dor_04_rozhk_u-21_05.07.2013
DESCRIPTION
DOR_04_Rozhk_U-21_05.07.2013TRANSCRIPT
URAL Oil & Gas LLP
Daily Operational Report
Well: Rozhkovsky RZK-U-21 Report no.: 04 Report date: 05-Jul-13
Wellbore No.: 1 Well Name: Rozhkovsky RZK-U-21 Common Name: Rozhkovsky RZK-U-21
Project: FEDOROVSKY BLOCK Site: Rozhkovsky RZK-U-21 Rig Name/No.: SKGW33/
Wellbore Type: APPRAISAL Est days: 60.00 days Spud date: 02-Jun-13
WELL INFOSupervisor: Chingis Nurliev / Amantay
Ibragimov
Engineer: Bela KissBlock: Fedorovsky Logistics Supervisor: Sattar Karimov
STATUS
24 hr summary: SLB logging Run 1: Junk Basket. HUD @ 4451m. Set BP at 4390 m. M/U clean up tools. 5 5/8" bit + scraper + brush + magnet.
Repair monkey board. Continue RIH 4 1/2" PH6 TBG to 1464 m. Meanwhile filtrate brine surface.
COSTSDaily cost: 315,444 (USD) Authorized cost: 7,938,092.71 (USD) Cumulative total: 477,135 (USD) Expenditure: 6%
OPERATION SUMMARY
From To Dur.
(hr)
MD from
(m)
MD to
(m)
Operation Time
Type
0:00 0:30 0.50 Continue SLB logging Run 1: Junk Basket. HUD @ 4451m. Start Correlation pass.
+3.73m Depth Offset applied.T2
0:30 2:30 2.00 SLB Logging. POOH. L/D Junk Basket. JB Clean. T2
2:30 5:30 3.00 SLB Logging. Prepare Easy Drillable COPPERHEAD Bridge Plug for 7.00" 26-35 ppf
casing, Arm the gun Distances: from CCL to MIDDLE of the seal element - 3.5m.
From CCL to TOP of the PLUG - 3.15m. From CCL to BOTTOM of the PLUG - 3.8m.
T2
5:30 9:00 3.50 SLB Logging. RIH Bridge Plug @4390 m. T2
9:00 9:30 0.50 SLB Logging. Correlation with witnessed UOG geologist and supervisor. Set BP at
4390 m.T2
9:30 12:30 3.00 POOH and R/D WL unit.
Start to filtered brine. After 30 minute of work, broken "Petro Unit" electrically pump
filter. "Petro Unit" office sent another pump for replacement.
T1
12:30 14:00 1.50 M/U clean up tools. 5 5/8" bit + scraper + brush + magnet. ( 2nd clean up tools
+/-2200 m ).T1
14:00 20:15 6.25 P/U RIH 4 1/2" PH6 TBG to 1062. Delivery filter pump from "Petro Unit" warehouse
and replacement. Meanwhile filtrate brine through filtration unit on surface. NTU
@16:00 - 1000; @17:00 - 900;
Zero rate applied as per the contract.
T1
20:15 22:30 2.25 Repair monkey board. Total downtime in July 8.25 hours. ( Reduced rate first 12hrs
per month ).T2
22:30 0:00 1.50 Continue RIH 4 1/2" PH6 TBG from mast 1062 m to 1464 m. Meanwhile filtrate brine
through filtration unit on surface. @23:00 - 600;T1
Morning Status: Continue RIH 4 1/2" PH6 TBG to 3330 m. Meanwhile filtrate brine surface. 50m3 of brine - NTU @ 150; In progress.
24 hr forecast: RIH tandem casing clean-up tool. Circulate. POOH to 2nd clean up tool. RIH to BP.
Comments:
MUD
Mud Desc: BRINE
Mud
density
(sg)
Viscosity
(s/qt)
MBT
(kg/m3)
Total
Solids (%)
Gel MD check
(m)
PV
(cp)
YP
(lbf/100ft?
)
Cl-
(ppm)
Ca+
(ppm)
pH ECD
(kg/L)
API WL
(ml/30 min)
1.220 / 4,450.00 180,000 9.0
HSE
StatusDSLTI: 143 (days)
BOP Pressure TestsLast BOP pressure test: 30-Jun-13 Next test due: 21-Jul-13 Last BOP function test: 30-Jun-13
PERSONELTotal No. of People: 73
Company No. People Company No. People
Baker-BJ 4 Petro Unit Fluid Engineering 2
SKGW for UOG 6 SKGW 27
SKGW Cathering 8 Batys Kuzet 7
Ural Oil & Gas 4 ITS 4
Grand Activ 4 Schlumberger Logging 7
REMARKS
00:00 - 02:45 Continue RIH 4 1/2" PH6 TBG from mast 1464 m to 2203 m.
Meanwhile filtrate brine through filtration unit on surface. NTU @ 02:00 - 300;
02:45 - 03:45 M/U 2nd set of clean up tools. Scraper + brush + magnet.
1July 06, 2013 at 8:01 am OpenWells R5000, Kazah v1.1
URAL Oil & Gas LLP
Daily Operational Report
Well: Rozhkovsky RZK-U-21 Report no.: 04 Report date: 05-Jul-13
Wellbore No.: 1 Well Name: Rozhkovsky RZK-U-21 Common Name: Rozhkovsky RZK-U-21
Project: FEDOROVSKY BLOCK Site: Rozhkovsky RZK-U-21 Rig Name/No.: SKGW33/
Wellbore Type: APPRAISAL Est days: 60.00 days Spud date: 02-Jun-13
REMARKS (Continued)03:45 - 07:30 Continue RIH 4 1/2" PH6 TBG from mast 2209 m to 3330 m. 50m3 of brine - NTU @ 150; In progress.
Transported liquid waste: (m3) (sg). Transported cumulative liquid waste: (m3).
Transported factory waste: (ton).
RIG Diesel Consumption: 3886 liter.
Camp Diesel Consumption: 450 liter.
RIG & Camp Stock: 72900 liter.
Diesel Received: 31136 liter.
Equipment to RIG SKGW-38:
Equipment from RIG SKG:
July 06, 2013 at 8:01 am OpenWells R5000, Kazah v1.1