dod parts management reengineering status briefing defense standardization conference 25 may 2006...

23
DoD Parts Management DoD Parts Management Reengineering Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

Upload: leon-flowers

Post on 17-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

3 Tasking of the Reengineering Effort Parts Management Declined After Acquisition Reform (1995 – 2002) DLA Requested Relief From Parts Management Mandate (2003) ADUSD (LPP) & Director DSPO Agreed that PM Should be Reengineered (2003) Parts Management Reengineering Working Group Chaired by DSPO (PMRWG) Chartered (2003)

TRANSCRIPT

Page 1: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

DoD Parts Management DoD Parts Management ReengineeringReengineering

Status Briefing Defense Standardization Conference

25 May 2006Donna McMurry, DSPO

Page 2: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

2

OutlineOutlineRecap Parts Management Reengineering

– Tasking of the effort – Definition / description of Parts Management– History of Parts Management

Review PMRWG RecommendationsDiscuss TLCSM EC Support Preview Implementation

Page 3: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

3

Tasking of theTasking of theReengineering EffortReengineering Effort

Parts Management Declined After Acquisition Reform (1995 – 2002)

DLA Requested Relief From Parts Management Mandate (2003)

ADUSD (LPP) & Director DSPO Agreed that PM Should be Reengineered (2003)

Parts Management Reengineering Working Group Chaired by DSPO (PMRWG) Chartered (2003)

Page 4: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

4

What Is Parts Management?What Is Parts Management? A multi-disciplined process designed to improve

system supportability : Reduce Life Cycle Cost Improve reliability Improve readiness (logistics/operational) Improve interoperability Control growth of Logistics Footprint Mitigate DMSMS issues Promote standardization across platforms

Collaboration between primes, subs, and the Government

Page 5: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

5

WhatWhat Is Parts Management?Is Parts Management?

Selecting parts during weapon system designAnalyzing parts for reliability, availability,

and quality– Mitigating DMSMS is critical

Screening for common usageReducing the number of unique partsQualifying products

Page 6: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

6

History of Parts ManagementHistory of Parts Management1977: MIL-STD-965, Parts Control Program1983: SECDEF Weinberger Spare Parts Acq memo 1984: DEPSECDEF Taft DoD Parts Control

Program memo1994: SECDEF Perry Acquisition Reform memo1996: MIL-STD-965, Parts Control Program

cancelled/replaced by MIL-HDBK-9652000: MIL-HDBK-965 cancelled/replaced by

MIL-HDBK-512, Parts Management

Page 7: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

7

ReengineeringReengineeringAll Services, DLA, OSD, Industry, Trade

AssociationsFact FindingStudy Industry Best PracticesEvaluate – Analyze – Explore AlternativesExamine Parallel Efforts (PBL, SE, CSI)Develop Findings, Conclusions,

Recommendations

Page 8: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

8

WarfighterWarfighter SupportSupport

Parts Management:Ensures optimum part is used in a design

– quality, reliability, availability, logistical, and costProvides Warfighter a more reliable, available, and

maintainable weapon system Ensures the logistics community has a better

understanding of the part and its applicationProvides metrics that relate parts management

decisions to increases in readiness and ROI

Page 9: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

9

FindingsFindings Footprint is growing Parts management/standardization can moderate growth Acquisition environment lacks adequate emphasis on

parts management/standardization at the DoD level– discipline, motivation, incentives, and requirements

Systems Engineering discipline currently lacks parts management/standardization focus

Most DoD programs do not address DoD level parts management/standardization

A performance-based mechanism to restore balance already exists– MIL-HDBK-512, SD-19

Page 10: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

10

ConclusionsConclusionsParts Management needs to be a requirementParts Management needs a total system

approachParts Management decision-makers need

better toolsParts Management can be fully accomplished

within a performance-based environment

Page 11: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

11

Major RecommendationsMajor Recommendations Restore parts management as an engineering discipline Make parts management a contractual requirement

– Identify effective incentives Create a Parts Management Knowledge Sharing Portal Improve DOD organization for parts management Build key partnerships and relationships

– Educate and train Develop parts management tools and metrics Develop new marketing products Understand parts management’s contribution to

logistics footprint

Page 12: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

12

Parts Management is First and Parts Management is First and Foremost an Engineering DisciplineForemost an Engineering Discipline

Part selection is an engineering responsibilitySelecting the right parts drives downstream

outcomesToday, engineering parts management

practice is inadequateOEM parts management often unfunded,

therefore, not doneOur recommendations address these issues

Page 13: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

13

What We Mean by Making Parts What We Mean by Making Parts Management A “Requirement”Management A “Requirement”Not a return to past “prescriptive” practices Proposal to add some needed discipline

– Action: Parts Management during design phase– Result: A more supportable system during

sustainment Require a Parts Management Plan that addresses:

– DMSMS– Parts Selection

Address Parts Management in program reviews – Key element of a well-executed program

DoD provide mechanism / shared data warehouse

Page 14: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

14

The Critical Need —The Critical Need —Current, Accurate Parts DataCurrent, Accurate Parts Data

Existing parts data is inadequate, inaccurate, incomplete, inconsistent

Parts data is spread across hundreds of sources DoD is now reengineering many of its parts-related

information systems Now is the time to act We must integrate parts management requirements

with current initiatives The first element is the DMSMS KSP

Page 15: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

15

DMSMS KSP CapabilitiesDMSMS KSP Capabilities

Page 16: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

TLCSM ECTLCSM EC SupportSupport On April 6, 2006, DSPO Director briefed TLCSM EC Granted “green light” to proceed into implementation Confirmed support during implementation phase

− Systems Engineering− Acquisition policy− Defense Acquisition University− Industry participation/buy-in

Advocacy for DoD Policy Changes

Page 17: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

17

Implementation PreviewImplementation Preview Implementation phase (12-18 months)

– DSPO will chair implementation effort– Continue working recommendations– Continue collaborating with key players

TLCSM EC oversight role– Receive periodic updates from DSPO– Provide access to industry via PPP Tiger Team– Serve as advocacy group for DoD policy changes

Implementation Working Group− Complete implementation planning− Coordinate implementation process

Page 18: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

ClosingClosing

Any Questions?Any Questions?

Page 19: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

19

Page 20: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

20

Some Facets of Parts ManagementSome Facets of Parts Management Part selection Part qualification Part analysis Part availability and source management Part information services and management DMSMS management Part inventory management Part engineering and technical support Part specifications and standards Part management best practices Part management policy, process, discipline, Parts related liaison with industry Part related warfighter support

Page 21: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

21

ChallengesChallengesReengineer process with a clean slate

– Reduce the Logistics FootprintFocus on desired results

– Operational availability– Operational reliability– Cost per unit of usage– Logistics Response Time

Page 22: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

22

ChallengesChallengesSystems Engineering Approach

– Parts Selection Process– DMS/MS Planning– Parts Management Plan

Milestone Reviews– Ensure Compliance– Measure Effectiveness

Page 23: DoD Parts Management Reengineering Status Briefing Defense Standardization Conference 25 May 2006 Donna McMurry, DSPO

23

Logistics FootprintLogistics FootprintThe size of the presence of logistics support required to deploy, sustain, and move a weapon system, including:

Inventory/equipment/parts Personnel Facilities Transportation Real Estate