Page 1: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

DOOR INSTALLATION GUIDE WOOD FRAMING

Page 2: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

MATERIALS REQUIRED

Can

ada

and

U.S

.A.

1.8

00

.56

3.9

36

7

2

Inte

rnat

ion

al 2

04

.32

6.6

44

6

• Readtheseinstructionsintheirentiretypriortoinstallingdoors.

• Anylocalbuildingcoderequirementssupersedetheserecommendedinstallationinstructions.

• Buildingdesign,constructionmethods,buildingmaterialsandsiteconditionsuniquetoyourprojectmayrequireaninstallationmethoddifferentfromtheseinstructions,andadditionalcare.

• Removeshippingblocksandrelatedstaplespriortoinstallation.

FOR TYPICAL WOOD FRAME CONSTRUCTION:

• Theseinstructionsweredevelopedandtestedforusewithtypicalwoodframewallconstructioninawallsystemdesignedtomanagewater,withaweatherresistantbarrierappliedpriortothedoorinstallation.

• Theseinstructionsarenottobeusedwithotherconstructionmethods.

PRECAUTIONS AND SAFETY:

• Donotworkalone.Itisrecommendedthatatleasttwopeopleworktogethertoavoidpersonalinjury ordamagewhenworkingwithdoors.

• Usecautionwhenhandlingglass.Brokenorcrackedglasscancauseseriousinjury.

• Wearnecessaryprotectivegear(gloves,clothing,goggles,etc.).

• Securetools,laddersorscaffolding.Followequipmentmanufacturers’operationinstructions, warningsandcautions.

• Secureandproperlysupporttheunituntilcompletelyfastened.

IMPORTANT NOTICES AND INFORMATION

TOOLS REQUIRED

• Highimpactshims(Sloped,shimpackorHorseshoeShimsbyGlazelockorequal)

• 11/2"(38mm)#8screws(stainlesssteel)

• OSITeQFoam™forinteriorcavityseal

• OSITeQFlash™SelfAdheredFlashing100'rolls(minimum6"widthonsillandminimum4"onjambsandhead).Checkyourcoderequirements

• OSITeQSeal™Sealant

• Rigid and sloped quality sill.

• Tapemeasure

• Level

• Square

• Hammer

• Stapler

• Screwdrivers

• Scissorsorutilityknife

• Screwgun

• OSITeQFoam™Applicator

• CaulkGun

• JRoller

Page 3: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

1. VERIFY THE ROUGH OPENING

ww

w.l

oe

we

n.c

om

3

• Measuretheroughopeningandthedoortodeterminethatthesizeiscorrect.Theroughopeningisrecommendedtobenolessthan3/4"(19mm)largerthanthedoorunitinwidthandheight.

• Ensurethattheroughopeningisplumb,levelandsquare,andthatthewallsintheopeningarenottwisted.

a) Sillmustbeflatandlevel.

b) Adequateheadermustbeapplied, checkwithengineering.

• IfWRBisappliedthencutawaywithacompleteboxcutoftheopening.

• NOWRBshouldbebroughtintotheroughopening.

• CreateatemporaryflapattheheadoftheopeningbycuttingtheWRBona45degreeangle.Temporarilytapetheflapupoutofthewaytoallowfordoorinstallationandheadflashings.

• Cutbackandexposethesheathingatthesidejambsbyremovingapproximately11/2"ofWRB.Thiswillcreatedirect-contactsealtothesheathing.

2. WRB SHOULD BE APPLIED AND FASTENED PER MANUFACTURERS INSTRUCTIONS. STEPS ON HANDLING THE WRB REMOVAL AT THE OPENING

(Loewen pic for step 1to come from Jeff)

EXPLODED VIEW TO DEMONSTRATE SEQUENCE

BRICKMOLD DOORFLANGED DOOR

Page 4: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

3. PREPARE AND APPLY THE SILL PAN

STEP 3A:

• Panflashingisusedatthebaseofopeningsanddesignedtocollectanddrainwaterdirectlytotheexteriororontotheweatherresistivebarrier.

• Panoptionsare(Rigid,FlexibleorCombinationRigid/Flexible),RigidSillPansarerecommendedtobeusedwhereverpossible.

• RigidSillPansshouldbeslopedoutwardwithaminimum2”enddam,1/2”interiorupturnlegand2”exteriordownturnleg.

• ApplyTeqFlashalongthefaceofthesillwheneverpossible.

• Beforefasteningthesillpan,applythreeheavy3/8”roundedbeadofOSITeqSealontotheconstructionplate,oneoutboard,inboardandattheexteriordownturnedleg.Continuethesealantapprox6”upbothjambsateachend.(figure1andsideviewofsillpan)

• Setthepanintothesealantandcheckforlevel.

• Securetheenddamswithfastenersasrequired(figure2)

• SealtheenddamswithTeQSeal,tooltheenddamstotheframingasshown.(seefigure3)

STEP 3B:

• CriticaltorunabeadofOSITeqSealalongtheinterioroftheupturnlegofthepan,thesealantbeadcanbeappliedbeforeorafterthedoorunitisinstalledandmustcreateapositivesealalongtheentiresillofthedoor.

• RunadiscontinuousbeadofOSITeqSealalongtheexteriorofthedoorsillnosing

Can

ada

and

U.S

.A.

1.8

00

.56

3.9

36

7

4

Inte

rnat

ion

al 2

04

.32

6.6

44

6

SIDEVIEWOFSILLPAN

FIGURE3

FIGURE2

FIGURE1

Page 5: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

4. PREPARE THE DOOR FOR INSTALLATION

• Apply3/8"beadforbeddingjoint.

• Onbacksideofflangeorbrickmold,(wherethesealantwillmakecontactwiththewallitisbeingappliedto)applyahealthy,plump3/8"beadofOSITeQ™Sealonall3sidesofflange/brickmold.

ww

w.l

oe

we

n.c

om

5

5. INSERT AND FASTEN THE DOOR

FLANGED DOOR

• Setthebottomofthedoorintotherigidsillpan, thentiltthetopintoposition.

• Centerthedoorbetweenthesidesofthe openingallowclearanceforshimming.

• Insert11/2"(38mm)#8screwtothetop corners,thiswillkeeptheunitfromfalling duringshimmingetc.

BRICKMOLDDOOR

FLANGEDDOOR

BRICKMOLDDOOR

FLANGEDDOOR

3/8" DIAMETERBEAD OF SEALANT

BRICKMOLD DOOR

• FlashtheopeningjambsandheadwithOSITeQFlash™beforethedoorisinstalled.

• Makesurethejambsstaystraightonflangeorbrickmoldapplicationswhileapplyingscrewsapprox.12"apart.

It is permitted to use tack hammer and construction staples to secure OSI TeQ Flash™ during inclement weather conditions.

Page 6: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

Can

ada

and

U.S

.A.

1.8

00

.56

3.9

36

7

6

Inte

rnat

ion

al 2

04

.32

6.6

44

6

6. APPLY SIDE SHIMS

• Shimtheunitatthejambs,ensuringthatitissquare,andthatthejambs,headandsillmustbelevelandstraight.

• Applya31/2"#8screwthrougheveryhingeintotheROstuds.

The shims should be placed at every hinge and

lock location.

7. FASTEN THE UNIT

FASTENER SCHEDULE

• Afterverification,proceedtosecuretheunit byapplying11/2"(38mm)#8screwsapproximatelyevery12"(300mm)throughthenailingflangestartingwithin8"(200mm)of thecorner.Thescrewshouldbecenteredintheholeandsecurelyfastened.Donotovertighten.

• Applyscrewsonallthreesides.

In areas where impact glass is required or in

high wind speed areas, install screws in all

prepunched holes (6 1/2" o.c. max.)

Galvanized or stainless steel screws are recommended.

FOR BRICKMOLD DOOR

• Installfastenersthroughjambareaorbrickmold,pre-drillholesandcountersink.

BRICKMOLDDOOR

FLANGEDDOOR

Page 7: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

ww

w.l

oe

we

n.c

om

7

8. IF FLANGED DOOR, INSTALL THE SELF ADHERED FLASHING

• Use4"or6"OSITeQFlash™toruntheheightofthedoorandextenduptheheadofthedooranother4"or6"(dependingonsizeofflashingusedacrossthehead).

• Installtheselfadheredflashingoverthemountingflangesonthejambs.

• Installtheselfadheredflashingoverthemountingflangesatthehead.

• UseJrollertosmoothoutflashing,eliminatingairbubbles.

9. INSTALL THE RECOMMENDED HEAD FLASHING

• Appropriaterigidheadflashingmust beinstalledacrossthetopoftheunit.

• Securetheheadflashingwithappropriatefasteners.(seefigure1)

• SealoverfastenerswithOSITeQSeal™. (seefigure2)

Note:Thisstepisnotnecessaryifyourdoorunithasanintegraldripcap.

FIGURE2

FIGURE1

Page 8: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

11. FOLD DOWN TOP FLAP OF WEATHER RESISTANT BARRIER

• RemovethepreviouslyappliedtapeholdingtheflapoftheWRBatthehead.

• Allowtheflaptolayflatovertheheadflashing.ApplyslicesofOSITeQFlash™overthediagonalcutsmadeintheWRB.Ensurethattheentirecutiscovered.

10. INSTALL ANOTHER PIECE OF TEQ FLASH™ AT THE HEAD

• Cutapieceof4"TeQFlash™toapplyovertheupturnedlegoftherigidheadflash.

Can

ada

and

U.S

.A.

1.8

00

.56

3.9

36

7

8

Inte

rnat

ion

al 2

04

.32

6.6

44

6

BRICKMOLDDOORINSTALL

FLANGEDDOORINSTALL

BRICKMOLDDOORINSTALL

FLANGEDDOORINSTALL

Page 9: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

12. INTERIOR SEAL

OSI TEQ FOAM™ APPLICATION

• UsingtheOSITeQFoam™ApplicatorandOSITeQFoam™,lowpressurefoam,carefullyapplyfoamaroundthethreesides.

• Fromtheinterior,insertthenozzleoftheapplicatorintotheroughopening,holdthetipofthenozzle1"(25mm)backfromtheexteriornailflangeandapplyaminimum2"(50mm)beadoffoamintotheroughopeningontopandbothsides.

• Checkandre-checktomakesurethatthefoamhasmadecompletecontactbetweenthedoorandframingtobothsurfaces.Ifanyvoids,reapplyOSITeQFoam.™

• Important:Atthispoint,fromtheinteriorside,checkthesillpanandmakesureanyvoidsaresealedwherethedoorandupturnedlegmeet.

ww

w.l

oe

we

n.c

om

9

13. SEAL THE EXTERIOR AT THE FACADE

•ExteriorFacadeshouldallowfor3/8"voidattheperimeterofthedoorframe.Thiswillallowforbackerrodandhighqualitysealantatthiscriticalinterface.OSIQuad®ishighlyrecommended.

• Applybackerrodinsuchawaytoavoidpuncturingbackerrod.Puncturedbackerrodcanoffgasandcausesealantbubbling.

• Backerrodshouldbeslightlylargerthanthevoidandfitsnugintothevoid.

Itiscriticaltofilltheexterior2"oftheroughopeningwithlowexpansionfoam.

Theinterioroftheroughopeningcouldbefilledwithfoamorfiberglass.

Page 10: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

ADDENDUM: INSTALLATION INSTRUCTIONSILL SUPPORT SCREW FOR I/S FRENCH DOOR PRODUCTS

ww

w.l

oe

we

n.c

om

10

STEP 1. PREPARING THE UNIT FOR INSTALLATIONS

Install door into wall structure as per standard Loewen instructions considering any local code requirements.

STEP 2. REMOVING SCREW TO STRIKE PLATE

Remove one of the two screws that secure the sill Strike Plate to the sill.

STEP 3. PRE-DRILL FOR SEALANT INJECTION

Using a 1/8” diameter drill bit, enlarge the hole for the screw removed in Step 2. Note: The hole should reach to the underside of the door sill.

STEP 4. SEALANT INJECTION

Using a high quality silicone sealant, inject sealant into the hole applied in Step 3. Note: Ensure enough sealant is injected into the hole to provide a seal around the screw and between the underside of the sill and wall structure.

STEP 5. SECURING THE SILL

Using the screw supplied with these instructions, re-install the screw through the sill strike plate and into the wall structure beneath the sill.

STEP 6. FINAL REVIEW & ADJUSTMENTS

Review the clearances between the door panel and frame ensuring they are even and that the door operates freely. Adjust the sill screw as needed to ensure proper clearance between the panel sweep and sill.

STEP 7. CLEAN-UP

Clean-up any sealant residue on the sill and strike plate being careful not to contaminate any wood surfaces.

LOEWEN is not responsible for deficiencies in building design, construction and maintenance and/or failure to install products in accordance with Loewen installation instructions. The determination of the suitability of all building components, including the use of products, as well as the design and installation of flashing and sealing systems, are the responsibility of the Buyer or User, the architect, contractor, installer, or other construction professional and are not the responsibility of LOEWEN.

Page 11: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

©Henkel Corporation 2010/33475

Henkel Corporation • 26235 First Street • Westlake, Ohio 44145 • Customer Relations: 1-800-624-7767

This warranty is made solely on behalf of Henkel and not on behalf of any retail lumberyard establishment.

Page 12: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

11w

ww

.lo

ew

en

.co

m

Page 13: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly
Page 14: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly
Page 15: DOOR INSTALLATION GUIDE WOOD FRAMING - Secure tools, ladders or scaffolding. Follow equipment manufacturers’ operation instructions, warnings and cautions. • Secure and properly

Distributed by Loewen Inc. in the U.S. and C.P. Loewen Enterprises Ltd. in Canada and internationally.

Trademarks owned by C.P. Loewen Enterprises Ltd. Used under license. ©2006 C.P. Loewen Enterprises Ltd.

All rights reserved.

Recycled Paper

Printed in Canada

September 2006

P1015A

Call 1.800.563.9367 for the dealer nearest you. International 204.326.6446 www.loewen.com E-mail: [email protected]

SW-COC-1739