1 DOE Response To The NIST Boulder Plutonium Contamination Incident David Everrett Contractor Response Coordinator DOE RAP, Region 6

Upload: borka

Post on 22-Feb-2016

32 views

Category:

Documents


0 download

DESCRIPTION

DOE Response To The NIST Boulder Plutonium Contamination Incident. David Everrett Contractor Response Coordinator DOE RAP, Region 6. RAP Response . Establish continuous air sampling outside the laboratory entrance Contamination control outside the laboratory entrance - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: DOE Response To The NIST Boulder Plutonium Contamination Incident

1

DOE Response To The NIST Boulder Plutonium

Contamination Incident

David EverrettContractor Response CoordinatorDOE RAP, Region 6

Page 2: DOE Response To The NIST Boulder Plutonium Contamination Incident

2

RAP Response • Establish continuous air

sampling outside the laboratory entrance

• Contamination control outside the laboratory entrance

• Establish air and smear sample screening methods

Page 3: DOE Response To The NIST Boulder Plutonium Contamination Incident

3

DOE Region 6 RAP • Requested by the NIST Boulder facility on

June 17, 2008

• Provided initial radiological characterization support to NIST radiation safety personnel

• Initial entry into the contaminated area on June 19, 2008

Page 4: DOE Response To The NIST Boulder Plutonium Contamination Incident

RAP Response (cont.)• Initial entry into the

laboratory areas to evaluate air-borne contamination levels

• Perform contamination measurements and collect smears

• Determine, if possible the activity (amount) remaining in the broken container and laboratory areas

4

Page 5: DOE Response To The NIST Boulder Plutonium Contamination Incident

RAP Response (cont.)• Additional DOE equipment and

personnel deployed to NIST on June 20, 2008• Continuous air sampler (CAM) with auto

alarm capability• Low background sample counter to

resolve high-natural (radon) background levels in air samples

• Additional personnel from DOE plutonium facilities

• Consultation with DOE REAC/TC 5

Page 6: DOE Response To The NIST Boulder Plutonium Contamination Incident

Advanced Measurements• Portable gamma spectroscopy

• Measure Pu activity remaining in the broken vial, large area wipes, and other sample containers

• Measure activity in duplicate Pu reference standard

• Need accurate distances, long count times, but more importantly contamination issues…

6

Page 7: DOE Response To The NIST Boulder Plutonium Contamination Incident

DOE RAP Conclusions• Extensive removable contamination

observed in the laboratory area• DOE Triage personnel able to provide

initial estimate of remaining Pu activity (60-78%)

• NIST able to combine survey results and measurements to evaluate amount of Pu lost to the sewer system

7

Page 8: DOE Response To The NIST Boulder Plutonium Contamination Incident

8

Questions ?