517MP

Kennisgewing vir Publieke deelname in gevolge Seksie 16(4)(b) vandie Mineraal en Petroleum Hulbronne Onwikkilings Wet (Wet 28 van2002) en seksie 40 to 43 van die Nationale Omgewings BestuursWet 1998 en die Omgewings Impak Assessering Regulasie 2014

Eva M. Lewis het ‘n aansoek ingedien om te myn vir diamante op nsekere gedeelte van gedeelte 5 van die plaas Kommagas 200, geleë indie administratiewe distrik van Namakwaland. Die area is 54,9 km wesvan Kleinzee en 59,5 km oos van Springbok.

Die aansoek is ingedien by die Streeksbe-stuurder, DepartementMinerale Hulpbronne, Van Der Stel Straat, 1ste Vloer, Hopley Sentrum,Springbok. Kontak nommer 027 712 8175

Die mynbou proses sal in vorm oopgroef mynbou wees deur gebruik temaak van swaar voertuie en ‘n diamand verwerkings aanleg.

Die voorgeskrewe Omgewings verslae moet ingedien word voor of op23 Mei 2016 , waarna dit beskikbaar sal wees vir insae by die Konsultantse kantore.

Alle geïnteresseerde en/of geaffekteerde partye word uitgenooi om teregistreer, voorstelle en/of besware skriftelik in te dien teen die 20Junie 2016 by:

LWConsultantsTel: 072 141 4164 Fax: 086 606 6315Adres: Posbus 3226, Kimberley, 8300E-pos: [email protected]

Berekisanang VakaturesAs gevolg van vinnige groei is daar in dieAfrifresh Groep die onderstaande postebeskikbaar by die Berekisanang produksieeenheid in Kakamas, effektief vanaf 1 Julie2016.

1. Finansiële AdministrateurKern Pligte:� Aankope – Kwotasies en Fakturering� Kontroleer Krediteure.� Beheer Kleinkas� Algemene boekhouding tot en met kasboek.� Begroting samestelling en verslae aan

bestuur.� Algemene kantoor administrasie.� Voorraad Kontrole

2. Adminstratiewe AssistentKern Pligte:� Voorraad Beheer.� Algemene Adminstratiewe pligte en

verwerking van lone.� Rekordhouding van spuitprogramme.� Bestellings van kunsmis en chemie� Programme: Excell en Donkerhoek Lone

3. WerktuigkundigeKern Pligte:� Algemene instandhouding van trekkers,

grondverskuiwing-, voertuie en implemente.� Bou van implemente.� Vlootbestuur� Hantering van tegniese aankope en

begroting bestuur.� Werkswinkel bestuur.

4. Sekuriteit beampteKern Pligte:� Opleiding en daarstelling van sekuriteits

span� Sekuriteit van persele� Monitering van voertuie.� Toegangs Beheer.� Vereistes:

Eie vervoerWerksondervinding in sekuriteit (Graad Averkieslik)

Kwalifikasie van al bg:� Matriek� Formele kwalifikasie (Diploma of Graad)

‘n Kompeterende salaris pakket gekoppel aan‘n bonus insentiewe stelsel word aangebied.

Om aansoek te doen, stuur CV [email protected]

Sluitingsdatum – 30 Mei 2016

The South African SKA Project (SKA SA) isa project of the Department of Science andTechnology (DST), administered by the NationalResearch Foundation (NRF). SKA SA is responsiblefor coordinating Africa’s involvement in the designand construction of the Square Kilometre ArrayRadio Telescope, the design and construction ofthe Karoo Array Radio Telescope (MeerKAT), andthe African VLBI Network (AVN). Information aboutthe project is available on www.ska.ac.za.

Request for ProposalsMobile Trunk Radio - Voice & Data Services

NRF Bid Number: SKA N0004-0004The SKA South Africa invites qualified and experienced service providers to submit mobile trunkradio bids for the supply, delivery, installation, operation, maintenance, and provision of managedtelecommunications services in the Northern Cape province areas declared as the Karoo CentralAstronomy Advantage Areas, protected for the purpose of radio astronomy and related scientificactivities in terms of the Astronomy Geographic Advantage Act, 2007 (Act No 21 of 2007). Thesuccessful bid will be for the trunk radio system that uses the radio frequency spectrum below200 MHz to provide mobile voice and limited data services to benefit the local public, SKA SouthAfrica, rural safety, emergency and municipal services.The SKA South Africa elected to finance the capital costs of the trunk radio network with thehigh-masts at Wildeperdeberg, Williston, Brandvlei and VanWyksvlei, and limited subsidy for end-user devices. It is the responsibility of the bidder to become familiar with all remote high-sitesto provide costing for all deliverables. The successful bidder will be appointed for a period of15 years to provide day-to-day managed services on behalf of the SKA SA and to findcustomers for the radio network. The bid will contain detailed costing for equipment, installation,maintenance, end-user telecommunications rates, and managed services for a period of 15 years.Preferential Procurement System applicable (Points for price: points for procurementpreference): 90:10A compulsory briefing session will be held at the SKA SA Offices on 31 May 2016 from 10:00 to 12:00Voluntary site visit to remote high-masts will be at own cost.The NRF has the right to withdraw and cancel the bid.For detailed bid documents and further information contact Mr Rayyan Arnold at (021) 506-7300 [email protected] or Mr Selaelo Matlhane at (011) 442-2434 or [email protected]: www.ska.ac.zaKindly submit your proposals by no later than 15 July 2016 before 11:00.

Human Communications 127123 www.humanjobs.co.za

KENNISGEWING VAN VOORGENOME PROSPEKTEER-AKTIWITEITE DME VERWYSING : NC 30/5/1/1/2/11793PR

Kennisgewing vir Publieke deelname in gevolge Seksie 16(4)(b) vandie Mineraal en Petroleum Hulbronne Onwikkilings Wet (Wet 28 van2002) en Seksie 40 tot 43 van die Nationale Omgewings Bestuurs Wet,1998 en die Omgewings Impak Assessering Regulasie 2014

Caroglo (Pty) Ltd. het ‘n aansoek ingedien om te prospekteer vir diamanteop sekere gedeeltes van die restant, porsie 1 en 3 van die palls T’Auseb 237, geleë in die administratiewe distrik van Namaqualand RD.Die area is 112 km suid suid-wes vanaf Pofadder en 143 km oos vanSpringbok.

Die aansoek is ingedien op 22 Maart 2016 by die Streeksbestuurder,Departement Minerale Hulp-bronne, Van der Stel Straat, 1

ste vloer,

Hopley Sentrum, Springbok, 8420. Kontak nommer 027 712 8175.

Die prospekteer proses sal geskied in die vorm boorwerk en massamonsterneming deur gebruik te maak van swaar voertuie en ‘n diamandverwerkings aanleg.

Die voorgeskrewe Omgewings verslae moet ingedien word voor of op19 Julie 2016, waarna dit beskikbaar sal wees in insae by die Konsultantse kantore.

Alle geïnteresseerde en/of geaffekteerde partye word uitgenooi om teregistreer, voorstelle en/of besware skriftelik in te dien teen die 20Junie 2016 by:

LW ConsultantsTel: 072 141 4164 Fax: 086 606 6315Adres: Posbus 3226, Kimberley, 8300E-pos: [email protected]

GEMSBOK-UPINGTON: Die afgelope naweek was maar stil by die klub as gevolg van die klein interjol.28 Spelers het deelgeneen aan ‘n IPS kompetisie.Uitslae: 1) Andries Vermeulen – 40; 2) Gustav du Preez – 39; 3) Jan van Zyl – 39 4) Willie Eiman - 38Spogtwees is gespeel deur Riko Taljaard (x2), John Moorcroft, Diago Brandt, Jan van Zyl, Willem Gresse(snr) en

Willie Eiman.Net so stil soos die afgelope naweek was, so besig gaan die die komende naweek wees.Vrydag 20 Mei is Kobus Duvenhage Bouers se gholfdag. Inskrywings hiervoor kan gedoen word by die borg: 054

3340031 – Liandie Louw of Eric Ludick. Daar is reeds heelwat spanne, so dit beloof om soos in die verlede ‘n groot dagte wees.

Saterdag 21 Mei is dit die beurt van Fit It se betterball stableford kompetisie.GROOT PRYSE IS OP DIE SPEL! Die manne van Fit It doen baie moeite, so alle golfers word uitgenooi om deel te

neem. 0543380239 / 0827882495 ONTHOU ONS SLAAN VANAF 12:00 AF.

Upington Gholfklub uitslae

Die volgendedrieleerders van die

Laerskool OranjeNoord- het

deurgedring nadie ATKV

provindialesemifinale rondtevir redenaars in

Kimberley.Hulle is Jana

Nel, Milla Slabberen Cornel Slabber.

Hulle

kan

praat

VAKATURE

VERKOOPS PERSOONDie suksesvolle kandidaat sal

verantwoordelik wees vir:Bemarking, uitreik van kwotasies,afneem van bestellings, aflos van

kassiere , hulpverlening met faktureringen ander admin verwante take.

Vereistes vir die pos is Graad 12,rekenaarvaardigheid op Excel en Word,

goeie kommunikasie vaardighedeen moet goed in ‘n span kan saamwerk.Vorige ondervinding in verkope sal in u

guns tel. Kandidaat moetbeskik oor bestuurslisensie en eie

vervoer hê.‘n Mededingende vergoedings pakket,

gekoppel aan kwalifikasie enondervinding word aangebied.

Aansoeke sluit 23 Mei 2016 om 14H00Stuur CV’S na [email protected]

V

A

K

A

T

U

R

E

AUTHORISATION OF THE PROPOSED DOUBLE CIRCUIT 132kV OVERHEADTRANSMISSION LINES [LINE OPTION 2 (KRONOS) AND LINE OPTION 3 (CUPRUM)]NEAR COPPERTON IN THE NORTHERN CAPE

(DEA REF. NO. 14/12/16/3/3/1/1343) (DEA REF. NO. 14/12/16/3/3/1/1344)

GOEDKEURING VAN DIE TWEE VOORGESTELDE OORHOOFSE 132kV KRAGLYNE[LYN OPSIE 2 (KRONOS) EN LYN OPSIE 3 (CUPRUM) NABY COPPERTON IN DIENOORD-KAAP

(DOS VERW. NO. 14/12/16/3/3/1/1343) (DOS VERW. NO. 14/12/16/3/3/1/1344)

The Department of Environmental Affairs (DEA) issued positive EnvironmentalAuthorisations (EA’s) on the 5th of May 2016 for the proposed double circuit overheadtransmission lines (approximately 50km southwest of Prieska). The EA is issued in termsof Regulation 45 of the 2010 Basic Assessment (EIA) Regulations (Government Notice(GN) No. R544 of 18 June 2010) of the National Environmental Management Act (Act No.107 of 1998) (NEMA). A copy of the EA can be obtained from Patrick Killick on request atTel: 044 805 5432 or Email: [email protected].

Please be advised of the right to appeal the decision in terms of Chapter 7 of the NEMA EIARegulations, 2010. Any person affected by a decision who wishes to appeal must lodgea Notice of Intention to Appeal with the Minister by the 25 May 2016. The relevant appealprocess forms can be obtained from www.environment.gov.za/documents/forms. Lodgingmay occur by any of the following methods:By post: Private Bag X447; Pretoria, 0001; orBy hand: Environment House; 473 Steve Biko Road; Acadia, Pretoria, 0083Please note that all appeals must be submitted in writing to Mr. Z. Hassam, Director:Appeals and Legal Review of the Department of Environmental Affairs at the abovementioned addresses. Mr. Z Hassam can also be contacted at Tel: 012 399 9356 orcontact via email: [email protected].

On submission of an appeal, an Appellant must serve on the applicant (juwi RenewableEnergies (Pty) Ltd) a copy of the Notice of Intention to Appeal, and indicate where and forwhat period the appeal submission will be made available for inspection by the applicant.Corné van der WesthuizenTel. 021 831 6129, Fax. 021 831 6199, [email protected]: 24th Floor, Metropolitan Centre, 7 Walter Sisulu Avenue, Foreshore,Cape Town, 8001

Die Departement van Omgewingsake (DOS) het positiewe Omgewingsmagtigings (OM’s)op 5 Mei 2016 vir die voorgestelde oorhoofse kraglyne (ongeveer 50km suid-wes vanPrieska) uitgereik. Die OM’s is uitgereik kragtens Regulasie 45 van die 2010 BasieseInvloedsbepaling (OIB) Regulasies- Goewermentskennisgewing (GK) No. R544 van 18Junie 2010) volgens die Wet op Nasionale Omgewingsbestuur (Wet No. 107 van 1998)(NEMA). ‘n Afskrif van die OM kan op aanvraag verkry word vanaf Patrick Killick by Tel:044 805 5432 of E-pos: [email protected].

Neem asseblief kennis van u reg om hierdie besluit te appelleer ingevolge Hoofstuk 7 vandie WNOB se OIB-regulasies, 2010. Enige persoon wat geraak word deur hierdie besluiten wil appelleer moet ‘n Kennisgewing van Voorneme om te Appelleer by die Minister teen25 Mei 2016 indien. Die betrokke appèl proses vorms kan verkry word vanafwww.environment.gov.za/documents/forms. Indiening kan gedoen word deur enige vandie volgende metodes te volg:Per pos: Privaatsak X447, Pretoria, 0001; ofPer hand: Environment House; 473 Steve Biko Straat; Arcadia, Pretoria, 0083Neem asseblief kennis dat alle appèlle skriftelik aan mnr. Z. Hassam, Direkteur: Appèlen Wetlike Hersiening van die Departement van Omgewingsake by die bogenoemdeadresse ingedien moet word. Mnr. Hassam kan ook gekontak word by Tel: 012 3999356 of kontak via e-pos: [email protected].

By die indiening van die appèl, moet die Appellant aan die aansoeker (juwi RenewableEnergies (Edms) Bpk) ‘n afskrif van die Kennisgewing van Voorneme om te Appelleerlewer en daarop aandui waar en vir watter tydperk die appel voorlegging beskikbaar is virinspeksie deur die aansoeker.Corné van der WesthuizenTel. 021 831 6129, Faks 021 831 6199, [email protected]: 24ste Vloer, Metropolitan Sentrum, 7 Walter Sisulu Laan, Foreshore,Kaapstad, 8001

Page 40: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 4

Registered I&APs Database

Page 41: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

Organisation Title Initial /Name Surname

Agri-Prieska Stockfarmers; Farm no. 118/3 Mr and Ms Hendrik Gideon and Maria Johanna Human

Birdlife South Africa Mr Mark Anderson

Mr James BraidDrielingspan Farm 101 Mrs Lettie de JagerRepli Investments No 27 Pty Ltd and Agama Exploration & Mining Mr Berend DeventerWelverdiend; Farm 117/4, 117/3 and Re/154 Mr Frans EkkerdNelspoortjie Farm (No. 103/6) Ms Wilhette FourieNelspoortjie Farm (No. 103/6) Mr Pieter Fourie

Repli Investments No 27 Pty Ltd Mr Hano HammanHoekplaas: Farm no. 146/RE Mr Johannes HumanFarm no. RE /147 Humasrus Ms Christina Susanna Human

Hoekplaas: Farm no. 146/RE Mr Hendrik Gideon Human

Plat Sjambok; Farm no. 102/RE Mr Wynand HumanHumansrus 147/RE Mr Deon Human

Klipgats Pan 117/4 Mr Bernard Jemima Josina

Alkantpan Test Range Mr Lutando Klaas

Vogelstruisbult Farm Mrs Hester Meyer

Request Trust Mr Mike MeyerRequest Trust Mr Mike MeyerContent Researcher: Lead to Business Mrs Melanie Miles

Rode and Associates (Pty) Ltd Mr Berchtwald Rode

Gyro SA Mr Eric Torr

Solek Mr Thys van der Hout

Alkantpan Test Range Mr Bertie van Heerden

Witfontein Farm (No. 103/7 & 266) Mr Fransi van Wyk

Farm Boesmansberg Mr Gerhard van Wyk

Farm no. 118/1 Kaffirskolk Mr Coenie Viljoen

Agri-Prieska Mr Piet Vos

Municipal Manager: SiyaThemba Local Municipality Mr JRM AlexanderCivil Aviation Authorities: Obstacle Specialist Mrs Lizelle StrohDAFF: AgriLand Liaison Office Ms Thoko ButheleziDAFF: Deputy Director Ms Mashudu MarubiniDAFF: Land Use & Soil Management (Att: Delegate of the Minister Act 70 of 1970) Mrs Jacoline Mans

Department of Agriculture, Land Reform & Rural Development Ms Lucia Manong

Department of Agriculture, Land Reform & Rural Development (HOD) Mr WVD Mothibi

Department of Energy (Northern Cape): Regional Energy Director Mrs SP Mokuele

Department of Environmental Affairs

Department of Environmental Affairs Mr Takalani Maswime

Department of Science and Technology Mr Tshepo SeekoeDepartment of Transport Mr RC BarlowDWS: Deputy Director Lower Orange WMA Mr Shaun CloeteEskom Mr J GeeringhNorthern Cape Department of Environmental Affairs and Nature Conservation Mr Brian FisherNorthern Cape Department of Environmental Affairs and Nature Conservation Ms Dineo MolekoNorthern Cape Provincial Heritage (Boswa ya Kapa Bokone) Mr Andrew TimothyNorthern Cape Transport, Roads and Public Works Mr K Nogwili Northern Cape Transport, Roads and Public Works Mr Tembelani MfecanePixley ka Seme District Municipality Mr Ivan ErmanusPixley ka Seme District Municipality Mr Sam DiokpalaPixley ka Seme District Municipality: Department of Roads and Public Works Mr Andrew PulenSANRAL The Regional ManagerSiyaThemba Local Municipality Cllr Gloria SpeelmanSKA Mr. Mere KgampeSKA Dr. Adrian TipladySouth African Heritage Resources Agency Dr Catherine MotsisiWeatherSA Mr Buhle Shandu

Authorities

Registered I&APs

Page 42: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 5

Authors CV’s

Page 43: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

1

CURRICULUM VITAE Name : Ross Matthew Holland Profession : Environmental Assessment Practitioner / Consultant Year of Birth : 1975 Nationality : South African Contact Details : P.O. Box 31108, Tokai, 7966 Cell: 072 601 0803 Fax: 086 653 1765 Email: [email protected] MEMBERSHIP IN PROFESSIONAL SOCIETIES: • Member, South African affiliate of International Association for Impact Assessment (IAIAsa) • Founder Member, Environmental Assessment Practitioners Association of South Africa (EAPASA)1 • Green Star SA Accredited Professional KEY QUALIFICATIONS: Ross Holland is a senior Environmental Assessment Practitioner with over 15 years’ practical experience in the field of Environmental Assessment and Management. Ross holds a BSc in Environmental and Geographical Science and Economics (UCT), a BSc (hons) in Environmental and Geographical Science (UCT) and an MSc in Environmental and Geographical Science (UCT). Ross also holds certificates of competence in the fields of Water Quality and Fresh Water Ecology, with distinction. Ross has been involved in in excess of 100 Environmental Assessments (in the capacity of either Author, Co-Author or Independent Reviewer), and has extensive experience in managing a diverse range of Environmental Impact Assessment processes including large and small scale water supply projects; river rehabilitation, housing, resort, and commercial developments; airfields, timber treatment facilities, chemical manufacturing plants, agricultural expansions; renewable energy facilities; educational facilities; new roads and road upgrades; pipelines, municipal waste sites, and a shooting range. Ross has also undertaken the independent review of a number of Environmental Assessment Processes, across a diverse range of projects.

For the past 11 years Ross has been involved as a contributing lecturer to a number of academic courses in Environmental Management. In particular, Ross is a contributor to the UWC Geography Departments postgraduate (honors) module on Environmental Management and also contributes annually to the Environmental Management Module which is presented to postgraduate students enrolled in the Masters of City and Regional Planning Degree, at UCT.

Ross has also been involved in a wide spectrum of other environmental work including the undertaking of capacity building within the National Department of Environmental Affairs’ Marine and Coastal Management Directorate, the undertaking of environmental opportunity and constraints analysis, environmental due diligence investigations and risk analysis, as well as, environmental auditing, drafting of Environmental Management Plans/ Programs (EMPr) and Environmental Control Officer (ECO) work.

EXPERIENCE RECORD 1) REGULATORY PROCESSES AND ENVIRONMENTAL IMPACT ASSESSMENT: YEAR ROLE TASKS & RESPONSIBILITIES

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of dams on Twee Heuwels Farm, Slanghoek Valley, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation Process, and co-author all Application and Environmental Impact Assessment Documents.

1 On account of having signed the original declaration of support for the establishment of EAPASA.

Page 44: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

2

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Expansion of Agricultural Land and Expansion of a Dam on Portion 2 of the Farm Bernheim 899, Near Worcester, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Expansion of Agricultural Land on Portion 2 of the Farm187, Near Worcester, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed clearance of indigenous vegetation and construction of a water storage dam on the Remainder of Portion 9 of the farm Kransvlei No. 205, Clanwilliam. Appointed by the Applicant to undertake a Scoping and EIA Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Reports and documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction the Wasplaas Dam, near Wellington, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of the De-Molen Dam and the undertaking of works within a water course, near Saron, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of dams, construction of a pipeline and works within a watercourse on Ou Plaas Farm, near Greyton, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff, specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of two dams, construction of a pipeline and works within a watercourse on Spes Bona Farm, near Caledon, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff, specialists, and the multi-disciplinary project team, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

Page 45: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

3

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Expansion of Agricultural Land on Rabiesberg Farm, near Worcester, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Expansion of a Dam and expansion of Agricultural Land on Boekenhoutskloof Farm, near Hermanus, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of dams and associated infrastructure and the clearance of indigenous vegetation, on Melkboomfontein Farm, near Citrusdal, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of dams and associated infrastructure and the clearance of indigenous vegetation, on Keerom Farm, near De Doorns, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2019 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction and enlargement of dams and associated infrastructure, works within a watercourse and the clearance of indigenous vegetation, on Oakdene Farm, near Genadendal, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of a dam on Riviera Farm, near Redelinghuys, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of the Namaquasfontein Skool Dam and associated infrastructure, near Redelinghuys, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Application. Tasks included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

Page 46: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

4

2018 Independent Review Specialist

The Proposed Evergreen Lake Michelle Lifestyle Retirement Village, Noordhoek, City of Cape Town, Western Cape. Appointed by a key stakeholder to undertake an independent review of the Pre-Application Basic Assessment Report for the project. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting. The Terms of Reference for the Review included ensuring that the clients concerns regarding the proposed development were adequately captured and responded to within the Reporting. Responsible for co-authoring the Independent Review Comment.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Construction of the Noordhoek Dam and Noordhoek Kop Dam, Piplelines and Associated Infrastructure on Noordhoek Farm, near Riviersonderend. Appointed by the Applicant to undertake a Scoping and EIA Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff, specialists, and the multi-disciplinary project team, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Reports and documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Expansion of the Rivierplaas Dam and Suurlemoen Dam and associated infrastructure, near Citrusdal, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to 2019

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of the Eben Sadie Dam, near Malmesbury, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2017 to 2019

Project Director and Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the enlargement of Dam 4 and associated infrastructure, and the clearance of indigenous vegetation, near Worcester, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff, specialists, and the multi-disciplinary project team, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Malmesbury Mall and Private Hospital Development, Malmesbury, Western Cape. Appointed by the Applicant to undertake the Basic Assessment Process, for the project. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff specialists, and the multi-disciplinary project team, planning and oversight of Public Participation Process, and co-author all Application and Environmental Impact Assessment Documents.

Page 47: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

5

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed Goreeshoogte Agricultural Expansion Project, Robertson, Western Cape. Appointed by the Applicant to undertake the Scoping and Environmental Impact Assessment Process, for this large-scale project which includes two dams, associated infrastructure and new cultivation areas. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff specialists, and the multi-disciplinary project team, planning and oversight of Public Participation Process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The proposed enlargement of the Meerlust Servitude Dam, near Worcester, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to present

Project Director and Environmental Assessment Practitioner

The unlawful commencement of Listed Activities related to the Repair of the Top Dam, the Enlargement of the Bottom Dam, clearance of 50ha of Indigenous Vegetation and installation of pipelines, Faerie Glen, Worcester, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2018 to 2019

Project Director and Environmental Assessment Practitioner

Proposed Enlargement of Riverside Dam, Construction of Riverside Kop Dam and associated Pipelines and Weir Diversion Infrastructure on Riverside Farm, Greyton, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2017 to present

Project Director and Environmental Assessment Practitioner

Proposed Construction of Altona Dam, Pipeline and Associated Infrastructure, near Klipheuwel, Western Cape. Appointed by the Applicant to undertake the Scoping and Environmental Impact Assessment Process, for this large-scale project which includes two dams, associated infrastructure and new cultivation areas. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff specialists, and the multi-disciplinary project team, planning and oversight of Public Participation Process, and co-author all Application and Environmental Impact Assessment Documents.

2017 to present

Project Director and Environmental Assessment Practitioner

The proposed phased Agriculture to Urban Development project on Wolwerivier and Remainder of Blaaubergsvlei Farms, Cape Town, Western Cape, South Africa. Appointed by the Applicant to undertake an integrated Screening, Scoping and Environmental Impact Assessment Process (including the management of the multi-disciplinary EIA team), for this large-scale project encompassing a landholding in excess of 1200ha. The proposal envisages that the currently un-utilized land on to be used for agricultural activities, while allowing gradual transformation to urban development over a period 5 - 20 years.

Page 48: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

6

2015 to 2017

Project Director and Environmental Assessment Practitioner

The Habata Agri Agricultural Expansion Project and Dam Scheme, Le Chasseur Valley, Robertson, Western Cape, South Africa. Scoping and EIA Process. Appointed by the Applicant to undertake the Scoping and Environmental Impact Assessment Process, for this large-scale project including (an initially proposed extent) of in excess of 600ha of new agricultural development and three new dams and associated infrastructure. Tasks and responsibilities included the undertaking of a site assessment, management and oversight of a detailed multi-disciplinary opportunities and constraints analysis, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff specialists, and the multi-disciplinary project team, planning and oversight of Public Participation Process, and co-author all Application and Environmental Impact Assessment Documents.

2017

Project Manager and Environmental Assessment Practitioner

Proposed Timber Treatment Facility, Elim, Western Cape. Appointed by the proponent, to undertake a full Enviro-Legal Due Diligence Investigation into to possible establishment of a new Chromated Copper Arsenic (CCA) wood treatment facility, in Elim, Western Cape, South Africa. Tasks involved undertaking a site inspection, reviewing all project technical information, undertaking an analysis of all applicable environmentally related statutes and policies and compiling an Environmental Due Diligence Report.

2016 to 2018

Independent Review Specialist

Proposed mixed use development of Erf 173712 Cape Town, Granger Bay Precinct and associated sea defence works. V&A Waterfront, Cape Town, South Africa. Scoping and EIA Process. Appointed by a key stakeholder to undertake an Independent Specialist Review, in consultation with Nicholas Smith Attorneys, of various iterations of EIA Reporting produced by the Applicants EAP. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting. The Terms of Reference for the Review included ensuring that the clients concerns regarding the proposed development were adequately captured and responded to within the Reporting. Responsible for co-authoring the Independent Review Comment, which resulted in significant revisions to the Applicants original reporting and development proposals.

2016 to 2017

Project Director and Environmental Assessment Practitioner

The unlawful clearance of indigenous vegetation and expansion of an airport by the Western Cape Microlight Club at Morningstar Airfield, City of Cape Town, Western Cape, South Africa: NEMA S24G Rectification Process. Appointed by Applicant to undertake the NEMA S24G Application and Assessment Process, in respect of the unlawful expansion of an airfield. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2015 to present

Project Director and Environmental Assessment Practitioner

The Rectification of the unlawfully constructed Brandwacht Upper Dam on the remainder of Portion 77 of the Farm Brandwagt No 187. Near Worcester, Western Cape, South Africa: NEMA S24G Rectification Process. Appointed by the Applicant to undertake the NEMA S24G Application and Assessment Process in respect of the unlawful commencement of construction of a Dam and unlawful agricultural expansion. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

Page 49: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

7

2014 to 2017

Project Director and Environmental Assessment Practitioner

The Rectification of Unlawful Commencement of Listed Activities on Portion 3 of Farm De Hoek Estate No. 35 and Remainder Farm Vorentoe No. 356, Near Porterville, Western Cape, South Africa: NEMA S24G Rectification Process. Initially appointed by the Applicant to undertake a Basic Assessment Process for the proposed construction of a Dam. During the course of the Application process the Applicant unlawfully commenced with Construction, and the Application therefore became a the NEMA S24G Assessment Process. A second NEMA S24G Application was initiated as a result of historic unlawful clearance of indigenous vegetation, on a different area of the Applicants land holding. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2015 to 2017

Project Manager and Environmental Assessment Practitioner

The Proposed Skoongesig Dam, and decommissioning of 10 small dams, near Malmesbury, Western Cape, South Africa. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2015 Independent Review Specialist

Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility: Independent Peer Review of Environmental Management Programme. Appointed by the Applicant (at the request of the National Department of Environmental Affairs), to undertake the independent peer review of the Environmental Management Programme for the proposed Wind Energy Facility, in light of the findings of specialist peer reviews of the pre-construction Avifauna and Bat monitoring. Tasks and responsibilities included determining the adequacy of procedures, processes, and management methods put forward in the EMPr and to assess compliance with relevant statutory requirements and to determine whether the all relevant recommendations and mitigation measures put forward by specialists and Authorities were included within the EMPr. Responsible for authoring the Independent Review Comment and updating the EMPr in order to address all identified shortcommings.

2015 to 2017

Project Director and Environmental Assessment Practitioner

The Rectification of Unlawful Commencement of Listed Activities on Breeland Farm, Near Rawsonville, Western Cape, South Africa: NEMA S24G Rectification Process. Appointed by the Applicant to undertake the NEMA S24G Assessment Process, including the management of the multi-disciplinary EIA team, in respect of the unlawful commencement of expansion of a dam, unlawful clearance of vegetation, and unlawful establishment of a clay borrow area within a watercourse and statutory conservation area. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2015 to 2017

Project Director and Environmental Assessment Practitioner

The Rectification of Unlawful Commencement of Listed Activities on Farm 220 Sandown Estate, Near Gansbaai, Western Cape, South Africa: NEMA S24G Rectification Process. Appointed by Mystic Pearl 133 (Pty) Ltd to undertake the NEMA S24G Assessment Process, including the management of the multi-disciplinary EIA team, in respect of the unlawful commencement of construction of two bridge structures and a river diversion channel. Primary Author of the S24G EIA Report and EMPr and responsible for the Public Participation Process.

Page 50: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

8

2014 to 2017

Project Director and Environmental Assessment Practitioner

The proposed Poplar Grove Off- Channel Dam Scheme and Agricultural Expansion Areas, near Villiersdorp, Western Cape, South Africa Appointed by the Applicant to undertake the Scoping and Environmental Impact Assessment Process, including the management of the multi-disciplinary EIA team, for the above-mentioned project. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2013 to 2015

Independent Review Specialist

Borrow Pits for The Supply Of Materials For Use in Maintenance and Re-Gravelling Work on Provincial and District Roads in the Western Cape, South Africa. Appointed by the Applicants EAP to undertake the independent peer review of 32 separate Basic Assessment Reports in respect of proposed gravel borrow pits dispersed widely across various areas of the Western Cape province. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform each assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting. Responsible for co-authoring each of the 32 Independent Review Reports, a number of which identified significant shortcomings in both process and substance.

2013 to 2014

Project Manager and Environmental Assessment Practitioner

The proposed enlargement of the Soetmelksvlei Dam, near Riviersonderend, Western Cape, South Africa Appointed by the Applicant to undertake the Basic Assessment Process, including the management of the multi-disciplinary EIA team, for the proposed enlargement of the Soetmelksvlei Dam, for irrigation purposes, in the vicinity of Riviersonderend, in the Western Cape. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2013 to 2014

Project Manager and Environmental Assessment Practitioner

The Rehabilitation and widening of the MR529, between Piketberg and Velddrif, Western Cape, South Africa. Appointed by Jeffares & Green (on behalf of the provincial Department of Transport and Public Works) to undertake the Basic Assessment Process, including the management of the multi-disciplinary EIA team, for the rehabilitation and widening of this provincial road in the Western Cape. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

2013 to 2015

Project Director and Environmental Assessment Practitioner

The proposed raising of the Jan Koekemoer Dam, in order to augment Municipal potable water supply to Pearly Beach, Western Cape, South Africa. Appointed by the Applicant to undertake the Basic Assessment Process, including the management of the multi-disciplinary EIA team, for the proposed raising of the Jan Koekemoer Dam in the vicinity of Pearly Beach, in the Western Cape. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and co-author all Application and Environmental Impact Assessment Documents.

Page 51: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

9

2012 to 2013

Project Manager and Environmental Assessment Practitioner

NEMA Section 24 G APPLICATION (for rectification of illegal activities) on Portion 4 of the Farm Twistwyk 182, Caledon, Western Cape Appointed by the Applicant to undertake the NEMA S24G Rectification Application, including the management of the multi-disciplinary EIA team, in terms of the National Environmental Management Act (107 of 1998), for unlawful commencement of activities within a water course, and rehabilitation of a water course. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and primary author of all Application and Environmental Impact Assessment Documents.

2013 Environmental Assessment Practitioner

Proposed Citrus Pack House, Citrusdal, Western Cape, South Africa Appointed by the Applicant to undertake a Set Back Line application for a proposed new Citrus Pack House in the Citrusdal area of the Western Cape, South Africa. Responsible for compilation of Specialist Terms of Reference and integrating specialist findings into the formal Development Set Back Line Application.

2013

Project Manager and Environmental Assessment Practitioner

Proposed Wood Treatment Facility, Paarden Eiland, Western Cape Appointed by the proponent, to undertake a full Enviro-Legal Due Diligence Investigation into to possible establishment of a new Chromated Copper Arsenic (CCA) wood treatment facility, in Paarden Eiland, Western Cape, South Africa. Tasks involved undertaking a site inspection, reviewing all project technical information, undertaking an analysis of all applicable environmentally related statutes and policies and compiling an Environmental Due Diligence Report.

2012 to 2013

Member of Project Team

Proposed Paarl Mountain and Ysterbrug Pumping Main Upgrades, Paarl, Western Cape, South Africa. Member of project team appointed by the Drakenstein Municipality to undertake the EIA process for the proposed water pipeline upgrades (partly within the sensitive Paarl Mountain Nature Reserve), Paarl, Western Cape. Co-Author of the EMPr for the project, and responsible for certain aspects of the Public Participation Process.

2012 to 2016

Member of Project Team

Proposed Kleinberg Dams, Hex River Valley, Western Cape South Africa Appointed by the Hex Valley Water Users Association to undertake the EIA process for the proposed Kleinberg Dam scheme, Western Cape, South Africa. Co-Author of the EMPr for the project, and responsible for certain aspects of the Public Participation Process.

2012 Project Manager and Environmental Assessment Practitioner

New Chemical Manufacturing and Wood Treatment Facility, Mosselbay, Western Cape South Africa. Appointed by the proponent, to undertake a full Enviro-Legal Due Diligence and Pre-Screening Investigation (in association with Havemann Inc. Attorneys) into to possible establishment of a new chemical manufacturing facility and wood treatment facility, at various potential locations in the Mosselbay Area, Western Cape, South Africa. Tasks involved undertaking site inspections, reviewing all project technical information, undertaking an analysis of all applicable environmentally related statutes and policies and compiling an Environmental Due Diligence Report

2012 Member of Project team

Raising of the Keerom Dam, Western Cape, South Africa. Appointed by the Worcester East Water Users Association to undertake the EIA process for the proposed raising of the Keerom Dam in the vicinity of Worcester in the Western Cape. Co-Author of the EMPr for the project, and responsible for certain aspects of the Public Participation Process.

Page 52: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

10

2011 to 2012

Independent Review Specialist

Shale Gas Exploration, Karoo, South Africa. Appointed by “Treasure the Karoo Action Group” to undertake the specialist Environmental Review (in association with Havemann Inc. Attorneys) of Applications by Shell Exploration Company B.V., Bundu Gas and Oil Exploration (Pty) Ltd and Falcon Oil and Gas Limited, to undertake shale gas exploration in the Karoo, via Seismic Survey and Hydraulic Fracturing (“Fracking”). Tasks and responsibilities included undertaking an extensive international literature review in order to gain an understanding of the relevant processes and technology, as well as an understanding of potential risks and best practice management methods. The terms of reference for the appointment included the compilation of terms of reference for independent specialist comment from consultants in the fields of geohydrology and public health, determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether all the relevant information necessary for decision-making was included within the reporting. Responsible for co-authoring the Independent Review Comment.

2011 Member of Project team

Proposed Groenwater Solar Farm, Northern Cape, South Africa Sub-contracted by Environmental Resource Management (ERM) to assist in the undertaking of the EIA process for this proposed renewable energy facility in the vicinity of Postmasberg in the Northern Cape. Co-Author of the EIA Report and EMPr for the project.

2011 to 2012

Environmental Assessment Practitioner

Proposed Driehoek Residential/Office Development and Jip De Jagger Drive Extention, Bellville, Western Cape, South Africa Appointed by the proponent to undertake the Basic Assessment process, including the management of the multi-disciplinary project team, for the abovementioned project. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and primary author of all Application and Environmental Impact Assessment Documents.

2010 to 2011

Member of Project team

Proposed Southdrift Solar Farm, Free State, South Africa Sub-contracted by Environmental Resource Management (ERM) to assist in the undertaking of the EIA process for this proposed renewable energy facility in the vicinity of Bloemfontein in the Free State. Co-Author of the EIA Report and EMPr for the project.

2011 Environmental Assessment Practitioner

Proposed Fourth Kloof Abstraction and River Diversion Scheme, Ceres, Western Cape, South Africa Appointed by the proponent to undertake the Basic Assessment process, including the management of the multi-disciplinary project team, for the abovementioned project. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage project staff and specialists, planning and oversight of Public Participation process, and primary author of all Application and Environmental Impact Assessment Documents.

2011 Member of Project Team and internal Peer Reviewer

Mothae Diamond Mine, North-Eastern Lesotho Member of multi-disciplinary project team undertaking the EIA process for the application for full scale mining production at the Mothae site, in the vicinity of Letseng, Lesotho. Responsible for assisting with various team members with field sampling and data collection during the multi-day site assessment, and for undertaking the internal project team peer review of the EIA Report, prior to the commencement of the Public Participation Process.

Page 53: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

11

2009 to 2011

Independent Review Specialist

MR302 Road Upgrade, Worcester, Western Cape, South Africa Appointed by an Environmental Consultancy to undertake the external review of environmental reports associated with the application for authorization to undertake the proposed development. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting.

2010 Independent Review Specialist

NEMA S24G Rectification Application, Erf 293, Plettenberg Bay, Western Cape, South Africa. Appointed by a key stakeholder to undertake an Independent Specialist Review, in consultation an Attorney, the S24G Report. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting. Responsible for co-authoring the Independent Review Comment.

2010 Environmental Assessment Practitioner

Environmental Opportunities and Constraints Analysis, Doornkom Farm, Alicedale, Eastern Cape, South Africa Appointed by the proponent to undertake an Environmental Opportunities and Constraints analysis with respect to a possible resort development proposal for the site. The project entailed interacting with the consulting planner and undertaking a detailed site inspection together with an analysis of aerial imagery. The development proposal was then analysed against the environmental characteristics of the site and its surrounds, as well as against the requirements of the prevailing environmental legislation as well as relevant spatial planning guidelines and policies. This analysis was then collated into an environmental opportunities and constraints report.

2010 Environmental Assessment Practitioner

Proposed Sky Tower Project, Breakwater Precinct, V&A Waterfront, Western Cape, South Africa Appointed by the Applicant to undertake a Basic Assessment for the proposed construction of a proposed tourist facility on the site.

2008 to 2010

Environmental Assessment Practitioner

Proposed Water Rock mixed use development, Hout Bay, Western Cape, South Africa Appointed by the Applicant to undertake a Basic Assessment for the proposed construction of a mixed-use development on the site. The project entailed the compilation of a Basic Assessment Report and undertaking a public participation process.

2008 to 2010 2009 to 2010

Environmental Assessment Practitioner Environmental Assessment Practitioner

Proposed Construction of the Groenvlei Farm Dam, Citrusdal, Western Cape, South Africa Appointed by the Applicant to undertake a Scoping and EIA process for the proposed construction of a new farm dam on Groenvlei Farm just outside Citrusdal. The project entailed the compilation of a Scoping Report and Environmental Impact Report and undertaking a public participation process, including the management of the multi-disciplinary EIA team. Erf 1591, Simonstown, Western Cape, South Africa Appointed by the Applicant to undertake a Basic Assessment for the proposed construction of a new house on the site. Tasks and responsibilities included the undertaking of a site assessment, pre-application meetings and liaison with Authorities, set terms of reference for specialist studies, manage specialists, planning and conducting the Public Participation process, and primary author of all Application and Environmental Impact Assessment Documents.

Page 54: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

12

2007 - 2009

Member of Project Team

Proposed Welbeloond mixed use development and road infrastructure, Potsdam Interchange, Western Cape, South Africa Appointed by the proponent to undertake an EIA for the proposed Welbeloond mixed use development and road infrastructure at Potsdam Interchange. Member of the environmental project team, responsible for assistance in the management of the Environmental Process, as well as assistance with the writing and review of reports associated with the application for authorization (Scoping & Environmental Impact Assessment) to undertake a mixed use development on the property.

2008 Member of Project Team

Proposed Hassendal mixed use development and road infrastructure, Kuilsrivier, Western Cape, South Africa Appointed by the Applicant to undertake an EIA for the proposed Hassendal mixed use development in Kuilsrivier. Member of the environmental project team, responsible for assistance in the management of the Environmental Process, as well as assistance with the writing and review of reports associated with the application for authorization (Scoping & Environmental Impact Assessment) to undertake a mixed-use development on the property.

2008 to 2012

Independent Review Specialist

Proposed Caledon Flight Park Development, Caledon, Western Cape, South Africa. Appointed by an Environmental Consultancy to undertake the external review of environmental the Scoping and EIA Reports associated with the application for authorization to undertake the proposed development. Tasks and responsibilities included determining the adequacy of environmental assessment procedures, processes, methods and reports utilized to inform the assessment, and to assess compliance with relevant enviro-legal statutory requirements and to determine whether the all relevant information necessary for decision-making was included within the reporting.

2008 Member of Project Team

Application to amend the Record of Decision for the Bisschop Rd Electrical Cable installation, Hout Bay, Western Cape, South Africa Appointed by the City of Cape Town to undertake an application for the amendment of the conditions of authorization of the Bisschop Road Electrical Cable installation project, in order to allow for the removal of certain trees along the cable route. The project entailed the compilation of the prescribed application form as well as undertaking a public participation process.

2007 Environmental Assessment Practitioner

Environmental Opportunities and Constraints Analysis, Erf 36 St Helena Bay, Western Cape, South Africa Appointed by Northern Spark Trading 307 (Pty) Ltd to undertake an environmental assessment of the site, and the subsequent compilation of an environmental opportunities and constraints report, with regard to a possible future housing development on the property.

2006 -2007

Member of Project Team

Proposed St Helena Views residential development and road infrastructure, St Helena Bay, Western Cape, South Africa Appointed by the proponent to undertake a Scoping and EIA process for the proposed residential development in St Helena Bay. Member of the environmental team, responsible for assistance in the management of the Environmental Process, as well as assistance with the writing and review of reports associated with the application for authorization to undertake a residential development on the property.

2006 -2007

Member of Project Team

Proposed Britannia Beach residential development and road infrastructure, St Helena Bay, Western Cape, South Africa Appointed by the proponent to undertake a Basic Assessment for the proposed residential development in St Helena Bay. Member of the environmental team, responsible for assistance in the management of the Environmental Process, as well as assistance with the writing and review of reports associated with the application for authorization to undertake a residential development on the property.

Page 55: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

13

2006 -2007

Environmental Assessment Practitioner

Proposed Bodenzee Residential development and road infrastructure, Sunnydale, Western Cape, South Africa Appointed by CHZA Investments (Pty) Ltd to undertake a Basic Assessment for the proposed construction of a residential development on the site. The project entailed the compilation of a Basic Assessment Report and undertaking a public participation process.

2006 Project Staff Erf 115, Rooi Els, Western Cape, South Africa Appointed by Tommy Brummer Town Planners to undertake the Environmental Process for the proposed construction of a residential house on the property. The project entailed the compilation of an application form and scoping checklist and undertaking a public participation process.

2006 Project Staff Proposed Tennis Courts for Reddam House School, Steenberg, Western Cape, South Africa. Appointed by Reddam House Properties to undertake the Environmental Process for the proposed construction of additional tennis courts on the property. The project entailed the compilation of an application form and scoping checklist, Scoping Report, Environmental Impact Report and undertaking a public participation process.

2005 -2007

Environmental Assessment Practitioner

Proposed Stallion Ridge Wine and Equestrian Estate, Malmesbury, Western Cape, South Africa. Appointed by Jupiter Consulting CC to undertake an Environmental Impact Assessment for the proposed construction of a residential and equestrian development on the site. The project entailed the compilation of a Scoping Report and undertaking a public participation process.

2005 -2007

Environmental Assessment Practitioner

Proposed Vineyards Residential Estate and road infrastructure, Bellville, Western Cape, South Africa Appointed by Umdiliya Estates (Pty) Ltd to undertake an Environmental Impact Assessment for the proposed construction of a residential development on the site. The project entailed the compilation of a Scoping Report and undertaking a public participation process.

2004 - 2006

Project Staff Proposed Residential Development on Erf 2 Gordons Bay, Western Cape, South Africa Sub-contracted by Withers Environmental Consultants to assist in undertaking the Environmental Process for the proposed construction of a residential development on the property. The project entailed the compilation of an application form and scoping checklist, Scoping Report, Environmental Impact Report and undertaking a public participation process.

2004 Project Staff Proposed Pringle Bay Community Hall, Pringle Bay, Western Cape, South Africa Appointed by the Kleinmond Municipality to undertake the Environmental Process for the proposed construction of a community hall on the property. The project entailed the compilation of an application form and scoping checklist and undertaking a public participation process.

2004 Project Staff

Proposed Oostenberg Refuse Transfer Station, Cape Town, Western Cape, South Africa Appointed by the then Oostenberg Municipality to undertake the Environmental Process for the proposed construction of a refuse transfer station. Involved in assisting with the compilation of the Scoping Report for the project.

2004 Project Staff Drakenstein Municipality State of Environment Report, Western Cape, South Africa. Appointed by the Drakenstein Municipality to undertake the studies necessary to undertake a detailed assessment of all aspects of the environment within the Drakenstein Municipal Boundary. Involved in the compilation of a photo documentary of the Berg River and major tributaries, a visual river survey, and water sampling. Assisted in the compilation of the chapter entitled “A Situational Assessment of the Berg River System”.

Page 56: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

14

2. ENVIRONMENTAL MANAGEMENT PLANS AND ECO WORK

2019 Environmental Control Officer

The Construction of the Vlermuiskelderkloof Dam, Napier, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2019 Environmental Control Officer

The Construction of the De Vlei Dam, De Doorns, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2017 to 2019

Environmental Control Officer

The Construction of the Nassima Beach Apartment Development, Blouberg, City of Cape Town, Western Cape. Appointed by the Developer Compile a Construction Environmental Management Plan and Waste Management Plan, and to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, review of Method Statements and monitoring and auditing compliance with the EMP for this residential construction project.

2017 to 2019

Environmental Control Officer

The Construction of the Beach Break Apartment Complex, Blouberg, City of Cape Town, Western Cape. Appointed by the Developer Compile a Construction Environmental Management Plan and Waste Management Plan, and to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, review of Method Statements and monitoring and auditing compliance with the EMP for this residential construction project.

2017 to 2018

Environmental Control Officer

The Raising of the Osplaas Dam, De Doorns, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2017 Environmental Control Officer

The Construction of the Rietvlei Dam, Grabouw, Western Cape, South Africa. Appointed by De Rust Estate (Pty) Ltd. Responsible for the implementation of the Environmental Awareness Training Course, Method Statement review and monitoring and auditing compliance with the EMP for this dam construction project.

2016 Environmental Control Officer

The construction of the Vyeboom Dam, Villiersdorp, Western Cape, South Africa. Appointed by the Vyeboom Irrigation Board. Responsible for the implementation of the Environmental Awareness Training Course, Method Statement review and monitoring and auditing compliance with the EMP for this dam construction project.

2015 to 2016

Environmental Control Officer

The Enlargement of the Soetmelksvlei Dam, near Greyton, Western Cape, South Africa. Appointed by the Japie Groenewald Trust . Responsible for the implementation of the Environmental Awareness Training Course, Method Statement review and monitoring and auditing compliance with the EMP for this dam construction project.

2016 Environmental Control Officer

The Construction of the Skoongesig Dam, near Malmesbury, Western Cape, South Africa. Appointed by Claassen Boerdery. Responsible for the implementation of the Environmental Awareness Training Course, Method Statement review and monitoring and auditing compliance with the EMP for this dam construction project.

Page 57: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

15

2015 Environmental Assessment Practitioner

Cultivation of Virgin Soil on Remainder of Farm Monte Vista No 43, Hex River Valley, Western Cape, South Africa: Environmental Management Programme. Appointed by Mr Bernard Joubert to compile the EMP for the proposed cultivation of virgin soil on the above-mentioned property.

2015 Environmental Control Officer

The Raising of the Tienrivieren Dam, Citrusdal, Western Cape, South Africa. Appointed by Mouton Citrus. Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this dam raising project.

2015 Environmental Control Officer

The Expansion of Vyeboom Dam F1, Villiersdorp, Western Cape, South Africa. Appointed by the Vyeboom Irrigation Board. Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this dam raising project.

2015 Environmental Control Officer

Riverbank Stabilization at 58 Plamboom Road, Newlands, Cape Town Western Cape, South Africa. Appointed by Mr David Evans. Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this riverbank stabilization project.

2015 Environmental Control Officer

The Construction of the Groenvlei Dam, Citrusdal, Western Cape, South Africa. Appointed by Mouton Citrus. Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP the construction of this new irrigation dam.

2014 to 2018

Environmental Control Officer

The Upgrade of Main Road (Phase 3) between Muizenberg and Clovelly, Cape Town, Western Cape, South Africa. Appointed by Martin and East (Pty) Ltd. Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this road upgrading project.

2014 Project Manager

Wolwerivier Farm Operational Environmental Management Plan (OEMP), Melkbosstrand, Western Cape, South Africa. Appointed by Mr Marthinus Stoffberg to compile an OEMP for his farming operation on Wolwerivier Farm which is leased from Garden Cities (Inc).

2013 Environmental Control Officer

Delft TRA-6 Low Cost Housing Project, Delft, Western Cape, South Africa. Appointed by Power Construction, responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this low cost housing project.

2012 to 2013

Member of Project Team

Ghaghoo Diamond Mine, Central Kalahari Game Reserve, Botswana. Appointed by Gem Diamonds, Botswana (Pty) Ltd, to undertake an external Audit of compliance with the EMP, Monitoring Plan and Environmental Conditions of Authorization for the Project. The appointment also included assisting the site team with EMP and monitoring plan implementation on site, as well as training of the newly appointed site Environmental Officer.

2013 to 2016

Environmental Control Officer

Caledon Low Cost Housing Project, Caledon, Western Cape, South Africa. Appointed by Power Construction (on behalf of the Theewaterskloof Municipality). Responsible for the implementation of the Environmental Awareness Training Course, Method Statement Review and monitoring and auditing compliance with the EMP for this low-cost housing project.

2012 to 2014

Environmental Consultant and Control Officer

Kapteinskop Road Maintenance and Repair, Aurora, Western Cape, South Africa. Appointed by the Department of Public Works to compile a Construction EMP for the project, and to act as Environmental Control Officer for the duration of the project

Page 58: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

16

2013 to 2014

Environmental Control Officer

Bot River Low Cost Housing Project, Bot River, Western Cape, South Africa. Appointed by Power Construction (on behalf of the Theewaterskloof Municipality). Responsible for the implementation of the Environmental Awareness Training Course and monitoring and auditing compliance with the EMP for this low-cost housing project.

2010 to 2014

Environmental Site Officer

Lake Michelle Housing Estate, Noordhoek, Western Cape, South Africa. Appointed by various owners within the estate to undertake the environmental monitoring of house construction. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP

2010 to 2012

Environmental Control Officer

Driftsands Nature Reserve Hiking Trail, Western Cape, South Africa. Appointed by Cape Nature. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of phase 1 & 2 of the new hiking trail within the reserve.

2013 Environmental Control Officer

Eerste Riverbank Stabilization Project, Stellenbosch, Western Cape, South Africa. Appointed by Remgro PTY Ltd. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the installation of gabions and associated erosion repair works on a reach of the Eerste River, Stellenbosch, Western Cape.

2010 to 2012

Member of Project Team

Millennia Park Extension and Refurbishment - Green Building Project, Stellenbosch, Western Cape, South Africa. Appointed by Remgro PTY Ltd. Responsible for the compilation of a combined Green Star SA and NEMA compliant Environmental Management Program, as well as the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction phase of this Green Star SA registered project.

2011 Environmental Consultant and Control Officer

Cleanup of a sediment spill into the Liesbeek River, Cape Town, Western Cape, South Africa Appointed by WBHO Pty Ltd to compile a management plan for adoption by the Western Cape Department of Environmental Affairs and Development Planning (DEA&DP), in respect of the emergency clean-up of a portion of the Liesbeek River which was inadvertently polluted with sediment from a construction site. Following the adoption of the management plan by DEA&DP, responsibilities included the environmental monitoring of the clean-up operation and co-ordination of specialist input

2010 Member of Project Team

Eastgate 20 Office Complex - Green Building Project, Johannesburg, Gauteng, South Africa. Appointed by Amathemba Environmental Management Consulting CC. Responsible for the compilation of the Green Star SA compliant Environmental Management Plan for the construction phase of this Green Star SA registered project.

2009 to 2011

Environmental Control Officer

Alpen Sewerage Pumpstation and Rising Main, Constantia, Western Cape South Africa. Appointed by Aurecon Pty Ltd, Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for the construction of a new pumpstation and 2km sewer pipeline

Page 59: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

17

2009 Project Manager

Erf 1591, Simons Town, Western Cape, South Africa. Appointed by the Avril Ocean Trust. Responsible for the compilation of the Environmental Management Program for the proposed housing development.

2008 Project

Manager Sea Lodge, Bloubergstrand, Western Cape, South Africa. Appointed by Portland (Pty) Ltd. Responsible for the compilation of a construction phase Environmental Management Plan for the proposed luxury apartment complex.

2008 to 2009

Environmental Control Officer

Bisschop Road Electrical Cable, Cape Town, Western Cape, South Africa: Appointed by City of Cape Town. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for the installation of a high voltage electrical cable between Wynberg and Hout Bay.

2008 to 2011

Environmental Control Officer

Gugulethu Square Shopping Centre, Gugulethu, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of this large new shopping precinct.

2008 to 2009

Environmental Control Officer

Bainskloof Housing Estate and Conference Centre, Wellington, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP.

2008 to 2013

Environmental Control Officer

Stellenbosch Urban Re-newal Project, Stellenbosch, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the redevelopment of an area covering 4 city blocks (centred around the Eikestad Mall) in central Stellenbosch.

2008 to Date

Environmental Control Officer

Mitchell’s Plain District Hospital, Mitchell’s Plain, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of this large new provincial hospital.

2008 to 2012

Environmental Control Officer

FIsantekraal Waste Water Treatment Works, Fisantekraal, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of this new waste water treatment works, including the construction of the outlet works into the Mosselbank River.

2008 to 2011

Environmental Control Officer

Fisantekraal Sewer Line and Pumpstation, Fisantekraal, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for the construction of a new pumpstation and 7km sewer pipeline.

2007 Environmental Control Officer

Riverbank Stabilization of a portion of the Liesbeek River, Kirstenbosch Drive, Cape Town, Western Cape, South Africa Subcontracted to Ninham Shand Pty Ltd. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for the installation of gabions for the stabilization of a portion of of the bank of the Liesbeek River adjacent to the remainder of Erf 240, Kirstenbosch Drive, Cape Town.

2006 to 2009

Environmental Control Officer

Helderstroom Prison, Caledon, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of additional staff quarters, sports facilities, and a filling station at the prison.

2005 to 2009

Environmental Control Officer

Tygerfalls Mixed Use Development, Bellville, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of two separate commercial developments (The Cliffs & Avanti Towers) within the development precinct.

Page 60: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

18

2005 to 2012

Environmental Control Officer

N2 Gateway Housing Project, Langa, Gugulethu and Delft, Western Cape, South Africa: Compiled construction phase Environmental Management Plan (EMP) for the construction of the “New Rest” Low Cost Housing Project. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of five separate housing and infrastructure projects undertaken under the auspices of the N2 Gateway housing project.

2004 to 2009

Environmental Control Officer

Lagoon Beach Housing, Hotel& Shops, Milnerton, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of three separate commercial developments within the development precinct.

2006 to 2009

Project Staff & Environmental Control Officer

Western Cape Sport Shooting Union - new shooting range near Atlantis, Western Cape, South Africa: Compiled construction phase Environmental Management Plan (EMP) and Operational Phase Environmental Management Plan for the construction of a new shooting range complex, as well as developing the Environmental Awareness Training Course for construction personnel and monitoring compliance with the EMP.

2006 to 2008

Environmental Control Officer

Patrysfontein Piggery, Fisantekraal, Western Cape, South Africa: Appointed by Garden Cities (inc) responsible for writing the method statements for closure and cleanup of an illegal pig farming operation on the property, including the monitoring of the cleanup and rehabilitation of the Mosselbank River, to the satisfaction of DWAF and the City of Cape Town.

2006 to 2008

Environmental Control Officer

Diep River Bridge, near Kilarney, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of a new provincial road bridge across the Diep River.

2006 to 2008

Environmental Control Officer

Bergvliet Farm Housing Development, Cape Town, Western Cape, South Africa: Appointed by Invest Afrique (Pty) Ltd. Compiled construction phase Environmental Management Plan (EMP) for the construction of the Bergvliet Farm Housing Development, as well as developing the Environmental Awareness Training Course for construction personnel and monitoring compliance with the EMP.

2004 to 2008

Environmental Control Officer

Bella Roas Village, Mixed Use Development, Bellville, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP, for the construction of this large mixed residential and commercial development.

2006 to 2008

Environmental Control Officer

Wellington – Hermon MR23 Road Upgrade, Wellington, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP.

2006 to 2008

Environmental Control Officer

The Bantry Luxury Apartment Complex, Bantry Bay, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for this construction of a luxury apartment complex, in close proximity to the coastal zone.

2006 to 2007

Environmental Control Officer

Lustigan Road Water Pipeline, Paarl, Western Cape, South Africa: Appointed by Drakenstein Municipality. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for a 5 km water pipeline.

Page 61: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

19

2007 Environmental Control Officer

Erf 240, Kirstenbosch Drive, Cape Town, Western Cape South Africa: Responsible for the monitoring of rehabilitation and bank stabilization of the Liesbeek River at this location. Responsible for the Environmental Awareness Training of workforce, monitoring compliance with the EMP, and compilation of a compliance report upon project completion.

2006 Environmental

Control Officer Withoogte Dam, Wellington, Western Cape, South Africa: Appointed by Drakenstein Municipality. Compiled construction phase Environmental Management Plan (EMP) for the emergency maintenance of the Dam, and water supply pipeline to Wellington, as well as developing the Environmental Awareness Training Course for construction personnel and monitoring compliance with the EMP.

2006 Environmental Control Officer

Orange Kloof Electrical Cable, Table Mountain National Park, Western Cape, South Africa: Appointed by City of Cape Town. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for the installation of a high voltage electrical cable between Constantia Neck, and the Orange Kloof water purification works.

2006 to 2007

Environmental Control Officer

Newtown Effluent Pipeline, between Wellington and Paarl Waste Water Treatment Works, Western Cape, South Africa: Appointed by Drakenstein Municipality. Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for this 11km effluent pipeline.

2006 to 2007

Environmental Control Officer

Land en Zeezicht housing development, Somerset West, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP.

2005 Environmental Control Officer

Overberg Roads Re-gravelling, Overberg, Western Cape, South Africa: Responsible for Environmental Awareness Training of site staff, monitoring compliance with the EMP, and the assessment of borrow pits following flood damage.

2004 to 2005

Environmental Control Officer

Eventide Luxury Apartment Complex, Bantry Bay, Western Cape, South Africa: Responsible for the implementation of the Environmental Awareness Training Course and monitoring compliance with the EMP for this construction of a luxury apartment complex, in close proximity to the coastal zone.

2003 to 2006

Environmental Control Officer

Film and Events Industry, Western Cape, South Africa: Numerous (approximately 130 in total) Environmental Control Officer assignments on both Stills and Commercial Productions. Responsible for monitoring compliance with permit conditions, as well as the EMP for the shoot, if applicable. Served as the ECO Coordinator for Amathemba Environmental Management Consulting CC, during this time period, responsible for the management and allocation of the requisite human resources to meet the obligations of bookings by film companies. Responsibilities also included marketing of the firm to the Film and Events Industry.

Page 62: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

20

3) LECTURING:

2008 to date

2008

Contributing Lecturer Assistant Lecturer

University of the Western Cape, Cape Town, Western Cape, South Africa: Responsible for annually co- lecturing a post graduate module on Environmental Management within the Geography Department. The focus of the course is on understanding and applying Integrated Environmental Management (IEM) concepts, principles and tools with a focus on Environmental Impact Assessment (EIA) as a specific tool; to convey an appreciation that environmental issues should be addressed by interdisciplinary teams; and to understand EMPs composition and implementation, as well as conducting a practical field excursion to a construction site for the post graduate students within the Geography Department.

Cape Peninsula University of Technology, Cape Town, Western Cape, South Africa: Responsible for co-presenting a lecture on Environmental Management Programs, to the 4th year Construction Management students as part of their Environmental module.

2009 to date

Guest Lecturer University of Cape Town, Cape Town, Western Cape, South Africa: Responsible for annually co-presenting a lecture on Environmental Management Programs, to post-graduate students undertaking the Masters in Town and Regional Planning Course as part of their Environmental Management module.

4). OTHER ENVIRONMENTAL WORK (AUDIT, RISK, CAPACITY BUILDING ETC): 2019 Independent

Auditor Farm 220 Sandown Estate, Near Gansbaai, Western Cape, South Africa: Appointed by the holder of the Environmental Authorization to undertake the Independent Audit (in Compliance with Regulation 34, and Appendix 7 of the 2014 NEMA EIA Regulations, as amended) of compliance with the Conditions of the Environmental Authorization, and Compliance with the Approved EMP. Tasks and responsibilities included undertaking a detailed site assessment, conducting interviews with the EA Holder and Site Staff, review of information and records, manage project staff, co-author of the Audit Report which details the levels of compliance with the EA and EMP and makes recommendations for changes required to the EMP and management practices to improve environmental management of the site.

2018 Independent Auditor

The Hunters Valley Equestrian Estate, Near Atlantis, Western Cape, South Africa: Appointed by the holder of the Environmental Authorization to undertake the Independent Audit (in Compliance with Regulation 34, and Appendix 7 of the 2014 NEMA EIA Regulations, as amended) of compliance with the Conditions of the Environmental Authorization, and Compliance with the Approved EMP. Tasks and responsibilities included undertaking a detailed site assessment, conducting interviews with the EA Holder and Site Staff, Liaison with the original EAP for the purposes to obtaining ECO monitoring records from the construction phase, Liaison with a Botanical specialist and Freshwater Ecologist in order to properly inform the audit outcomes, review of information and records, manage project staff, co-author of the Audit Report which details the levels of compliance with the EA and EMP and makes recommendations for changes required to the EMP and management practices to improve environmental management of the site.

Page 63: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

21

2017 Environmental Risk Advisor

Environmental Risk and Compliance Advice to Nine Chromated Copper Arsenic (CCA) Timber Treatment Facilities and a Creosote Plant, situated across the Provinces of Mpumalanga and KwaZulu Natal. Appointed by a prominent chemical manufacturer to provide environmental compliance and risk management advice to a number of their premier clients in the timber treatment industry. Tasks and responsibilities involved undertaking detailed inspections of each plant in order to gain a thorough understanding of any shortcomings in facility design or operational procedure, that could give rise to avoidable risks of environmental contamination and pollution. Tasks included an analysis of Environmental Authorization Conditions, for those plants that had been constructed post the advent of South African EIA legislation, as well as an analysis of the each plants obligations and potential vulnerabilities when viewed against (inter alia) the Duty of Care obligations imposed under S28 of NEMA, as well as the pollution prevention provisions under S19 of the National Water Act. Furthermore, each plant was analyzed against the Environmental Best Practice requirements for Timber Treatment facilities, as set out within SANS10255. The culmination of the project was the compilation of an environmental compliance and risk advice report for internal use, for each facility, which outlined the identified vulnerabilities, and set out recommendations and priorities to address these.

2015; 2011 and 2008

Independent Auditor

Long Beach Mall OEMP Audit, Cape Town, Western Cape, South Africa: Appointed by Growthpoint Properties (Pty) Ltd to undertake an Audit of the Operational Phase Environmental Management Plan for the Long Beach Mall shopping centre for the 2008, 2011 and 2015 audit periods. Responsibilities included auditing compliance with the OEMP for the project and the compilation of an audit report outlining the degree of compliance with the OEMP as well as recommendations for changes required to the OEMP and management practices to improve environmental management of the site.

2005 to 2010

Project Staff Off Road Vehicle Permitting and Capacity Building for Marine and Coastal Management, South Africa: Member of the external consulting team assisting MCM in the review and processing of applications for authorization for vehicle use in the coastal zone, in terms of the National Environmental Management Act, Off Road Vehicle regulations. Additional responsibilities include capacity building, and training of MCM staff.

2008 to 2012

Field Assistant Table Mountain Group Aquifer Project, Western Cape, South Africa: Field assistant for the freshwater specialist investigation into the potential impact of the proposed supplementation of the water supply to the City of Cape Town, and surrounding areas, via harvesting of water from the Table Mountain Group aquifer, on freshwater ecosystems. Responsibilities included assistance with water quality sampling (water chemistry) as well as invertebrate sampling, and algal sampling in various headwater streams and wetlands within the study area.

2007 Field Assistant Proposed Worcester Island Residential Development, Worcester Dam, Western Cape, South Africa: Field assistant for the specialist investigation into the potential impact of the proposed residential development on freshwater ecosystems. Responsibilities included assistance with water quality sampling (water chemistry) as well as invertebrate sampling.

2007 Field Assistant Proposed Upgrade of the Waste Water Treatment Works at Spier, Western Cape, South Africa: Field assistant for the specialist investigation into the potential impact of the proposed WWTW upgrade on freshwater ecosystems. Responsibilities included assistance with water quality sampling (water chemistry) as well as invertebrate sampling.

2000 - 2002

Senior Image Processing Analyst and Project Manager

The Millenium Map Project, United Kingdom: The project entailed the ortho-rectification, and creation of seamless mosaics, from various datasets of aerial imagery in order to create an updated, hi resolution, seamless aerial map of the United Kingdom. Responsible for managing individual projects, liaison with clients, quality assurance, management of staff and resources, attendance at production meetings and maintaining forward load/ project progress information.

Page 64: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

RR..MM.. HHoollllaanndd

22

COUNTRIES OF WORK EXPERIENCE: South Africa ; United Kingdom ; Lesotho ; Botswana EDUCATION: • BSc (Environmental and Geographical Science and Economics), University of Cape Town, South Africa,

1997. • BSc (Hons) (Environmental and Geographical Science), University of Cape Town, South Africa, 1998. • MSc (Environmental and Geographical Science), University of Cape Town, South Africa, 2000.

• The Framework Programe for Education & Training in Water. Certificates of competence held with distinction, in “Water Quality” and “Aquatic Ecology”, University of Cape Town, South Africa, 2007.

• Green Star SA Accredited Professional Course and Exam, Green Building Council of South Africa, 2010.

EMPLOYMENT HISTORY: 2017 to present Senior EAP and Director of Holland Group (Pty) Ltd, t/a Holland & Associates

Environmental Consultants.

2004 to 2017 Self-employed t/a Holland & Associates Environmental Consultants and free lance sub-contractor to the environmental consulting industry.

2002 - 2003 Franchised, DSA Approved, Professional Driving Instructor working through Britannia Driving School, Wimbledon, London, United Kingdom

2000 - 2002 Project Manager and Senior Applications Analyst, working on various mapping projects, Geosense Limited, Cape Town, South Africa

1998 - 2000 Tutor & Demonstrator for the following courses; ERT 100, EGS101, EGS212 & EGS 314, University of Cape Town, Cape Town, South Africa

1997 Volunteer Parliamentary Monitor, monitoring working committees on Agriculture, Environmental Affairs, Water & Forestry, Parliamentary Monitoring Group, Cape Town, South Africa

1995 – 1998 Short term contractor to Mossgas (PTY) Ltd (now PetroSA) undertaking various internal environmental audit investigations on a contract basis

LANGUAGES:

Speaking Reading Writing

English Excellent Excellent Excellent

Afrikaans Fair Good Good

PUBLISHED PAPERS: J. Boardman, A. J. Parsons, R. Holland, P. J. Holmes and R. Washington (2003). Development of badlands and gullies in the Sneeuberg, Great Karoo, South Africa. Catena Volume 50, Issues 2-4, Pages 165-184 DJ Hagen, JS Mbenga, R Holland & T Belcher (2018). Environmental Considerations in Small Dam Site Selection in the Western Cape and Mitigation Measures. South African National Committee on Large Dams (SANCOLD) Conference Proceedings 2018, “Sustainable dam engineering in an ever-changing world” Pages 201-212. AWARDS: SAAF Museum/ Royal Air Forces Association (South Africa Area) (Sept. 2000) Meritorious Service Award. Awarded in recognition of outstanding and devoted service.

York High School (1992): Top Ten Award. Awarded in recognition of academic excellence.

Page 65: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

K.J. ROSS

1

CURRICULUM VITAE Name : Kelli Jade Ross Profession : Junior Environmental Assessment Practitioner Year of Birth : 1993 Nationality : South African Contact Details : P.O. Box 31108, Tokai, 7966 Cell: 083 704 6075 Email: [email protected]

MEMBERSHIP IN PROFESSIONAL SOCIETIES: • Member, South African affiliate of International Association for Impact Assessment (IAIAsa)

KEY QUALIFICATIONS:

Kelli Ross is a junior Environmental Consultant and holds a Bachelor of Science (Hons) in Marine Biology from the University of Cape Town and a Bachelor of Science (Zoology and Geography) in Environmental Management from the University of South Africa. Kelli’s academic background has equipped her with valuable knowledge on environmental sustainability and management as well as the ability to understand ecological processes and apply these to environmental issues. Kelli is a registered WWF-SASSI volunteer and assists with the enhancement of the WWF-SASSI network and education on sustainable marine practices. She has a keen interest in sustainable development and resource use, nature conservation and waste management, with a focus on plastic pollution. Kelli has assisted in the compilation of Basic Assessment Reports and Environmental Impact Assessments within the agricultural sector, Conservation of Agricultural Resources Act (CARA) application processes and the development of Environmental Management Plans/ Programmes (EMP). Kelli has also been involved with various amendment applications, for the amendment of environmental authorisations for renewable energy projects. For the past two years Kelli has assisted in environmental due diligence investigations as well as Environmental Control Officer (ECO) work on agricultural and urban projects.

EXPERIENCE RECORD 1) REGULATORY PROCESSES AND ENVIRONMENTAL IMPACT ASSESSMENT: 2018 to present

Junior Environmental Assessment Practitioner

The proposed Expansion of the Rivierplaas Dam and Suurlemoen Dam and associated infrastructure, near Citrusdal, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, assisting with the compilation of terms of reference for specialist studies, assistance in managing project staff and specialists, assisting with the planning and oversight of Public Participation process, and assisting with the compilation of all Application and Environmental Impact Assessment Documents.

2018 to present

Junior Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of a dam on Riviera Farm, near Redelinghuys, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, assisting with the compilation of terms of reference for specialist studies, assistance in managing project staff and specialists, assisting with the planning and oversight of Public Participation process, and assisting with the compilation of all Application and Environmental Impact Assessment Documents.

2018 to present

Junior Environmental

The proposed Rectification of the Unlawful Commencement of the construction of the Namaquasfontein Skool Dam and associated infrastructure, near Redelinghuys, Western Cape.

Page 66: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

K.J. ROSS

2

Assessment Practitioner

Appointed by the Applicant to undertake a NEMA S24G Application. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, assisting with the compilation of terms of reference for specialist studies, assistance in managing project staff and specialists, assisting with the planning and oversight of Public Participation process, and assisting with the compilation of all Application and Environmental Impact Assessment Documents.

2018 to present

Junior Environmental Assessment Practitioner

The proposed enlargement of the Meerlust Servitude Dam, near Worcester, Western Cape. Appointed by the Applicant to undertake a Basic Assessment Process. Tasks and responsibilities include the undertaking of a site assessment, pre-application meetings and liaison with Authorities, assisting with the compilation of terms of reference for specialist studies, assistance in managing project staff and specialists, assisting with the planning and oversight of Public Participation process, and assisting with the compilation of all Application and Environmental Impact Assessment Documents.

2019 to present

Junior Environmental Assessment Practitioner

Proposed Langkloof Dam and associated infrastructure, near Worcester, Western Cape Province. Appointed by the Applicant, Worcester East Water Users Association, to undertake a Scoping and Environmental Impact Reporting process for the proposed project. The tasks and responsibilities include: undertaking a site assessment; pre-application meetings and assisting with the liaison with the relevant authorities, engineers and Applicant; assisting with the compilation of specialist Terms of References and review of specialist reports; assisting with the compilation of the “Notice of Intent” Form, Application Form and Scoping and EIA reports, Environmental Management Programme; as well as assisting with planning and conducting the public participation process.

2019 to present

Junior Environmental Assessment Practitioner

Proposed Vlakte Dam and associated infrastructure, near Worcester, Western Cape Province. Appointed by the Applicant, Worcester East Water Users Association, to undertake a Scoping and Environmental Impact Reporting process for the proposed project. The tasks and responsibilities include: undertaking a site assessment; pre-application meetings and assisting with the liaison with the relevant authorities, engineers and Applicant; assisting with the compilation of specialist Terms of References and review of specialist reports; assisting with the compilation of the “Notice of Intent” Form, Application Form and Scoping and EIA reports, Environmental Management Programme; as well as assisting with planning and conducting the public participation process.

2019 Junior Environmental Assessment Practitioner

Wind Energy Facility on the eastern plateau (South) near De Aar, Northern Cape Province. Appointed by Mulilo De Aar 2 South (Pty) Ltd to undertake an Application for Amendment of the Environmental Authorisation (EA) for the project (for an amendment to the project description). The tasks and responsibilities included: assisting with the compilation of the Application Form for Amendment of the Environmental Authorisation and assisting with the planning and conducting the public participation process.

2019 Junior Environmental Assessment Practitioner

Springbok Wind Energy Facility, near Springbok, Northern Cape Province. Appointed by Mulilo Springbok Wind Power (Pty) Ltd to undertake an Application for Amendment of the Environmental Authorisation (EA) for the project (for an amendment to the project description). The tasks and responsibilities included: assisting with the compilation of the Application Form for Amendment of the Environmental Authorisation and assisting with the planning and conducting the public participation process.

Page 67: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

K.J. ROSS

3

2018 to 2019

Junior Environmental Assessment Practitioner

The proposed Rectification of the Unlawful Commencement of the construction of the Eben Sadie Dam, near Malmesbury, Western Cape. Appointed by the Applicant to undertake a NEMA S24G Rectification Application. Tasks and responsibilities include assisting with the planning and oversight of Public Participation process and assisting with the compilation of all Application and Environmental Impact Assessment Documents.

2018 to 2019

Junior Environmental Assessment Practitioner

The Proposed raising of Ou Brakfontein Dam near Citrusdal, Western Cape Province. Appointed by Mouton Citrus (Pty) Ltd to undertake a Basic Assessment process for the proposed project. The tasks include assisting with the compilation of a Basic Assessment Report, Environmental Management Programme, as well as assisting with the public participation process.

2018 to 2019

Junior Environmental Assessment Practitioner

The Proposed upgrade of a low level bridge over the Olifants River, near Citrusdal, Western Cape Province. Appointed by Mouton Citrus (Pty) Ltd to undertake a Basic Assessment process for the proposed project. The tasks include assisting with the compilation of a Basic Assessment Report, Environmental Management Programme, as well as assisting with the public participation process.

2) ENVIRONMENTAL MANAGEMENT PROGRAMMES AND ENVIRONMENTAL CONTROL OFFICER (ECO) WORK:

2019 to present

Environmental Control Officer

The Expansion of an Existing Water Storage Dam (Kloof Dam), the Construction of a Water Pipeline and new Culverts and the Decommissioning of Dams and Weirs, Worcester, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, assisting with the review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2019 to present

Environmental Control Officer

The Construction of C Breeze Apartments (previously known as Berry Apartments), Table View, Western Cape. Appointed by the Developer to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, assisting with the review of Method Statements and monitoring and auditing compliance with the EMP for this residential construction project.

2019 Environmental Control Officer

The Construction of the Vlermuiskelderkloof Dam, Napier, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Assisted with the review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2019 Environmental Control Officer

The Construction of the De Vlei Dam, De Doorns, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Responsible for the implementation of the Environmental Awareness Training Course, assisted with the review of Method Statements and monitoring and auditing compliance with the EMP for this dam construction project.

2018 to 2019

Junior Environmental

The Kelp Products Harvesting Operations Operational Environmental Programme, Soetwater, Cape Peninsula, Western Cape. Appointed by Kelp Products (Pty) Ltd to compile an Operational

Page 68: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

K.J. ROSS

4

Assessment Practitioner

Environmental Management Programme (OEMP) for their kelp harvesting activities at Soetwater Resort. The tasks included attending meetings with the client, observational site visits, review of relevant literature and assisting with the compilation of the OEMP.

2018 to 2019

Environmental Control Officer

The Construction of the Nassima Beach Apartment Development, Blouberg, City of Cape Town, Western Cape. Appointed by the Developer to act as ECO for the construction phase of the project. Assisted with the monitoring and auditing compliance with the EMP for this residential construction project.

2018 Environmental Control Officer

The Construction of the Beach Break Apartment Complex, Blouberg, City of Cape Town, Western Cape. Appointed by the Developer to act as ECO for the construction phase of the project. Assisted with the monitoring and auditing compliance with the EMP for this residential construction project.

2018 Environmental Control Officer

The Construction of the La Recolte Retirement Village, Ridgeworth, Bellville, Western Cape. Appointed by the Developer to act as ECO for the construction phase of the project. Assisted with the monitoring and auditing compliance with the EMP for this residential construction project.

2018 Environmental Control Officer

The Habata Agri Agricultural Expansion Project and Dam Scheme, Le Chasseur Valley, Robertson, Western Cape. Appointed by the holder of the Environmental Authorization to act as ECO for the construction phase of the project. Assisted with the monitoring and auditing compliance with the EMP for this dam and agricultural construction project.

COUNTRIES OF WORK EXPERIENCE: South Africa

EDUCATION: • BSc (Hons) (Marine Biology), University of Cape Town, South Africa, 2017.

• BSc (Environmental Management – Zoology & Geography), University of South Africa, South Africa, 2016.

• IEB Matric Certificate (NSC – University Exemption), BESA Leadership Academy, South Africa, 2011.

EMPLOYMENT RECORD: 2018 to date Junior Environmental Assessment Practitioner, Holland & Associates Environmental Consultants, Cape Town, South Africa 2015 to 2018 Administration Assistant, Solulab, Johannesburg, South Africa 2014 to 2015 Personal Assistant to the General Manager, KTB Financial Services, Johannesburg, South Africa 2013 to 2014 Au Pair for the Balmforth Family, Johannesburg, South Africa

LANGUAGES:

Speaking Reading Writing

English Excellent Excellent Excellent

Afrikaans Fair Fair Fair

Page 69: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 6

Independent Auditor Declaration

Page 70: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

P O Box 31108, Tokai, 7966, South Africa Mobile 072 601 0803 ~ Fax 086 653 1765 ~ e-mail: [email protected]

Web: www.hollandandassociates.net

5 December 2019

DECLARATION OF INDEPENDENCE

I, Ross Holland, compiled this audit report as an independent consultant and declare that it

correctly reflects the findings made at the time of the audit. I further declare that I act as an

independent consultant and

• Do not have any financial interest in the undertaking of the activity, other than

remuneration for the work performed in terms of the National Environmental Management

Act, 1998 (Act 107 of 1998)

• I have no personal or other interest in the activity and there are no other circumstances

known to me that may compromise my objectivity, or impact upon my ability to act

independently, as required in terms of the relevant provisions of the 2014 NEMA EIA

Regulations, as amended.

• Undertake to disclose, to the competent authority, any material information that has or

may have the potential to influence the decision of the competent authority or the

objectivity of any report, plan or document required in terms of the National Environmental

Management Act, 1998 (Act 107 of 1998);

• Based on information provided to me by the holder of the EA, and in addition to information

obtained during the course of the audit, will present the results and conclusion within the

associated document to the best of my professional judgement.

Yours sincerely,

ROSS HOLLAND BSc hons, MSc, Green Star SA Accredited Professional, EAPASA Founder

Member

For: Holland & Associates - Environmental Consultants

Impact Assessments - Environmental Management Programs - Compliance Monitoring - Process Review

Page 71: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …

ANNEXURE 7

DEA No Appeal Confirmation

Page 72: DOUBLE CIRCUIT 132kV OVERHEAD TRANSMISSION LINE …